Prefabricated ecological foundation pit supporting structure and supporting method

Through the prefabricated and assembled ecological foundation pit support structure, the inclined support frame and external support piles are used, combined with connecting rod components and auxiliary fixing mechanisms, the problems of long construction cycle and high cost of traditional foundation pit support methods are solved. , improves construction safety and efficiency, and realizes multiple use of components.

CN119061908AInactive Publication Date: 2024-12-03BEIJING UNIV OF CIVIL ENG & ARCHITECTURE
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411417491.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional foundation pit support method has a long construction cycle, high cost, and the temporary structure cannot be reused, which poses safety hazards and waste of resources.

Method used

A prefabricated ecological foundation pit support structure is adopted, including a first support mechanism, a second support mechanism and an intermediate connecting mechanism. The soil layer is inserted through an inclined support frame and an outer support pile, combining the connecting rod assembly and Auxiliary fixing mechanism to achieve stable support of foundation pits and simplify construction steps through prefabricated assembly.

Benefits of technology

It reduces the displacement and stress of the foundation pit support structure, improves construction safety and efficiency, reduces construction costs, and standardized components can be used multiple times.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061908A_ABST
    Figure CN119061908A_ABST
Patent Text Reader

Abstract

The invention discloses a prefabricated ecological foundation pit supporting structure and method.The foundation pit supporting structure comprises a first supporting mechanism, a second supporting mechanism and a middle connecting mechanism, the first supporting mechanism comprises a first supporting frame, and a first supporting plate is arranged on the inner side of the first supporting frame; the first supporting mechanism comprises a first supporting frame, a first outer supporting pile is obliquely arranged at the top of the first supporting frame, the second supporting mechanism comprises a second supporting frame, a second supporting plate is arranged on the inner side of the second supporting frame, a second outer supporting pile is obliquely arranged at the top of the second supporting frame, and the two ends of the middle connecting mechanism are detachably connected with the first supporting frame and the second supporting frame respectively. Standardization of components of the foundation pit supporting structure is achieved in a prefabricated assembly mode, a large number of tedious construction steps are omitted, assembly is easy, construction is convenient and fast, the construction period can be greatly shortened, the construction efficiency is improved, all the standardized components can be used repeatedly, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a prefabricated assembled ecological foundation pit support structure and a support method. Background Art

[0002] Foundation pit support is a measure of support, reinforcement and protection for the side walls of the foundation pit and the surrounding environment to ensure the safety of underground structure construction and the surrounding environment of the foundation pit. my country's deep foundation pit engineering began in the 1980s. Due to the rapid development of urban high-rise buildings, underground parking lots, high-rise building burial depth, civil air defense and other needs, high-rise buildings need to build a certain basement. In recent years, due to the rapid development of urban subway projects, subway stations, local open excavation and other projects also involve foundation pit engineering. In subway stations with double-line intersections, the foundation pit is as deep as 20-30m. In addition, water conservancy and electricity also have the problem of foundation pit excavation for underground plants and underground pump rooms. Whether it is a deep foundation pit project for high-rise buildings or subways, it may involve extensive soil excavation in densely populated areas of cities. There are usually various structures such as traffic arteries, existing buildings or underground pipelines around the foundation pit. This involves a very important content of the foundation pit project, which is to protect the safe use of surrounding structures. However, most foundation pit supports are temporary structures, which require large investments and are prone to waste. In addition, the reliability of possible temporary support structures is low and they are prone to engineering accidents. Therefore, in the context of building industrialization and sustainable development requirements, how to safely and reasonably select appropriate support structures and design them scientifically according to the characteristics of foundation pit projects is the main issue to be addressed in foundation pit projects.

