Bushing water plugging method for partition wall of foundation pit of commercial complex

By opening holes and grouting in the foundation pit partition wall of commercial complexes, pressure grouting and sealing is used to use the double slurry of water glass and cement slurry, the problem of water in the foundation pit partition wall is solved, and the quality of concrete pouring and water stopping effect is ensured. , reduce the risk of water seepage in construction joints.

CN119061944APending Publication Date: 2024-12-03URBAN RAIL TRANSIT ENGINEERING CO LTD OF CHINA RAILWAY FIRST GROUP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411460513.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Water influx of the foundation pit partition wall of commercial complexes causes water accumulation in the rear pouring belt, affecting the concrete strength and water stop effect, and poses quality hazards.

Method used

Open holes in the side wall of the structure, insert steel pipes for horizontal hole grouting. First inject pure cement slurry to judge the smoothness. If it is unobstructed, inject double slurry between water glass and cement slurry to observe the solidification of the slurry, and perform pressure grouting and sealing. Finally, the steel pipe is cut off.

Benefits of technology

Effectively seal the water inflow of the structural base plate to ensure the unobstructed water of the post-pouring strip and construction joints, improve the efficiency of water-swelling glue when exposed to water, reduce the probability of water seepage in construction joints, and ensure the quality of concrete pouring.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a commercial complex foundation pit partition wall gushing water leaking stoppage method, and belongs to the technical field of building construction.The method includes the steps that a hole is formed in a structural side wall, concrete is punched through, a steel pipe is inserted into the hole, a one-way valve is installed at the end, located on the outer side of the side wall, of the steel pipe, and horizontal hole grouting is adopted; firstly, pure cement paste is injected, whether a grouting point and a water leakage point are smooth or not is judged, if the grouting point and the water leakage point are smooth, double-liquid paste of water glass and cement paste is injected, whether slurry flowing out of the water leakage point is solidified or not is observed, and after the cement paste and the double-liquid paste of the water glass and the cement paste are injected, the slurry emerges from the water leakage point and is gradually solidified; and if no water gushes out or seeps out, pressure grouting is conducted, and grouting plugging is completed. Water gushing of a bottom plate of a completed structure can be effectively blocked, it is ensured that no water exists at a post-cast strip and a construction joint, the concrete pouring quality is ensured, the effective rate of the water-swelling water stop glue is improved, and the water seepage probability of the construction joint is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and more specifically relates to a method for plugging water gushing from partition walls of a commercial complex foundation pit. Background Art

[0002] At present, the partition walls of large and irregular foundation pits are generally made of underground continuous walls or bored cast-in-place piles. The excavation of small foundation pits and the sequence of structural backbuilding after each sub-pit are determined according to the calculations of the design unit. The middle partition wall needs to be demolished for the construction of the post-cast strip. There is a risk of water seeping and gushing from the bottom plate of the structure into the post-cast strip, which makes the construction of the reinforcement and waterproofing projects of the post-cast strip difficult and poses quality risks.

[0003] Currently, the main method of lowering water is to deepen a section of the middle partition wall and place a water pump to lower the water level to below the steel bars to play a drainage role. However, it is impossible to avoid water accumulation in the post-cast strip, which leads to water accumulation when concrete is poured, which has a certain impact on the strength of the concrete. At the same time, since the post-cast strip is equipped with water-expanding waterstop glue, it is easy to expand prematurely, affecting the waterstop effect.

[0004] Therefore, how to provide a method for plugging water seepage in the partition wall of a commercial complex foundation pit is an urgent problem that technicians in this field need to solve. Summary of the invention

[0005] In view of this, the present invention provides a method for plugging water gushing from partition walls of foundation pits of commercial complexes, which can effectively block water gushing from the bottom slab of a completed structure, ensure that there is no visible water in the post-cast joints and construction joints, ensure the quality of concrete pouring, improve the efficiency of water-swelling water-stop glue, and reduce the probability of water seepage in construction joints.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] A method for plugging water leakage in a commercial complex foundation pit partition wall, comprising the following steps:

[0008] S1. Drill a hole in the side wall of the structure, punch through the concrete, and insert a steel pipe into the hole. Install a one-way valve at one end of the steel pipe located outside the side wall, and use horizontal hole grouting;

[0009] S2, first inject pure cement slurry to determine whether the grouting point and the leaking point are unobstructed. If not, repeat step S1. If the grouting point and the leaking point are unobstructed, inject double liquid slurry of water glass and cement slurry to observe whether the slurry flowing out from the leaking point solidifies. When the grouting pressure is high, the slurry still cannot be seen coming out from the leaking point, indicating that the grouting hole selection point is not appropriate, and re-drill holes and repeat step S1;

[0010] S3. After the cement slurry and the double slurry of water glass and cement slurry are injected, the slurry emerges from the leaking point and gradually solidifies without water gushing out or seeping out. Pressure grouting is performed to complete the grouting plugging;

[0011] S4. Cut off the part of the steel pipe outside the side wall.

[0012] Furthermore, in step S1, the diameter of the drill bit used for drilling the hole is 20 mm, and the diameter of the steel pipe used is 20 mm.

[0013] Furthermore, the Baume degree of the water glass is between 30-35.

[0014] Furthermore, the volume ratio of water glass to cement slurry is between 1:2-1:3, and the specific gravity of cement slurry is 1.5.

