Connecting structure of prefabricated assembled pier and cap beam
By designing the sill heads and grooves with slopes at the connection between the bridge pier and the cap beam, combining embedded steel bars and cast-in-place concrete, the problems of splicing accuracy and construction speed between the bridge pier and the cap beam are solved, and a simple and efficient connection is achieved. Improved shear strength and engineering quality.
Patent Information
- Application Number
- CN202411352677.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-12-03
AI Technical Summary
The splicing method of bridge piers and cap beams is difficult to control the accuracy, especially the horizontality and elevation control of the cap beams on the two pier columns, and the construction speed is slow, so there is a problem that a large number of steel bar joints need to be grouted one by one.
The column head with slope angle is designed to cooperate with the corresponding grooves, and the embedded steel bars are prefabricated in the factory and assembled directly on site. They are connected through cast-in-place concrete to simplify the installation process and improve shear strength.
It reduces labor intensity, improves construction speed and safety, simplifies the connection process between the cap beam and the bridge pier, improves the shear strength at the connection, saves materials and improves the quality of the project.
Smart Images

Figure CN119061777A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge structure construction, in particular to a connection structure of a prefabricated assembled bridge pier and a cap beam. Background Art
[0002] As one of the main development directions of intelligent construction in the future, the safe and fast assembly of prefabricated segments in bridge engineering has become a research hotspot. The assembly of cap beams and piers is an important component. Generally, they are divided into pier column segments and cap beam segments, which are prefabricated in the factory. When assembling on site, the pier column segments and foundations are assembled first, and then the cap beam segments are assembled with the pier column segments to form an overall structure.
[0003] The inventors have found that the current method of splicing bridge piers and cap beams has many problems. The requirements for hole penetration accuracy are high and the control is difficult. In particular, the cap beam needs to be installed on two piers at the same time, and its horizontality and elevation are difficult to control. When the cap beam needs to adjust its posture, the operation is more difficult and there are more steps. In addition, there are many steel bar joints between the cap beam and the piers, and grouting needs to be carried out one by one, which slows the construction speed. These problems have become problems that need to be urgently solved by technical personnel in this field. Summary of the invention
[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a connection structure of a prefabricated pier and a cap beam, the pier is provided with a column head with a slope angle, and the cap beam is provided with a corresponding groove. The pier and the cap beam can be transported to the construction site for direct assembly after being prefabricated in the factory, and the column head and the groove can be directly snap-fitted together. The design of the column head with a slope angle makes the installation of the pier and the cap beam easy, the construction is simple, and the labor intensity is reduced.
[0005] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0006] A connection structure of a prefabricated assembled bridge pier and a cap beam, comprising:
[0007] The bridge pier has a prefabricated capital with a sloped side at the top;
[0008] The cap beam has a groove at its bottom, and the shape of the groove is adapted to the shape of the column head; embedded steel bars are provided at the groove and the column head, and the groove is used to match the column head, and then cast concrete at the connection between the groove and the column head; the bridge pier is provided with a column head with a slope angle, and the cap beam is provided with a corresponding groove. The bridge pier and the cap beam can be prefabricated in the factory and transported to the construction site for direct assembly. The column head and the groove can be directly snap-fitted. The column head design with a slope angle makes the installation of the bridge pier and the cap beam easy, the construction is simple, and the labor intensity is reduced.
[0009] As a further implementation, the pier includes a column body, and the column capital is arranged at the top of the column body.
[0010] As a further implementation, the column body is a solid concrete column pier or a hollow concrete column pier.
[0011] As a further implementation, the bridge pier is a single pier or multiple piers.
[0012] As a further implementation, the slope angle is arranged on the side opposite to the column head.
[0013] As a further implementation, the column head has a height of 0.7-0.9 m and a slope angle of 70-80°.
[0014] As a further implementation method, the embedded steel bars are U-shaped; vertical embedded steel bars are arranged in the groove mouth of the bottom surface of the cap beam; oblique embedded steel bars are arranged at the junction of the column head and the column body, and the oblique angle is 40-50°.
[0015] As a further implementation method, after the groove is matched with the column head, the embedded steel bars at the groove mouth and the column head are arranged alternately.
[0016] As a further implementation method, the embedded steel bars are located inside the cast-in-place concrete, the cast-in-place cross-section is larger than the diameter of the pier, and is in the shape of an inverted truncated cone; by casting concrete at the connection between the cap beam and the pier, the problem of a large number of steel bar joints between the cap beam and the pier in the prior art, which requires grouting one by one and results in slow construction speed, is solved.
