Quality improvement, efficiency improvement, precise pollution control and target reachable analysis method for sewage system

Through data collection, pipeline topology survey, water quality monitoring and water balance analysis, an accurate pollution control plan was proposed for the sewage pipeline network, solving the problems of investment waste and complex model verification in traditional methods, and achieving efficient and accurate inspection of the sewage pipeline network and governance, shorten the construction period and improve the quality and efficiency improvement.

CN119041537AInactive Publication Date: 2024-11-29YANGTZE ECOLOGY & ENVIRONMENT CO LTD +1

Patent Information

Application Number
CN202411007152.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing sewage pipeline inspection methods are wasted investment, long cycles, high costs and lack accuracy. The traditional model verification is complex and unintuitive, making it difficult to effectively solve the health status of urban underground sewage pipelines and the diagnosis of problem-based pipe sections.

Method used

Through data collection and collation analysis, municipal pipeline topological structure investigation, water quality and water volume monitoring, sewage system water balance analysis and on-site investigation, engineering plans are proposed, weighted method is used to calculate the water quality improvement effect of sewage system, and engineering solutions for key issues are proposed. , reduce model dependence and improve decision-making accuracy.

Benefits of technology

It has achieved efficient and accurate inspection and management of sewage pipelines, narrowed the scope of on-site investigation and inspection, saved manpower and material resources, quickly found the main problems of the sewage system, shortened construction period, avoided investment waste, and intuitively predicted the transformation effect through quantitative analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041537A_ABST
    Figure CN119041537A_ABST
Patent Text Reader

Abstract

The invention discloses a sewage system quality improvement, efficiency improvement, accurate pollution control and target reachable analysis method, which can accurately check and screen main external water infiltration and sewage direct discharge point locations through water balance analysis and water quality and water quantity monitoring of a sewage system, and then peel infiltrated external water from the sewage system through a small amount of engineering measure improvement, so that the sewage system can be accurately treated. And the direct-discharge sewage is recovered to the sewage system, so that systematic synergy of the sewage system is quickly realized, the sunny inlet water concentration of a sewage plant is improved, and the purposes of quickly improving quality and synergy and precisely treating pollution are realized. In addition, through quantitative analysis of water quality and water quantity and in combination with the inflow water concentration of an existing sewage plant, the reasonability and accessibility of a target after engineering measure improvement can be quickly demonstrated, complex analysis such as model verification is avoided, the demonstration difficulty is reduced, and the demonstration efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of sewage system treatment, and specifically relates to a sewage system quality improvement and efficiency enhancement precise pollution treatment and target achievable analysis method. Background Art

[0002] At present, my country's urban water environment system has achieved phased results, and the goal of urban water environment governance has gradually shifted to systematic governance and precise pollution control. However, my country's urban sewage treatment industry still has the following two main problems: 1. The urban underground pipe network is complicated. The urban underground sewage pipe network generally has the problems of unclear routes, unknown assets, incomplete and inaccurate data. In addition, there are various factors such as structural and functional defects in the urban underground sewage pipe network. How to accurately identify the problematic pipe sections and timely and scientifically pre-diagnose the health status of the existing sewage pipe network facilities needs to be solved urgently.

[0003] 2. The drawbacks of traditional pipe network inspection methods are prominent. The existing conventional method of inspecting pipe network problems is to conduct an exhaustive survey and inspection of the pipe network, and conduct a centralized inspection of the entire sewage treatment plant's pollution range. This traditional approach lacks water quality and quantity monitoring, pre-diagnosis analysis, and precise inspection links, and comprehensive inspection of the pipe network is prone to waste of investment. In addition, the traditional inspection and treatment model generally conducts a comprehensive inspection and comprehensive treatment, without identifying the main problems, exposing the shortcomings of long cycle, high cost, and lack of focus. Sometimes, even after the treatment, many key problems still exist.

