Method for shortening vacuumizing time of steam turbine condenser
By using three vacuum pumps at the same time during the steam turbine condenser vacuum process and adjusting the shaft seal steam flow rate, the temperature difference of high-pressure cylinder is controlled, and the problem of long vacuum extraction time is solved, and the unit start efficiency and economic benefits are improved.
Patent Information
- Application Number
- CN202411182735.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
AI Technical Summary
When the steam turbine condenser is vacuumed, the temperature difference between the upper and lower high-pressure cylinders is large, resulting in a long vacuum extraction time, which affects the unit's start-up efficiency and economic benefits.
During the overhaul, three vacuum pumps were put into place at the same time to adjust the opening of the shaft seal steam valve and the regulating valve, adjust the steam flow rate according to the temperature increase of the high-pressure cylinder exhaust port, and control the temperature difference between the upper and lower high-pressure cylinders within the permitted range of the regulations to ensure the vacuum velocity and Security.
The vacuum time of the steam turbine condenser is shortened, the labor cost and material consumption of the unit overhaul is greatly reduced, the overhaul is shortened, and the economic benefits of the power station are improved.
Smart Images

Figure CN119063506A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vacuum pumping of a steam turbine condenser, and in particular to a method for shortening the vacuum pumping time of a steam turbine condenser. Background Art
[0002] The secondary circuit of Units 1 and 2 of Tianwan Nuclear Power Plant uses K-1000 / 60-3000 steam turbine, which is a condensing steam turbine with a rated power of 1000MW, a rated steam pressure of 60kgf / cm2 (5.88MPa) in front of the steam turbine, and a speed of 3000 rpm. The steam turbine has five cylinders, including four low-pressure cylinders and one high-pressure cylinder. From the turbine head to the generator, they are low-pressure cylinder No. 1, low-pressure cylinder No. 2, high-pressure cylinder, low-pressure cylinder No. 3, and low-pressure cylinder No. 4.
[0003] One of the main tasks of the secondary circuit after overhaul is to evacuate the turbine condenser. Only after the vacuum is established can the primary circuit be heated and pressurized, and the unit can be started smoothly. To establish a vacuum in the condenser after overhaul, especially when the turbine is initially cold, it is necessary to supply seal steam to the turbine shaft seal. Since the hot steam is lighter after entering the high-pressure cylinder, most of the hot steam flows to the upper cylinder area of the high-pressure cylinder after entering the high-pressure cylinder. After contacting the metal inner wall of the high-pressure cylinder, it heats the upper cylinder of the high-pressure cylinder. The condensed water of the heated steam falls into the lower cylinder of the high-pressure cylinder, and the heat of the condensed water is used to heat the lower cylinder of the high-pressure cylinder. However, due to the relatively low temperature of the condensed water, the heating speed of the lower cylinder of the low-pressure cylinder is slow, causing the temperature difference between the upper and lower cylinders of the high-pressure cylinder of the turbine to rapidly expand to the limit value specified in the regulations.
[0004] Among them, the steam turbine regulations stipulate that the metal temperature of the high-pressure cylinder shall not exceed 80°C, and the temperature difference is allowed to be greater than 30°C but not more than 50°C; when the metal temperature of the high-pressure cylinder exceeds 80°C, the temperature difference between the upper and lower cylinders in the steam inlet area of the high-pressure cylinder should not exceed 30°C.
[0005] When the temperature difference between the upper and lower cylinders of the steam turbine high-pressure cylinder expands to the limit specified in the regulations, it is necessary to stop vacuuming, break the vacuum, and wait for the temperature difference between the upper and lower cylinders to decrease before re-vacuuming. Due to the temperature difference limit of the high-pressure cylinder of the steam turbine, it is necessary to break the vacuum and vacuumize multiple times, and the vacuum pump is repeatedly started and stopped, resulting in a long vacuuming time (about 36-48 hours).
