Large-diameter heading machine in-hole swivel supporting structure and construction method
By setting up arch cover support structures and hoisting parts in the large-diameter boring machine hole, the precise rotation in a limited space is achieved, and the problems of complex operation, large environmental impact and long construction cycle in traditional methods are solved, and the construction is improved Safety and efficiency.
Patent Information
- Application Number
- CN202411453227.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-11-29
AI Technical Summary
When existing large-diameter boring machines turn or change paths in limited spaces, traditional methods have problems such as complex operation, high structural requirements, large environmental impact, long construction cycle, high safety risks and high costs.
The rotary support structure in the large-diameter boring machine hole, including the arch cover support structure and hoisting parts in areas A and B, is connected through the door opening interface to form a rotary track, and the arch cover, lower sleeping beam and locking anchor rod are used. The upper and lower support system combines the monitoring system to achieve accurate rotation, simplify construction processes and reduce safety risks.
It improves the stability and construction safety of the tunnel, shortens the construction cycle, reduces environmental impact and costs, and ensures stable rotation and efficient construction of the boring machine.
Smart Images

Figure CN119041927A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel boring machine rotation, and in particular to a large-diameter tunnel boring machine in-hole rotation support structure and a construction method. Background Art
[0002] In the field of tunnel and underground engineering, shield tunneling machines are often used as construction equipment. For large-diameter tunneling machines, when turning or changing the path of a tunnel in a limited space or a very small radius, traditional large-diameter tunneling machines are not able to achieve precise turning functions by relying solely on the angle adjustment capability of their internal propulsion cylinders due to their large size.
[0003] In the prior art, the steering of a large diameter tunnel boring machine is achieved by the following three methods:
[0004] 1. TBM body modification method: This method enhances the steering capability of the TBM by improving the structure of the TBM body. The main means include the adjustment of mechanical structures such as retractable TBM cutterhead and rotatable TBM head. These adjustments usually rely on complex hydraulic systems to control the extension and retraction of the cutterhead or the rotation of the head to adapt to the steering requirements of the tunnel. However, the TBM structure modification method has problems such as complex operation, long adjustment time, and high structural requirements. When applied to large-diameter TBMs, additional steering equipment is added, which increases the risk of TBM failure and is not conducive to the continuous excavation and construction efficiency of the equipment.
[0005] 2. Open-cut shaft and open-cut foundation pit method: This method relies on ground construction. After constructing the support structure, the ground hoisting equipment and the jacking machinery in the tunnel are used to turn or change the path of the tunnel boring machine in a limited space. This technology is suitable for shallow buried tunnel projects. However, since it involves open-cut construction, it has a great impact on the surrounding environment, especially in the city center or traffic-intensive areas, which may cause problems such as ground subsidence and building damage. In addition, if the tunnel is buried deep, the construction difficulty and safety risks of this method will increase significantly, while also greatly increasing the construction cost.
[0006] 3. Mining method dark excavation tunnel construction method: This method adopts the traditional mining method dark excavation method. This method does not rely on the modification of the tunnel boring machine or ground construction, but uses manual or mechanical excavation in the tunnel, combined with the initial support (such as steel arch, shotcrete, etc.) and the stable structure of the secondary lining to complete the tunnel turning. However, this method requires the completion of the construction of the secondary lining, so the construction period is long, the safety risk is high, and the construction cost is high. Summary of the invention
[0007] The technical problem to be solved by the present invention is that the existing construction methods have shortcomings that are difficult to overcome for turning a large-diameter tunnel boring machine. The purpose is to provide a large-diameter tunnel boring machine in-hole rotating support structure and construction method to solve the above-mentioned problem.
[0008] The present invention is achieved through the following technical solutions:
[0009] In a first aspect, the present invention provides a large-diameter tunnel boring machine in-tunnel swivel support structure, comprising an A zone, a tunnel door interface, and a B zone;
[0010] A first arch cover support structure is provided in area A, and a first hoisting member for steering the tunnel boring machine is provided on the first arch cover support structure;
[0011] A door opening support structure is provided on the door opening interface, and area A and area B are connected through the door opening interface;
[0012] A second arch cover support structure is provided in area B, and a second hoisting member for steering the tunnel boring machine is provided on the second arch cover support structure;
[0013] Correspondingly, the first hoisting member and the second hoisting member form a load-bearing guide line for steering the tunnel boring machine.
[0014] In one possible design, the first arch cover supporting structure includes a first primary support, a first underlying beam and a first arch cover;
[0015] The first primary support is arranged around the inner wall of the tunnel in area A, two first lower beams are provided and are arranged on two inner walls of the tunnel in area A, a plurality of first locking foot anchor rods are passed through the first lower beam, the first locking foot anchor rods are connected to the first lower beam, and the first locking foot anchor rods pass through the first lower beam and the first primary support and are inserted into the soil layer;
[0016] The first arch cover is arranged on the inner wall surface of the upper part of the first primary support, and the two ends of the first arch cover respectively extend along the first primary support and are connected to the first lying beam; the first hanging member is arranged on the inner wall surface of the first arch cover.
[0017] In a possible design, the second arch cover supporting structure includes a second primary support, a second underlying beam and a second arch cover;
[0018] The second primary support is arranged around the inner wall of the tunnel in zone B, two second lower beams are provided and are arranged on two inner walls of the tunnel in zone B, a plurality of second locking foot anchor rods are passed through the second lower beam, the second locking foot anchor rods are connected to the second lower beam, and the second locking foot anchor rods pass through the second lower beam and the second primary support and are inserted into the soil layer;
[0019] The second arch cover is arranged on the inner wall surface of the upper part of the second primary support, and the two ends of the first arch cover extend along the second primary support and are connected to the second lower beam respectively; the second hanging piece is arranged on the inner wall surface of the second arch cover, and longitudinal support and transverse support are arranged between the second primary support and the second arch cover.
