Rock area wind tower combined foundation

By pouring new roofing and new foundations on the original wind power foundation and installing concealed beams and prestressed components, the disadvantages of demolition and reconstruction in wind farm renovation are solved, the life extension and resource utilization of the foundation are achieved, and the engineering is reduced Cost and construction period provide technical guarantees for wind power upgrade and transformation.

CN119061930APending Publication Date: 2024-12-03DATANG ENVIRONMENT IND GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411409422.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the existing wind farm fan renovation project, there are problems such as difficulty in dismantling the original foundation and building the new foundation, inadequate electricity price subsidies, complex land acquisition approval, difficulty in disposing of solid waste and weak economics, resulting in increased project costs and construction periods.

Method used

The new roof and new foundation are poured on the original foundation, and the overall strength and stiffness are increased by setting up the first hidden beam, the second hidden beam and the prestressed assembly. The anchor bolts, steel bars and prestressed assembly guarantee the overall foundation. The load-bearing capacity avoids demolition and reconstruction.

Benefits of technology

It has achieved the life extension and resource utilization of the original foundation, reduced project costs and construction periods, solved environmental protection, land acquisition, investment and other problems, and provided technical support for the upgrading and transformation of wind power.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061930A_ABST
    Figure CN119061930A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wind tower foundations, in particular to a combined foundation of a wind tower in a rock area. Comprising an original foundation, a top table is arranged at the top of the original foundation, a first hidden beam is annularly arranged on the periphery of the top table, a plurality of anchor bolts are annularly arranged on the first hidden beam, and the anchor bolts are anchored into the original foundation; a new foundation is poured on the side face of the original foundation and connected with the original foundation and the first hidden beams through steel bars. Second hidden beams are arranged on the periphery of the original foundation in the circumferential direction, a plurality of prestress assemblies are evenly arranged on the second hidden beams, and the lower portions of the prestress assemblies are anchored into the rock soil layer. The combined foundation is improved on the basis of an original foundation, the service life of the original foundation and facilities is prolonged, resource utilization is achieved to a large extent, various problems existing in an existing technical method are comprehensively solved, and technical guarantee is provided for obtaining and implementing a future wind power upgrading and rebuilding project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind tower foundations, in particular to a combined foundation for a wind tower in a rocky area. Background Art

[0002] In June 2023, the National Energy Administration issued the "Management Measures for the Renovation, Upgrading and Decommissioning of Wind Farms", which encourages wind farms with a capacity of less than 1.5MW and connected to the grid for more than 15 years to carry out renovation, upgrading and decommissioning. According to this measure, many old wind farms across the country are planning to renovate or expand their capacity. In the future, wind power upgrading and renovation will be an important direction for the development of wind power new energy.

[0003] At present, in wind farm wind turbine renovation projects, most of the existing wind turbine foundations are basically demolished and new foundations are built. This method has the following disadvantages:

[0004] (1) The relevant departments for wind farm upgrade and reconstruction projects will consider approving them as new construction projects. The current market new energy indicators are relatively scarce, making it difficult to approve them;

[0005] (2) The relevant departments for approving wind farm upgrade and reconstruction projects will consider approving them as new projects. The existing on-grid electricity price will not be settled according to the original electricity price, and relevant national subsidies will not be enjoyed, and the operation and maintenance benefits will be greatly affected;

[0006] (3) The original foundation is demolished. The capacity of a single machine in the upgrading and renovation project is large. The existing foundation red line does not meet the requirements and new land acquisition approval is required;

[0007] (4) The demolition of a large number of original foundations involves the disposal of solid waste from the original foundations, which makes environmental protection approval difficult;

[0008] (5) The original foundation was demolished and a large number of original foundations, roads and other facilities were abandoned, which had poor economic efficiency and affected the project cost and construction period.

[0009] Based on the above drawbacks, some universities and research institutes are conducting research on in-situ transformation based on the original foundation, but most of the research results are still at the stage of scheme and local analysis, and there is no mature advanced technology. Therefore, the present invention is proposed. Summary of the invention

[0010] The purpose of the present invention is to provide a combined foundation for wind towers in rocky areas. The combined foundation is modified on the original foundation to extend the life and resource utilization of the original foundation and facilities to the greatest extent, comprehensively solve a series of problems existing in the prior art such as environmental protection, land acquisition, construction period, investment, etc., and provide technical guarantee for the acquisition and implementation of future wind power upgrade and transformation projects.