[0003] The traditional foundation pit support method is mainly the underground continuous wall method, which is to dig narrow deep trenches in sections underground, put steel cages in the trenches, and then pour concrete to form reinforced concrete wall sections, and finally connect these wall sections into a continuous underground wall. The support structure obtained by the underground continuous wall method has high bearing capacity and stability, and is suitable for various geological conditions. Therefore, it can be used as a common method for deep foundation pit enclosure of large-scale projects. However, this support structure requires deep trench excavation and concrete pouring, and the construction steps are cumbersome, which will lead to a long overall construction period, affecting the progress of the project. Moreover, the support structure is a temporary structure with a high one-time investment cost, and it cannot be turned around or recycled, which increases the construction cost. Summary of the invention

[0004] The purpose of the present invention is to provide a prefabricated and assembled ecological foundation pit support structure and support method to solve the above-mentioned problems existing in the prior art.

[0005] In order to achieve the above-mentioned purpose, on the one hand, the present invention adopts the following technical scheme: a prefabricated and assembled ecological foundation pit support structure, comprising a first support mechanism, a second support mechanism and an intermediate connecting mechanism, wherein the first support mechanism and the second support mechanism are respectively arranged on opposite sides of the foundation pit; the first support mechanism comprises a first support frame, which is inclinedly arranged along the inner wall of the foundation pit, a first support plate is provided on the inner side of the first support frame, and a first outer support pile is inclinedly provided on the top of the first support frame, and the first outer support pile is used to be inserted into the soil layer of the side wall of the foundation pit; the second support mechanism comprises a second support frame, which is inclinedly arranged along the inner wall of the foundation pit, a second support plate is provided on the inner side of the second support frame, and a second outer support pile is inclinedly provided on the top of the second support frame, and the second outer support pile is used to be inserted into the soil layer of the side wall of the foundation pit; the two ends of the intermediate connecting mechanism are detachably connected to the first support frame and the second support frame respectively.

[0006] As an optional implementation of the above technical solution, the intermediate connecting mechanism includes an intermediate fixed pile, the bottom of the intermediate fixed pile is inserted in the soil layer at the bottom of the foundation pit, and the intermediate fixed pile is provided with a first connecting head and a second connecting head. A first connecting rod assembly is provided between the first connecting head and the first support frame, and a second connecting rod assembly is provided between the second connecting head and the second support frame.

[0007] As an optional implementation of the above technical solution, the first connecting rod assembly includes a first connecting rod A, a first connecting rod B and a first adjustment sleeve, the two ends of the first adjusting sleeve are respectively threadedly connected to the first connecting rod A and the first connecting rod B, the end of the first connecting rod A away from the first adjusting sleeve is connected to the first support frame, and the end of the first connecting rod B away from the first adjusting sleeve is connected to the first connecting head.

[0008] As an optional implementation of the above technical solution, the surface threads of the first connecting rod A and the first connecting rod B are in opposite directions.

[0009] As an optional implementation of the above technical solution, the second connecting rod assembly includes a second connecting rod A, a second connecting rod B and a second adjustment sleeve, the two ends of the second adjusting sleeve are respectively threadedly connected to the second connecting rod A and the second connecting rod B, the end of the second connecting rod A away from the second adjusting sleeve is connected to the second support frame, and the end of the second connecting rod B away from the second adjusting sleeve is connected to the second connecting head.

[0010] As an optional implementation of the above technical solution, the surface thread directions of the second connecting rod A and the second connecting rod B are opposite.

[0011] As an optional implementation of the above technical solution, an auxiliary fixing mechanism is provided at the bottom of the middle fixing pile.

[0012] As an optional implementation of the above technical solution, the auxiliary fixing mechanism includes multiple auxiliary fixing seats, which are arranged circumferentially along the middle fixing pile. A pull rod is connected between the auxiliary fixing seat and the middle fixing pile, and an auxiliary fixing nail is provided at the bottom of the auxiliary fixing seat.

[0013] As an optional implementation manner of the above technical scheme, the first support frame includes a first support top beam, a first support bottom beam, a first left beam, a first right beam and a first middle connecting beam. The first support top beam, the first left beam, the first support bottom beam and the first right beam are connected end to end to form a rectangular structure. The first support top beam is provided with a first insertion groove for inserting a first support plate along its length direction, and the first support bottom beam is provided with a first limiting groove adapted to the first support plate along its length direction; the bottoms of the first left beam and the first right beam are both inserted into the soil layer at the bottom of the foundation pit, and the two ends of the first middle connecting beam are respectively connected to the first left beam and the first right beam.