[0020] In a possible design, the second primary branch includes an advance small duct, a steel frame and reinforcing steel arranged in sequence from the outside to the inside. The advance small duct, the steel frame and the reinforcing steel are connected by a concrete layer. Accordingly, the concrete layer is formed by solidifying concrete sprayed from the advance small duct.
[0021] In a possible design, the second arch cover includes a horizontal section adjacent to the door opening interface and an upward concave section away from the door opening interface.
[0022] In a possible design, the first lifting member and the second lifting member respectively include a plurality of lifting groups, and each lifting group includes a plurality of hooks.
[0023] In one possible design, the portal support structure includes a portal support steel frame and a vertical support steel frame. The portal support steel frame is frame-shaped, and the outer wall of the portal support steel frame abuts against the inner wall of the portal. The vertical support steel frame is located inside the portal support steel frame and abuts against the top surface of the portal support steel frame.
[0024] In a possible design, the A area, the portal interface and the B area are respectively provided with swivel brackets, and the swivel brackets of the three areas are connected to form a continuous swivel track;
[0025] The swivel support comprises a top plate and a plurality of support columns. The top surface of the top plate is configured to fit the swivel concave surface of the tunnel boring machine, and the bottom surface of the top plate is connected to the support columns.
[0026] In a second aspect, the present invention provides a construction method for a rotating support structure in a large-diameter tunnel boring machine, comprising the following steps:
[0027] Preparation work: Obtain the rotation position of the tunnel boring machine according to the tunnel design; divide the area A and area B according to the rotation position; geological survey;
[0028] Construction of Area A: Construction of the first primary support; construction of the first lower beam; construction of the first arch cover; construction of the first hoisting component;
[0029] Doorway interface construction: doorway interface area support removal; doorway support structure construction;
[0030] Construction of Area B: Excavation of Area B; construction of the second primary support; construction of longitudinal support; construction of transverse support; construction of the second lower beam; construction of the second arch cover; construction of the second hoisting parts;
[0031] Turn around.
[0032] In one possible design, the step rotation includes the following steps:
[0033] Temporary support removal;
[0034] Laying of swivel brackets: swivel brackets are placed in area A, door opening interface and area B respectively to obtain swivel tracks;
[0035] Hoisting of the tunnel boring machine: connect the lifting ring of the tunnel boring machine and the first lifting part through the lifting rope; hoist the tunnel boring machine onto the swivel bracket through the lifting equipment;
[0036] Start the rotation: the tractor drives the tunnel boring machine to rotate;
[0037] Rotation monitoring: The position, angle and posture of the tunnel boring machine are obtained through the monitoring system; the rotation status is obtained based on the position, angle and posture of the tunnel boring machine; according to the rotation status, it is determined whether to continue the rotation, or to stop the rotation and adjust the tunnel boring machine;
[0038] Complete rotation: the cutterhead of the tunnel boring machine is facing area B, the lifting is released and the lifting rope, the first lifting part and the second lifting part are removed.
[0039] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0040] 1. In the first arch cover support structure and the second arch cover support structure, the arch cover, the lower beam and the locking anchor rod cooperate with each other to form a complete upper and lower support system, which effectively improves the overall stability of the tunnel and prevents safety hazards such as stratum collapse and displacement during the rotation of the tunnel boring machine.
[0041] 2. On the basis of primary support, the arch cover method is directly used to support the structure. The combination of primary support and arch cover provides continuous support and protection, reducing the safety risks that may occur during tunnel construction. At the same time, it reduces the dependence on secondary lining, simplifies the construction process of the support structure, quickly completes the construction of the support system, and significantly shortens the construction period;
[0042] 3. The first hoisting part, the second hoisting part and the swivel bracket cooperate with each other to achieve the smooth swivel of the large-diameter TBM in the narrow tunnel space and under different geological conditions, ensuring the stability and safety of the TBM swivel process. In addition, the monitoring system is used to accurately control the entire swivel operation, which not only improves efficiency but also ensures the safety of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0044] Figure 1 It is a schematic diagram of the plan structure of a rotating support structure in a large-diameter tunnel boring machine.
[0045] Figure 2 When constructing the second primary support of Area B, Figure 1 Schematic diagram of the cross-sectional structure.
[0046] Figure 3 After the construction of Area B is completed, Figure 1 Schematic diagram of the cross-sectional structure.
[0047] Figure 4 This is a schematic diagram of the working condition of the tunnel boring machine rotating to area B.
[0048] Figure 5 This is a structural diagram of the door opening interface during initial construction.
[0049] Figure 6 This is a structural diagram of the door opening interface after construction is completed.
[0050] Figure 7 It is a schematic diagram of the structure of the swivel bracket.
[0051] Figure 8 The present invention is a schematic flow chart of a construction method of a rotating support structure in a large-diameter tunnel boring machine.
[0052] Marks and corresponding parts names in the attached drawings:
[0053] 1. Area A; 2. Tunnel portal interface; 3. Area B; 4. TBM; 5. First arch cover support structure; 501. First primary support; 502. First lower beam; 503. First arch cover; 504. First locking foot anchor rod; 505. Support anchor rod; 6. First lifting component; 7. Doorway support structure; 701. Doorway support steel frame; 702. Vertical support steel frame; 8. Second arch cover support structure; 801. Second primary support; 802. Second lower beam; 803. Second arch cover; 804. Longitudinal support; 805. Horizontal support; 806. Advance small guide tube; 807. Steel frame; 808. Reinforcement steel; 9. Second lifting component; 10. Swivel bracket; 101. Top plate; 102. Support column; 11. Lifting rope; 12. Towing vehicle. DETAILED DESCRIPTION
[0054] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0055] In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is apparent to one of ordinary skill in the art that these specific details are not necessarily employed to practice the present invention. In other embodiments, in order to avoid obscuring the present invention, well-known structures, circuits, materials, or methods are not specifically described.
