Road surface speed bump component and manufacturing method thereof

By combining prefabricated foundation main component and the surface layer of the cartilage, polyurea materials are used to fill and bond structural defects, the problems of prone to cracking and falling off in traditional speed bumps are solved, and higher wear resistance and shorter construction cycle are achieved, reducing the number of Destruction of the road surface.

CN119061815AInactive Publication Date: 2024-12-03GUANGDONG POLYTECHNIC COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411460282.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional speed bumps are prone to cracking and falling off during use, resulting in an increase in replacement or maintenance frequency, and the prior art is difficult to effectively solve these problems.

Method used

Prefabricated foundation main member is used to combine with the cartilage surface layer, and the structural defects are filled and bonded during the construction process through polyurea materials, forming a solid ground bonding layer and a firm bonding layer, fixed in the installation groove, reducing cracks and damage.

Benefits of technology

It improves the wear resistance and construction efficiency of the speed bump, reduces material and labor costs, reduces damage to the road surface, and extends the service life of the speed bump.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061815A_ABST
    Figure CN119061815A_ABST
Patent Text Reader

Abstract

The invention discloses a road surface speed bump component and a manufacturing method thereof, the road surface speed bump component comprises a road surface and a roadbed, and a mounting groove is formed in the road surface, the manufacturing method comprises the following steps: step 1, grooving the road surface to form the mounting groove; secondly, concrete is used for manufacturing a foundation main body component; step 3, manufacturing a surface layer: uniformly spreading carborundum on the surface of the foundation main body component in the manufacturing process to cover the surface layer on the surface of the foundation main body component; fourthly, after the concrete in the third step is subjected to final setting, finished product curing is conducted, so that the foundation body component and the surface layer are formed together; fifthly, the foundation main body component is installed in the installation groove, polyurea is injected into the gap between the foundation main body component and the ground and the gap between the foundation main body component and the installation groove, and the polyurea is cured into a ground combination layer and a bonding firm layer through reaction; after construction, the curing speed is high, the construction period is short, and meanwhile, due to the particularity of materials, the material is harmless to the environment and human bodies after construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road construction, and in particular to a road speed bump component and a manufacturing method thereof. Background Art

[0002] In the construction and use of traditional roads, the role of speed bumps is almost irreplaceable. With the continuous increase in the number of motor vehicles, various unavoidable problems have been caused by speed bumps, which are mainly manifested in the cracking and falling off of speed bumps, and will also increase the frequency of speed bump replacement or repair. Promoting the iteration of speed bumps is an urgent issue at present. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the first aspect of the present invention provides a road speed bump component, including a road surface and a roadbed, wherein the road surface is provided with an installation groove, the installation groove extends deep into the roadbed, and comprises a basic main body component, a surface layer, a ground bonding layer, and an adhesive layer, the basic main body component is installed in the installation groove, and the basic main body component is fixed in the installation groove by the adhesive layer;

[0004] The surface layer covers the top surface of the basic main component, and the surface layer is connected to the basic main component through cement mortar; the ground bonding layer is used to fix the basic main component on the roadbed, and the bonding layer is used to fix the basic main component in the installation groove.

[0005] A second aspect of the present invention provides a method for manufacturing a road speed bump component, which is used to manufacture the above-mentioned road speed bump component, comprising:

[0006] Step 1: grooving the road surface to form the installation groove;

[0007] Step 2: using concrete to make the foundation main component;

[0008] Step 3, manufacturing the surface layer, evenly spreading corundum on the surface of the basic main component in the manufacturing process in step 2, smoothing and calendering, and finally polishing the entire basic main component before final setting, so that the surface of the basic main component is covered with the surface layer;

[0009] Step 4, performing finished product curing on the concrete in step 3 after final setting, so that the foundation main component and the surface layer are formed together;

[0010] Step five, install the basic main body component into the installation groove, inject polyurea into the gap between the basic main body component and the ground, and between the basic main body component and the installation groove, and the polyurea is cured by reaction to form the ground bonding layer and the bonding firming layer.

[0011] According to some embodiments of the present invention, fibers are added to the concrete in step 2.

[0012] According to some embodiments of the present invention, the maintenance time in step 4 is days.

[0013] The present invention has at least the following beneficial effects:

[0014] 1. The main components of the foundation are prefabricated, which can save material costs and labor costs.

[0015] 2. The surface layer is made of corundum, which can greatly improve the wear resistance of the speed bump and reduce maintenance costs.

[0016] 3. During the construction process, polyurea materials are injected into the cracks of the main components of the foundation, as well as the gaps between the main components of the foundation and the road surface and roadbed. Through reaction, curable polymers are formed to fill and bond the defective parts of the structure. This solution can quickly and effectively bond the concrete and the roadbed into a whole. The curing speed after construction is fast and the construction period is short. At the same time, due to the particularity of the material, it is harmless to the environment and human body after construction. Through the combination of the above-mentioned new materials and new processes, the durable road speed bump component reduces the damage to the road surface during construction compared with traditional speed bumps, and has better effects while also being able to effectively protect the road surface.

