Multi-objective optimization design method for fabricated low-energy-consumption building

By comprehensively utilizing natural light, low thermal conductivity materials, precise measurement and intelligent equipment during the multi-objective optimization design, construction and operation stage of prefabricated buildings, and combining renewable energy and fresh air treatment systems, the energy consumption of prefabricated buildings is solved throughout the life cycle of prefabricated buildings. The reduction of the shortfall has achieved a significant reduction in energy consumption and an improvement in resource utilization efficiency.

CN119047047APending Publication Date: 2024-11-29DEJIEMENG PLANNING & DESIGN GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411177954.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In the multi-objective optimization design of prefabricated steel structure ultra-low energy consumption buildings, the energy consumption reduction measures for prefabricated buildings throughout the life cycle have not been fully considered, resulting in a large room for further reduction of energy consumption.

Method used

Multi-stage optimization of design, construction and operation methods, including the optimization design stage to utilize natural light and natural ventilation, the selection of low-thermal conductive materials, the optimization construction stage to reduce gap losses through precise measurement and calibration technology, and the operation stage to use intelligent equipment and sensors to achieve automated regulation. , and combine renewable energy and fresh air treatment systems to reduce energy consumption.

Benefits of technology

It significantly reduces the energy consumption throughout the entire life cycle of the building, improves resource utilization efficiency, and promotes the green transformation and technological progress of the construction industry.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047047A_ABST
    Figure CN119047047A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-objective optimization design method for an assembly type low-energy-consumption building, which comprises an optimization design stage, an optimization construction stage and an optimization operation stage, in the optimization design stage, local renewable resource conditions are comprehensively considered, building orientation and window arrangement design elements are optimized, and natural illumination and natural ventilation are utilized to the maximum extent; through application of insulating materials and structural heat insulation design means, heat conduction is reduced, thermal performance analysis and optimization are carried out, and the heat preservation performance of a building is ensured; a heat insulation material with low heat conductivity coefficient is selected, so that the influence of external environment on indoor temperature is reduced, and energy consumption is reduced; the method has the beneficial effects that through comprehensive optimization in the three stages of design, construction and operation, the energy consumption of the whole life cycle of the building is remarkably reduced, the resource utilization efficiency is improved, and important strength is contributed to sustainable development; meanwhile, the method also promotes green transformation of the building industry, and promotes progress and application of related technologies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of prefabricated building optimization, and in particular relates to a multi-objective optimization design method for prefabricated low-energy consumption buildings. Background Art

[0002] With the promotion of the concept of sustainable development and the enhancement of people's awareness of environmental protection, prefabricated buildings have gradually received attention as a building form that can effectively reduce resource consumption and energy use; in the construction process of prefabricated buildings, how to further reduce energy consumption has become an important issue.

[0003] With the intensification of the global energy crisis and the improvement of environmental awareness, low-energy buildings have become the development trend of the construction industry; existing technologies such as the multi-objective optimization design method and platform for ultra-low energy consumption buildings with prefabricated steel structures with publication number CN116341354A disclose the consideration of the cost and energy consumption of ultra-low energy consumption buildings with prefabricated steel structures. The specific contents include the following parts: according to the structural characteristics of the prefabricated steel structure, parametric design research and BIM dynamic model automatic modeling are carried out; considering the influence of the material parameters of the building envelope structure on the building energy consumption, a variety of artificial intelligence algorithms are used to complete the prediction of building energy consumption, and an efficient and accurate building energy consumption prediction method is obtained through comparison and variable importance analysis is carried out; considering the bearing capacity constraints of the structure, a multi-objective optimization algorithm is used to perform a multi-objective optimization design method for ultra-low energy consumption buildings with prefabricated steel structures. Although the cost and energy consumption of ultra-low energy consumption buildings with prefabricated steel structures have been multi-objective optimized, there is still room for improvement in comprehensively considering the energy consumption reduction measures within the life cycle of prefabricated buildings. Summary of the invention