[0014] As an optional implementation of the above technical solution, the side walls of the first supporting top beam and the first intermediate connecting beam are both provided with a first limiting sliding groove, a first sliding block is provided in the first limiting sliding groove, and the first sliding block is connected to the first connecting rod A.

[0015] As an optional implementation of the above technical solution, the first supporting plate includes a plurality of first plate bodies spliced ​​to each other, a first splicing slot is provided on one side of the first plate body, and a first splicing protrusion adapted to the first splicing slot is provided on the other side of the first plate body.

[0016] As an optional implementation of the above technical solution, a first drainage hole is opened on the first plate body, a first water guide tube is arranged in the first drainage hole, and one end of the first water guide tube is inserted into the soil layer of the side wall of the foundation pit.

[0017] As an optional implementation of the above technical solution, the first water guide cylinder includes a first cylinder body, a first spiral head is provided at one end of the first cylinder body, a first blocking plate is provided at the other end of the first cylinder body, a plurality of first water guide holes are opened on the surface of the first cylinder body, and a first soil retaining plate is provided on the outer side of the first water guide hole.

[0018] As an optional implementation of the above technical solution, the second support frame includes a second support top beam, a second support bottom beam, a second left beam, a second right beam and a second middle connecting beam. The second support top beam, the second left beam, the second support bottom beam and the second right beam are connected end to end to form a rectangular structure. The second support top beam is provided with a second insertion groove for inserting a second support plate along its length direction, and the second support bottom beam is provided with a second limiting groove adapted to the second support plate along its length direction; the bottoms of the second left beam and the second right beam are both inserted into the soil layer at the bottom of the foundation pit, and the two ends of the second middle connecting beam are respectively connected to the second left beam and the second right beam.

[0019] As an optional implementation of the above technical solution, the side walls of the second supporting top beam and the second intermediate connecting beam are both provided with a second limiting sliding groove, and a second sliding block is provided in the second limiting sliding groove, and the second sliding block is connected to the second connecting rod A.

[0020] As an optional implementation of the above technical solution, the second supporting plate includes a plurality of second plate bodies spliced ​​to each other, a second splicing slot is provided on one side of the second plate body, and a second splicing protrusion adapted to the second splicing slot is provided on the other side of the second plate body.

[0021] As an optional implementation of the above technical solution, a second drainage hole is opened on the second plate body, a second water guide tube is arranged in the second drainage hole, and one end of the second water guide tube is inserted into the soil layer of the side wall of the foundation pit.

[0022] As an optional implementation of the above technical solution, the second water guide cylinder includes a second cylinder body, a second spiral head is provided at one end of the second cylinder body, a second blocking plate is provided at the other end of the second cylinder body, a plurality of second water guide holes are opened on the surface of the second cylinder body, and a second soil retaining plate is provided on the outer side of the second water guide hole.

[0023] On the other hand, the present invention adopts the following technical solution: a prefabricated and assembled ecological foundation pit support method, using the above-mentioned prefabricated and assembled ecological foundation pit support structure, the foundation pit support method comprises the following steps:

[0024] S1, survey and lay out, excavate the foundation pit, and make the side wall of the foundation pit form an inclined surface;

[0025] S2, inserting a first outer support pile into the soil layer of the side wall of the foundation pit, and installing a first support frame and a first support plate; inserting a second outer support pile into the soil layer of the side wall of the foundation pit, and installing a second support frame and a second support plate;

[0026] S3, installing the intermediate connection mechanism, and connecting the two ends of the intermediate connection mechanism to the first support frame and the second support frame respectively, so that the first support frame and the second support frame remain in a fixed state.