[0056] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment," "an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or sub-combination. In addition, it will be appreciated by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0057] In the description of the present invention, the directions or positional relationships indicated by terms such as “front”, “rear”, “left”, “right”, “up”, “down”, “vertical”, “horizontal”, “high”, “low”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limiting the scope of protection of the present invention.
[0058] Embodiment 1:
[0059] like Figure 1-Figure 7 As shown, a large-diameter tunnel boring machine internal rotation support structure includes an A zone 1, a tunnel door interface 2, and a B zone 3;
[0060] A first arch cover support structure 5 is provided in the A area 1, and a first hoisting member 6 for steering the tunnel boring machine 4 is provided on the first arch cover support structure 5;
[0061] A door opening support structure 7 is provided on the door opening interface, and the A area 1 and the B area 3 are connected through the door opening interface;
[0062] The B area 3 is provided with a second arch cover support structure 8, and the second arch cover support structure 8 is provided with a second hoisting member 9 for steering the tunnel boring machine 4;
[0063] Correspondingly, the first hoisting member 6 and the second hoisting member 9 form a load-bearing guide line for steering the tunnel boring machine 4 .
[0064] In the large-diameter tunnel boring machine internal rotation support structure, area A 1 is used as the starting area for the tunnel boring machine 4 to rotate, and area B 3 is the position after the tunnel boring machine 4 rotates. There is an angle between area A 1 and area B 3. The specific angle depends on the tunnel design, and the present invention does not impose any restrictions on this. Area A 1 and area B 3 are connected and communicated through a doorway interface to form a continuous and unobstructed tunnel structure.
[0065] For area A 1, after excavation, area A 1 is reinforced by the first arch cover support structure 5 to ensure the safety of the tunnel and prevent geological collapse and displacement. At the same time, area A 1 is connected to the tunnel boring machine 4 through the first hoisting member 6, and the first arch cover support structure 5, the first hoisting member 6 and the tunnel boring machine 4 are connected so that the first arch cover support structure 5 bears part of the gravity of the tunnel boring machine 4. During the rotation of the tunnel boring machine 4, the pressure of the tunnel boring machine 4 on the bottom surface of the tunnel is reduced, and the convenience of the rotation of the tunnel boring machine 4 is improved. In addition, the first arch cover support structure 5 realizes the reinforcement of the tunnel, and also makes the bottom surface structure of the tunnel more compact, avoiding the situation where the tunnel boring machine 4 crushes the tunnel, and also avoiding the abnormal posture such as the center of gravity shift and skewness of the tunnel boring machine 4 during the rotation process due to defects in the bottom surface of the tunnel, ensuring the smoothness and safety of the rotation.
[0066] Similarly, corresponding support structures are provided in the portal interface and in the B zone 3, and their functions are the same as those of the first arch cover support structure 5 in the A zone 1, which will not be described in detail here. In addition, the width of the portal interface is small, which does not affect the switching of the tunnel boring machine 4 between the first hoisting member 6 and the second hoisting member 9, so no hoisting member is required at the portal interface. Furthermore, the portal interface makes the transition between different areas in the tunnel smoother, improving the continuity and safety of the construction process.
[0067] The tunnel boring machine 4, especially the large-diameter tunnel boring machine, is heavy, and the construction work is located underground, so it is difficult to rotate. In the large-diameter tunnel boring machine in-hole rotation support structure, the first arch cover support structure 5 and the second arch cover support structure 8 are introduced into the tunnel rotation position to form a stable support on the upper and side of the tunnel, effectively avoiding the risk of collapse of the tunnel top and ensuring the safety of the operation. During the rotation of the tunnel boring machine 4, the connection between the tunnel boring machine 4 and the arch cover structure is realized through the hoisting parts, and the arch cover structure bears the gravity of the tunnel boring machine 4, reducing the pressure of the tunnel boring machine 4 on the bottom surface of the tunnel, thereby reducing the resistance of the tunnel boring machine 4 to move forward, which is helpful to realize the movement and rotation of the tunnel boring machine 4.
[0068] At the same time, the first arch cover support structure 5 and the second arch cover support structure 8 support and reinforce the entire inner circumference of the tunnel, making the tunnel bottom smoother and having better mechanical properties, which not only reduces the resistance of the tunnel boring machine 4, but also can better support the tunnel boring machine 4, and can also reduce the probability of abnormal posture of the tunnel boring machine 4. On the basis of ensuring the safe rotation of the tunnel boring machine 4, the rotation speed of the tunnel boring machine 4 can be increased, thereby improving the construction efficiency. In addition, even if the tunnel boring machine 4 has an abnormal posture and hits the tunnel wall, the probability of tunnel collapse is lower due to the reinforcement of the inner circumference of the tunnel, which ensures safety and leaves enough space for the subsequent remedial construction of the staff.
[0069] The first arch cover support structure 5 and the second arch cover support structure 8 are not only suitable for ordinary strata, but also can be used to rotate the tunnel boring machine 4 in soft, broken or water-rich strata, and can adapt to various complex geological conditions, provide additional support and reinforcement, and ensure the safety of the rotation operation of the tunnel boring machine 4. Specifically, adjustments are made according to specific geological conditions to ensure the stability of the tunnel structure.
[0070] In a possible implementation, the first arch cover supporting structure 5 includes a first primary support 501, a first lower beam 502 and a first arch cover 503;
[0071] The first primary support 501 is arranged around the inner wall of the tunnel in area A, two first lower beams 502 are provided and are arranged on two inner walls of the tunnel in area A, a plurality of first locking foot anchor rods 504 are passed through the first lower beam 502, the first locking foot anchor rods 504 are connected to the first lower beam 502, and the first locking foot anchor rods 504 pass through the first lower beam 502 and the first primary support 501 and are inserted into the soil layer;
[0072] The first arch cover 503 is arranged on the inner wall surface of the upper part of the first primary support 501 , and the two ends of the first arch cover 503 extend along the first primary support 501 and connect the first lower beam 502 ; the first hanging member 6 is arranged on the inner wall surface of the first arch cover 503 .