[0004] The purpose of the present invention is to provide a multi-objective optimization design method for prefabricated low-energy buildings, further reduce the energy consumption of the building throughout its life cycle, and improve resource utilization efficiency.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a multi-objective optimization design method for assembled low-energy buildings, including an optimization design stage, an optimization construction stage, and an optimization operation stage, wherein: Optimization design stage: Comprehensively consider the local renewable resources, optimize the building orientation and window layout design elements, and maximize the use of natural light and natural ventilation; reduce heat conduction through the application of insulation materials and structural thermal insulation design, and conduct thermal performance analysis and optimization to ensure the building's thermal insulation performance; select insulation materials with low thermal conductivity to reduce the impact of the external environment on indoor temperature and reduce energy consumption; Optimize the construction phase: Use precise measurement and calibration technology to ensure the accuracy of module manufacturing and installation, and reduce energy loss caused by excessive gaps; through refined design and production, plan material transportation routes, minimize packaging measures, and reduce waste generation and energy consumption during construction; select green, low-energy, and recyclable materials to promote energy reduction in prefabricated building construction; Optimize the operation stage: use smart devices and sensor technology to monitor and adjust indoor temperature and humidity parameters in real time, realize automatic control, and reduce energy waste; combine solar panels and wind power generation renewable energy to complement the traditional power system, and rationally plan energy supply plans according to seasonal and time demands; improve indoor air quality and comfort through fresh air treatment systems and purification equipment, and reduce dependence on mechanical ventilation and air-conditioning systems.

[0006] As a preferred technical solution of the present invention, taking into account the local renewable resources, optimizing the building orientation and window layout design elements, and maximizing the use of natural light and natural ventilation, the specific implementation method is as follows: Use professional sunlight analysis software or tools, combined with local meteorological data and the sun's trajectory, to accurately calculate the building's orientation; ensure that the main use space of the building can receive sufficient sunlight while avoiding excessive solar radiation in summer; In the northern hemisphere, choose a north-south orientation so that the building can receive more sunlight in the winter and increase the indoor temperature; in the summer, the north-south orientation of the building can reduce the time when the sun directly hits the room and reduce the indoor temperature; Considering the local dominant wind direction, the natural wind is guided into the building through reasonable orientation design. Improve ventilation effect; Determine the location and size of windows based on the lighting and ventilation requirements of the building; the location of windows takes into account the layout of indoor furniture and people's activity habits; Install sunshades outside windows to reduce the impact of summer solar radiation on indoor spaces; Install solar photovoltaic panels on the roof of the building or in appropriate locations to convert solar energy into electricity for use in the building; use solar water heating systems to provide hot water for the building and reduce energy consumption; Automatically adjust lighting brightness according to indoor light intensity and human activity to reduce electricity consumption; use sensors to monitor indoor air quality and temperature and humidity parameters, automatically adjust the operating status of ventilation equipment to maintain a comfortable indoor environment; establish a building energy management system to monitor and analyze the building's energy consumption in real time.

[0007] As a preferred technical solution of the present invention, precise measurement and calibration technology is used to ensure the accuracy of module manufacturing and installation and reduce energy loss caused by excessive gaps. The specific implementation method is as follows: Use high-precision measuring instruments to accurately measure each link in the module manufacturing process; Digital modeling and simulation: Use digital technology for modeling and simulation. In the module design stage, use the BIM model to perform accurate three-dimensional modeling, simulate the manufacturing and installation process of the module, discover and solve potential problems in advance, and ensure the accuracy of the module. In the module manufacturing process, perform multiple checks and corrections, and through the comparison and analysis of measurement data, timely discover and adjust deviations in the manufacturing process to ensure the accuracy of the module size and shape. For modules that need to be installed with sensors, accurate calibration is performed and the sensors are calibrated using standard equipment to ensure the accuracy of their measurement data; During module installation, precise positioning tools and methods are used to ensure that sensors and other key components are installed accurately. By accurately calibrating the installation position, measurement errors and energy losses caused by position deviation can be avoided. Before installing the module, clean the installation location thoroughly to remove oil, water stains and impurities, and ensure that the contact surface between the module and the installation location is clean and has no gaps; Use precision installation tools to accurately adjust the installation position, and ensure that the connection between modules is tight and seamless during the installation process; The gaps between modules are sealed with sealing materials to ensure that the sealing materials have good sealing and durability to prevent energy loss caused by excessive gaps.

[0008] As a preferred technical solution of the present invention, the high-precision measuring instrument includes a laser rangefinder, a total station, and a three-dimensional scanner; the installation tool includes a level ruler and a vertical ruler.