[0006] It can be seen that most of the existing VVER units use the method of multiple vacuum pumping to reduce the temperature difference between the upper and lower parts of the high-pressure cylinder, and vacuum pumping takes a long time. Summary of the invention
[0007] The purpose of the present invention is to provide a method for shortening the vacuum pumping time of a steam turbine condenser, so as to solve the problems of large temperature difference between the upper and lower parts of the steam turbine high-pressure cylinder and long vacuum pumping time during vacuum pumping, shorten the vacuum pumping time, reduce the manpower cost and material consumption of the overhaul and startup of the unit, shorten the overhaul period, and improve the economic benefits of the power station.
[0008] In order to achieve the above object, the present invention provides the following technical solutions:
[0009] A method for shortening the vacuum pumping time of a steam turbine condenser. During the overhaul, three vacuum pumps (in order to shorten the initial vacuum pumping speed) are put into use at the same time. The vacuum pumps keep working continuously when the vacuum is started, when the steam is discharged to the condenser and when the steam turbine is running. When the pressure of the main condenser is stable and no longer decreases, the shaft seal steam is supplied, and the shaft seal steam valve LBW10AA102 is opened by pulse. The temperature LBW10CT002 after the shaft seal steam valve LBW10AA102 is monitored. The opening of the shaft seal steam regulating valve LBW10AA201 is adjusted according to the temperature increase of the high-pressure cylinder exhaust port. If the temperature of the high-pressure cylinder exhaust port is relatively stable, the shaft seal steam regulating valve LBW10AA201 is appropriately opened. If the temperature increase rate of the high-pressure cylinder exhaust port is accelerated, the opening of the shaft seal steam regulating valve LBW10AA201 is kept unchanged or the valve opening is reduced.
[0010] In some embodiments, the opening of the shaft seal steam regulating valve LBW10AA201 is adjusted to ensure that the exhaust temperature of the high-pressure cylinder does not exceed 80°C, so as to ensure that the upper cylinder temperature does not exceed 80°C.
[0011] In some embodiments, the method for controlling the opening of the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 is as follows:
[0012] If the lower cylinder temperature MAA10CT012 is less than 30°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to be the lower cylinder temperature MAA10CT012+50°C (the temperature of the lower cylinder temperature MAA10CT012 plus 50°C);
[0013] If the lower cylinder temperature MAA10CT012 is greater than 30°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to 80°C;
[0014] If the lower cylinder temperature MAA10CT012 is greater than 50°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to be the lower cylinder temperature MAA10CT012 + 30°C (increase 30°C);
[0015] If the lower cylinder temperature MAA10CT012 is greater than 60℃, the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 can be gradually opened.
[0016] In some embodiments, the opening of the shaft sealing steam regulating valve LBW10AA102 is pulse-regulated, the upper and lower cylinders of the high-pressure cylinder are slowly heated, and the temperature LBW10CT002 behind the shaft sealing steam valve LBW10AA102 is controlled to be controlled at 120±10°C, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79°C; after the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27°C, the shaft sealing steam valve LBW10AA102 is gradually opened, and the temperature difference is controlled not to exceed 27°C. After the shaft sealing steam valve LBW10AA102 is fully opened, the shaft sealing steam regulating valve LBW10AA201 is slowly opened at 5% per step.
[0017] In some embodiments, if the temperature difference between the upper and lower cylinders at the high-pressure cylinder inlet MAA10FT911 and the relative expansion difference MAY10CY907 of the high-pressure rotor rises faster, the pressure boosting speed of the shaft seal steam is reduced. If the turbine is in a hot state, the pressure boosting speed of the shaft seal steam is increased; adjust the opening of the shaft seal steam regulating valve LBW10AA201 to adjust the pressure of the shaft seal steam main pipe between 18-22 kPa.
[0018] In some embodiments, when evacuating, adjust the opening of the shaft seal steam regulating valve LBW10AA201. If the temperature rises steadily at the high-pressure cylinder exhaust port, open the shaft seal steam regulating valve LBW10AA201 appropriately. If the rising rate accelerates, keep the valve opening unchanged or reduce the valve opening to ensure that the temperature at the high-pressure cylinder exhaust port does not exceed 80°C.
[0019] In some embodiments, the monitoring parameters of the high-pressure cylinder of the steam turbine include the upper cylinder temperature, the lower cylinder temperature, the temperature difference between the upper and lower cylinders, and the high-pressure cylinder exhaust port temperature.