[0004] 3. Model verification has some disadvantages. First, the basic requirements are high. Model analysis often requires a large amount of accurate basic information and data of the pipeline network, which is not available for many preliminary projects; second, it is time-consuming. From data preprocessing, model selection, training to final interpretation and analysis, the whole process can be very time-consuming, especially when dealing with large data sets or complex models; third, there are many variables. In practical problems, the model may involve many variables, and the interactions and influences of these variables are difficult to accurately describe with simple models. The increase in variables will also increase the complexity of model analysis; fourth, it is highly professional: model analysis usually requires professional knowledge, which may be difficult for non-professionals to operate and understand; fifth, it is not intuitive. The results of model analysis are often numerical or statistical quantities, which may not be intuitive enough for non-professionals to understand and interpret.

[0005] Therefore, there is an urgent need for an efficient and accurate method for sewage pipe network inspection and management, to design customized precision pollution control plans, and to intuitively predict the transformation effects through quantitative analysis without relying on complex models, so as to make decisions more accurate. Summary of the invention

[0006] In response to the above technical problems, the present invention provides a method for accurate pollution control and target achievable analysis for improving the quality and efficiency of a sewage system.

[0007] In order to achieve the above-mentioned object, the present invention provides a method for accurately treating pollution and analyzing target achievableness of a sewage system by improving the quality and efficiency, comprising the following steps: S1: Data collection, collation and analysis: Collect water quality and quantity data of sewage treatment facilities within the region, operation data of pumping stations and storage tanks, annual water consumption data of each drainage household, current status map of drainage network, information on outlets and direct drainage volume, current permanent population and registered population data, historical surface water system map, groundwater level distribution, typical annual rainfall, river and lake water level data, pipe network liquid level, etc.; and preliminarily analyze the water volume and mixing degree inside and outside the region; S2: Survey and construction of municipal pipe network topology: Through the data collected in S1 or through pipe network census, the topological relationship of pipe network in the region is clarified, so as to draw the pipe network system diagram and clarify the topological relationship of pipe network in the region; S3: Water quality and quantity monitoring: monitor the water quality and quantity of each sewage zone; detect the water quality and quantity of each outlet, and calculate the actual direct discharge of sewage; S4: Water balance analysis of sewage system: calculate the water balance relationship of the whole area and each sub-area, and draw a water balance diagram; S5: On-site investigation and testing: Conduct on-site investigation and testing of sewage direct discharge points and external water infiltration points; S6: Propose engineering solutions for key issues; S7: Target attainability analysis: Based on the quantitative analysis of the water quality and quantity balance of the sewage system, and on the basis of the water volume and concentration of the existing sewage plant influent, the water quality concentration that can be improved by the sewage system after solving the direct discharge of sewage and stripping of external water is calculated through the weighted method, to demonstrate the rationality and attainability of the project plan goals.

[0008] Preferably, the drawing of the pipe network system diagram in step S2 is to draw the pipe network route on the topographic map, classifying and representing the primary trunk pipe, secondary trunk pipe, and tertiary branch pipe; and marking the specific locations of the pumping station and the terminal sewage treatment plant on the pipe network system diagram.

[0009] Preferably, the step S2 of clarifying the topological relationship of the pipe network within the area includes clarifying the drainage system and drainage divisions, marking the diversion system and the confluence system areas; clarifying and indicating the specific location and information of each outlet, including the outlet type, pipe diameter, etc.; clarifying and marking the specific location of the interception well to facilitate finding whether there is a phenomenon of river water backflow; through on-site investigation of the pipeline liquid level, marking the first and second level main pipes with high water level operation; preferably, if conditions permit, a pipe network census can also be carried out, and a pipe network census report and a pipe network census results map are formed in accordance with the "Technical Code for Detection of Urban Underground Pipelines" (CJJ 61-2017), indicating the pipeline flow direction, pipe diameter, elevation, interception well, mixing point, ground elevation and other information.

[0010] Preferably, the calculation formula for the actual direct discharge of sewage in step S3 is: Q 排 =Q 排污 +Q 排清 , Q 排 ×C 测 =Q 排污 ×C 1 +Q 排清 ×C 2 ; Where: C 1 is the original sewage concentration at the outlet, in mg / L; C 2 is the clean water concentration, in mg / L; C 测 is the actual sewage concentration, in mg / L; Q 排污 is the amount of primary sewage in the outfall sewage, Q 排清 is the amount of clean water in the outfall sewage, Q 排 The actual amount of direct sewage discharge.