[0073] Based on the above design scheme, the first primary support 501 is preferably supported by sprayed concrete anchor rods and steel frames 807. After spraying, the concrete solidifies to form a concrete layer, which improves the inner periphery of the tunnel, realizes reinforcement and makes the bottom surface of the tunnel smoother and reduces bumps. At the same time, a number of support anchor rods 505 are inserted into the concrete layer, and a steel frame 807 is also provided to ensure the integrity and shear resistance of the first primary support 501, further improve the structural strength of the first primary support 501, ensure the support effect, ensure the safety of the tunnel, and prevent geological collapse and displacement.
[0074] The first lying beam 502 is used to form a strip foundation under the wall. The two first lying beams 502 cooperate with each other to make the first arch cover 503 extend from the upper part of the tunnel to the side of the tunnel. At the same time, the first lying beam 502 also limits the area covered by the first arch cover 503. At the same time, the first lying beam 502 cooperates with the first arch cover 503 to increase the overall rigidity and stability of the tunnel, thereby creating a safe working environment. In addition, the first lying beam 502 can also disperse the load. During the rotation of the tunnel boring machine 4, the first arch cover support structure 5 will bear the weight of the tunnel boring machine 4. By dispersing the load, the tunnel as a whole bears the weight, ensuring the safety of the rotation.
[0075] Furthermore, the specific position of the first lower beam 502 on the inner wall of the tunnel is determined by those skilled in the art based on construction experience and rotation requirements, and the present invention does not impose any limitation on this.
[0076] The first locking foot anchor rod 504 passes through the first lying beam 502 and the first primary support 501 and is inserted into the soil layer. The first locking foot anchor rod 504 determines the position of the first lying beam 502. The two cooperate with each other to form a stable lower support structure, ensuring that the lower support structure can withstand the gravity of the first arch cover 503 and the upper rock layer, enhancing the stability of the support structure, and avoiding collapse or overturning of the tunnel boring machine 4 due to unstable foundation. For soft strata or water-rich strata, the installation of the first locking foot anchor rod 504 can effectively prevent the surrounding rock from becoming unstable.
[0077] It is easy to understand that, on the basis of meeting the performance requirements, the present invention does not impose any limitation on the number and arrangement of the first locking foot anchor rods 504 .
[0078] The first arch cover 503 is constructed as a dark excavation arch cover structure, which has the advantages of short construction time, high safety, small environmental impact, high construction efficiency and good economic benefits. After the arch cover is formed, large-area operations can be carried out, which is suitable for the rotation operation of large-diameter tunnel boring machines, and helps to improve the rotation efficiency. The arch cover can simplify the support system and reduce the amount of abandoned projects, thereby reducing the project cost.
[0079] At the same time, the first arch cover 503 has a high structural strength. The arch cover structure can effectively disperse and bear the load through its unique arch design, thereby improving the stability and load-bearing capacity of the structure, so that the first arch cover 503 can bear the gravity of the tunnel boring machine 4 during the rotation of the tunnel boring machine 4.
[0080] The first arch cover 503 cooperates with the first lower beam 502 and the first locking foot anchor rod 504 to form a complete upper support structure to ensure the stability of the upper part of the tunnel and prevent the top rock layer from sliding or collapsing when the tunnel boring machine 4 rotates.
[0081] In a possible implementation, the second arch cover supporting structure 8 includes a second primary support 801, a second lower beam 802 and a second arch cover 803;
[0082] The second primary support 801 is arranged around the inner wall of the tunnel in zone B, two second lower beams 802 are provided and are arranged on two inner walls of the tunnel in zone B, a plurality of second locking foot anchor rods are passed through the second lower beam 802, the second locking foot anchor rods are connected to the second lower beam 802, and the second locking foot anchor rods pass through the second lower beam 802 and the second primary support 801 and are inserted into the soil layer;
[0083] The second arch cover 803 is arranged on the inner wall surface of the upper part of the second primary support 801, and the two ends of the first arch cover 503 extend along the second primary support 801 and are connected to the second lower beam 802; the second hanging part 9 is provided on the inner wall surface of the second arch cover 803, and a longitudinal support 804 and a transverse support 805 are provided between the second primary support 801 and the second arch cover 803.
[0084] Based on the above design, the structure of the second arch cover support structure 8 is basically the same as that of the first arch cover support structure 5, and the functions of the components are also basically the same. The difference between the two is that the positions are different. In addition, the second arch cover support structure 8 is provided with a longitudinal support 804 and a transverse support 805 between the second primary support 801 and the second arch cover 803. The longitudinal compressive capacity is enhanced by the longitudinal support 804, and the transverse support 805 is enhanced by the transverse support 805, so as to improve the support performance of the second arch cover support structure 8 and ensure that the stratum around the tunnel boring machine 4 is stable during the rotation process.
[0085] In conjunction with the rotation of the tunnel boring machine 4, in order to smoothly complete the rotation of the tunnel boring machine 4 and avoid contact between the tunnel boring machine 4 and the tunnel wall, the size of area B 3 must be larger than area A 1. In order to ensure the supporting effect of area B 3, area B 3 is provided with longitudinal support 804 and transverse support 805.
[0086] Optionally, the longitudinal supports 804 are made of reinforced steel, and the transverse supports 805 are arranged in a plurality of rows, and the transverse supports 805 in adjacent rows are fixed on the inner wall of the tunnel in sequence from top to bottom.