[0017] As a further implementation, the strength grade of the cast-in-place concrete is higher than the strength grade of the piers and cap beams.
[0018] The beneficial effects of the present invention are as follows:
[0019] 1. The bridge pier of the present invention is provided with a column head with a slope angle, and the cap beam is provided with a corresponding groove. The bridge pier and the cap beam can be transported to the construction site for direct assembly after being prefabricated in the factory. The column head and the groove can be directly snap-fitted. The column head design with a slope angle makes the installation of the bridge pier and the cap beam easy, the construction is simple, and the labor intensity is reduced.
[0020] 2. The groove and the connection between the column head and the column body of the present invention are provided with embedded steel bars. After the groove and the column head are matched, the embedded steel bars at the two places are arranged in a staggered manner, and concrete is cast in situ, which improves the shear strength of the connection between the cap beam and the bridge pier. The joint assembly of the present invention requires low precision and has great economic benefits. While saving raw materials, it makes the connection between the bridge pier and the cap beam safer and more reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0022] Figure 1 It is a side view of the embedded joint structure of the prefabricated assembled bridge pier and the cap beam in the embodiment of the present invention;
[0023] Figure 2 It is a front view of the embedded joint structure of the prefabricated assembled bridge pier and the cap beam in the embodiment of the present invention;
[0024] Figure 3 It is a structural schematic diagram after the present invention is installed.
[0025] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0026] Among them: 1. Cap beam; 2. Pier; 3. U-shaped embedded steel bars; 4. High-strength concrete; 11. Groove; 21. Column capital. DETAILED DESCRIPTION
[0027] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0028] Embodiment 1
[0029] In a typical embodiment of the present invention, reference is made to Figure 1-Figure 3 As shown, a connection structure of a prefabricated assembled bridge pier and a cap beam comprises a cap beam 1 and a bridge pier 2. The cap beam 1 is provided with a groove 11, and a column head 21 is provided at the top of the bridge pier. The shape of the column head 21 is adapted to the shape of the groove 11, and the cap beam 1 and the bridge pier 2 are snap-fitted together through the column head 11 and the groove 21.
[0030] like Figure 1 As shown, the bridge pier 2 includes a column body and a column head 21. The column head 21 is located at the top of the column body. The column body is a solid concrete column pier or a hollow concrete column pier. The column body in this embodiment is a hollow concrete column pier. The bridge pier is a single pier or multiple piers.
[0031] A column head with a sloped side is prefabricated at the top of the pier 2, and a groove of a corresponding shape is processed at the bottom of the cap beam 1 where it matches the pier. After the groove matches the column head, concrete is cast at the connection between the groove and the column head 21.
[0032] The top of the pier column of this embodiment is prefabricated with a double-slope column head 21, and the slope angles are set on opposite sides of the column head 21. The column head 21 has a height of 0.7-0.9m and a slope angle of 70-80°; preferably, the column head has a height of 0.8m and a slope angle of 75°.
[0033] Correspondingly, an inverted U-shaped groove is provided at the connection between the lower part of the cap beam 1 and the pier column. The size of the groove 11 is adapted to the shape of the pier column head. The depth of the groove is 0.8m, and the inclination angle of the groove wall is 75°.
[0034] In other examples, the column head 21 is a quadrangular column structure, the top surface of the column head is a square, and the area of the top surface is smaller than the area of the bottom surface of the column head, so that when the cap beam is matched with the pier, the groove of the cap beam can be directly clamped with the column head.
[0035] In an optional embodiment, the column capital is a truncated cone structure, the top surface and the bottom surface of the column capital are both circular, and the area of the top surface is smaller than the area of the bottom surface.
[0036] The matching part of the cap beam 1 and the bridge pier 2 is provided with embedded steel bars, which are U-shaped embedded steel bars 3. Specifically, oblique U-shaped embedded steel bars are arranged at the junction of the pier column head and the column body, with an oblique angle of 40-50°, preferably 45°, and a spacing of 200mm. HRB400 steel bars with a diameter of 25mm are used. The lower part of the cap beam has a groove adapted to the pier column head, and vertical embedded steel bars (U-shaped embedded steel bars 3) are arranged at the groove mouth, with a spacing of 200mm. The vertical embedded steel bars are perpendicular to the plane of the groove mouth, that is, perpendicular to the bottom surface of the cap beam, or perpendicular to the side surface of the cap beam.