[0011] Preferably, the water quality and quantity monitoring described in step S3 includes monitoring the water quality and quantity at the connection point where the main secondary trunk pipe is connected to the primary trunk pipe, at both ends of the cross-river pipe, and upstream and downstream of the primary trunk pipe on sunny days; and monitoring the water quality and quantity of each outlet.

[0012] Further preferably, the water quality and quantity monitoring also needs to pay attention to the following situations: (1) Water volume monitoring should be carried out using Doppler flowmeter or cross-correlation flowmeter; (2) Continuous monitoring is recommended for water volume monitoring; intermittent monitoring can be used for outfall water volume monitoring, and the average daily flow rate is estimated based on the instantaneous flow rate during intermittent monitoring; (3) The flow meter monitoring point should ensure uniform flow. Flow meters should not be installed for monitoring at inspection wells with waterfalls, branch pipe access, bends, eccentricities, etc. Doppler flow meters should not be used for monitoring at pipe sections with large burial depths, too fast flow rates, too low water levels, or easy full pipe operation; (4) Water quality monitoring should be carried out by on-site sampling and laboratory testing according to national standards. For on-site sampling, mechanical equipment should be used to take 24-hour mixed samples, followed by manual sampling. Sampling must be done in flowing water at the point to avoid sampling pipeline bottom mud; (5) Water quality monitoring should focus on testing CODcr, TP, and TN, and conductivity and other indicators can be additionally tested when necessary; Preferably, the calculation formula for the water balance relationship between the entire area and each subarea described in step S4 is as follows: Q 排污 +Q 测 =Q 理论 +Q 清 ; Q 理论 =Q 用 *0.9+Q u ; Where: Q 排污 is the amount of sewage in the outlet, Q 测 is the measured sewage volume in the area, Q 理论 is the theoretical sewage volume calculated based on water consumption, Q 用 is the tap water consumption, Q 清 is the amount of invading low-concentration external water, Q u For infiltration of groundwater.

[0013] Preferably, the drawing of the water balance diagram in step S4 includes the following contents: (1) Draw a water balance diagram for the entire region, including the theoretical sewage volume, direct sewage volume, direct clean water volume, and actual water treatment volume of the sewage treatment plant in the region, and obtain the external water volume within the region; (2) Draw a water balance diagram for each sewage zone, including the theoretical sewage volume, direct sewage volume, direct clean water volume, and measured water volume of each sewage zone, and obtain the external water volume of each zone; (3) Based on the water quality and quantity monitoring of important upstream and downstream sections such as cross-river pipelines and primary trunk pipelines, observe the logical relationship between upstream and downstream sections and analyze whether there is infiltration of external water such as river water; (4) The external water volume of each zone and pipe section should be consistent with the external water volume within the area. The zones and pipe sections should be sorted in order of external water volume as the inspection order; Preferably, the on-site investigation of sewage direct discharge points described in step S5 refers to surveying the direct discharge points based on a pipe network census map or on-site and tracing back to find the source discharge points; the on-site investigation of external water infiltration points refers to conducting targeted on-site inspections and tests on key problem areas and pipe sections selected based on water balance analysis.

[0014] Further preferably, the order of on-site investigation of the external water infiltration points described in step S5 is as follows: (1) Focus on checking whether there is backflow of river water from interception wells along the river; check whether precipitation from construction sites is discharged into the sewage system; check whether surface water and mountain water from individual households, farmland, streams, etc. are intercepted and enter the sewage system; (2) Prioritize the areas where external water infiltration is more serious. Visually observe and test the water quality and quantity at the secondary main inspection wells and the connection points of the tertiary branch pipes to the secondary main in the area, and trace the source upward until the clean water point with concentrated inflow is found.

