Deslagging continuous belt conveyor for TBM (Tunnel Boring Machine) tunneling construction

By designing dustproof sheds, spray pipes and separation devices in TBM excavation construction, the dust pollution problem is solved, and dustproof treatment is achieved while continuous slag output is achieved, the environment and staff health is protected, and construction safety is improved. efficiency.

CN119059313AInactive Publication Date: 2024-12-03XINJIANG WATER RESOURCES & HYDROPOWER SURVEY DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410973152.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the TBM excavation construction, dust permeates the tunnel, causing environmental pollution and damage to the health of staff.

Method used

A continuous belt belt machine for slag output for TBM excavation construction is designed, including a disassembled dustproof shed, spray pipe and spray rack for dust reduction treatment; at the same time, a metering device, a separation device and a flushing device are set up to realize the slag metering , separate and clean to avoid dust pollution.

Benefits of technology

It effectively avoids dust pollution to the tunnel, protects the environment and the health of staff, and realizes continuous slag output while carrying out dustproof treatment, improving construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059313A_ABST
    Figure CN119059313A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of TBM continuous deslagging, in particular to a continuous deslagging belt conveyor for TBM tunneling construction, which comprises a material receiving belt and a conveying belt, the conveying belt is covered with a detachable dustproof shed, a spraying pipe and a spraying frame are arranged in the dustproof shed, and the spraying frame is used for reducing dust of muck on the conveying belt; a metering device is arranged between the material receiving belt and the conveying belt and used for metering the amount of muck output by the conveying belt, a separating device is arranged at the tail end of the conveying belt and used for separating the muck into stone, fine sand and slurry, the slurry flows back to the slurry settling pond, and the slurry settling pond supplies water to the spraying pipe and the spraying frame through a water suction pump. The device has the advantages that dust prevention treatment is carried out while continuous slag discharging is carried out, and dust is prevented from polluting a roadway, and the problems that in the prior art, dust pervades in the roadway and can be continuously conveyed out along with broken rock slag, so that environment pollution is caused, and the health of workers is damaged are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of TBM continuous slag discharge, and in particular to a slag discharge continuous belt conveyor for TBM excavation construction. Background Art

[0002] TBM (Tunnel Boring Machine) is a high-performance mechanical equipment used in tunnel construction. It can realize the integrated operation of tunnel excavation, support and mucking. The working principle of TBM is based on the cutting and crushing of rocks by a rotating cutterhead. The cutterhead is equipped with multiple rollers, which apply pressure to the rock, crushing it for excavation. The propulsion force of TBM comes from the support shoes and jacks, which work together on the tunnel wall to push the machine forward. The construction efficiency of TBM is much higher than that of traditional drilling and blasting methods, which can significantly reduce construction risks and improve construction safety and quality.

[0003] During the tunnel boring machine excavation process, the crushed rock slag is continuously transported out by a conveyor belt or a mine truck. The crushed rock will be mixed with a large amount of dust. The dust will spread in the tunnel and will be continuously transported out with the crushed rock slag, causing environmental pollution and damage to the health of workers. For this reason, we propose a continuous belt conveyor for slag discharge for TBM excavation construction. Summary of the invention

[0004] The purpose of the present invention is to provide a continuous belt conveyor for slag discharge for TBM excavation construction, which has the advantages of continuous slag discharge and dust prevention treatment to avoid dust pollution in the tunnel, and solves the problem in the prior art that dust is diffused in the tunnel and is continuously transported out along with the crushed rock slag, thereby causing environmental pollution and damage to the health of workers.

[0005] To achieve the above object, the present invention provides the following technical solutions: a continuous belt conveyor for slag discharge for TBM excavation construction, comprising a material receiving belt and a conveyor belt, wherein a detachable dustproof shed is provided on the conveyor belt, a spray pipe and a spray rack are provided inside the dustproof shed, and the spray rack is used to reduce dust on the slag on the conveyor belt;

[0006] A metering device is arranged between the receiving belt and the conveyor belt, and the metering device is used to measure the amount of debris output by the conveyor belt. A separation device is arranged at the end of the conveyor belt, and the separation device is used to separate the debris into stones, fine sand and mud. The mud flows back to the mud sedimentation tank, and the mud sedimentation tank supplies water to the spray pipe and the spray rack through a water pump.