[0020] In some embodiments, the method specifically comprises:
[0021] Step 1: Preheating of shaft seal steam;
[0022] Step 2: Determine whether the steam turbine is in a hot state or a warm state. When the steam turbine is in a warm state or a hot state, proceed to step 3; when the steam turbine is not in a warm state or a hot state, proceed to step 4;
[0023] Step 3: Supply the shaft seal steam first, and adjust the pulse width according to the temperature rise speed of the upper and lower cylinders of the high-pressure cylinder to ensure that: the temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 is controlled at 120±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃. Start vacuuming, start a MAM blower, and start the MAJ33, MAJ34, and MAJ35 vacuum pump groups to vacuum;
[0024] Step 4: Start to evacuate, start the vacuum pump group MAJ33, MAJ34, MAJ35 to evacuate, start to supply shaft seal steam when the pressure of the main condenser reaches -10kPa or the pressure is stable and no longer drops, pulse open the shaft seal steam valve LBW10AA102, evacuate in cold state, the shaft seal steam gathers in the middle to increase the temperature of the high-pressure cylinder, control the opening of the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 (two valves are connected in series, both valves can be pulse controlled, LBW10AA102 is a stop valve);
[0025] Step 5: The temperature difference between the upper and lower parts of the high-pressure cylinder begins to decrease, and a vacuum is established.
[0026] In some embodiments, step 1 specifically includes:
[0027] Step 1.1: Determine whether the steam turbine is in warm and hot state. If so, perform shaft seal steam preheating. If not, start a MAM blower when the steam turbine is cold, and then enter shaft seal steam preheating;
[0028] Step 1.2: When the condensate system is running, cooling water is supplied to the shaft seal steam cooler MAM10AC001, and the flow rate is greater than 152 kg / s. The water seal of the drain pipe of the shaft seal steam cooler MAM10AC001 has been established, and the water seal pressure MAM20CP501 is greater than 20 kPa;
[0029] Step 1.3: The turbine shaft seal exhaust system has been put online, and a MAM blower is started;
[0030] Step 1.4: At least two circulating water pumps are in operation to supply cooling water to the two sets of condensers respectively;
[0031] Step 1.5: Execute the operation sheet to put the oil motor cooling water into operation;
[0032] Step 1.6: Complete the pre-startup inspection of the MAJ33, MAJ34, and MAJ35 vacuum pump groups;
[0033] Step 1.7: Start the pumps PGE11AP001 and PGE12AP001 that supply cooling water to the MAJ33, MAJ34, and MAJ35 vacuum pump groups, and keep at least one pump running;
[0034] Step 1.8: Preheat the steam supply pipeline for the steam turbine shaft seal in front of the shaft seal steam regulating valve LBW10AA201. Before supplying sealing steam to the steam turbine shaft seal, strengthen the drainage of the steam main pipe and open the valve LBW01AA101 to prevent water hammer. The pressure rise rate does not exceed 0.05MPa / min. When the pressure of LBW10CP001 rises to the plant steam header pressure of 0.6±0.1MPa, observe on-site that there is no water hammer in the pipeline.
[0035] Step 1.9: Preheat the shaft seal steam supply pipeline after the shaft seal steam regulating valve LBW10AA201.
[0036] In some embodiments, step 4 specifically includes:
[0037] Step 4.1: Pulse-regulate the opening of the shaft seal steam valve LBW10AA102, slowly heat the upper and lower cylinders of the high-pressure cylinder, so that the temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 is controlled at 120℃±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃; after the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27℃, gradually open the LBW10AA102 valve, and the temperature difference does not exceed 27℃;
[0038] Step 4.2: After the shaft seal steam valve LBW10AA102 is fully opened, the shaft seal steam regulating valve LBW10AA201 is opened smoothly at a speed of 5% per step. If the upper and lower temperature difference MAA10FT911 of the high-pressure cylinder inlet and the relative expansion difference MAY10CY907 of the high-pressure rotor increase rapidly, the pressure increase speed of the shaft seal steam is reduced. If the steam turbine is in a hot state, the pressure increase speed of the shaft seal steam is increased.