[0087] In a possible implementation, the second primary support 801 includes an advance small duct 806, a steel frame 807 and a reinforcing steel 808 arranged in sequence from the outside to the inside. The advance small duct 806, the steel frame 807 and the reinforcing steel 808 are connected by a concrete layer. Accordingly, the concrete layer is formed by solidifying concrete sprayed by the advance small duct 806.
[0088] Based on the above design, the advance small guide tube 806 realizes advance support, provides support and stability for the front space, and at the same time, the advance small guide rail reinforces the rock layer, and the stability of the surrounding rock is enhanced after grouting, which is conducive to the stability of the surrounding rock after excavation and during the initial support time, so that the surrounding rock will not be unstable and damaged until it collapses, and it also helps to improve the adaptability to different geological conditions. The steel frame 807 and the reinforcing steel 808 cooperate with the concrete layer to form the steel frame 807 support to ensure that area B 3 is in a stable state.
[0089] Optionally, when necessary, the structure of the first primary support 501 can be the same as that of the second primary support 801 to reduce construction difficulty and reduce economic costs.
[0090] In a possible implementation, the second arch cover 803 includes a horizontal section adjacent to the door opening interface and an upper concave section away from the door opening interface. Based on the above design, when area B 3 is used for other functions, the second arch cover 803 reserves space through the upper concave section, thereby leaving space for related construction, equipment installation and other operations, facilitating subsequent operations and helping to improve construction efficiency.
[0091] In a possible implementation, the first hoisting member 6 and the second hoisting member 9 respectively include several hoisting groups, and each hoisting group includes several hooks. Based on the above design scheme, during the rotation of the tunnel boring machine 4, the first hoisting member 6 and the second hoisting member 9 cooperate with each other and form a load-bearing guide line. The hoisting members can ensure the stability of the tunnel boring machine 4, prevent it from sliding or losing control during the rotation process, and ensure the safety and efficiency of the rotation. Specifically, on the one hand, it shares the weight of the tunnel boring machine 4, reduces the pressure of the tunnel boring machine 4 on the bottom surface of the tunnel, and makes it easier for the tunnel boring machine 4 to rotate. On the other hand, it plays a guiding role, so that the tunnel boring machine 4 moves according to the designed rotation route, ensuring the accuracy, safety and efficiency of the rotation.
[0092] It is easy to understand that the present invention does not impose any restrictions on the number and layout of the lifting groups. Further, the lifting hook can be constructed as any suitable structure, or any suitable existing model can be selected.
[0093] In one possible implementation, the door opening support structure 7 includes a door opening support steel frame 701 and a vertical support steel frame 702. The door opening support steel frame 701 is frame-shaped, and the outer wall surface of the door opening support steel frame 701 abuts against the inner wall surface of the door opening. The vertical support steel frame 702 is located inside the door opening support steel frame 701 and abuts against the top surface of the door opening support steel frame 701.
[0094] Based on the above design, the shape of the doorway support steel frame 701 is adapted to the shape of the doorway interface, and the vertical support steel frame 702 provides additional support to ensure the support effect of the doorway support steel frame 701. And because the volume of the doorway interface is small, the structure of the doorway support structure 7 is relatively simple while ensuring the stability of the support.
[0095] It is easy to understand that when the tunnel boring machine 4 rotates, if the vertical support steel frame 702 blocks the tunnel boring machine 4, the vertical support steel frame 702 on the rotation route of the tunnel boring machine 4 should be removed in advance to ensure that the tunnel boring machine 4 rotates smoothly.
[0096] In a possible implementation, the A area 1, the portal interface 2 and the B area 3 are respectively provided with a swivel bracket 10, and the swivel brackets 10 of the three are connected to form a continuous swivel track. Based on the above design scheme, the swivel bracket 10 is used to isolate the tunnel boring machine 4 and the bottom surface of the tunnel. Even if the initial support is applied, the friction coefficient of the tunnel bottom surface is large, and the resistance when the tunnel boring machine 4 rotates is large. The swivel bracket 10 with a smoother surface can reduce the resistance, making it easier for the tunnel boring machine 4 to rotate. In addition, the swivel bracket 10 also forms a swivel track, which limits the movement route of the tunnel boring machine 4 and guides it, so that the center of gravity of the tunnel boring machine 4 transitions smoothly during the rotation process, reduces the probability of the tunnel boring machine 4 touching the inner wall of the tunnel, and realizes the smooth rotation of the tunnel boring machine 4 in a narrow space, ensuring the safety of the rotation.
[0097] For different geological conditions, the swivel bracket 10 separates the tunnel bottom surface from the tunnel boring machine 4, thereby providing necessary support and guidance for the tunnel boring machine 4, effectively preventing the tunnel boring machine 4 from shifting or tilting during the rotation process, and minimizing the impact of the tunnel geological conditions on the swivel, so as to facilitate use in different geological conditions and have better practicality.
[0098] The setting of the swivel bracket 10 also raises the height of the tunnel boring machine 4, and the tunnel boring machine 4 is hoisted onto the swivel bracket 10 by the cooperation between the first hoisting member 6 and the hoisting equipment. Among them, the first hoisting member 6 is connected to the tunnel boring machine 4 through the hoisting rope 11, and the hoisting process also realizes the pre-tightening of the hoisting rope 11, eliminates the gap, improves the rigidity and stability of the structure, reduces the deformation during the rotation process, and ensures the stability of the arch cover.
[0099] Optionally, the swivel bracket 10 includes a top plate 101 and a plurality of support columns 102. The top surface of the top plate 101 is configured to fit the swivel concave surface of the tunnel boring machine 4, and the bottom surface of the top plate 101 is connected to the support columns 102. Based on the above design scheme, the swivel concave surface of the top plate 101 fits the tunnel boring machine 4. Accordingly, for tunnel boring machines 4 of different sizes, the swivel bracket 10 is provided with different specifications for selection by technicians in this field. A plurality of support columns 102 are provided to share the gravity, increase the service life of the swivel bracket 10, and avoid damaging the bottom surface of the tunnel as much as possible. The plurality of support columns 102 cooperate with each other. Even if the bottom surface of the tunnel at individual support columns 102 has defects such as concave, it will not affect the rotation of the tunnel boring machine 4, thereby ensuring smooth and safe rotation.