[0015] Preferably, the key issues in step S6 include the following categories: (1) Pollutant deposition and degradation caused by high water levels; (2) Direct discharge of sewage; (3) External water problems such as concentrated inflow and infiltration from construction site rainfall; (4) Issues concerning surface water such as farmland and streams, and mountain water (5) River water backflow problem.

[0016] Further preferably, the engineering solutions for the key issues include the following categories: (1) One or more of pump station technical renovation, pipeline desilting and excavation repair; (2) Connect the source direct discharge points to the sewage system, or adopt end-of-pipe throttling and source modification methods; (3) Connect inflow and infiltration points from sources such as mountain water and construction site precipitation to the rainwater system; (4) Connect clean and dirty water such as surface water to the rainwater system or treat them on site; (5) Take measures to prevent backflow.

[0017] Preferably, the weighted calculation formula in step S7 is:

[0019] Further preferably, the calculation formula is: ; Where C 测 is the measured sewage concentration at the outlet of the entire system, C 1 is the original sewage concentration at the outlet, in mg / L; Q 排污 is the amount of sewage in the outlet, Q 整 The amount of clean water stripped for rectification, Q 测 is the measured sewage volume in the area, Q 理论 It is the theoretical sewage volume calculated based on water consumption.

[0020] The beneficial effects of the present invention are: 1. Through data collection, investigation and construction of municipal pipe network topology, monitoring of water quality and quantity, and water balance analysis of sewage system, sewage systems in a large area and multiple areas can be screened and graded, and the focus of investigation can be determined, thereby narrowing the scope of subsequent on-site investigation and testing, saving manpower and material resources, and dividing the key areas for the proposal of rectification plans and rectification measures, saving project investment, and improving rectification efficiency; in addition, the present invention only needs to monitor the water quality and quantity of the outlets of each sewage area, which greatly reduces the number of monitoring and reduces the workload.

[0021] 2. The present invention can quickly clarify and find the main problems of the sewage system in the region based on only a pipe network census or even without a pipe network census; at the same time, it can quickly improve the quality and efficiency of the sewage system through a small number of engineering measures, shorten the construction period and avoid wasting investment; in addition, it can quickly and intuitively demonstrate the engineering goals after the transformation through quantitative analysis of water quality and quantity, conduct target reachability analysis, and estimate the quality and efficiency improvement effect without verifying models such as ICM.

[0022] 3. The present invention can propose engineering solutions for key issues, focus on key issues, and quickly achieve the purpose of improving quality and efficiency through rectification with a small number of engineering measures, helping to shorten the construction period while avoiding waste of investment. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is the pipe network topology and zoning diagram in Example 1. DETAILED DESCRIPTION

[0024] The technical solution of the present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It is worth noting that the following embodiments are only preferred embodiments of the present invention and should not be understood as limiting the present invention. The protection scope of the present invention shall be based on the contents recorded in the claims. Any modification or replacement made by those skilled in the art to the technical solution of the present invention without creative work shall fall within the protection scope of the present invention.