[0039] Step 4.3: Adjust the opening of the shaft seal steam regulating valve LBW10AA201, adjust the pressure of the shaft seal steam main pipe between 18 and 22 kPa and put it into automatic mode, and check the turbine shaft seal;
[0040] Step 4.4: When the condenser vacuum is close to the rated value, close the shaft seal steam supply pipe to drain. If the condenser vacuum cannot reach -92kPa, check the vacuum boundary, vacuum pump operation, and shaft seal steam supply;
[0041] Step 4.5: The condenser vacuum reaches the rated pressure of -92~100kPa, and the vacuum pumping work of the turbine condenser is completed.
[0042] Compared with the prior art, the method for shortening the vacuum pumping time of a steam turbine condenser provided by the present invention has the following beneficial effects:
[0043] The present invention is applicable to the evacuation of the condenser of the K-1000 / 60-3000 steam turbine, greatly shortening the evacuation time of the condenser of the K-1000 / 60-3000 steam turbine, reducing the manpower cost and material consumption of the overhaul start-up of the unit, and shortening the overhaul period by about 20 hours. The present invention enables the unit to realize the start-up and grid-connected power generation as early as possible, and generates considerable economic benefits.
[0044] Through multiple practical verifications of the initial establishment of vacuum in the cold state of the steam turbines of Tianwan Units 1 and 2, the operation control method for evacuating the steam turbine condenser of the present invention overcomes the large temperature difference between the upper and lower parts of the steam turbine high-pressure cylinder during vacuuming, shortens the vacuuming time, reduces the manpower cost and material consumption of the overhaul and startup of the unit, shortens the overhaul period, and improves the economic benefits of the power station.
[0045] Furthermore, three vacuum pumps were started for this vacuum pumping. On-site personnel controlled the vacuum pump inlet pressure at about -75kpa by adjusting the vacuum pump exhaust inlet valve MAJ33-35AA003 at the vacuum pump, which can ensure the vacuum pumping speed and effectively prevent the pump from overloading. In the early stage of vacuum pumping, LBW10AA201 maintains a small opening of about 2%. At the same time, by observing the temperature LBW10CT002 after LBW10AA201, the average value is controlled at about 120 degrees. When the temperature rises, LBW10AA102 is closed with an appropriate pulse, and when the temperature drops, it is opened with an appropriate pulse. When preheating the metal temperature of the upper and lower cylinders of the high-pressure cylinder, by controlling the high-pressure cylinder exhaust steam temperature MAA10CT003 / 004 / 005 / 006 not to exceed 80 degrees, it can be ensured that the metal temperature of the upper cylinder of the high-pressure cylinder does not exceed 80 degrees. During this vacuuming process, the metal temperature of the lower cylinder of the high-pressure cylinder increased significantly after preheating for about 3 hours. The temperature difference between the upper and lower cylinders reached a maximum value of 35 degrees in about 5 hours. At this time, the temperature of the upper cylinder of the high-pressure cylinder was about 77 degrees, and the metal temperature of the lower cylinder was about 42 degrees. When the metal temperature of the lower cylinder rises to about 53 degrees and the temperature difference between the upper and lower cylinders is less than 27 degrees, LBW10AA102 and LBW10AA201 can be slowly pulsed on to increase the steam supply to the shaft seal. At this time, the metal temperature of the upper and lower cylinders will drop significantly, and the regulatory limit will no longer be violated, and the vacuum can be successfully established. The vacuuming process lasted about 20 hours, and the condenser vacuum was maintained at about -98kpa, and the shaft seal pressure was about 13kpa. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the technical solution of the present invention, the following briefly introduces the drawings required for the technical description.
[0047] Figure 1 It is a schematic diagram of the existing high-pressure cylinder and shaft seal;
[0048] Figure 2 This is the flow chart of the existing shaft seal steam system;
[0049] Figure 3 A flow chart of a method for shortening the vacuum pumping time of a steam turbine condenser provided by the present invention;
[0050] Figure 4 A graph showing the temperature variation trend of the metal in the high-pressure cylinder during vacuuming provided by the present invention;
[0051] Figure 5The present invention provides a control diagram of shaft seal steam parameters during vacuuming. DETAILED DESCRIPTION
[0052] The following is further explained in detail through specific implementation methods.