[0100] Embodiment 2:
[0101] This embodiment introduces a construction method for a rotating support structure in a large-diameter tunnel boring machine based on the embodiment 1, such as Figure 8 As shown, the construction method for the rotating support structure in the large-diameter tunnel boring machine includes the following steps:
[0102] S100 preparation work: obtain the rotation position of the tunnel boring machine 4 according to the tunnel design; divide the A area 1 and B area 3 according to the rotation position; geological survey;
[0103] S200A area 1 construction: construction of the first primary support 501; construction of the first lower beam 502; construction of the first arch cover 503; construction of the first hoisting piece 6;
[0104] S300 door opening interface construction: door opening interface area support removal; door opening support structure 7 construction;
[0105] S400B zone 3 construction: excavation of B zone 3; construction of the second primary support 801; construction of the longitudinal support 804; construction of the transverse support 805; construction of the second lower beam 802; construction of the second arch cover 803; construction of the second hoisting piece 9;
[0106] S500 swivel.
[0107] Based on this, in S100, the rock and soil conditions of the construction area are obtained through geological survey, and the construction parameters are determined according to the rock and soil conditions to avoid accidents such as collapse and ensure construction safety. In S200-S400, the construction is carried out in the order of A area 1-doorway interface-B area 3. For the doorway interface, the support structure of A area 1 is constructed normally, and then the support structure located in the doorway interface area is removed; or, the support structure 6 of A area 1 is constructed to avoid the doorway interface area. After the construction of the support structure is completed, the rotation operation can be carried out.
[0108] Specifically, for S300, the door opening interface is divided into a left door opening and a right door opening. One of the left door opening and the right door opening is constructed first to form a stable support structure before constructing the other. It is easy to understand that if the width of the door opening interface is large, the door opening interface can also be divided into more sub-areas on the basis of being divided into two sub-areas of the left door opening and the right door opening, so that the door opening support steel frame 701 can use an existing model to avoid customization.
[0109] In S400, when excavating in Area B3, the stability of the stratum was strictly monitored to avoid stratum movement due to excavation.
[0110] For S500, step S500 includes the following steps:
[0111] S510 temporary support removal;
[0112] S520 swivel bracket 10 laying: swivel brackets 10 are placed in area A 1, door opening interface and area B 3 respectively to obtain swivel tracks;
[0113] S530 Hoisting of the tunnel boring machine 4: connecting the hoisting ring of the tunnel boring machine 4 and the first hoisting member 6 through the hoisting rope 11; hoisting the tunnel boring machine 4 onto the swivel support 10 through the hoisting equipment;
[0114] S540 Start the rotation: the tractor 12 drives the tunnel boring machine 4 to rotate;
[0115] S550 rotation monitoring: obtaining the position, angle and posture of the tunnel boring machine 4 through the monitoring system; obtaining the rotation status according to the position, angle and posture of the tunnel boring machine 4; determining whether to continue the rotation according to the rotation status, or to stop the rotation and adjust the tunnel boring machine 4;
[0116] S560 Complete the rotation: the cutter head of the tunnel boring machine 4 faces the B area 3, release the lifting and remove the lifting rope 11, the first lifting component 6 and the second lifting component 9.
[0117] Based on the above design scheme, in S510, the temporary supports used in the construction process of the supporting structure are dismantled to clear the space and reduce obstructions to ensure that the tunnel boring machine 4 can rotate smoothly. In S520, the swivel bracket 10 is laid and the swivel track is obtained. The length of the swivel bracket 10 and the swivel track is determined according to the actual working conditions, and the appropriate number of swivel brackets 10 can be selected accordingly. In S530, the hook is used as a fulcrum, and the hook and the tunnel boring machine 4 are connected by the lifting rope 11, and then the tunnel boring machine 4 is hoisted to the swivel track by the lifting equipment, and the pre-tightening of the lifting rope 11 is also achieved.
[0118] Furthermore, if necessary, if the strength of the bottom surface of the track is good, the swivel bracket 10 may not be used, and accordingly, S520 and S530 in S500 may be canceled.
[0119] In S540, any suitable existing tractor 12 can be selected. In S550, the monitoring system selects any suitable existing equipment and is deployed in advance. During the rotation process, the staff obtains more accurate rotation information, reduces the reliance on manual experience, and is convenient for the staff to make adjustments in time to ensure smooth and safe rotation.
[0120] In S550, after the rotation is completed, the equipment such as the suspension rope 11 can be removed to release the restriction on the tunnel boring machine 4, so that the tunnel boring machine 4 is ready for the next step of work.
[0121] Embodiment 3:
[0122] Based on Examples 1 and 2, this embodiment compares the large-diameter tunnel boring machine internal rotating support structure and construction method with the prior art. Specifically:
[0123] 1) Disadvantages of the tunnel boring machine body modification method:
[0124] Operational complexity: Modifying the roadheader itself to achieve steering functions usually involves complex mechanical structure adjustments, such as hydraulic systems controlling the extension and retraction of the cutterhead or the rotation of the head. These adjustments require precise operation and a high degree of technical knowledge, increasing the complexity of the operation.
[0125] Long adjustment time: Since the tunnel boring machine needs to be physically modified, this usually means longer downtime and construction delays, which affects the project schedule.
[0126] High structural requirements: Modifying the TBM to adapt to steering requirements may require substantial adjustments to the original structure of the TBM, which not only increases the technical difficulty but may also affect the stability and durability of the TBM.