[0017] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0019] Figure 1 It is a schematic structural diagram of an embodiment of the present invention. DETAILED DESCRIPTION

[0020] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0021] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0022] In the description of the present invention, the meaning of "a plurality" is more than two, and "greater than", "less than", "exceed" etc. are understood to exclude the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0023] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention in combination with the specific content of the technical solution.

[0024] Reference Figure 1 A road speed bump component includes a road surface 101 and a roadbed 102. The road surface 101 is provided with an installation groove 103, the installation groove 103 penetrates into the roadbed 102, and includes a basic main component 100, a surface layer 200, a ground binding layer 300, and an adhesive layer 400. The basic main component 100 is installed in the installation groove 103, and the basic main component 100 is fixed in the installation groove 103 by the adhesive layer 400.

[0025] The surface layer 200 covers the top surface of the basic main component 100, and the surface layer 200 and the basic main component 100 are connected by cement mortar; the ground bonding layer 300 is used to fix the basic main component 100 on the roadbed 102, and the bonding layer 400 is used to fix the basic main component 100 in the installation groove 103.

[0026] A method for manufacturing a road speed bump component, used for manufacturing the above-mentioned road speed bump component, comprising:

[0027] Step 1: groove the road surface 101 to form an installation groove 103;

[0028] Step 2: Use concrete to make the foundation main component 100;

[0029] Step three, manufacturing the surface layer 200, evenly spreading corundum on the surface of the basic main body component 100 in the manufacturing process in step two, which can better withstand dynamic loads, effectively increase the internal toughness of the deceleration component, and reduce the generation of internal shrinkage cracks, and then manually smoothing and calendering with an iron trowel, and finally polishing the basic main body component 100 as a whole before final setting, and polishing the whole body with an electric polishing machine, so that the surface of the basic main body component 100 is covered with the surface layer 200;

[0030] Step 4: After the concrete in step 3 is finally set, curing is performed to form the base main component 100 and the surface layer 200 together;

[0031] Step five, install the basic main component 100 into the installation groove 103, inject polyurea into the gap between the basic main component 100 and the ground, and between the basic main component 100 and the installation groove 103, and the polyurea is cured by reaction to form the ground bonding layer 300 and the bonding and firming layer 400.

[0032] Adding fibers to the concrete in step 2 can better withstand dynamic loads, effectively increase the internal toughness of the deceleration component, and reduce the occurrence of internal shrinkage cracks.

[0033] The maintenance period in step 4 is 7 days.

[0034] Firstly, the basic main body component 100 is made in the form of prefabricated components, which can save material costs and labor costs.

[0035] Secondly, the surface layer 200 is made of corundum, which can greatly improve the wear resistance of the speed bump and reduce maintenance costs.

[0036] Again, during the construction process, polyurea material is injected into the cracks of the basic main component 100, as well as the gaps between the basic main component 100 and the road surface 101 and the roadbed 102, and a curable polymer is formed through reaction to fill and bond the defective parts of the structure. This solution can quickly and effectively bond the concrete and the roadbed 102 into a whole; the curing speed after construction is fast and the construction period is short. At the same time, due to the particularity of the material, it is harmless to the environment and human body after construction; through the combination of the above-mentioned new materials and new processes, the durable road speed bump component reduces the damage to the road surface 101 during the construction process compared to traditional speed bumps, and has better effects while also being able to effectively protect the road surface 101.

[0037] In the description of this specification, the description with reference to the terms "some embodiments" or "it is conceivable that" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0038] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.

Claims

1. A road speed bump component, comprising a road surface (101) and a roadbed (102), wherein a mounting groove (103) is formed on the road surface (101), and the mounting groove (103) extends deep into the roadbed (102). It is characterized in that It comprises a basic main body component (100), a surface layer (200), a ground bonding layer (300), and an adhesive and firming layer (400), wherein the basic main body component (100) is installed in the installation groove (103), and the basic main body component (100) is fixed in the installation groove (103) by the adhesive and firming layer (400); The surface layer (200) covers the top surface of the basic main component (100), and the surface layer (200) and the basic main component (100) are connected by cement mortar; the ground bonding layer (300) is used to fix the basic main component (100) on the roadbed (102), and the bonding layer (400) is used to fix the basic main component (100) in the installation groove (103).

2. A method for manufacturing a road speed bump component, It is characterized in that A road speed bump component for manufacturing the road speed bump component according to claim 1, comprising: Step 1, grooving the pavement (101) to form the installation groove (103); Step 2: using concrete to make the foundation main component (100); Step 3, manufacturing the surface layer (200), evenly spreading corundum on the surface of the basic main component (100) in the manufacturing process in step 2, smoothing and calendering, and finally polishing the entire basic main component (100) before final setting, so that the surface of the basic main component (100) is covered with the surface layer (200); Step 4, performing finished product curing on the concrete in step 3 after final setting, so that the foundation main component (100) and the surface layer (200) are formed together; Step five, installing the basic main component (100) into the installation groove (103), injecting polyurea into the gap between the basic main component (100) and the ground, and between the basic main component (100) and the installation groove (103), and curing the polyurea through reaction to form the ground bonding layer (300) and the bonding layer (400).

3. A method for manufacturing a road speed bump component according to claim 2, It is characterized in that Add fibers to the concrete in step two.

4. A method for manufacturing a road speed bump component according to claim 2, It is characterized in that The curing time in step 4 is 7 days.