[0011] The present invention provides a combined foundation for a wind tower in a rocky area, comprising an original foundation, a top platform being provided on the top of the original foundation, a first hidden beam being provided in a circumferential direction around the top platform, a plurality of anchor bolts being provided in a circumferential direction around the first hidden beam, and the anchor bolts being anchored into the original foundation; a new foundation being cast on the side of the original foundation, and the new foundation being connected to the original foundation and the first hidden beam through steel bars; a second hidden beam being provided in a circumferential direction around the original foundation, a plurality of prestressed assemblies being evenly provided on the second hidden beam, and the lower part of the prestressed assemblies being anchored into a rocky soil layer.

[0012] Furthermore, a plurality of circumferential steel bars and a plurality of radial steel bars are provided inside the new foundation, the circumferential steel bars are anchored inside the original foundation, and the radial steel bars are anchored inside the first hidden beam.

[0013] Furthermore, the top of the first hidden beam is more than 1 meter higher than the outdoor floor; the top of the new foundation is at least 500 mm lower than the outdoor floor; the top of the second hidden beam is lower than the outdoor floor and higher than the top of the new foundation.

[0014] Furthermore, a gusset is provided at the bottom of the side wall of the second concealed beam, and the gusset is connected to the bottom of the original foundation.

[0015] Furthermore, the height of the added arm is between 0-1500 mm; the bottom end of the second hidden beam is located lower than the bottom end of the original foundation.

[0016] Furthermore, a polystyrene board is provided at the bottom of the second hidden beam.

[0017] Furthermore, the prestressed assembly includes prestressed anchor cables and prestressed anchor bolts, and a plurality of the prestressed anchor cables and a plurality of the prestressed anchor bolts are evenly arranged along the circumferential direction of the second concealed beam.

[0018] Furthermore, a temporary protection device is provided above the prestressed assembly.

[0019] Furthermore, the temporary protection device includes a protection cover, a fixing bolt is provided on the protection cover, a threaded hole is provided on the top of the second concealed beam, and the fixing bolt is connected to the threaded hole.

[0020] Furthermore, the protective cover is provided with an inspection opening, and a sealing plate is hinged at the inspection opening.

[0021] In summary, compared with the prior art, the present invention has the following advantages:

[0022] The technical solution of the present invention is to cast a new top platform, a new foundation and set a first hidden beam and a second hidden beam in a circumferential direction on the original foundation of the wind tower, and set a prestressed assembly on the second hidden beam. The diameter of the original foundation does not change much, which can meet the requirements of the original foundation red line, and the overall strength is increased. The overall stiffness of the overall foundation is guaranteed by the arranged anchor bolts, steel bars and prestressed assemblies. The combined foundation provided by the present invention is transformed on the original foundation, which improves the bearing capacity of the original foundation and avoids various disadvantages of demolishing the original foundation and building a new foundation in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 A top view of the assembled foundation in Example 1 of the present invention;

[0025] Figure 2 It is a cross-sectional view of the combined foundation in Example 1 of the present invention;

[0026] Figure 3 This is a schematic diagram of the structure of the protective cover in Example 2 of the present invention;

[0027] Figure 4 A top view of the assembled foundation in Example 2 of the present invention;

[0028] Figure 5 It is a cross-sectional view of the combined foundation in Example 2 of the present invention.

[0029] Explanation of the reference numerals: 1-original foundation; 2-second hidden beam; 201-added armpit; 202-phenylene board; 301-prestressed anchor cable; 302-prestressed anchor bolt; 303-protective cover; 3031-fixing bolt; 3032-inspection port; 3033-sealing plate; 4-new foundation; 5-top platform; 6-first hidden beam; 601-anchor bolt; 7-wind tower; 8-outdoor floor. DETAILED DESCRIPTION

[0030] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0032] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] Example 1

[0034] A combined foundation for wind towers in rocky areas, such as Figure 1 and Figure 2 As shown, it includes an original foundation 1, a top platform 5, a first hidden beam 6, a new foundation 4, and a second hidden beam 2, wherein the first hidden beam 6 is provided with a plurality of anchor bolts 601, and the second hidden beam 2 is provided with a plurality of prestressed assemblies.

[0035] The original foundation 1 is a truncated cone-shaped foundation. The outer surface of the original foundation 1 is roughened, and new steel bars are welded to the steel bars in the original foundation 1 and then inserted into the newly-built foundation, so that the newly-built foundation and the original foundation 1 are subjected to stress together, forming a combined foundation and ensuring the overall rigidity.