[0127] Increased risk of failure: Additional steering equipment may increase the failure rate of the roadheader because more mechanical parts mean more potential failure points.
[0128] Increased costs: Modifying a roadheader to enable steering capabilities may require additional equipment and materials, which will increase project costs.
[0129] 2) Disadvantages of open-cut shaft and open-cut foundation pit method:
[0130] Large environmental impact: Open-cut shaft and open-cut foundation pit technology requires a large amount of construction activities on the ground, which may cause damage to the surrounding environment, such as noise, dust, traffic interference, etc.
[0131] Safety risks: If the tunnel is buried very deep, the use of ground lifting and in-hole jacking technology may bring greater safety risks, such as ground collapse, equipment failure, etc.
[0132] Huge investment: Open-cut technology usually requires a large amount of upfront investment, including land acquisition, construction equipment, personnel training, etc., which may lead to a significant increase in project costs.
[0133] Long construction period: Open-cut technology usually requires a longer construction period because it involves the coordination of ground construction and underground works, which may delay the completion time of the entire project.
[0134] 3) Disadvantages of the mining method of tunneling:
[0135] Slow construction speed: Traditional mining methods usually need to be carried out in steps, including excavation, support, lining, etc. Each step takes time to ensure safety and quality, which leads to a slow overall construction speed.
[0136] High labor intensity: This method usually requires a lot of manual participation, especially in the initial support and secondary lining stages. The labor intensity is high and requires high physical strength and skills of the workers.
[0137] Poor environmental adaptability: Traditional mining methods have poor adaptability to geological conditions, especially in soft, broken or water-rich strata, which increases construction difficulty and risk.
[0138] Safety issues: Since a large amount of excavation and support work needs to be done underground, if the support is not timely or sufficient, safety accidents such as collapse and water gushing may occur.
[0139] Higher cost: Traditional mining methods require a large number of temporary support structures and materials, such as steel frames, shotcrete, etc. These materials are expensive, and waste during construction may also lead to increased costs. Traditional mining methods require the completion of secondary lining construction, which is more expensive.
[0140] Impact on the environment: A large amount of dust and noise may be generated during the excavation process, affecting the surrounding environment and residents' lives.
[0141] Construction quality control is difficult: Since the construction process involves multiple links and multiple materials, quality control is relatively complex and requires strict management and supervision.
[0142] Poor flexibility: During the construction process, if there are design changes or changes in geological conditions, the traditional mining methods have poor adjustment and adaptability, which may lead to delays in construction plans.
[0143] The large-diameter tunnel boring machine internal rotating support structure and construction method effectively avoid the defects existing in the prior art, as follows:
[0144] 1. Simplified operation: The arch cover support structure not only strengthens the tunnel, but also can be used for the rotation of the tunnel boring machine, without the need for complex mechanical modification or additional equipment for large-diameter tunnel boring machines, thus avoiding the complicated steps of adjusting the cutter head extension and retraction, head rotation, etc. in the hydraulic system. The support structure can realize the rotation operation without changing the mechanical structure of the tunnel boring machine, thereby ensuring the main tunneling performance of the tunnel boring machine, reducing the difficulty of operation and technical requirements, and reducing the maintenance and failure risks of the equipment.
[0145] Based on this, the shortcomings of the tunnel boring machine body modification method are effectively overcome.
[0146] 2. Reduce environmental impact and cost: The rotation operation is carried out in the hole, which avoids the damage to the ground environment caused by open-cut shaft or foundation pit construction, and reduces problems such as ground subsidence, noise, dust and traffic interruption. At the same time, the present invention does not rely on a large amount of ground equipment and construction infrastructure, significantly reduces the demand for construction sites and the impact on the surrounding environment, and greatly reduces safety risks. By optimizing the use of construction technology and materials, the present invention can reduce costs in the construction process, including equipment, material and labor costs.
[0147] Based on this, the shortcomings of open-cut shaft and open-cut foundation pit methods are effectively overcome.
[0148] 3. Shorten the construction period: The arch cover is constructed after the initial support, which optimizes the construction process, reduces the complex construction steps of implementing secondary lining and other links in the traditional method, simplifies the rotation process of the tunnel boring machine, thereby speeding up the construction progress, reducing construction stagnation and delay time, and further shortening the overall construction period. At the same time, this method can reduce the degree of manual participation, reduce labor intensity, and speed up the completion of the project.
[0149] Based on this, the shortcomings of the mining method of dark tunneling are effectively overcome.
[0150] 4. Improve construction flexibility and safety: It is suitable for different geological conditions, including soft, broken or water-rich strata, and has higher adaptability. The support structure design can provide sufficient stability and support under complex geological conditions, effectively avoiding the risks of collapse and water inrush common in traditional mining methods, and improving the safety and reliability of the construction process. Even if there are design changes or changes in geological conditions, the construction method of the present invention can be flexibly adjusted, thereby improving the flexibility and adaptability of the project.
[0151] In summary, the large-diameter tunnel boring machine's in-tunnel rotation support structure and construction method not only retain the efficient tunneling capability of the large-diameter tunnel boring machine, but also solve the problems of complex in-tunnel rotation operation, great environmental impact, and long construction period, achieving the goals of simple operation, low cost, fast construction, and environmental protection.
[0152] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A large-diameter tunnel boring machine internal rotation support structure, characterized in that: It includes area A (1), portal interface (2) and area B (3); A first arch cover support structure (5) is provided in the A zone (1), and a first hoisting member (6) for steering the tunnel boring machine (4) is provided on the first arch cover support structure (5); A door opening support structure (7) is provided on the door opening interface, and the A area (1) and the B area (3) are connected through the door opening interface; The B zone (3) is provided with a second arch cover support structure (8), and the second arch cover support structure (8) is provided with a second hoisting member (9) for steering the tunnel boring machine (4); Correspondingly, the first hoisting member (6) and the second hoisting member (9) form a load-bearing guide line for steering the tunnel boring machine (4).