[0009] As a preferred technical solution of the present invention, intelligent devices and sensor technology are used to monitor and adjust indoor temperature and humidity parameters in real time, realize automatic control, and reduce energy waste. The specific implementation method is as follows: Intelligent sensors collect indoor temperature and humidity data in real time and transmit them to the intelligent control system wirelessly or wiredly; the intelligent control system stores, displays and preliminarily analyzes the received data so that users can understand the current indoor environmental conditions at any time; According to the preset comfort and energy-saving standards, the intelligent control system makes a comprehensive judgment on the received temperature and humidity data; when the indoor temperature or humidity exceeds the preset range, the intelligent control system automatically issues control instructions to the corresponding control equipment; The intelligent control system not only automatically adjusts the indoor environment, but also optimizes the control according to the user's usage habits and energy-saving needs; By learning the user's usage habits and preferences, the intelligent control system continuously optimizes the control strategy to improve energy saving; Users can remotely access the intelligent control system through smartphones and tablet terminal devices, view indoor temperature and humidity data in real time, adjust the operating status of equipment and energy consumption information, and can also remotely set and adjust control parameters to meet personalized needs.

[0010] As a preferred technical solution of the present invention, the terminal device includes a smart phone and a tablet computer.

[0011] As a preferred technical solution of the present invention, the indoor air quality and comfort are improved by using a fresh air treatment system and purification equipment. The specific implementation method is as follows: The fresh air treatment system introduces fresh air from outside into the room through external pipes, providing a constant supply of fresh air to the room, thereby reducing the concentration of pollutants in the indoor air; The fresh air system is equipped with a heat exchanger. While introducing fresh air, it uses the heat energy of the exhaust gas discharged from the room to preheat or precool the fresh air, making the fresh air close to the indoor temperature, thereby reducing the energy consumption of the air conditioning system; The fresh air system has a built-in high-efficiency filter to remove large particles, suspended solids, bacteria, viruses, formaldehyde, benzene and other harmful substances in the air, improving indoor air quality; Install air purification equipment indoors to further remove tiny particles, odors, and harmful organic compounds in the air, and improve the freshness and comfort of indoor air; Air purification equipment uses a combination of multiple purification technologies to ensure all-round and efficient air purification.

[0012] As a preferred technical solution of the present invention, a combination of multiple purification technologies includes HEPA filtration technology, activated carbon adsorption technology, and ultraviolet sterilization technology.

[0013] Compared with the prior art, the present invention has the following beneficial effects: Through comprehensive optimization in the three stages of design, construction and operation, the energy consumption of the entire life cycle of the building has been significantly reduced, the efficiency of resource utilization has been improved, and important contributions have been made to sustainable development. At the same time, this method has also promoted the green transformation of the construction industry and promoted the advancement and application of related technologies. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0016] See also Figure 1 The present invention provides a multi-objective optimization design method for assembled low-energy buildings, including an optimization design stage, an optimization construction stage, and an optimization operation stage, wherein: Optimization design stage: Comprehensively consider the local renewable resources (such as solar energy and wind power), optimize the building orientation, window layout and other design elements to maximize the use of natural light and natural ventilation; reduce heat conduction through the application of insulation materials and structural thermal insulation design, and conduct thermal performance analysis and optimization to ensure the building's thermal insulation performance; select insulation materials with low thermal conductivity to reduce the impact of the external environment on the indoor temperature and reduce energy consumption; Optimize the construction phase: Use precise measurement and calibration technology to ensure the accuracy of module manufacturing and installation, and reduce energy loss caused by excessive gaps; reduce waste generation and energy consumption during construction through refined design and production, reasonable planning of material transportation routes, and minimization of packaging; select green, low-energy, and recyclable materials, strengthen cooperation with suppliers, and jointly promote energy consumption reduction in prefabricated building construction; Optimize the operation stage: Use smart devices and sensor technology to monitor and adjust indoor temperature, humidity and other parameters in real time, realize automatic control, and reduce energy waste; combine renewable energy such as solar panels and wind power generation, and use them in a complementary manner with traditional power systems, and rationally plan energy supply plans according to seasonal and time demands; improve indoor air quality and comfort through fresh air treatment systems, purification equipment, etc., and reduce dependence on mechanical ventilation and air-conditioning systems.