[0025] Example 1 Taking the Chaisang area of ​​Jiujiang City as an example, Chaisang District is divided into the Jiangzhou Avenue North Area, Jiangzhou Avenue East and West Area, Shahe Area, and Lushan South Road and Industrial Park Area ( Figure 1 ), conduct precise pollution control and target achievable analysis on sewage system quality improvement and efficiency enhancement in the entire area. The specific steps are as follows: S1: Data collection, collation and analysis: Collect the annual operation records of the sewage treatment facilities in the area for the past two years, including the monthly water quality and quantity of the sewage treatment plant, the water volume or electricity consumption of the intermediate lifting pump station, and the annual water consumption data of each drainage household in the area; the current status map of the drainage network, outlet information and direct drainage volume, network liquid level, current permanent population and registered population data; historical surface water system map, groundwater level distribution, river and lake water level data; Among them, the Dongquan Pump Station and the South Group Pump Station in Chaisang District are not equipped with electromagnetic flow meters, and the outlet flow detection data cannot be directly obtained. Therefore, the annual average monthly power consumption and pump head of the two pump stations are collected to calculate their average daily flow. The calculation formula is as follows: Q 泵 =W / h*η / 9.8 / H In the formula, Q 泵 is the flow rate of the pump, in m 3 / s; η is the efficiency of the water pump and motor, generally 60%~70%, take 64%; H is the head, the unit is m; W is the power consumption, the unit is KWh; h is the power consumption time, the unit is hour; Substituting the average monthly power consumption of Dongquan Pump Station in 2023 of 18170 kwh and a head of 8 meters, and the average monthly power consumption of Nantuan Pump Station in 2023 of 2042 kwh and a head of 10 meters into the above formula, the following results are obtained: Dongquan Pumping Station: Q 泵 = 18170 / 30 / 24*0.64 / 9.8 / 8=17800m 3 / d, South Group Pump Station: Q 泵 = 2042 / 30 / 24*0.64 / 9.8 / 10=1600m 3 / d; S2: Survey and construction of municipal pipe network topology: S2-1: Integrate the drainage network status map collected in step S1 with other data, and draw the network topology and zoning map; S2-2: Sort out the drainage zoning, drainage system, and outlet information of sewage in the area, and divide the direct sewage outlets that discharge sewage on sunny days into three categories, namely, direct sewage outlets, separate rainwater outlets, and combined outlets, and make statistics according to the drainage zoning. The statistical results are shown in Table 1: Table 1 Classification and statistics of direct sewage outlets within drainage zones

[0026] S3: Water quality and quantity monitoring: S3-1: 18km in total at the exits of Shahe area and Jiangzhou Avenue East and West areas, key nodes such as both ends of the first-level trunk pipe across the river, and the connection points where the second-level trunk pipe connects to the first-level trunk pipe 2 A total of 9 flow meters were deployed within the range of 100 m to monitor water quality and quantity (Table 2); Table 2 Monitoring sites and water quality and quantity

[0027] S3-2: The flow rate monitored by the flow meter is used as the daily drainage flow rate (Q 排 ), the monitored water quality (COD on sunny days) is used as the daily drainage water quality (C 测 ), calculate the actual sewage discharge load of sewage zone outlets, key nodes and connection points, and estimate the actual sewage discharge volume; the calculation formula is as follows, and the calculation results are shown in Table 2; Q 排 =Q 排污 +Q 排清 , Q 排 ×C 测 =Q 排污 ×C 1 +Q 排清 ×C 2 ; Where: C 1 The concentration of the original sewage at the outlet is in mg / L. The concentration of the original sewage at the outlet is generally 100-180 mg / L in cities along the river. Therefore, the middle value of 150 mg / L is taken as the concentration of the original sewage at the outlet. C 2 is the clean water concentration in mg / L, generally 10-30 mg / L, so the middle value of 20 mg / L is taken as the clean water concentration; C 测 is the actual sewage concentration, in mg / L; Q 排污 is the amount of sewage in the outlet, Q 排清 is the amount of clean water in the outlet, Q 排 is the actual amount of direct sewage discharge; Therefore, it is deduced = ; Table 3 Actual discharge volume of each area outlet, key node and connection point