[0027] The beneficial effects of the present invention are:

[0028] The present invention arranges the first support frame and the second support frame obliquely along the inner wall of the foundation pit, and inserts the first external support pile and the second external support pile into the soil layer of the side wall of the foundation pit, thereby reducing the displacement and stress of the first support frame and the second support frame on the basis of satisfying the stability of the foundation pit, improving the support stability of the foundation pit, and increasing the construction safety. The present invention realizes the standardization of the foundation pit support structure components by prefabrication and assembly, eliminating a large number of cumbersome construction steps, and its assembly is simple, the construction is convenient and fast, which can greatly reduce the construction period and improve the construction efficiency, and each standardized component can be used repeatedly, reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a structural schematic diagram of a prefabricated assembled ecological foundation pit support structure in one embodiment of the present invention;

[0030] Figure 2 It is a schematic structural diagram of an intermediate fixing pile according to an embodiment of the present invention;

[0031] Figure 3 is a schematic structural diagram of a first support frame in one embodiment of the present invention;

[0032] Figure 4 It is a schematic structural diagram of a first water guide cylinder in one embodiment of the present invention.

[0033] In the figure: 1-first supporting frame; 2-first outer supporting pile; 3-second supporting frame; 4-second outer supporting pile; 5-middle fixing pile; 6-first connecting head; 7-second connecting head; 8-first connecting rod assembly; 9-second connecting rod assembly; 10-auxiliary fixing seat; 11-pull rod; 12-auxiliary fixing nail; 13-first supporting top beam; 14-first supporting bottom beam; 15-first left beam; 16-first right beam; 17-first middle connecting beam; 18-first limiting slide groove; 19-first plate body; 20-first drainage hole; 21-first water guide tube; 22-first cylinder body; 23-first spiral head; 24-first blocking plate; 25-first water guide hole; 26-first soil retaining plate; 27-first slider. DETAILED DESCRIPTION

[0034] like Figure 1-Figure 4As shown, this embodiment provides a prefabricated and assembled ecological foundation pit support structure, including a first supporting mechanism, a second supporting mechanism and an intermediate connecting mechanism, wherein the first supporting mechanism and the second supporting mechanism are respectively arranged on opposite sides of the foundation pit, and two pairs of first supporting mechanisms and second supporting mechanisms can be arranged on the surrounding side of the foundation pit as needed, one pair of first supporting mechanisms and second supporting mechanisms are arranged on the left and right sides of the foundation pit, and the other pair of first supporting mechanisms and second supporting mechanisms are arranged on the front and back sides of the foundation pit, and the two pairs of first supporting mechanisms and second supporting mechanisms are connected to the intermediate connecting mechanism, so that the first supporting mechanisms and the second supporting mechanisms can stably support the foundation pit.

[0035] like Figure 1 As shown, the first supporting mechanism includes a first supporting frame 1, which is inclined along the inner wall of the foundation pit, a first supporting plate is provided on the inner side of the first supporting frame 1, and a first external supporting pile 2 is inclined on the top of the first supporting frame 1. The first external supporting pile 2 is used to be inserted into the soil layer of the side wall of the foundation pit, and the first supporting plate is used to support the foundation pit.

[0036] The second supporting mechanism includes a second supporting frame 3, which is obliquely arranged along the inner wall of the foundation pit, and a second supporting plate is provided on the inner side of the second supporting frame 3. A second external supporting pile 4 is obliquely provided on the top of the second supporting frame 3, and the second external supporting pile 4 is used to be inserted into the soil layer of the side wall of the foundation pit. The second supporting plate is used to support the foundation pit, and the two ends of the intermediate connecting mechanism are detachably connected to the first supporting frame 1 and the second supporting frame 3 respectively.

[0037] The present invention arranges the first support frame 1 and the second support frame 3 obliquely along the inner wall of the foundation pit, and inserts the first external support piles 2 and the second external support piles 4 into the soil layer of the side wall of the foundation pit, thereby reducing the displacement and stress of the first support frame 1 and the second support frame 3 on the basis of ensuring the stability of the foundation pit, thereby improving the support stability of the foundation pit and increasing the construction safety.

[0038] The present invention realizes the standardization of foundation pit support structure components through prefabrication and assembly, eliminating a large number of tedious construction steps. The assembly is simple and the construction is convenient and fast, which can greatly shorten the construction period and improve the construction efficiency. Moreover, each standardized component can be used repeatedly, reducing the construction cost.

