Single-width double-machine lifting sling for closure section of cable-stayed bridge and synchronous loading and lifting method of single-width double-machine lifting sling

By adopting a combined structure of C-type distribution beam and shoulder pole beam in the construction of the cable-stayed bridge, combined with the design of wire rope and pulley, the problems of cantilever balance and elevation matching in the existing technology are solved, and single-span double-machine lifting and The synchronous operation of two four-deck cranes improves construction efficiency and accuracy.

CN119059401APending Publication Date: 2024-12-03ZHONGCHUAN NO 9 DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411473901.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the construction of the cable-stayed bridge joint section, the counterweight adjustment cantilever balance and the elevation matching of the steel box girder between the two sides of the shore is cumbersome and inefficient, which cannot meet the needs of single-frame dual-machine improvement.

Method used

The structural design of C-type distribution beam and shoulder pole beam is adopted. Through the combination of wire rope and pulley, the synchronous operation of the spreader and stand-alone operation are realized, which meets the needs of cantilever section balance and the elevation matching of steel box beams on both sides of the shore, simplifies the operation process and improves positioning. efficiency.

Benefits of technology

The synchronous operation of single-frame dual-machine lifting and two-frame four-frame crane lifting is realized, which simplifies the construction process, improves the elevation matching accuracy, shortens the construction period, is simple to operate, safe and reliable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059401A_ABST
    Figure CN119059401A_ABST
Patent Text Reader

Abstract

The invention discloses a single-width double-machine lifting sling for a closure section of a cable-stayed bridge and a synchronous loading and lifting method of the single-width double-machine lifting sling. The single-width double-machine lifting sling is characterized by comprising a carrying pole beam, a C-shaped distribution beam, a steel wire rope, a lower pulley, a pin shaft and a shackle, the carrying pole beam is a solid-web type combined box-shaped steel beam, and is provided with an anchor head reinforced by a lug plate reinforcing ring to be connected with the main lug plate; the anchor head connecting main lug plates are arranged at the two ends of the steel beam. The upper pulley is arranged below the beams at the two ends of the distribution main beam through the two distribution connecting lug plates; shackles connected through bolts are arranged below the distribution connecting lug plates; two lower pulleys which are connected through a pin shaft are arranged on the bridge floor lifting lug; and the steel wire rope is sleeved on the upper pulley and is connected with the two lower pulleys through shackles. Compared with the prior art, balance weights do not need to be added to adjust the balance of the cantilevers, single-width double-crane lifting and two-width four-deck crane lifting can be operated synchronously or independently, the positioning efficiency is high, and the lifting appliance is simple in structure, easy and convenient to operate, safe, reliable and good in application prospect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge deck cranes for steel structure bridge construction, in particular to a single-span double-machine lifting hoist for a closure section of a cable-stayed bridge and a synchronous loading and lifting method thereof. Background Art

[0002] At present, the steel box girder of the main span between the two main towers of the cable-stayed bridge is installed by the cantilever method. Two bridge cranes are used on each side to install it symmetrically from the main tower to the mid-span. When the mid-span is closed, two bridge cranes are often used to lift it at the same time. In order to ensure the balance of the cantilever section and the elevation matching of the steel box girders on both sides, it is necessary to set water bags, concrete blocks or other counterweights in the area of ​​the other two bridge cranes. The counterweight is large, the counterweight application cycle is long and the operation is cumbersome.

[0003] Patent "CN 216586201 U" discloses a hoisting device for mid-span closure of cable-stayed bridge construction, including a balance beam and a connecting lug provided on the upper part of the balance beam for connecting to the steel rope of the bridge deck crane, wherein the upper part of the balance beam is provided with an upper lug on one side of the connecting lug, and the upper part of the balance beam is provided with an upper lug on the other side of the connecting lug, and the lower part of the balance beam is provided with a lower lug for connecting to the main beam of the closure section of the cable-stayed bridge corresponding to each upper lug on each side, and the corresponding upper and lower lugs are connected by steel wire ropes. Through the transition of the balance beam and the upper and lower lugs, the bridge can pass through the closure smoothly, ensuring the stress condition of the steel main beam during the lifting process. However, when the sling is used to close the closure section of a single-width double-machine lifting, a counterweight needs to be added to adjust the balance of the cantilever section.