[0017] In this embodiment, preferably, the local renewable resources are comprehensively considered, the building orientation and window arrangement design elements are optimized, and the natural light and natural ventilation are maximized. The specific implementation method is as follows: Use professional sunshine analysis software or tools, combined with local meteorological data and the sun's trajectory, to accurately calculate the building's orientation; ensure that the main use spaces of the building (such as living rooms and bedrooms) can receive sufficient sunshine, while avoiding excessive solar radiation in summer; in the northern hemisphere, a north-south orientation is generally chosen, so that the building can receive more sunlight in winter and increase the indoor temperature; in summer, due to the large solar altitude angle, a north-south building can reduce the time the sun shines directly into the room and reduce the indoor temperature; consider the local dominant wind direction, and guide natural wind into the building through reasonable orientation design to improve ventilation effect; The location and size of windows should be reasonably determined according to the lighting and ventilation requirements of the building. For example, large windows should be installed in rooms that require sufficient lighting (such as living rooms and study rooms); openable windows should be installed in rooms that require good ventilation (such as bedrooms and kitchens); the location of windows should take into account the layout of indoor furniture and people's activity habits to avoid windows being blocked or affecting the use of indoor space; Choose window types that are suitable for local climate conditions, such as hollow glass windows and Low-E glass windows, to improve thermal insulation and lighting effects; the window opening method should be easy to operate and can effectively guide natural wind into the room, such as casement windows and sliding windows; Install sunshade facilities (such as awnings, blinds, etc.) outside windows to reduce the impact of summer solar radiation on indoor space; windows should be designed to facilitate ventilation, such as setting openable vents or using the opening method of windows to create air convection; Install solar photovoltaic panels on the roof of the building or in appropriate locations to convert solar energy into electricity for use in the building; use solar water heating systems to provide hot water for the building and reduce energy consumption; in areas with abundant wind resources, consider installing small wind turbines to provide electricity support for the building; Automatically adjust lighting brightness according to indoor light intensity and human activity to reduce electricity consumption; use sensors to monitor indoor air quality and temperature, humidity and other parameters, automatically adjust the operating status of ventilation equipment to maintain a comfortable indoor environment; establish a building energy management system to monitor and analyze the building's energy consumption in real time, and put forward energy-saving suggestions and optimization plans.

[0018] In this embodiment, preferably, precise measurement and calibration technology is used to ensure the accuracy of module manufacturing and installation and reduce energy loss caused by excessive gaps. The specific implementation method is as follows: Use high-precision measuring instruments, such as laser rangefinders, total stations, 3D scanners, etc., to accurately measure each link in the module manufacturing process. These instruments can provide high-precision measurement data to ensure the accuracy of module dimensions; Adopt digital technologies such as BIM (Building Information Modeling) for modeling and simulation. In the module design stage, accurate three-dimensional modeling is carried out through BIM models to simulate the manufacturing and installation process of the modules, discover and solve potential problems in advance, and ensure the accuracy of the modules. During the module manufacturing process, multiple checks and corrections are carried out. Through the comparison and analysis of measurement data, deviations in the manufacturing process are discovered and adjusted in a timely manner to ensure the accuracy of the module size and shape. For modules that need to be installed with sensors, such as temperature, humidity, light and other sensors, accurate calibration is performed; sensors are calibrated using standard equipment to ensure the accuracy of their measurement data; during module installation, precise positioning tools and methods are used to ensure that sensors and other key components are installed in the correct position; by accurately calibrating the installation position, measurement errors and energy losses caused by position deviation can be avoided; Before installing the module, thoroughly clean the installation location to remove impurities such as oil and water stains, and ensure that the contact surface between the module and the installation location is clean and has no gaps; use precise installation tools and methods, such as using tools such as a level ruler and a vertical ruler to accurately adjust the installation location; during the installation process, ensure that the connection between the modules is tight and has no gaps; For the gaps between modules, appropriate sealing materials are used for sealing to ensure that the sealing materials have good sealing and durability to prevent energy loss caused by excessive gaps.