[0007] Preferably, a flushing pipe and a flushing head are provided at the end of the conveyor belt corresponding to the dustproof shed, the flushing pipe is used to supply water to the flushing head, the flushing head is used to flush the debris at the end of the conveyor belt to the separation device, and the flushing pipe and the flushing head are supplied with water through a mud sedimentation tank and a water pump.

[0008] Preferably, the metering device includes metering box 1, metering box 2 and bracket 1. The bottom of metering box 1 is staggeredly connected to the bottom of metering box 2, and the connection is rotatably connected to bracket 1 through a rotating shaft. A counter is provided at the corresponding rotating shaft on bracket 1. The counter is used to record the number of flipping times of the metering device. After being filled, metering box 1 or metering box 2 is flipped over by gravity to discharge the material to the conveyor belt.

[0009] Preferably, a first counterweight is provided on the metering box one, and a second counterweight is provided on the metering box two, and the first counterweight and the second counterweight are used to adjust the load capacity when the metering device is turned over.

[0010] Preferably, the metering device also includes a bracket two, and the bracket two is connected to the bracket one through a connecting rod one. The bracket one is provided with a support spring for resisting the metering box one or the metering box two, and the support spring is used to keep the metering box one or the metering box two stable when loaded. One end of the support spring is threadedly connected to the bracket two through an adjusting screw, and the adjusting screw is used to adjust the compression degree of the support spring.

[0011] Preferably, the separation device includes a separation box, in which an inclined first screen plate and an inclined second screen plate are arranged in sequence from top to bottom, the first screen plate is used to screen out large-particle stones and discharge them to the elevator through the stone discharge port of the separation box, the second screen plate is used to screen out fine sand and discharge it to the fine sand recovery pool through the fine sand discharge port of the separation box, and the mud at the bottom of the separation box is returned to the mud sedimentation tank through a pipeline and a mud pump.

[0012] Preferably, a first flusher is provided above the first sieve plate in the separation box, and a second flusher is provided above the second sieve plate in the separation box. Both the first flusher and the second flusher are used to flush the debris in the separation box, and the first flusher and the second flusher are supplied with water through a mud sedimentation tank and a water pump.

[0013] Preferably, the separation box is connected to the pillar via a buffer spring, two adjacent pillars are fixed via a second connecting rod, and a vibration motor is provided on the separation box.

[0014] Preferably, a first discharge raft is provided in the stone discharge port, and a second discharge raft is provided in the fine sand discharge port.

[0015] Preferably, a receiving hopper is provided at the bottom of the elevator at a position corresponding to the stone discharge port, and a discharge port is provided at the top of the elevator.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] The present invention provides a detachable dustproof shed, which is installed above the conveyor belt after it is arranged. The slag enters the conveyor belt in the dustproof shed through the material connection belt. The material connection belt and the conveyor belt are driven by a driving device. The alternating sections of the material connection belt and the conveyor belt are also arranged in the dustproof shed. The dustproof shed can prevent dust from entering the tunnel on the one hand, and can achieve dust reduction by spraying water on the slag on the conveyor belt on the other hand. In this way, dust prevention can be carried out while continuously discharging slag, avoiding dust pollution in the tunnel, and solving the problem in the prior art that dust is diffused in the tunnel and is continuously transported out along with the crushed rock slag, thereby causing environmental pollution and damage to the health of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the present invention;

[0019] Figure 2 It is a schematic diagram of the structure of the metering device of the present invention;

[0020] Figure 3 It is a schematic diagram of the structure of the separation device of the present invention.

[0021] In the figure: 1, material receiving belt; 2, conveyor belt; 3, dustproof shed; 4, spray pipe; 5, spray rack; 6, metering device; 61, metering box 1; 62, metering box 2; 63, bracket 1; 64, counter; 65, counterweight 1; 66, counterweight 2; 67, bracket 2; 68, connecting rod 1; 69, support spring; 610, adjusting screw; 7, separation device; 71, separation box; 72, first sieve plate; 73, second sieve plate; 74, The first flusher; 75, the second flusher; 76, the stone discharge port; 77, the fine sand discharge port; 78, the pillar; 79, the buffer spring; 710, the second connecting rod; 711, the exciting motor; 712, the first discharge raft; 713, the second discharge raft; 8, the elevator; 9, the fine sand recovery tank; 10, the mud sedimentation tank; 11, the flushing pipe; 12, the flushing head; 13, the mud pump; 14, the water pump; 15, the receiving hopper; 16, the discharge port. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] Embodiment 1:

[0024] like Figure 1 As shown, a slag-discharging continuous belt conveyor for TBM excavation construction comprises a material connection belt 1 and a conveyor belt 2. A detachable dust-proof shed 3 is provided on the conveyor belt 2. A spray pipe 4 and a spray rack 5 are provided inside the dust-proof shed 3. The spray rack 5 is used to reduce dust on the slag on the conveyor belt 2. By providing a detachable dust-proof shed 3, the dust-proof shed 3 is installed above the conveyor belt 2 after the conveyor belt 2 is arranged. The slag passes through the material connection belt 1 and enters the conveyor belt 2 in the dust-proof shed 3. The material connection belt 1 and the conveyor belt 2 are both driven by a driving device. The alternating sections of the material connection belt 1 and the conveyor belt 2 are also arranged in the dust-proof shed 3. The dust-proof shed 3 can prevent dust from entering the tunnel on the one hand, and on the other hand, dust reduction treatment is achieved by spraying water on the slag on the conveyor belt 2.

[0025] A metering device 6 is provided between the material connection belt 1 and the conveyor belt 2. The metering device 6 is provided between the material connection belt 1 and the conveyor belt 2 and can perform metering before spraying water to reduce dust on the slag to avoid the water spray affecting the metering accuracy.

[0026] The metering device 6 is used to measure the amount of slag output by the conveyor belt 2. A separation device 7 is provided at the end of the conveyor belt 2. The separation device 7 is used to separate the slag into stones, fine sand and mud. The mud flows back to the mud sedimentation tank 10. The mud sedimentation tank 10 supplies water to the spray pipe 4 and the spray rack 5 through the water pump 14. The separation device 7 can screen the slag and recycle it according to the different particle sizes, saving construction costs and reducing transportation costs.

[0027] Embodiment 2:

[0028] like Figure 1 As shown, on the basis of embodiment one, a flushing pipe 11 and a flushing head 12 are provided at the end of the dustproof shed 3 corresponding to the conveyor belt 2. The flushing pipe 11 is used to supply water to the flushing head 12. The flushing head 12 is used to flush the debris at the end of the conveyor belt 2 to the separation device 7. The flushing pipe 11 and the flushing head 12 are supplied with water through a mud sedimentation tank 10 and a water pump 14.

[0029] Since the dustproof shed 3 uses the spray pipe 4 and the spray rack 5 to spray water on the debris on the conveyor belt 2 to reduce dust, the debris after the spraying must have a certain degree of stickiness and is easy to stick to the belt of the conveyor belt 2. If it is not cleaned in time, it is easy to cause the debris to accumulate or even block, affecting the carrying capacity and normal operation of the conveyor belt 2. By setting the flushing pipe 11 and the flushing head 12, the belt of the conveyor belt 2 is flushed during the unloading process, and the debris on the surface of the belt can be completely flushed to the separation device 7, and the belt can be cleaned. In addition, the flushing water or mud passes through the separation device 7 into the mud sedimentation tank 10, and then the mud sedimentation tank 10 supplies water to the flushing pipe 11 and the flushing head 12 to achieve water recycling.

[0030] Embodiment three:

[0031] like Figure 2 As shown, on the basis of the second embodiment, the metering device 6 includes a metering box 1 61, a metering box 2 62 and a bracket 1 63. The bottom of the metering box 1 61 is staggeredly connected to the bottom of the metering box 2 62. The metering box 1 61 and the metering box 2 62 are arranged in a centrally symmetrical manner with the rotating shaft as the center, and the connection is rotatably connected to the bracket 1 63 through the rotating shaft. A counter 64 is arranged at the corresponding rotating shaft on the bracket 1 63. The counter 64 is used to record the number of flips of the metering device 6. After the metering box 1 61 or the metering box 2 62 is filled, it flips under the action of gravity and discharges the material to the conveyor belt 2. By setting two metering boxes, when one of the metering boxes is full, or after being loaded to a certain extent, it flips, and the other metering box continues to load the slag. Assuming that the volume of the metering box is 1 cubic meter, the conveying amount of the metering device 6 after flipping once is 1 cubic meter. The above method can be used to roughly estimate the slag transportation volume.

[0032] The metering box 1 61 is provided with a counterweight 1 65, and the metering box 2 62 is provided with a counterweight 2 66. The counterweight 1 65 and the counterweight 2 66 are used to adjust the loading amount when the metering device 6 is turned over. The setting of the counterweight 1 65 and the counterweight 2 66 can more accurately control the amount of slag when the metering device 6 is turned over. For example, the volume of the metering box when turning over is adjusted to 1.5 cubic meters or 0.5 cubic meters.