2. The large-diameter tunnel boring machine in-hole rotating support structure according to claim 1 is characterized in that: The first arch cover supporting structure (5) comprises a first primary support (501), a first lower beam (502) and a first arch cover (503); The first primary support (501) is arranged around the inner wall of the tunnel in zone A, two first lower beams (502) are provided and are arranged on two inner walls of the tunnel in zone A, a plurality of first locking foot anchor rods (504) are passed through the first lower beam (502), the first locking foot anchor rods (504) are connected to the first lower beam (502), and the first locking foot anchor rods (504) pass through the first lower beam (502) and the first primary support (501) and are inserted into the soil layer; The first arch cover (503) is arranged on the inner wall surface of the upper part of the first primary support (501), and the two ends of the first arch cover (503) respectively extend along the first primary support (501) and are connected to the first lower beam (502); the first hanging member (6) is arranged on the inner wall surface of the first arch cover (503).
3. The large-diameter tunnel boring machine in-hole rotating support structure according to claim 1 is characterized in that: The second arch cover supporting structure (8) comprises a second primary support (801), a second lower beam (802) and a second arch cover (803); The second primary support (801) is arranged around the inner wall of the tunnel in zone B, two second lower beams (802) are provided and are arranged on two inner walls of the tunnel in zone B, a plurality of second locking anchor rods are passed through the second lower beam (802), the second locking anchor rods are connected to the second lower beam (802), and the second locking anchor rods pass through the second lower beam (802) and the second primary support (801) and are inserted into the soil layer; The second arch cover (803) is arranged on the inner wall surface of the upper part of the second primary support (801), and the two ends of the first arch cover (503) respectively extend along the second primary support (801) and are connected to the second lower beam (802); the second hanging member (9) is arranged on the inner wall surface of the second arch cover (803), and a longitudinal support (804) and a transverse support (805) are arranged between the second primary support (801) and the second arch cover (803).
4. The large-diameter tunnel boring machine in-hole rotating support structure according to claim 3 is characterized in that: The second primary branch (801) includes an advance small duct (806), a steel frame (807) and a reinforcing steel (808) which are arranged in sequence from the outside to the inside. The advance small duct (806), the steel frame (807) and the reinforcing steel (808) are connected by a concrete layer. Accordingly, the concrete layer is formed by solidifying concrete sprayed from the advance small duct (806).
5. The large-diameter tunnel boring machine in-hole rotating support structure according to claim 3 is characterized in that: The second arch cover (803) includes a horizontal section adjacent to the door opening interface and an upward concave section away from the door opening interface.
6. The large-diameter tunnel boring machine in-hole rotating support structure according to any one of claims 1 to 5, characterized in that: The first lifting component (6) and the second lifting component (9) respectively include a plurality of lifting groups, and each lifting group includes a plurality of lifting hooks.
7. The large-diameter tunnel boring machine in-hole rotating support structure according to claim 6 is characterized in that: The door opening support structure (7) comprises a door opening support steel frame (701) and a vertical support steel frame (702). The door opening support steel frame (701) is frame-shaped, and the outer wall surface of the door opening support steel frame (701) abuts against the inner wall surface of the door opening. The vertical support steel frame (702) is located inside the door opening support steel frame (701) and abuts against the top surface of the door opening support steel frame (701).
8. The large-diameter tunnel boring machine in-hole rotating support structure according to claim 7 is characterized in that: The A zone (1), the tunnel portal interface (2) and the B zone (3) are respectively provided with a swivel bracket (10), and the swivel brackets (10) of the three are connected to form a continuous swivel track; The swivel support (10) comprises a top plate (101) and a plurality of support columns (102); the top surface of the top plate (101) is configured to fit the swivel concave surface of the tunnel boring machine (4); and the bottom surface of the top plate (101) is connected to the support columns (102).
9. A construction method for a rotating support structure in a large-diameter tunnel boring machine according to any one of claims 1 to 8, characterized in that: The following steps are involved: Preparatory work: obtaining the rotation position of the tunnel boring machine (4) according to the tunnel design; dividing the A area (1) and the B area (3) according to the rotation position; geological survey; Construction of Area A (1): construction of the first primary support (501); construction of the first lower beam (502); construction of the first arch cover (503); construction of the first hoisting component (6); Doorway interface construction: doorway interface area support removal; doorway support structure (7) construction; Construction of Area B (3): Excavation of Area B (3); Construction of the second primary support (801); Construction of the longitudinal support (804); Construction of the transverse support (805); Construction of the second lower beam (802); Construction of the second arch cover (803); Construction of the second hoisting component (9); Turn around.
10. The construction method of the rotating support structure in a large-diameter tunnel boring machine according to claim 9, characterized in that: Steps The rotation includes the following steps: Temporary support removal; Laying of the rotating bracket (10): placing the rotating bracket (10) in the A area (1), the door opening interface and the B area (3) respectively to obtain the rotating track; Lifting the tunnel boring machine (4): connecting the lifting ring of the tunnel boring machine (4) and the first lifting member (6) via a lifting rope (11); and lifting the tunnel boring machine (4) onto the swivel bracket (10) via a lifting device; Starting the rotation: the tractor (12) drives the tunnel boring machine (4) to rotate; Rotation monitoring: obtaining the position, angle and posture of the tunnel boring machine (4) through a monitoring system; obtaining the rotation status according to the position, angle and posture of the tunnel boring machine (4); judging whether to continue the rotation or stop the rotation and adjust the tunnel boring machine (4) according to the rotation status; Complete the rotation: the cutter head of the tunnel boring machine (4) faces the B zone (3), the lifting is released and the lifting rope (11), the first lifting member (6) and the second lifting member (9) are removed.