[0036] A new top platform 5 is cast on the top platform of the original foundation 1, and a first hidden beam 6 is arranged circumferentially around the top platform 5. The steel bars in the first hidden beam 6 are reliably connected to the anchor cage inside the original foundation 1; a plurality of anchor bolts 601 are arranged circumferentially on the first hidden beam 6, and the anchor bolts 601 are anchored into the inside of the original foundation 1. In this embodiment, the first hidden beam 6 is provided with two inner and outer circles of anchor bolts, wherein the inner circle of anchor bolts is located inside the wind tower 7, and the outer circle of anchor bolts is located outside the wind tower 7. The height of the first hidden beam 6 is determined according to the length of the anchor bolts 601, and generally the top of the first hidden beam 6 is located more than 1 meter higher than the location of the outdoor floor 8.

[0037] A new foundation 4 is cast on the side of the original foundation 1, and the new foundation 4 is connected to the original foundation 1 and the first hidden beam 6 through steel bars. A plurality of circumferential steel bars and a plurality of radial steel bars are arranged on the top of the new foundation 4, the circumferential steel bars are anchored into the original foundation 1, and the radial steel bars are anchored into the first hidden beam 6. The top of the new foundation 4 is a plane structure and is parallel to the outdoor floor 8. The top of the new foundation 4 is at least 500mm lower than the outdoor floor 8, which is convenient for covering the surface with green plants after the overall foundation in-situ transformation is completed. At the same time, the new foundation 4 is also connected to the second hidden beam 2 through steel bars.

[0038] A second hidden beam 2 is provided around the original foundation 1, and the second hidden beam 2 is connected to the original foundation 1 through steel bars. The top of the second hidden beam 2 is lower than the outdoor floor 8 and higher than the top of the new foundation 4 to prevent the prestressed assembly on the second hidden beam 2 from wading. The bottom of the second hidden beam 2 is located lower than the bottom of the original foundation 1. The bottom side wall of the second hidden beam 2 is provided with an arm 201, which is connected to the bottom of the original foundation 1. The height and inclination of the arm 201 are determined by calculation. Generally, the height of the arm 201 is between 0-1500mm. A polystyrene board 202 is provided at the bottom of the second hidden beam 2.

[0039] A plurality of prestressed assemblies are arranged on the top of the second hidden beam 2, and the prestressed assemblies include prestressed anchor cables 301 and prestressed anchor bolts 302. The plurality of prestressed anchor cables 301 and the plurality of prestressed anchor bolts 302 are evenly arranged along the circumferential direction of the second hidden beam 2, and the prestressed anchor cables 301 and the prestressed anchor bolts 302 of each prestressed assembly are located on the same radius of the second hidden beam 2. During installation, the prestressed anchor cables 301 are located on the inner side, and the prestressed anchor bolts 302 are located on the outer side, and the positions of the two can also be interchanged. The prestressed assembly assembly can also be designed as a plurality of prestressed anchor cables 301 and a plurality of prestressed anchor bolts 302 are cross-distributed as needed. The lower parts of the prestressed anchor cables 301 and the prestressed anchor bolts 302 are anchored into the rock soil layer, and the anchoring depth can be calculated and determined according to the design requirements.

[0040] Practical Application

[0041] A 1.5MW wind turbine was upgraded to a 6.25MW unit. The original foundation was a 15m diameter truncated cone gravity foundation, rock foundation, and the red line width was 17m. The original foundation steel reinforced concrete consumption was about 350m 3 .

[0042] If the original foundation is demolished and a new foundation is built, the wind load bending moment will be more than three times the original bending moment of 46,000 kNm after the 1.5 MW unit is upgraded to a 6.25 MW unit. The diameter of the new foundation will be about 22 meters, and the amount of concrete used will be about 750m 3, and the new foundation will exceed the original foundation red line, and conventional technology will not be able to solve the problem of land acquisition restrictions.

[0043] The technical solution provided by the present invention is used to transform the original foundation to obtain a combined foundation. The width of the second hidden beam is only 0.8m, and the diameter of the combined foundation is about 16.6m. Within the red line range, the problem of land acquisition restrictions is solved, and the amount of concrete used in the transformation is about 300m 3 , saving 450m3 of reinforced concrete compared with conventional technology 3 , saving about 60% of the engineering workload, with obvious results.

[0044] Example 2

[0045] A combined foundation for a wind tower in a rocky area. The technical solution in this embodiment is basically the same as that in Embodiment 1, except that a temporary protection device is provided above the prestressed assembly in this embodiment to ensure the connection stability and reliability of the prestressed anchor cable 301 and the prestressed anchor bolt 302.