[0004] In order to solve the above problems, the cable-stayed bridge joint section adopts a method of lifting with four bridge cranes on both sides of the left and right sides. At this time, the two single-span bridge cranes on both sides share a set of hoists. The loads lifted on both sides are the same, and there is no need to apply counterweights to balance the load. The elevation of the steel box girders on both sides is consistent, and only the original hoists need to be replaced. However, the hoists in the existing technology cannot meet the requirements of the balance of the cantilever section and the elevation matching of the steel box girders on both sides. For this reason, a hoist suitable for lifting the joint section with two cranes on a single span is designed to meet the construction and installation requirements of the cable-stayed bridge joint section with two single-span bridge cranes sharing a set of hoists, so that the four bridge cranes can be lifted synchronously or individually. Summary of the invention

[0005] The purpose of the present invention is to provide a single-span double-machine lifting sling for the joint section of a cable-stayed bridge and a synchronous loading and lifting method thereof in response to the deficiencies in the prior art. The present invention adopts a structural design in which the longitudinal arrangement of a C-shaped distribution beam is symmetrically arranged with the axis of the shoulder beam. The longitudinal arrangement spacing of the C-shaped distribution beam is consistent with the longitudinal spacing of the bridge deck lifting ears, and is symmetrically arranged with the axis of the distribution main beam. The lateral spacing is consistent with the lateral arrangement of the bridge deck lifting ears. The wire rope passes over the upper pulley and the lower pulley and is connected to the distribution connecting ear plate through a shackle. The structure is simple and easy to use. It can be operated synchronously or by a single machine. The positioning efficiency is high. It can better realize the lifting of a single span with two machines and the lifting of two spans with a total of four bridge deck cranes, meeting the requirements of balancing the cantilever section and matching the elevations of the steel box beams on both sides. The operation is simple and the work efficiency is high. The on-site annular seam construction period is shortened, and the elevation matching accuracy of the joint section is greatly improved. The present invention has a good application prospect.

[0006] The specific technical scheme for achieving the purpose of the present invention is: a single-span double-machine lifting sling for the joint section of a cable-stayed bridge, characterized in that the lifting sling is composed of a shoulder beam, a C-shaped distribution beam, a steel wire rope, a lower pulley, a pin shaft, and a shackle; the shoulder beam is a solid-web combined box section, composed of a flange plate, a web plate, an anchor head connected to a main ear plate, an ear plate reinforcement ring, an ear plate stiffening, and a shoulder beam stiffening fully welded structure, wherein the flange plate and the web plate, and the flange plate and the anchor head connected to the main ear plate are fully penetrated welded; the anchor head connected to the main ear plate and the crane steel strand anchor head are connected by a pin shaft, and an ear plate stiffening and a shoulder beam stiffening are arranged between the two anchor heads connected to the main ear plates; the ear plate stiffening and the shoulder beam stiffening are respectively connected to the flange plate and the web plate, and the flange plate and the anchor head connected to the main ear plate are fully penetrated welded; the anchor head connected to the main ear plate and the crane steel strand anchor head are connected by a pin shaft, and an ear plate stiffening and a shoulder beam stiffening are arranged between the two anchor heads connected to the main ear plates; the ear plate stiffening and the shoulder beam stiffening are respectively connected to the flange plate and the web plate, and the flange plate and the anchor head connected to the main ear plate are fully penetrated welded. The edge plate and the web plate are welded; the C-type distribution beam is composed of a distribution main beam, a distribution connecting ear plate and an upper pulley; the distribution main beam is a solid-web composite box section with a fully welded structure; the distribution connecting ear plate and the distribution main beam are connected by full penetration welding, and are symmetrically arranged with the axis of the distribution main beam, and the lateral spacing is consistent with the lateral arrangement of the bridge deck lifting ears; the C-type distribution beam and the shoulder beam are bolted and symmetrically arranged with the axis of the shoulder beam, and the longitudinal arrangement spacing of the C-type distribution beam is consistent with the longitudinal spacing of the bridge deck lifting ears; the steel wire rope passes over the upper pulley, the lower pulley and the distribution connecting ear plate through a shackle; the lower pulley is connected to the bridge deck lifting ear through a pin shaft; the length of the shoulder beam is less than the length of the joint section.