[0028] S4: Water balance analysis of sewage system: S4-1: Calculate the water balance of each area according to the following formula to obtain the clean water volume of each area: Q 排污 +Q 测 =Q理论 +Q 清 ; Q 清 =Q 排污 +Q 测 -Q 理论 ; Q 理论 =Q 用 *0.9+Q u =Q 用 *0.9* (1.15~1.2); Where: Q 排污 is the amount of sewage in the outlet, Q 测 is the measured sewage volume in the area, Q 理论 is the theoretical sewage volume calculated based on water consumption, Q 用 is the tap water consumption, Q 清 Q is the amount of invading low-concentration external water; u Infiltration into groundwater, cities along the Yangtze River generally account for 15-20% of the sewage volume, i.e. Q 用 *0.9×(15%~20%), Q in Chaisang District u 15% of the sewage volume; The annual water consumption data of each drainage household in the area collected in step S1 shows that the tap water consumption in the area is 18404m 3 / d(Q 用 ), so we can calculate Q 理论 =18404*0.9*1.15=19048m 3 / d; According to the water quality and quantity monitoring at each key node, the total flow measured in the four areas is 20436m 3 / d, the discharge volume calculated by S3 is 7948m 3 / d, the total amount of clean water intrusion in the area is calculated to be Q 清 =20436+7945-19048=9333m 3 / d; S4-2: The annual water consumption data of each drainage household collected in step S1 is used to obtain the tap water consumption of each area (Q 用 ), and the direct discharge of sewage from each area outlet, key node and connection point calculated in step S3 (Q 排污 ), calculate the direct discharge sewage volume of each area (Q 排污 ), and finally the clean water volume of each area is calculated. The results are shown in Table 3: Table 4 Water balance relationship of each area Drainage zones <![CDATA[Q 排污 ]]> <![CDATA[Q 测 ]]> <![CDATA[Q 理论 ]]> <![CDATA[Q 清 ]]> <![CDATA[Q 用 ]]> Jiangzhou Avenue North Area 60 1600 1540 120 1488 Jiangzhou Avenue East and West Area 1753 6232 5251 2734 5073 Shahe Area 3239 7514 6239 4514 6028 Lushan South Road and Industrial Park Area 2893 5090 6018 1965 5814 total 7945 20436 19048 9333 18404 As can be seen from Table 3, the amount of clean water intrusion in the Shahe area is the largest, which needs to be investigated first, followed by the Jiangzhou Avenue East and West areas, Lushan South Road and the Industrial Park area, while the amount of clean water intrusion in the Jiangzhou Avenue North area is only 120m 3 / d, there is no need to carry out investigation work, thus saving manpower and material resources.

[0029] In addition, the main pipes of Lushan South Road and the Industrial Park area merge with the main pipes of Shahe area and cross the river to the main pipe of Liulin Road. According to the water quality and water quantity monitoring at each key node, the flow rate of Ganjiahe sewage interception main pipe is 5090m 3 / d, the flow rate of the main pipeline of Shahe Yanhe South Road is 5646m 3 / d, the flow rate of Shahe Yanhe North Road is 1868m 3 / d, the flow rate of the Liulin Road main is 11134m 3 / d; By comparison, the flow before crossing the river is 5090+5646+1868=12604m 3 / d, the flow after crossing the river is 11134m 3 / d, the flow error is within 20%. Preliminary judgment shows that there is no river water infiltration in this cross-river section.

[0030] The estimated water volume operation data of Dongquan Pump Station and Nantuan Pump Station are 17800m 3 / d and 1600m 3 / d, which is basically consistent with the upstream detection data, and it can be judged that the detection data is relatively accurate.

[0031] S5: On-site investigation and testing: After on-site investigation and testing, no river water backflow was found along the main pipeline and interception wells. Then, the four areas were checked in the order of the areas determined in step S4-2. The results are as follows: There are two problem points in Shahe area: 1959 m of external water from Chenghe Road culvert 3 / d, which comes from the reservoir upstream of the box culvert; the water from the Chaisang North Road combined pipe is about 602m 3 / d, mainly from nearby ponds and broken water pipes; a total of 2561t of intruding clean water was found; There are three problem points in the east and west areas of Jiangzhou Avenue, namely, the slightly polluted surface water source (upstream farmland sewage) of Lijiacun on Yuanming Avenue, about 1130 m 3 / d, COD is 15~20mg / L; the basements of communities with high groundwater levels such as Shanyu City, Guanglong Future City, and Park No. 1 have strong drainage of about 500 m 3 / d; the precipitation at the construction sites of Chaisang County and Shui'an Xiangpu is about 300 m 3 / d; A total of 1930t of clean water was found to have invaded; There are three problem points in Lushan South Road and the Industrial Park area. All three problem points are where surface water is connected to the sewage pipes in the plot. Specifically, Xinhua Printing, Fuyuan 3rd Road, about 200 m 3 / d, COD is 14mg / L; Fuyuan 2nd Road, Jiangxi Sipabo Optoelectronics Technology, about 200 m 3 / d, COD is 17mg / L; Fuyuan 2nd Road Health Industry Park 800m 3 / d, COD is 16mg / L; a total of 1200 t of clean water was found to have invaded; A total of about 5,691 tons of clean water was found to have invaded the three areas.