[0046] like Figure 3 As shown, the temporary protection device in this embodiment includes a square protection cover 303, and the four corners of the protection cover 303 are respectively provided with through holes, and the through holes are threadedly connected with fixing bolts 3031. The top of the second hidden beam 2 is provided with threaded holes corresponding to the through holes. When installing, the fixing bolts 3031 are directly tightened with the threaded holes. After re-applying prestress after one year, the protection cover 303 is removed, and concrete is poured on the top of the second hidden beam 2 to bury the prestressed anchor cable 301 and the prestressed anchor bolt 302. Figure 4 As shown, the width of the protective cover 303 in this embodiment is greater than the width of the second dark beam 2, and the top of the protective cover 303 is higher than the outdoor floor 8, as shown in FIG. Figure 5 As shown. Figure 4 and Figure 5 The structures of the fixing bolt 3031 and the sealing plate 3033 are omitted.

[0047] The top wall of the protective cover 303 is provided with an inspection port 3032, and a sealing plate 3033 is hinged at the inspection port 3032, so as to facilitate the inspection of the prestressed anchor cable 301 and the prestressed anchor bolt 302. The sealing plate 3033 and the protective cover 303 are locked by a locking member, such as a spring latch in the prior art.

[0048] Considering that the wind tower foundation is subjected to the dynamic effect of wind load for a long time, the foundation is mainly controlled by the bending moment of wind load. The bending moment of the new unit is generally more than twice the original bending moment. The combined foundation of the wind tower provided by the present invention is improved on the original basis, and a top platform, a first hidden beam and a new foundation, a second hidden beam are set to expand the original foundation. By setting the prestressed assembly, the good tensile performance of the prestressed anchor cable and the prestressed anchor bolt is fully utilized to greatly reduce the bottom area of ​​the foundation. In the upgrading and reconstruction project, it can meet the requirement that the foundation of a single machine does not exceed the red line, and effectively reduce the engineering cost and construction period, and extend the life and resource utilization of the existing foundation and facilities to the greatest extent, and comprehensively solve the series of problems existing in the prior art such as environmental protection, land acquisition, construction period, investment, etc., to provide technical guarantee for the acquisition and implementation of future wind power upgrading and reconstruction projects.

[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A combined foundation for a wind tower in a rocky area, characterized in that: The invention comprises an original foundation (1), a top platform (5) is provided on the top of the original foundation (1), a first hidden beam (6) is provided around the top platform (5), a plurality of anchor bolts (601) are provided around the first hidden beam (6), and the anchor bolts (601) are anchored into the interior of the original foundation (1); a new foundation (4) is cast on the side of the original foundation (1), and the new foundation (4) is connected to the original foundation (1) and the first hidden beam (6) through steel bars; a second hidden beam (2) is provided around the original foundation (1), a plurality of prestressed assemblies are evenly provided on the second hidden beam (2), and the lower part of the prestressed assemblies is anchored into the rock soil layer.

2. The rocky area wind tower combined foundation according to claim 1 is characterized in that: The new foundation (4) is provided with a plurality of circumferential steel bars and a plurality of radial steel bars. The circumferential steel bars are anchored into the interior of the original foundation (1), and the radial steel bars are anchored into the interior of the first concealed beam (6).

3. The rocky area wind tower combined foundation according to claim 1, characterized in that: The top of the first hidden beam (6) is more than 1 meter higher than the outdoor floor; the top of the new foundation (4) is at least 500 mm lower than the outdoor floor; the top of the second hidden beam (2) is lower than the outdoor floor and higher than the top of the new foundation (4).

4. The rocky area wind tower combined foundation according to claim 1, characterized in that: The bottom of the side wall of the second concealed beam (2) is provided with an added arm (201), and the added arm (201) is connected to the bottom of the original foundation (1).

5. The rocky area wind tower combined foundation according to claim 4, characterized in that: The height of the added arm (201) is between 0 and 1500 mm; the bottom end of the second concealed beam (2) is located lower than the bottom end of the original foundation (1).

6. The rocky area wind tower combined foundation according to claim 1, characterized in that: A polystyrene plate (202) is provided at the bottom of the second hidden beam (2).

7. The rocky area wind tower combined foundation according to claim 1, characterized in that: The prestressed assembly comprises a prestressed anchor cable (301) and a prestressed anchor bolt (302), and a plurality of the prestressed anchor cables (301) and a plurality of the prestressed anchor bolts (302) are evenly arranged along the circumferential direction of the second concealed beam (2).

8. The rocky area wind tower combined foundation according to claim 7, characterized in that: A temporary protection device is provided above the prestressed assembly.

9. The rocky area wind tower combined foundation according to claim 8, characterized in that: The temporary protection device comprises a protection cover (303), a fixing bolt (3031) is provided on the protection cover (303), a threaded hole is provided on the top of the second concealed beam (2), and the fixing bolt (3031) is connected to the threaded hole.

10. The rocky area wind tower combined foundation according to claim 9, characterized in that: The protective cover (303) is provided with an inspection port (3032), and a sealing plate (3033) is hinged at the inspection port (3032).