[0007] A synchronous loading and lifting method for a single-width dual-machine lifting spreader at a closure section of a cable-stayed bridge, characterized in that the method includes synchronous loading and lifting of a single-width dual-machine spreader and a two-width four-machine spreader, wherein the single-width dual-machine synchronous loading and lifting specifically includes the following steps: S1. Assemble the shoulder beam, C-type distribution beam, wire rope, lower pulley, pin shaft and shackle to form a sling assembly; S2. Connect the anchor heads of the steel strands of two single-width bridge cranes to the anchor heads of the hoisting equipment and the main ear plates through pins; S3. Connect the lifting device and the bridge deck lifting lugs through the pin shaft to realize the installation and construction of the joint section of the single-span double-machine lifting cable-stayed bridge.

[0008] The two-frame four-machine synchronous loading and lifting specifically includes the following steps: S1. Assemble the shoulder beam, C-type distribution beam, wire rope, lower pulley, pin shaft and shackle to form a sling assembly; S2. Connect the anchor heads of the steel strands of two single-width bridge cranes to the anchor heads of the hoisting equipment and the main ear plates through pins; S3, connecting the lifting device and the bridge deck lifting lug through a pin; S4, connect the anchor heads of the steel strands of the other two bridge cranes to the anchor heads of the lifting equipment and the main ear plates through the pins, and connect the lifting equipment to the bridge deck lifting ears; S5. Four bridge cranes are used to load and lift simultaneously to carry out installation construction of the joint section of the cable-stayed bridge.

[0009] Compared with the prior art, the present invention has the advantages of being able to achieve single-span double-machine lifting or two-span four-crane lifting without adding counterweight to adjust the cantilever balance, and can be operated synchronously or individually. The hoisting device has a simple structure, is easy to operate, has high positioning efficiency, and is safe and reliable. It better solves the problem of single-span double-machine lifting in the closure section of a cable-stayed bridge and has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 for Figure 1 AA section view; Figure 3 for Figure 1 BB cross-sectional view. DETAILED DESCRIPTION

[0011] See also Figure 1The present invention is composed of a shoulder pole beam 1, a C-type distribution beam 2, a steel wire rope 3, a lower pulley 4, a pin shaft 5 and a shackle 6. The shoulder pole beam 1 is a solid-web composite box-type steel beam welded by a flange plate 11 and a web plate 12, on which an anchor head connecting the main ear plate 13 reinforced by an ear plate reinforcement ring 14 is provided; the anchor head connecting the main ear plates 13 are symmetrically arranged at both ends of the steel beam composed of the flange plate 11 and the web plate 12, and an ear plate stiffener 15 and a shoulder pole beam stiffener 16 are arranged between the two anchor head connecting the main ear plates 13; the ear plate stiffener 15 is welded to the flange plate 11 and the two anchor head connecting the main ear plates 13; the shoulder pole beam stiffener 16 is welded to the web plate 12 and the two anchor head connecting the main ear plates 13; the C-type distribution beam 2 is composed of a distribution main beam 21, a distribution connection ear plate 22 and an upper pulley 23; the distribution main beam 21 is symmetrically arranged on the axis of the shoulder pole beam 21. On the shoulder beam 1, and fixedly connected with the shoulder beam 1 by bolts; the upper pulley 23 is arranged under the beam at both ends of the distribution main beam 21 by two distribution connecting ear plates 22, the distribution connecting ear plates 22 and the distribution main beam 21 are connected by full penetration welding, and the upper pulley 23 and the distribution connecting ear plates 22 are connected by axle pins; a bolt-connected shackle 6 is provided under the distribution connecting ear plates 22; two lower pulleys 4 connected by a pin shaft 5 are provided on the bridge deck lifting ear 7; the steel wire rope 3 is sleeved on the upper pulley 23 and connected with the two lower pulleys 4 by the shackle 6; the length of the shoulder beam 1 is less than the length of the joint section; the flange plate 11 and the web plate 12, the flange plate 11 and the anchor head connecting main ear plate 13 are fully penetrated and welded; the longitudinal arrangement spacing of the C-type distribution beam 2 is consistent with the longitudinal spacing of the bridge deck lifting ear 7; the distribution main beam 21 is a steel beam structure with a solid web combined box section.