[0015] The beneficial effects of the present invention are:

[0016] First, a hole is drilled in the side wall of the structure, the concrete is punched through, and a steel pipe is inserted into the hole. A one-way valve is installed at the end of the steel pipe located on the outside of the side wall, and horizontal hole grouting is used; then pure cement slurry is injected to determine whether the grouting point and the leaking point are unobstructed. If not, a new hole is drilled. If the grouting point and the leaking point are unobstructed, a double liquid slurry of water glass and cement slurry is injected to observe whether the slurry flowing out of the leaking point solidifies. When the grouting pressure is high, the slurry is still not seen emerging from the leaking point, indicating that the grouting hole selection is inappropriate. Re-drill holes and repeat the steps, re-grouting, after injecting cement slurry and double liquid slurry of water glass and cement slurry, the slurry emerges from the leaking point and gradually solidifies, without water gushing out or seeping out, pressure grouting is carried out to complete grouting sealing; finally, the part of the steel pipe located outside the side wall is cut off. Therefore, the present invention can effectively block water gushing from the bottom plate of the completed structure, ensure that there is no visible water in the post-casting strips and construction joints, ensure the quality of concrete pouring, improve the efficiency of water-expanding water-stop glue, and reduce the probability of water seepage in the construction joints. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] The present invention provides a method for plugging water leakage in a foundation pit partition wall of a commercial complex, comprising the following steps:

[0019] S1. Drill a hole in the side wall of the structure, punch through the concrete, and insert a steel pipe into the hole. Install a one-way valve at one end of the steel pipe located outside the side wall, and use horizontal hole grouting;

[0020] S2. First, inject pure cement slurry to determine whether the grouting point and the leaking point are unobstructed. If not, repeat step S1. If the grouting point and the leaking point are unobstructed, inject double liquid slurry of water glass and cement slurry to observe whether the slurry flowing out from the leaking point solidifies. When the grouting pressure is large, the slurry is still not seen coming out from the leaking point, which means that the grouting hole selection is inappropriate. Re-drill holes and repeat step S1. Do not use excessive grouting pressure. As long as the dangerous situation can be controlled, the grouting pressure should be around 0.3MPa, which should not be too large.

[0021] S3. After the cement slurry and the double slurry of water glass and cement slurry are injected, the slurry emerges from the leaking point and gradually solidifies without water gushing out or seeping out. Pressure grouting is performed to complete the grouting plugging;

[0022] S4. Cut off the part of the steel pipe outside the side wall.

[0023] In step S1, the diameter of the drill bit used for drilling the hole is 20 mm, and the diameter of the steel pipe used is 20 mm. During the specific construction, steel pipes of other sizes can be selected according to specific circumstances.

[0024] The Baume degree of the water glass is between 30-35.

[0025] The volume ratio of water glass to cement slurry is between 1:2-1:3, and the specific gravity of cement slurry is 1.5. After the implementation of the present invention, water gushing under the bottom plate and side wall can be stopped, there is no visible water in the post-casting belt and construction joint, the concrete structure can be constructed normally, and the structural quality is ensured.

[0026] First, a hole is drilled in the side wall of the structure, the concrete is punched through, and a steel pipe is inserted into the hole. A one-way valve is installed at the end of the steel pipe located on the outside of the side wall, and horizontal hole grouting is used; then pure cement slurry is injected to determine whether the grouting point and the leaking point are unobstructed. If not, a new hole is drilled. If the grouting point and the leaking point are unobstructed, a double liquid slurry of water glass and cement slurry is injected to observe whether the slurry flowing out of the leaking point solidifies. When the grouting pressure is high, the slurry is still not seen emerging from the leaking point, indicating that the grouting hole selection is inappropriate. Re-drill holes and repeat the steps, re-grouting, after injecting cement slurry and double liquid slurry of water glass and cement slurry, the slurry emerges from the leaking point and gradually solidifies, without water gushing out or seeping out, pressure grouting is carried out to complete grouting sealing; finally, the part of the steel pipe located outside the side wall is cut off. Therefore, the present invention can effectively block water gushing from the bottom plate of the completed structure, ensure that there is no visible water in the post-casting strips and construction joints, ensure the quality of concrete pouring, improve the efficiency of water-expanding water-stop glue, and reduce the probability of water seepage in the construction joints.

[0027] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0028] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for plugging water leakage in the partition wall of a commercial complex foundation pit, characterized in that: The following steps are involved: S1. Drill a hole in the side wall of the structure, punch through the concrete, and insert a steel pipe into the hole. Install a one-way valve at one end of the steel pipe located outside the side wall, and use horizontal hole grouting; S2, first inject pure cement slurry to determine whether the grouting point and the leaking point are unobstructed. If not, repeat step S1. If the grouting point and the leaking point are unobstructed, inject double liquid slurry of water glass and cement slurry to observe whether the slurry flowing out from the leaking point solidifies. When the grouting pressure is high, the slurry still cannot be seen coming out from the leaking point, indicating that the grouting hole selection point is not appropriate, and re-drill holes and repeat step S1; S3. After the cement slurry and the double slurry of water glass and cement slurry are injected, the slurry emerges from the leaking point and gradually solidifies without water gushing out or seeping out. Pressure grouting is performed to complete the grouting plugging; S4. Cut off the part of the steel pipe outside the side wall.

2. A method for plugging water leakage in a commercial complex foundation pit partition wall according to claim 1, characterized in that: In step S1, the diameter of the drill bit used for drilling the hole is 20 mm, and the diameter of the steel pipe used is 20 mm.

3. A method for plugging water leakage in a commercial complex foundation pit partition wall according to claim 1, characterized in that: The Baume degree of the water glass is between 30-35.

4. A method for plugging water leakage in a commercial complex foundation pit partition wall according to claim 1, characterized in that: The volume ratio of water glass to cement slurry is between 1:2 and 1:3, and the specific gravity of the cement slurry is 1.5.