[0037] After the cap beam is matched with the column head of the bridge pier through the groove, the U-shaped embedded steel bars 3 on the two are arranged in a staggered manner, and then cast-in-place concrete is constructed, and the embedded steel bars are located inside the cast-in-place high-strength concrete 4. Specifically, after the embedding is completed, the on-site cast-in-place concrete with a grade of C60 or above or UHPC concrete is used to complete the joint structure. The strength grade of the joint concrete is one or more strength grades higher than the strength of the pier column and cap beam concrete, making the joint safe and reliable. The cast-in-place section of the joint should be larger than the diameter of the pier column and the notch, and be in the shape of an inverted truncated cone.
[0038] The cap beam and bridge piers of this embodiment can be prefabricated in the factory, and then the prefabricated components can be transported to the construction site for splicing, which saves the time for curing test pieces, improves the level of mechanization, reduces labor intensity, and ensures the quality of the project.
[0039] Specifically, the prefabricated pier is inserted into the groove of the cap beam through a column head with a double slope angle, and a U-shaped embedded steel bar is used as a connecting accessory. When the prefabricated pier is assembled with the cap beam, the oblique embedded steel bars of the pier column and the embedded steel bars of the cap beam are arranged crosswise. After the assembly is completed, C60 concrete is used to cast the crosswise arranged steel bars. The cast-in-place cross-section of the joint should be larger than the diameter of the pier column and the notch, and support the inverted truncated cone shape. After the pouring is completed, it must be maintained in accordance with the requirements of the specifications. The top surface of the cast-in-place high-strength concrete 4 is higher than the bottom surface of the cap beam, and the bottom surface is located at the column body below the column head. The top surface height of the cast-in-place high-strength concrete 4 is flush with the height of the middle position of the column head. By casting concrete at the connection between the cap beam and the pier, the problem of a large number of steel bar joints between the cap beam and the pier column in the prior art, and the need to grout one by one, resulting in slow construction speed, is solved.
[0040] The bridge pier 2 and the cap beam 1 can be prefabricated in the factory at one time and then transported to the site for installation, which saves the curing time of the poured concrete and greatly protects the quality of the bridge pier and the cap beam. In addition, the prefabricated components are short in length and convenient for transportation to the viaduct site for assembly, avoiding the problem that the traditional main beam is difficult to hoist and transport due to its large length and weight, and is inconvenient for construction.
[0041] During assembly, the column head of the pier column is inserted into the groove of the cap beam, and then the interface structure is completed with C60 concrete. The construction is simple and the labor intensity is reduced. In addition, the connection joint technology improves the shear strength of the connection between the cap beam and the pier. The assembly of this joint requires low precision and has great economic benefits. It saves raw materials and makes the connection between the pier and the cap beam safer and more reliable.
[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A connection structure between a prefabricated assembled bridge pier and a cap beam, characterized in that: include: The bridge pier has a prefabricated capital with a sloped side at the top; The cap beam has a groove at the bottom, and the shape of the groove is adapted to the shape of the column head; embedded steel bars are provided at the groove and the column head, and the groove is used to match the column head and then cast concrete at the connection between the groove and the column head.
2. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 1, characterized in that: The bridge pier comprises a column body, and the column head is arranged at the top of the column body.
3. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 2 is characterized in that: The column body is a solid concrete column pier or a hollow concrete column pier.
4. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 1 is characterized in that: The bridge pier is a single pier or multiple piers.
5. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 1 is characterized in that: The slope angle is arranged on the side opposite to the column head.
6. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 5, characterized in that: The column head has a height of 0.7-0.9 m and a slope angle of 70-80°.
7. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 2 is characterized in that: The embedded steel bars are U-shaped; vertical embedded steel bars are arranged at the groove mouth of the bottom surface of the cap beam; oblique embedded steel bars are arranged at the junction of the column head and the column body, and the oblique angle is 40-50°.
8. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 7, characterized in that: After the groove is matched with the column head, the embedded steel bars at the groove mouth and the column head are arranged alternately.
9. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 8, characterized in that: The embedded steel bars are located inside the cast-in-place concrete, and the cast-in-place cross-section is larger than the diameter of the pier column and is in the shape of an inverted truncated cone.
10. The connection structure of the prefabricated assembled bridge pier and cap beam according to claim 9, characterized in that: The strength grade of cast-in-place concrete is higher than that of piers and cap beams.
Citation Information
Patent Citations
Connection structure of prefabricated bridge pier and bearing platform and construction method thereof
CN105442433A
Prefabricated cover beam of fabricated bridge and construction method of prefabricated cover beam
CN110273359A
Connecting structure of UHPC prefabricated hollow pier and bearing platform
CN117166354A
Connecting structure of assembly type bent cap and pier column
CN219117936U
Pile head joint part
JP2018031206A