[0012] See also Figure 2 The distribution main beam 21 is axially symmetrically arranged on the shoulder pole beam 1, and is fixedly connected to the shoulder pole beam 1 by bolts; the upper pulley 23 is arranged under the beam at both ends of the distribution main beam 21 by two distribution connecting ear plates 22, the distribution connecting ear plates 22 and the distribution main beam 21 are connected by full penetration welding, and the upper pulley 23 and the distribution connecting ear plates 22 are connected by axle pins; a bolt-connected shackle 6 is provided under the distribution connecting ear plates 22; two lower pulleys 4 connected by a pin shaft 5 are provided on the bridge deck lifting ear 7; the steel wire rope 3 is sleeved on the upper pulley 23 and connected to the two lower pulleys 4 through the shackle 6.

[0013] See also Figure 3 The ear plate reinforcement ring 14 is arranged on both sides of the upper part of the main ear plate 13 connected to the anchor head, and is welded to the main ear plate 13 connected to the anchor head; the plate stiffener 15 is welded to the main ear plates 13 and the flange plate 11 connected to the two anchor heads.

[0014] The loading and lifting method of the present invention includes: single-width dual-machine and two-width four-machine synchronous loading and lifting, wherein the single-width dual-machine synchronous loading and lifting specifically includes the following steps: S1. Assemble the shoulder beam, C-type distribution beam, wire rope, lower pulley, pin shaft and shackle to form a sling assembly; S2. Connect the anchor heads of the steel strands of two single-width bridge cranes to the anchor heads of the hoisting equipment and the main ear plates through pins; S3, connect the lifting device and the bridge deck lifting lug through the pin shaft to realize the installation construction of the closure section of the single-span double-machine lifting cable-stayed bridge; The two-frame four-machine synchronous loading and lifting specifically includes the following steps: S1. Assemble the shoulder beam, C-type distribution beam, wire rope, lower pulley, pin shaft and shackle to form a sling assembly; S2. Connect the anchor heads of the steel strands of two single-width bridge cranes to the anchor heads of the hoisting equipment and the main ear plates through pins; S3, connecting the lifting device and the bridge deck lifting lug through a pin; S4, connect the anchor heads of the steel strands of the other two bridge cranes to the anchor heads of the lifting equipment and the main ear plates through the pins, and connect the lifting equipment to the bridge deck lifting ears; S5. Four bridge cranes are used to load and lift simultaneously to carry out installation construction of the joint section of the cable-stayed bridge.

[0015] The present invention does not need to add counterweights to adjust the cantilever balance, and can achieve single-width double-machine lifting or two-width four-machine bridge crane lifting, and can be operated synchronously or individually, with high positioning efficiency. The above is only a further explanation of the present invention, and is not intended to limit this patent. All equivalent implementations of the present invention should be included in the scope of the claims of this patent.