[0039] like Figure 2As shown, specifically, the intermediate connection mechanism includes an intermediate fixed pile 5, the bottom of the intermediate fixed pile 5 is inserted into the soil layer at the bottom of the foundation pit, and the intermediate fixed pile 5 is provided with a first connector 6 and a second connector 7, a first connecting rod assembly 8 is provided between the first connecting head 6 and the first support frame 1, and a second connecting rod assembly 9 is provided between the second connecting head 7 and the second support frame 3. For two pairs of first support mechanisms and second support mechanisms, two pairs of first connecting heads 6 and second connecting heads 7 can be provided correspondingly. Among them, the first connecting rod assembly 8 includes a first connecting rod A, a first connecting rod B and a first adjustment sleeve, the two ends of the first adjustment sleeve are respectively threadedly connected to the first connecting rod A and the first connecting rod B, the end of the first connecting rod A away from the first adjustment sleeve is connected to the first support frame 1, and the end of the first connecting rod B away from the first adjustment sleeve is connected to the first connecting head 6. Preferably, the surface thread directions of the first connecting rod A and the first connecting rod B are opposite. By rotating the first adjustment sleeve, the first connecting rod A and the first connecting rod B can be relatively separated, so that the end of the first connecting rod assembly 8 presses the first supporting frame 1 tightly, thereby improving the stability of the foundation pit support.

[0040] The second connecting rod assembly 9 includes a second connecting rod A, a second connecting rod B and a second adjusting sleeve, the two ends of the second adjusting sleeve are respectively threadedly connected to the second connecting rod A and the second connecting rod B, the end of the second connecting rod A away from the second adjusting sleeve is connected to the second support frame 3, and the end of the second connecting rod B away from the second adjusting sleeve is connected to the second connector 7. Preferably, the surface threads of the second connecting rod A and the second connecting rod B are in opposite directions. By rotating the second adjusting sleeve, the second connecting rod A and the second connecting rod B can be relatively separated, so that the end of the second connecting rod assembly 9 presses against the second support frame 3, thereby improving the stability of the foundation pit support.

[0041] In a specific embodiment, an auxiliary fixing mechanism is provided at the bottom of the intermediate fixing pile 5. Specifically, the auxiliary fixing mechanism includes a plurality of auxiliary fixing seats 10, which are arranged circumferentially along the intermediate fixing pile 5, a pull rod 11 is connected between the auxiliary fixing seat 10 and the intermediate fixing pile 5, and an auxiliary fixing nail 12 is provided at the bottom of the auxiliary fixing seat 10 to keep the intermediate fixing pile 5 fixed, thereby providing support for the first support frame 1 and the second support frame 3.

[0042] like Figure 3As shown, in a specific embodiment, the first support frame 1 includes a first support top beam 13, a first support bottom beam 14, a first left side beam 15, a first right side beam 16 and a first middle connecting beam 17. The first support top beam 13, the first left side beam 15, the first support bottom beam 14 and the first right side beam 16 are connected end to end to form a rectangular structure. The first support top beam 13 is provided with a first insertion groove for inserting the first support plate along its length direction, and the first support bottom beam 14 is provided with a first limiting groove adapted to the first support plate along its length direction; the bottoms of the first left side beam 15 and the first right side beam 16 are both inserted into the soil layer at the bottom of the foundation pit, and the two ends of the first middle connecting beam 17 are respectively connected to the first left side beam 15 and the first right side beam 16. The side walls of the first support top beam 13 and the first middle connecting beam 17 are both provided with a first limiting slide groove 18, and the first limiting slide groove 18 is provided with a first slider 27, and the first slider 27 is connected to the first connecting rod A.