[0053] For ease of understanding, the present invention first analyzes the reason for the large temperature difference between the upper and lower parts of the high-pressure cylinder.
[0054] During the overhaul, at the initial stage of establishing vacuum in the condenser, the turbine is in a cold state and the temperature of the high-pressure cylinder body is the ambient temperature. After the turbine shaft seal steam system supplies shaft seal steam to the turbine, the hot steam enters the high-pressure cylinder and tends to flow to the upper cylinder area of the high-pressure cylinder due to its low density. The steam heats the upper cylinder body faster, and the lower cylinder body is mainly heated by steam condensate, and the temperature rises relatively slowly. Uneven steam flow and distribution are one of the reasons for the large temperature difference between the upper and lower parts of the high-pressure cylinder.
[0055] In the early stage of heating the upper cylinder of the high-pressure cylinder, the initial metal temperature is low (about 25-30 degrees Celsius from room temperature). When the heating steam contacts the upper cylinder of the high-pressure cylinder, the condensed water temperature is low, while the heating of the lower cylinder of the high-pressure cylinder relies on the low-temperature condensed water of the steam, which further causes the lower cylinder of the high-pressure cylinder to heat slowly. Only when the metal temperature of the upper cylinder is heated to a certain degree, the temperature of the condensed water generated by the heating steam will rise, and the lower cylinder of the high-pressure cylinder will be heated relatively quickly. The temperature difference between the heating steam and the condensed water is one of the reasons for the large temperature difference between the upper and lower parts of the high-pressure cylinder.
[0056] Depending on the shaft seal steam flow rate, the rate of expansion of the temperature difference between the upper and lower parts of the high-pressure cylinder is different.
[0057] If the LBW steam (steam from the turbine shaft seal system) supply is large at the beginning of vacuum pumping, the metal temperature of the upper cylinder will rise quickly, while the temperature of the lower cylinder will rise relatively slowly. This will cause the temperature difference between the upper and lower cylinders of the high-pressure cylinder to rise quickly, which may easily exceed the regulatory limit.
[0058] If the LBW steam supply is small at the beginning of vacuum pumping, the shaft seal steam cannot seal the shaft seal, which allows the cold air in the turbine plant to enter the high-pressure cylinder from the shaft seal, resulting in a loose vacuum boundary and an inability to establish a vacuum. The cold air entering the high-pressure cylinder cools the lower cylinder, causing the temperature difference between the upper and lower parts of the high-pressure cylinder to exceed the limit.
[0059] Therefore, the fundamental reason for the large temperature difference between the upper and lower parts of the high-pressure cylinder when the turbine condenser is evacuated is that the flow control of the shaft seal steam supplied to the turbine by the turbine shaft seal steam system is unreasonable, and the vacuum degree during vacuum extraction is not reasonably matched with the temperature difference between the upper and lower parts of the high-pressure cylinder.
[0060] In view of the above reasons, combined with the structure of the high-pressure cylinder of the steam turbine and the process flow of condenser vacuum pumping, without changing the original system equipment configuration, at different times of the steam turbine condenser vacuum pumping (for example, in the initial stage of vacuum pumping, three vacuum pumps are put into use at the same time, and when the pressure of the main condenser reaches -10kPa, the shaft seal steam is supplied. According to the temperature rise of the high-pressure cylinder exhaust port, the opening of LBW10AA201 is adjusted. If it is relatively stable, LBW10AA201 is appropriately opened. If the rising rate is accelerated, the valve opening is kept unchanged or reduced to ensure that the temperature of the high-pressure cylinder exhaust port does not exceed 80℃). Adjust the supply flow of turbine shaft seal steam in time and match it reasonably (for example, if MAA10CT012 is greater than 60℃, LBW10AA101 / 201 can be gradually opened, and the opening of LBW10AA102 can be pulse-adjusted to slowly heat the upper and lower cylinders of the high-pressure cylinder and control the temperature of LBW10CT002 at around 120℃; at the same time, the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃; after the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27℃, the LBW10AA102 valve can be gradually opened, and be careful not to exceed 27℃) to reduce the temperature difference between the upper and lower pressure cylinders of the turbine.