[0019] In this embodiment, preferably, intelligent devices and sensor technology are used to monitor and adjust indoor temperature and humidity parameters in real time to achieve automatic control and reduce energy waste. The specific implementation method is as follows: Intelligent sensors collect indoor temperature and humidity data in real time and transmit them to the intelligent control system wirelessly or wiredly; the intelligent control system stores, displays and preliminarily analyzes the received data so that users can understand the current indoor environmental conditions at any time; based on the preset comfort and energy-saving standards, the intelligent control system makes a comprehensive judgment on the received temperature and humidity data; when the indoor temperature or humidity exceeds the preset range, the intelligent control system automatically issues control instructions to the corresponding control equipment; While the intelligent control system automatically adjusts the indoor environment, it also optimizes control based on the user's usage habits and energy-saving needs. By learning the user's usage habits and preferences, the intelligent control system can continuously optimize the control strategy to improve energy-saving effects. Users can remotely access the intelligent control system through terminal devices such as smartphones and tablets; view indoor temperature and humidity data, the operating status of control equipment, energy consumption and other information in real time; at the same time, users can also remotely set and adjust control parameters to meet personalized needs.

[0020] In this embodiment, preferably, the indoor air quality and comfort are improved by using a fresh air treatment system and purification equipment, and the specific implementation method is as follows: The fresh air treatment system introduces fresh air from outside into the room through external pipes, providing a constant supply of fresh air to the room, thereby reducing the concentration of pollutants in the indoor air; The fresh air system is equipped with a heat exchanger. While introducing fresh air, it uses the heat energy of the exhaust gas discharged from the room to preheat or precool the fresh air, making the fresh air close to the indoor temperature, thereby reducing the energy consumption of the air conditioning system; The fresh air system has a built-in high-efficiency filter to remove large particles, suspended solids, bacteria, viruses, formaldehyde, benzene and other harmful substances in the air, improving indoor air quality; Install air purification equipment indoors to further remove tiny particles, odors, and harmful organic compounds in the air, and improve the freshness and comfort of indoor air; The air purification equipment adopts a combination of multiple purification technologies, including HEPA filtration technology, activated carbon adsorption technology, and ultraviolet sterilization technology to ensure all-round and efficient air purification.

[0021] Although the embodiments of the present invention have been shown and described, as detailed above, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A multi-objective optimization design method for prefabricated low-energy buildings, characterized by: It includes the optimization design stage, the optimization construction stage, and the optimization operation stage, among which: Optimization design stage: Comprehensively consider the local renewable resources, optimize the building orientation and window layout design elements, and maximize the use of natural light and natural ventilation; reduce heat conduction through the application of insulation materials and structural thermal insulation design, and conduct thermal performance analysis and optimization to ensure the building's thermal insulation performance; select insulation materials with low thermal conductivity to reduce the impact of the external environment on indoor temperature and reduce energy consumption; Optimize the construction phase: Use precise measurement and calibration technology to ensure the accuracy of module manufacturing and installation, and reduce energy loss caused by excessive gaps; through refined design and production, plan material transportation routes, minimize packaging measures, and reduce waste generation and energy consumption during construction; select green, low-energy, and recyclable materials to promote energy reduction in prefabricated building construction; Optimize the operation stage: use smart devices and sensor technology to monitor and adjust indoor temperature and humidity parameters in real time, realize automatic control, and reduce energy waste; combine solar panels and wind power generation renewable energy to complement the traditional power system, and rationally plan energy supply plans according to seasonal and time demands; improve indoor air quality and comfort through fresh air treatment systems and purification equipment, and reduce dependence on mechanical ventilation and air-conditioning systems.

2. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 1 is characterized in that: Taking into account the local renewable resources, the building orientation and window layout design elements are optimized to maximize the use of natural light and ventilation. The specific implementation methods are as follows: Use professional sunlight analysis software or tools, combined with local meteorological data and the sun's trajectory, to accurately calculate the building's orientation; ensure that the main use space of the building can receive sufficient sunlight while avoiding excessive solar radiation in summer; In the northern hemisphere, choose a north-south orientation so that the building receives more sunlight in winter and increases the indoor temperature; In summer, north-south oriented buildings can reduce the time when the sun shines directly into the room and lower the indoor temperature; Consider the local dominant wind direction and guide natural wind into the building through reasonable orientation design to improve ventilation effect; Determine the location and size of windows based on the lighting and ventilation requirements of the building; the location of windows takes into account the layout of indoor furniture and people's activity habits; Install sunshades outside windows to reduce the impact of summer solar radiation on indoor spaces; Install solar photovoltaic panels on the roof of the building or in appropriate locations to convert solar energy into electricity for use in the building; use solar water heating systems to provide hot water for the building and reduce energy consumption; Automatically adjust lighting brightness according to indoor light intensity and personnel activities to reduce energy consumption; use sensors to monitor indoor air quality and temperature and humidity parameters, automatically adjust the operating status of ventilation equipment to maintain a comfortable indoor environment; Establish a building energy management system to monitor and analyze the building’s energy consumption in real time.

3. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 1 is characterized in that: Use precise measurement and calibration technology to ensure the accuracy of module manufacturing and installation and reduce energy loss caused by excessive gaps. The specific implementation methods are as follows: Use high-precision measuring instruments to accurately measure each link in the module manufacturing process; Digital modeling and simulation: Use digital technology for modeling and simulation. During the module design phase, use the BIM model to perform accurate three-dimensional modeling, simulate the manufacturing and installation process of the module, discover and solve potential problems in advance, and ensure the accuracy of the module. During the module manufacturing process, multiple checks and corrections are carried out. Through comparison and analysis of measurement data, deviations in the manufacturing process are discovered and adjusted in a timely manner to ensure the accuracy of module size and shape. For modules that need to be installed with sensors, accurate calibration is performed and the sensors are calibrated using standard equipment to ensure the accuracy of their measurement data; During module installation, precise positioning tools and methods are used to ensure that sensors and other key components are installed accurately. By accurately calibrating the installation position, measurement errors and energy losses caused by position deviation can be avoided. Before installing the module, clean the installation location thoroughly to remove oil, water stains and impurities, and ensure that the contact surface between the module and the installation location is clean and has no gaps; Use precision installation tools to accurately adjust the installation position, and ensure that the connection between modules is tight and seamless during the installation process; The gaps between modules are sealed with sealing materials to ensure that the sealing materials have good sealing and durability to prevent energy loss caused by excessive gaps.

4. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 3 is characterized by: The high-precision measuring instruments include a laser rangefinder, a total station, and a three-dimensional scanner; the installation tools include a level ruler and a vertical ruler.

5. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 1 is characterized in that: Use smart devices and sensor technology to monitor and adjust indoor temperature and humidity parameters in real time, realize automatic control, and reduce energy waste. The specific implementation methods are as follows: Intelligent sensors collect indoor temperature and humidity data in real time and transmit them to the intelligent control system wirelessly or wiredly; the intelligent control system stores, displays and preliminarily analyzes the received data so that users can understand the current indoor environmental conditions at any time; According to the preset comfort and energy-saving standards, the intelligent control system makes a comprehensive judgment on the received temperature and humidity data; when the indoor temperature or humidity exceeds the preset range, the intelligent control system automatically sends control instructions to the corresponding control equipment; The intelligent control system not only automatically adjusts the indoor environment, but also optimizes the control according to the user's usage habits and energy-saving needs; By learning the user's usage habits and preferences, the intelligent control system continuously optimizes the control strategy to improve energy saving; Users can remotely access the intelligent control system through smartphones and tablet terminal devices, view indoor temperature and humidity data in real time, and adjust the operating status of the equipment and energy consumption information. Users can also remotely set and adjust control parameters to meet personalized needs.

6. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 5 is characterized by: The terminal devices include smart phones and tablet computers.

7. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 1 is characterized in that: Improve indoor air quality and comfort through fresh air treatment system and purification equipment. The specific implementation methods are as follows: The fresh air treatment system introduces fresh air from outside into the room through external pipes, providing a constant supply of fresh air to the room, thereby reducing the concentration of pollutants in the indoor air; The fresh air system is equipped with a heat exchanger. While introducing fresh air, it uses the heat energy of the exhaust gas discharged from the room to preheat or precool the fresh air, making the fresh air close to the indoor temperature, thereby reducing the energy consumption of the air conditioning system; The fresh air system has a built-in high-efficiency filter to remove large particles, suspended solids, bacteria, viruses, formaldehyde, benzene and other harmful substances in the air, improving indoor air quality; Install air purification equipment indoors to further remove tiny particles, odors, and harmful organic compounds in the air, and improve the freshness and comfort of indoor air; Air purification equipment uses a combination of multiple purification technologies to ensure all-round and efficient air purification.

8. The multi-objective optimization design method for prefabricated low-energy buildings according to claim 7 is characterized in that: A combination of multiple purification technologies, including HEPA filtration technology, activated carbon adsorption technology, and ultraviolet sterilization technology.

Citation Information

Cited By

  • Intelligent building engineering three-dimensional modeling system and method

    CN119903578A