[0043] The second support frame 3 includes a second support top beam, a second support bottom beam, a second left beam, a second right beam and a second middle connecting beam. The second support top beam, the second left beam, the second support bottom beam and the second right beam are connected end to end to form a rectangular structure. The second support top beam is provided with a second insertion groove for inserting the second support plate along its length direction, and the second support bottom beam is provided with a second limiting groove adapted to the second support plate along its length direction; the bottoms of the second left beam and the second right beam are both inserted into the soil layer at the bottom of the foundation pit, and the two ends of the second middle connecting beam are respectively connected to the second left beam and the second right beam. The side walls of the second support top beam and the second middle connecting beam are both provided with a second limiting slide groove, and a second slider is provided in the second limiting slide groove, and the second slider is connected to the second connecting rod A. According to the needs, the present invention can adjust the positions of the first slider 27 and the second slider, so that the first connecting rod assembly 8 effectively supports the first support frame 1, and the second connecting rod assembly 9 effectively supports the second support frame 3.

[0044] The first support plate includes a plurality of first plates 19 connected to each other, one side of the first plate 19 is provided with a first joint slot, and the other side of the first plate 19 is provided with a first joint protrusion adapted to the first joint slot. The first plate 19 is provided with a first drainage hole 20, and the first drainage hole 20 is provided with a first water guide 21, and one end of the first water guide 21 is inserted into the soil layer of the side wall of the foundation pit. Figure 4 As shown, preferably, the first water guide cylinder 21 includes a first cylinder body 22, a first spiral head 23 is provided at one end of the first cylinder body 22, a first blocking plate 24 is provided at the other end of the first cylinder body 22, a plurality of first water guide holes 25 are opened on the surface of the first cylinder body 22, and a first soil retaining plate 26 is provided on the outer side of the first water guide hole 25.

[0045] The second support plate includes a plurality of second plate bodies spliced ​​to each other, a second splicing slot is provided on one side of the second plate body, and a second splicing protrusion adapted to the second splicing slot is provided on the other side of the second plate body. The first support plate and the second support plate both adopt a splicing structure, which can improve the construction speed. A second drainage hole is provided on the second plate body, and a second water guide cylinder is provided in the second drainage hole, and one end of the second water guide cylinder is inserted into the soil layer of the side wall of the foundation pit. Preferably, the second water guide cylinder includes a second cylinder, a second spiral head is provided at one end of the second cylinder, a second blocking plate is provided at the other end of the second cylinder, a plurality of second water guide holes are provided on the surface of the second cylinder, and a second retaining plate is provided on the outside of the second water guide hole. The present invention utilizes the first water guide cylinder 21 and the second water guide cylinder to guide water out of the soil layer outside the foundation pit, thereby improving the stability of the foundation pit, and the design of the first retaining plate 26 and the second retaining plate can avoid the blockage of the first water guide hole 25 and the second water guide hole.

[0046] This embodiment also provides a prefabricated and assembled ecological foundation pit support method, using the above-mentioned prefabricated and assembled ecological foundation pit support structure, the foundation pit support method includes the following steps:

[0047] S1, survey and lay out, excavate the foundation pit, and make the side wall of the foundation pit form an inclined surface;

[0048] S2, inserting a first external support pile 2 into the soil layer of the side wall of the foundation pit, and installing a first support frame 1 and a first support plate; inserting a second external support pile 4 into the soil layer of the side wall of the foundation pit, and installing a second support frame 3 and a second support plate;

[0049] S3, installing the intermediate connection mechanism, and connecting the two ends of the intermediate connection mechanism to the first supporting frame 1 and the second supporting frame 3 respectively, so that the first supporting frame 1 and the second supporting frame 3 remain in a fixed state.

[0050] The present invention adopts prefabricated structures to support the foundation pit, and the construction process is fast and simple, which can improve the construction efficiency of the foundation pit project and shorten the construction period.

[0051] In the description of the present invention, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, and may be fixedly connected, detachably connected, or integrated; may be mechanically connected or electrically connected; may be directly connected or indirectly connected through an intermediate medium, may be the internal connection of two elements or the interaction relationship between two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood. In addition, the specific features, structures, etc. described in the embodiments are included in at least one embodiment. Under the condition that there is no contradiction, those skilled in the art may combine the features of different embodiments. The protection scope of the present invention is not limited to the above-mentioned specific embodiments. According to the basic technical concept of the present invention, the embodiments that can be associated with by ordinary technicians in this field without creative work all belong to the protection scope of the present invention.