[0033] The metering device 6 also includes a bracket 2 67, which is connected to the bracket 1 63 through a connecting rod 1 68. The bracket 1 63 is provided with a support spring 69 for resisting the metering box 1 61 or the metering box 2 62. The support spring 69 is used to keep the metering box 1 61 or the metering box 2 62 stable during loading. One end of the support spring 69 is threadedly connected to the bracket 2 67 through an adjusting screw 610, and the adjusting screw 610 is used to adjust the compression of the support spring 69. Since the metering box is connected through a rotating shaft, it is easy to shake during the process of loading the slag. The support spring 69 can ensure the stability of the metering box to a certain extent. When the turning torque generated by the metering box under the action of gravity is greater than the elastic force of the support spring 69, it turns over. By adjusting the screw 610 to set the compression of the spring, the elastic force applied by the spring to the metering box can be adjusted, and the turning timing of the metering box and the slag loading amount of the metering box during a single turning of the metering box can be adjusted.

[0034] Embodiment 4:

[0035] like Figure 3As shown, the separation device 7 includes a separation box 71, in which an inclined first sieve plate 72 and an inclined second sieve plate 73 are arranged from top to bottom. The first sieve plate 72 is used to screen out large-grained stones and discharge them to the elevator 8 through the stone discharge port 76 of the separation box 71, and the second sieve plate 73 is used to screen out fine sand and discharge it to the fine sand recovery tank 9 through the fine sand discharge port 77 of the separation box 71. The mud at the bottom of the separation box 71 flows back to the mud sedimentation tank 10 through the pipeline and the mud pump 13. Since the slag passes through the first sieve plate 72 and the second sieve plate 73, stones, fine sand and mud can be separated; large-grained stones can be used for mixing concrete or foundations, fine sand can be used for grouting in the hole, and mud can be used for the construction of bored piles. The separation box 71 can separate and recycle the slag for reuse, without the need to transport the slag away from the site by a loader. The transportation capacity and construction material costs are saved.

[0036] A first flusher 74 is provided above the first sieve plate 72 in the separation box 71, and a second flusher 75 is provided above the second sieve plate 73 in the separation box 71. The first flusher 74 and the second flusher 75 are both used to flush the slag in the separation box 71. The first flusher 74 and the second flusher 75 are supplied with water through the mud sedimentation tank 10 and the water pump 14. By providing two flushers, the two sieve plates can be flushed respectively, which can prevent the sieve plates from being blocked on the one hand, and improve the screening efficiency on the other hand.

[0037] Embodiment five:

[0038] like Figure 1 and 3 As shown, the separation box 71 is connected to the support 78 through a buffer spring 79, and two adjacent support 78 are fixed by a connecting rod 2 710, and a vibration motor 711 is provided on the separation box 71. By providing the vibration motor 711 and the buffer spring 79 on the separation box 71, the entire box body can be driven to vibrate relative to the support 78 to improve the screening efficiency.

[0039] The first discharging raft 712 is arranged in the stone discharging port 76, and the second discharging raft 713 is arranged in the fine sand discharging port 77. By arranging two discharging rafts, the discharging rafts can be electrically controlled to ensure that the screening is basically completed before discharging, so as to avoid that the stones after discharging still have too much fine sand and mud without sufficient screening time.

[0040] A receiving hopper 15 is provided at the bottom of the elevator 8 at a position corresponding to the stone discharge port 76, and a discharge port 16 is provided at the top of the elevator 8. By providing the elevator 8, materials that need to be transported on the surface can be lifted to the surface. For example, when a concrete mixing plant is provided on the surface, the recovered stones can be transported to the concrete mixing plant on the surface. Alternatively, fine sand can be transported to the surface, which can be provided as needed.

[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A slag discharging continuous belt conveyor for TBM excavation construction, characterized in that: It comprises a material receiving belt (1) and a conveyor belt (2), wherein a detachable dustproof shed (3) is provided on the upper cover of the conveyor belt (2), a spray pipe (4) and a spray rack (5) are provided inside the dustproof shed (3), and the spray rack (5) is used to reduce dust on the debris on the conveyor belt (2); A metering device (6) is provided between the receiving belt (1) and the conveyor belt (2), and the metering device (6) is used to measure the amount of debris output by the conveyor belt (2). A separation device (7) is provided at the end of the conveyor belt (2), and the separation device (7) is used to separate the debris into stones, fine sand and mud. The mud flows back to the mud sedimentation tank (10), and the mud sedimentation tank (10) supplies water to the spray pipe (4) and the spray rack (5) through a water pump (14).