[0061] During the overhaul, the vacuum establishment of the condenser is mainly completed by the turbine shaft seal system and the condenser vacuum system. During the vacuum establishment stage, the turbine shaft seal system mainly supplies sealing steam to the vacuum boundary turbine high and low pressure cylinder end seals to prevent the surrounding air from leaking into the system through the gaps of the turbine high and low pressure cylinder end seals. The shaft seal steam cooling system MAM (the destination of the turbine bearing steam after sealing, collecting and cooling the steam used by LBW) is mainly to draw the steam-air mixture at the turbine end seal and the main steam valve, main regulating valve and bypass valve into the shaft seal condenser, condense the steam into water and return it to the condenser, and the non-condensable gas is extracted by the negative pressure fan and discharged to the atmosphere. The condenser vacuum system MAJ mainly removes the non-condensable gas in the condenser through a water ring vacuum device to establish and maintain a vacuum state.
[0062] like Figure 1 and Figure 2 As shown, the existing high-pressure cylinder and shaft seal, and shaft seal steam system are shown, including: a high-pressure cylinder 1, a high-pressure cylinder shaft seal 2, a shaft seal steam supply pipeline 3, a steam-gas mixture extraction pipeline 4, a high-pressure cylinder lower cylinder metal temperature measuring point 5, and a high-pressure cylinder upper cylinder metal temperature measuring point (a first measuring point 6 and a second measuring point 7).
[0063] Based on the above analysis, in order to shorten the time to establish vacuum during overhaul, the present invention provides a method for shortening the time to evacuate a steam turbine condenser, such as Figures 3 to 5 As shown, including:
[0064] Three vacuum pumps are put into operation at the same time. The vacuum pumps keep working when the vacuum is built, when the steam is discharged to the condenser, and when the turbine is running. When the pressure of the main condenser reaches -10kPa or the pressure is stable and no longer drops, the shaft seal steam is supplied, and the shaft seal steam valve LBW10AA102 is opened by pulse. The monitoring parameters of the high-pressure cylinder of the steam turbine are: upper cylinder temperature MAA10CT011 / 013 (the upper cylinder of the high-pressure cylinder is equipped with two temperature measuring points), lower cylinder temperature MAA10CT012, upper and lower cylinder temperature difference MAA10FT911, high-pressure cylinder exhaust port temperature MAA10CT003 / 004 / 005 / 006 (the high-pressure cylinder has four exhausts, and there is a measuring point on each exhaust), and monitoring The temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 rises, and the opening of the shaft seal steam regulating valve LBW10AA201 is adjusted according to the temperature rise of the high-pressure cylinder exhaust port. If the temperature of the high-pressure cylinder exhaust port is relatively stable, then open the shaft seal steam regulating valve LBW10AA201 appropriately. If the temperature rise rate of the high-pressure cylinder exhaust port accelerates, keep the opening of the shaft seal steam regulating valve LBW10AA201 unchanged or reduce the valve opening to ensure that the temperature of the high-pressure cylinder exhaust port does not exceed 80°C, so as to ensure that the upper cylinder temperature does not exceed 80°C.
[0065] In cold vacuum operation, since the shaft seal steam enters the cylinder body from the tail of the high-pressure cylinder and finally gathers in the middle to increase the temperature of the high-pressure cylinder, the temperature of the cylinder body will not exceed the exhaust temperature, and the exhaust temperature is sensitive to the opening changes of the shaft seal steam valve LBW10AA102 and the shaft seal steam valve regulating valve LBW10AA201 (both valves can be pulse controlled, but LBW10AA102 is a stop valve). The opening of the shaft seal steam valve LBW10AA102 / 201 is controlled by the following method:
[0066] 1. If the lower cylinder temperature MAA10CT012 is less than 30°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to be the lower cylinder temperature MAA10CT012+50°C (the temperature of the lower cylinder temperature MAA10CT012 plus 50°C);
[0067] 2. If the lower cylinder temperature MAA10CT012 is greater than 30°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to 80°C;
[0068] 3. If the lower cylinder temperature MAA10CT012 is greater than 50°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to be the lower cylinder temperature MAA10CT012 + 30°C;
[0069] 4. If the lower cylinder temperature MAA10CT012 is greater than 60℃, the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 can be gradually opened.