Claims

1. A prefabricated ecological foundation pit support structure, characterized in that: The invention comprises a first supporting mechanism, a second supporting mechanism and an intermediate connecting mechanism, wherein the first supporting mechanism and the second supporting mechanism are respectively arranged on opposite sides of a foundation pit; the first supporting mechanism comprises a first supporting frame (1), the first supporting frame (1) is arranged obliquely along the inner wall of the foundation pit, a first supporting plate is arranged on the inner side of the first supporting frame (1), a first outer supporting pile (2) is arranged obliquely on the top of the first supporting frame (1), and the first outer supporting pile (2) is used to be inserted into the soil layer of the side wall of the foundation pit; the second supporting mechanism comprises a second supporting frame (3), the second supporting frame (3) is arranged obliquely along the inner wall of the foundation pit, a second supporting plate is arranged on the inner side of the second supporting frame (3), a second outer supporting pile (4) is arranged obliquely on the top of the second supporting frame (3), and the second outer supporting pile (4) is used to be inserted into the soil layer of the side wall of the foundation pit; the two ends of the intermediate connecting mechanism are detachably connected to the first supporting frame (1) and the second supporting frame (3), respectively.

2. The prefabricated and assembled ecological foundation pit support structure according to claim 1 is characterized in that: The intermediate connection mechanism comprises an intermediate fixing pile (5), the bottom of which is inserted into the soil layer at the bottom of the foundation pit, the intermediate fixing pile (5) is provided with a first connecting head (6) and a second connecting head (7), a first connecting rod assembly (8) is provided between the first connecting head (6) and the first supporting frame (1), and a second connecting rod assembly (9) is provided between the second connecting head (7) and the second supporting frame (3).

3. The prefabricated and assembled ecological foundation pit support structure according to claim 2 is characterized in that: The first connecting rod assembly (8) comprises a first connecting rod A, a first connecting rod B and a first adjustment sleeve, the two ends of the first adjusting sleeve are respectively threadedly connected to the first connecting rod A and the first connecting rod B, the end of the first connecting rod A away from the first adjustment sleeve is connected to the first support frame (1), and the end of the first connecting rod B away from the first adjustment sleeve is connected to the first connecting head (6); the surface threads of the first connecting rod A and the first connecting rod B are in opposite directions.

4. The prefabricated and assembled ecological foundation pit support structure according to claim 2 is characterized in that: The second connecting rod assembly (9) comprises a second connecting rod A, a second connecting rod B and a second adjustment sleeve, the two ends of the second adjusting sleeve are respectively threadedly connected to the second connecting rod A and the second connecting rod B, the end of the second connecting rod A away from the second adjustment sleeve is connected to the second support frame (3), and the end of the second connecting rod B away from the second adjustment sleeve is connected to the second connecting head (7); the surface threads of the second connecting rod A and the second connecting rod B are in opposite directions.

5. The prefabricated and assembled ecological foundation pit support structure according to claim 2 is characterized in that: An auxiliary fixing mechanism is provided at the bottom of the intermediate fixing pile (5); the auxiliary fixing mechanism comprises a plurality of auxiliary fixing seats (10), the plurality of auxiliary fixing seats (10) are arranged along the circumference of the intermediate fixing pile (5), a pull rod (11) is connected between the auxiliary fixing seat (10) and the intermediate fixing pile (5), and an auxiliary fixing nail (12) is provided at the bottom of the auxiliary fixing seat (10).