2. A slag discharging continuous belt conveyor for TBM excavation construction according to claim 1, characterized in that: A flushing pipe (11) and a flushing head (12) are provided at the end of the dustproof shed (3) corresponding to the conveyor belt (2); the flushing pipe (11) is used to supply water to the flushing head (12); the flushing head (12) is used to flush the debris at the end of the conveyor belt (2) to the separation device (7); the flushing pipe (11) and the flushing head (12) are supplied with water through a mud sedimentation tank (10) and a water pump (14).

3. The slag discharging continuous belt conveyor for TBM excavation construction according to claim 1, characterized in that: The metering device (6) comprises a metering box 1 (61), a metering box 2 (62) and a bracket 1 (63). The bottom of the metering box 1 (61) is staggeredly connected to the bottom of the metering box 2 (62), and the connection is rotatably connected to the bracket 1 (63) via a rotating shaft. A counter (64) is provided at the corresponding rotating shaft on the bracket 1 (63). The counter (64) is used to record the number of times the metering device (6) is turned over. When the metering box 1 (61) or the metering box 2 (62) is filled, it turns over under the action of gravity and discharges the material to the conveyor belt (2).

4. A slag-discharging continuous belt conveyor for TBM excavation construction according to claim 3, characterized in that: The metering box one (61) is provided with a counterweight block one (65), and the metering box two (62) is provided with a counterweight block two (66). The counterweight block one (65) and the counterweight block two (66) are used to adjust the load capacity when the metering device (6) is turned over.

5. A slag-discharging continuous belt conveyor for TBM excavation construction according to claim 4, characterized in that: The metering device (6) further comprises a second bracket (67), wherein the second bracket (67) is connected to the first bracket (63) via a connecting rod (68), and a support spring (69) is provided on the first bracket (63) for supporting the first metering box (61) or the second metering box (62), and the support spring (69) is used to keep the first metering box (61) or the second metering box (62) stable when loaded, and one end of the support spring (69) is threadedly connected to the second bracket (67) via an adjusting screw (610), and the adjusting screw (610) is used to adjust the compression degree of the support spring (69).

6. The slag-discharging continuous belt conveyor for TBM excavation construction according to claim 1, characterized in that: The separation device (7) comprises a separation box (71), wherein an inclined first screen plate (72) and an inclined second screen plate (73) are arranged in sequence from top to bottom in the separation box (71); the first screen plate (72) is used to screen out large-particle stones and discharge them to the elevator (8) through a stone discharge port (76) of the separation box (71); the second screen plate (73) is used to screen out fine sand and discharge it to a fine sand recovery tank (9) through a fine sand discharge port (77) of the separation box (71); and the mud at the bottom of the separation box (71) is returned to the mud sedimentation tank (10) through a pipeline and a mud pump (13).

7. A slag-discharging continuous belt conveyor for TBM excavation construction according to claim 6, characterized in that: A first flusher (74) is provided above the first sieve plate (72) in the separation box (71), and a second flusher (75) is provided above the second sieve plate (73) in the separation box (71). The first flusher (74) and the second flusher (75) are both used to flush the debris in the separation box (71). The first flusher (74) and the second flusher (75) are supplied with water through a mud sedimentation tank (10) and a water pump (14).

8. A slag-discharging continuous belt conveyor for TBM excavation construction according to claim 7, characterized in that: The separation box (71) is connected to the support (78) via a buffer spring (79), two adjacent support pillars (78) are fixed via a second connecting rod (710), and a vibration excitation motor (711) is provided on the separation box (71).

9. A slag-discharging continuous belt conveyor for TBM excavation construction according to claim 6, characterized in that: A first discharge raft (712) is arranged in the stone discharge port (76), and a second discharge raft (713) is arranged in the fine sand discharge port (77).

10. A slag-discharging continuous belt conveyor for TBM excavation construction according to claim 6, characterized in that: A receiving hopper (15) is provided at the bottom of the elevator (8) at a position corresponding to the stone discharging port (76), and a discharging port (16) is provided at the top of the elevator (8).