Claims

1. A single-width dual-machine lifting sling for the closure section of a cable-stayed bridge, characterized in that: The lifting sling is composed of a shoulder beam, a C-shaped distribution beam, a steel wire rope, a lower pulley, a pin shaft, a shackle and a bridge deck lifting lug. The shoulder beam is a solid-web composite box-type steel beam welded from a flange plate and a web plate, on which an anchor head with a lug plate reinforcement ring is provided to connect the main lug plate; the anchor heads connecting the main lug plates are symmetrically arranged in pairs at both ends of the steel beam composed of the flange plate and the web plate, and lug plate reinforcement and shoulder beam reinforcement are arranged between the two anchor heads connecting the main lug plates; the lug plate reinforcement is welded to the flange plate and the two anchor heads to connect the main lug plates; the shoulder beam reinforcement is welded to the web plate and the two anchor heads to connect the main lug plates The C-shaped distribution beam is composed of a distribution main beam, a distribution connecting ear plate and an upper pulley; the distribution main beam is axially symmetrically arranged on the shoulder beam and fixedly connected to the shoulder beam by bolts; the upper pulley is arranged under the beam at both ends of the distribution main beam by two distribution connecting ear plates, the distribution connecting ear plate and the distribution main beam are connected by full penetration welding, and the upper pulley and the distribution connecting ear plate are connected by an axle pin; a bolt-connected shackle is provided under the distribution connecting ear plate; two lower pulleys connected by a pin shaft are provided on the bridge deck lifting ear; the wire rope sleeve is arranged on the upper pulley and connected to the two lower pulleys by a shackle.

2. The single-width dual-machine lifting sling for the closure section of a cable-stayed bridge according to claim 1 is characterized in that: The length of the shoulder pole beam is smaller than the length of the joint section.

3. The single-width dual-machine lifting sling for the closure section of a cable-stayed bridge according to claim 1 is characterized in that: The flange plate and the web plate, as well as the anchor head connecting the main ear plate, are fully penetrated welded.

4. The single-width dual-machine lifting sling for the closure section of a cable-stayed bridge according to claim 1 is characterized in that: The longitudinal arrangement spacing of the C-shaped distribution beams is consistent with the longitudinal spacing of the bridge deck lifting ears.

5. The single-width dual-machine lifting sling for the closure section of a cable-stayed bridge according to claim 1 is characterized in that: The distribution main beam is a steel beam structure with a solid-web combined box-section.

6. A synchronous loading and lifting method for a single-width dual-machine lifting sling for a cable-stayed bridge closure section as claimed in claim 1, characterized in that: The method includes single-width dual-machine and two-width four-machine synchronous loading and lifting, and the single-width dual-machine synchronous loading and lifting specifically includes the following steps: S1. Assemble the shoulder beam, C-type distribution beam, wire rope, lower pulley, pin shaft and shackle to form a sling assembly; S2. Connect the anchor heads of the steel strands of two single-width bridge cranes to the anchor heads of the hoisting equipment and the main ear plates through pins; S3, connect the lifting device and the bridge deck lifting lug through the pin shaft to realize the installation construction of the closure section of the single-span double-machine lifting cable-stayed bridge; The two-frame four-machine synchronous loading and lifting specifically includes the following steps: S1. Assemble the shoulder beam, C-type distribution beam, wire rope, lower pulley, pin shaft and shackle to form a sling assembly; S2. Connect the anchor heads of the steel strands of two single-width bridge cranes to the anchor heads of the hoisting equipment and the main ear plates through pins; S3, connecting the lifting device and the bridge deck lifting lug through a pin; S4, connect the anchor heads of the steel strands of the other two bridge cranes to the anchor heads of the lifting equipment and the main ear plates through the pins, and connect the lifting equipment to the bridge deck lifting ears; S5. Four bridge cranes are used to load and lift simultaneously to carry out installation construction of the joint section of the cable-stayed bridge.