6. The prefabricated and assembled ecological foundation pit support structure according to claim 3 is characterized in that: The first support frame (1) comprises a first support top beam (13), a first support bottom beam (14), a first left side beam (15), a first right side beam (16) and a first middle connecting beam (17); the first support top beam (13), the first left side beam (15), the first support bottom beam (14) and the first right side beam (16) are connected end to end to form a rectangular structure; the first support top beam (13) is provided with a first insertion groove for inserting a first support plate along its length direction; the first support bottom beam (14) is provided with a first insertion groove for inserting a first support plate along its length direction; A first limiting groove adapted for a guard plate; the bottoms of the first left beam (15) and the first right beam (16) are both inserted into the soil layer at the bottom of the foundation pit, and the two ends of the first middle connecting beam (17) are respectively connected to the first left beam (15) and the first right beam (16); the side walls of the first supporting top beam (13) and the first middle connecting beam (17) are both provided with a first limiting sliding groove (18), and a first sliding block (27) is provided in the first limiting sliding groove (18), and the first sliding block (27) is connected to the first connecting rod A.

7. The prefabricated and assembled ecological foundation pit support structure according to claim 6 is characterized in that: The first supporting plate comprises a plurality of first plate bodies (19) spliced ​​to each other, a first splicing slot being provided on one side of the first plate body (19), and a first splicing protrusion being matched with the first splicing slot being provided on the other side of the first plate body (19); a first drainage hole (20) being provided on the first plate body (19), a first water guide tube (21) being provided in the first drainage hole (20), one end of the first water guide tube (21) being inserted into the soil layer of the side wall of the foundation pit; the first water guide tube (21) comprising a first cylinder body (22), a first spiral head (23) being provided at one end of the first cylinder body (22), a first blocking sheet (24) being provided at the other end of the first cylinder body (22), a plurality of first water guide holes (25) being provided on the surface of the first cylinder body (22), and a first soil retaining sheet (26) being provided on the outer side of the first water guide hole (25).

8. The prefabricated and assembled ecological foundation pit support structure according to claim 4 is characterized in that: The second support frame (3) comprises a second support top beam, a second support bottom beam, a second left beam, a second right beam and a second middle connecting beam. The second support top beam, the second left beam, the second support bottom beam and the second right beam are connected end to end to form a rectangular structure. The second support top beam is provided with a second insertion groove for inserting a second support plate along its length direction, and the second support bottom beam is provided with a second limiting groove adapted to the second support plate along its length direction; the bottoms of the second left beam and the second right beam are both inserted into the soil layer at the bottom of the foundation pit, and the two ends of the second middle connecting beam are respectively connected to the second left beam and the second right beam; the side walls of the second support top beam and the second middle connecting beam are both provided with a second limiting sliding groove, and a second sliding block is provided in the second limiting sliding groove, and the second sliding block is connected to the second connecting rod A.

9. The prefabricated and assembled ecological foundation pit support structure according to claim 8 is characterized in that: The second supporting plate includes a plurality of second plate bodies spliced ​​with each other, a second splicing slot is provided on one side of the second plate body, and a second splicing protrusion adapted to the second splicing slot is provided on the other side of the second plate body; a second drainage hole is provided on the second plate body, a second water guide cylinder is provided in the second drainage hole, and one end of the second water guide cylinder is inserted into the soil layer of the side wall of the foundation pit; the second water guide cylinder includes a second cylinder body, a second spiral head is provided at one end of the second cylinder body, a second blocking plate is provided at the other end of the second cylinder body, a plurality of second water guide holes are provided on the surface of the second cylinder body, and a second soil retaining plate is provided on the outer side of the second water guide hole.

10. A prefabricated and assembled ecological foundation pit support method, characterized in that: Using the prefabricated assembled ecological foundation pit support structure according to any one of claims 1 to 9, the foundation pit support method comprises the following steps: S1, survey and lay out, excavate the foundation pit, and make the side wall of the foundation pit form an inclined surface; S2, inserting a first external support pile (2) into the soil layer of the side wall of the foundation pit, and installing a first support frame (1) and a first support plate; inserting a second external support pile (4) into the soil layer of the side wall of the foundation pit, and installing a second support frame (3) and a second support plate; S3, installing an intermediate connection mechanism, and connecting the two ends of the intermediate connection mechanism to the first support frame (1) and the second support frame (3) respectively, so that the first support frame (1) and the second support frame (3) remain in a fixed state.

Citation Information

Cited By

  • Deep foundation pit water stop excavation device

    CN119824928A