[0032] S6: Propose engineering plan: S6-1: Propose specific improvement ideas: (1) High water level in front of Dongquan Pump Station: The cause is the lack of grille at the pump station, which causes damage to the water pump, resulting in insufficient pumping capacity of the pump station and continuous high water level in front of the pump station. The improvement method is to add a spare pump to the Dongquan Pump Station and replace the grille of the pump station; (2) There are 32 sewage direct discharge outlets with mixed sources within the system: the improvement method is to connect the sewage or combined sewer network sewage direct discharge outlets to the municipal road sewage system; (3) The problem of large amount of clean water intrusion: The improvement method is to connect the discovered clean water intrusion points to the rainwater system, and consider treating the slightly polluted surface water sources on site before discharge; S6-2: For the entire system, a step-by-step transformation plan is proposed: eliminating direct discharge, skimming external water, reducing overflow, and reducing infiltration. This time, the focus is on the first two stages, with a total improvement area of ​​18km 2 , with an investment of RMB 200 million and an investment intensity of approximately RMB 11.11 million / km 2 ; S7: Target achievable analysis: According to the annual report of the sewage treatment plant, the average concentration of influent on sunny days from 2022 to 2023 is 89 mg / L, and the amount of clean water that has been found and can be rectified and stripped is 5691m 3 / d, combined with the total measured sewage volume of the four areas in Chaisang District in Table 3, is 20436m 3 / d, the amount of intrusion water that has been found and can be rectified and stripped is 5891m 3 / d; Calculate the target concentration of the sewage system after rectification according to the following formula:

[0033] =127.7mg / L; In summary, it can be seen that this method can increase the sewage concentration in Chaisang District from 89 mg / L to 127.7 mg / L, indicating that by eliminating direct discharge and skimming external water within this area, a high economic and practical effect of improving quality and efficiency can be achieved.

Claims

1. A method for accurate pollution control and target reachability analysis for improving the quality and efficiency of a sewage system, characterized by: The steps include: S1: Data collection, collation and analysis: Collect water quality and quantity data of sewage treatment facilities within the region, operation data of pumping stations and storage tanks, annual water consumption data of each drainage household, current status map of drainage network, information on outlets and direct drainage volume, current permanent population and registered population data, historical surface water system map, groundwater level distribution, typical annual rainfall, river and lake water level data, and pipe network liquid level; and preliminarily analyze the water volume and mixing degree inside and outside the region; S2: Survey and construction of municipal pipe network topology: Draw a pipe network system diagram and clarify the topological relationship of the pipe network within the region; S3: Water quality and quantity monitoring: monitor the water quality and quantity of each sewage zone; detect the water quality and quantity of each outlet, and calculate the actual direct discharge of sewage; S4: Water balance analysis of sewage system: calculate the water balance relationship of the whole area and each sub-area, and draw a water balance diagram; S5: On-site investigation and testing: Conduct on-site investigation and testing of sewage direct discharge points and external water infiltration points; S6: Propose engineering solutions for key issues; S7: Target attainability analysis: Based on the quantitative analysis of the water quality and quantity balance of the sewage system, and on the basis of the water volume and concentration of the existing sewage plant influent, the water quality concentration that can be improved by the sewage system after solving the direct discharge of sewage and stripping of external water is calculated through the weighted method, to demonstrate the rationality and attainability of the project plan goals.

2. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: Drawing the pipe network system diagram in step S2 is to draw the pipe network route on the topographic map, classifying and representing the primary trunk pipe, secondary trunk pipe, and tertiary branch pipe; and marking the specific locations of the pump station and the terminal sewage treatment plant on the pipe network system diagram.

3. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: Step S2 of clarifying the topological relationship of the pipe network within the area includes clarifying the drainage system and drainage zones, indicating the diversion system and the confluence system zones; clarifying and indicating the specific location and information of each outlet; clarifying and marking the specific location of the interception well.

4. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: The calculation formula for the actual direct discharge of sewage in step S3 is: Q 排 =Q 排污 +Q 排清 ; Q 排 ×C 测 =Q 排污 ×C1+Q 排清 ×C2; Where: C1 is the original sewage concentration at the outlet, in mg / L; C2 is the clean water concentration, in mg / L; C 测 is the actual sewage concentration, in mg / L; Q 排污 is the amount of raw sewage in the actual direct sewage discharge, Q 排清 is the amount of clean water in the actual direct sewage discharge, Q 排 The actual amount of direct sewage discharge.

5. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: The calculation formula for the water balance relationship of the entire area and each sub-area described in step S4 is as follows: Q 排污 +Q 测 =Q 理论 +Q 清 ; Q 理论 =Q 用 *0.9+Q u ; Where: Q 排污 is the amount of sewage in the outlet, Q 测 is the measured sewage volume in the area, Q 理论 Q is the theoretical sewage volume calculated based on water consumption. 用 is the tap water consumption, Q 清 is the amount of invading low-concentration external water, Q u For infiltration of groundwater.

6. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: The sequence of on-site investigation of the external water infiltration points described in step S5 is as follows: (1) Focus on checking whether there is backflow of river water from interception wells along the river; check whether precipitation from construction sites is discharged into the sewage system; check whether surface water and mountain water from individual households, farmland, streams, etc. are intercepted and enter the sewage system; (2) Prioritize the areas where external water infiltration is more serious. Visually observe and test the water quality and quantity at the secondary main inspection wells and the connection points of the tertiary branch pipes to the secondary main in the area, and trace the source upward until the clean water point with concentrated inflow is found.

7. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: The key issues in step S6 include the following categories: (1) Pollutant deposition and degradation caused by high water levels; (2) Direct discharge of sewage; (3) External water problems such as concentrated inflow and infiltration from construction site rainfall; (4) Issues concerning surface water and mountain water, such as farmland and streams; (5) River water backflow problem.

8. A method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement according to claim 1 or 7, characterized in that: Engineering solutions for key issues include the following categories: (1) One or more of pump station technical renovation, pipeline desilting and excavation repair; (2) Connecting the direct discharge points from the source to the sewage system, or adopting the methods of end-of-line interception and source transformation; (3) Connect inflow and infiltration points from mountain water and other sources to the rainwater system; (4) The clean and dirty surface water is separated and connected to the rainwater system or treated on site; (5) Take measures to prevent backflow.

9. According to claim 1, a method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement is characterized by: The weighted calculation formula in step S7 is: 。 10. A method for accurate pollution control and target achievable analysis of sewage system quality improvement and efficiency enhancement according to claim 9, characterized in that: The calculation formula is ; Where C 测 is the measured sewage concentration at the outlet of the entire system, C1 is the original sewage concentration at the outlet, in mg / L; Q 排污 is the amount of sewage in the outlet, Q 整 The amount of clean water stripped for rectification, Q 测 is the measured sewage volume in the area, Q 理论 It is the theoretical sewage volume calculated based on water consumption.

Citation Information

Patent Citations

  • Urban sewage quality and efficiency improvement evaluation method based on water quality and water quantity diagnostic analysis

    CN114240127A

  • Sewage pipe network problem pre-diagnosis and accurate troubleshooting method

    CN115577506A

  • Stripping method for external water inflow of urban sewage system in dry days

    CN115650327A

  • Method and device for calculating and evaluating sewage treatment capacity of sewage plant

    CN116307932A

  • Calculation method and device for quality and efficiency improvement evaluation of urban sewage treatment and storage medium

    CN116562689A

Cited By

  • Method for predicting net water consumption of urban water supply

    CN119227915A

  • Sewage pipe network management information intelligent classification method and system based on multiple scenes

    CN121211070A

  • A multi-scene-based sewage pipe network management information intelligent classification method and system

    CN121211070B

  • Method for evaluating quality and efficiency improvement effect of sewage system based on water quality and water quantity

    CN122596734A

  • Systematic treatment method for sewage concentration improvement and multi-source external water reduction

    CN122977472A