[0070] Pulse adjustment of the opening of the shaft seal steam valve LBW10AA102, slowly heat the upper and lower cylinders of the high-pressure cylinder, control the temperature of the shaft seal steam valve LBW10AA102 LBW10CT002 at 120℃±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃. After the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27℃, the shaft seal steam valve LBW10AA102 can be gradually opened, and it is noted that the temperature difference should not exceed 27℃. After the shaft seal steam valve LBW10AA102 is fully opened, the shaft seal steam regulating valve LBW10AA201 is opened smoothly at 5% per step. No water hammer impact is allowed. Check the turbine shaft seal on site to prevent steam from leaking from the shaft seal. If the temperature difference between the upper and lower cylinders of the high-pressure cylinder inlet MAA10FT911 and the relative expansion difference of the high-pressure rotor MAY10CY907 rise quickly, reduce the pressure increase rate of the shaft seal steam. If the steam turbine is in a hot state, increase the pressure increase rate of the shaft seal steam. Adjust the opening of the shaft seal steam regulating valve LBW10AA201, adjust the pressure of the shaft seal steam main pipe between 18-22kPa and automatically check the turbine shaft seal. If necessary, adjust the following valves to ensure that the shaft seal does not inhale air and does not leak steam to the outside.
[0071] Strictly follow the steam turbine regulations. When evacuating the vacuum, adjust the opening of the shaft seal steam regulating valve LBW10AA201 according to the temperature rise of the high-pressure cylinder exhaust port. If it is relatively stable, appropriately open the shaft seal steam regulating valve LBW10AA201. If the rising rate is faster, keep the valve opening unchanged or reduce the valve opening to ensure that the temperature of the high-pressure cylinder exhaust port does not exceed 80°C, so as to ensure that the temperature of the upper cylinder does not exceed 80°C. When it is found that the temperatures of the upper and lower cylinders are gradually decreasing, and the temperature of the lower cylinder is rising faster and faster, the vacuum is quickly established after increasing the shaft seal pressure.
[0072] When the condenser vacuum is close to the rated value, close the shaft seal steam supply pipe to drain. Note: If the condenser vacuum cannot reach -92kPa, check the vacuum boundary, vacuum pump operation, shaft seal steam supply, etc.
[0073] As an practicable manner, the method for shortening the vacuum pumping time of a steam turbine condenser provided by the present invention specifically comprises the following steps:
[0074] Step 1: Shaft seal steam preheating work, including: completing the online work of vacuum pumping related systems, completing the online work of vacuum boundary related systems, notifying BOP to start the boiler / adjacent units, the turbine body overhaul has been completed, the main steam valve, regulating valve, and bypass valve overhaul has been completed, and the turning device MAK11AE001 is in operation.
[0075] Step 1.1: It is necessary to determine whether the steam turbine is in warm and hot state. If so, the shaft seal steam preheating is performed. If not, a MAM blower is started when the steam turbine is cold, and then the shaft seal steam preheating is performed.
[0076] Step 1.2: During the operation of the condensate system, cooling water is supplied to the shaft seal steam cooler MAM10AC001, with a flow rate greater than 152 kg / s. The water seal of the drain pipe of the shaft seal steam cooler MAM10AC001 has been established, and the water seal pressure MAM20CP501 is greater than 20 kPa.
[0077] Step 1.3: The turbine shaft seal exhaust system has been put online and a MAM blower is started.
[0078] Step 1.4: At least two circulating water pumps are in operation to supply cooling water to the two sets of condensers respectively.
[0079] Through the shaft seal steam preheating work, the vacuum pumping online operation has been performed, and the legacy items do not affect the vacuum pumping.
[0080] Step 1.5: Execute the operation sheet to put the oil motor cooling water LCW10, 20 into operation (system KKS code, the same below).
[0081] Step 1.6: The online operation of MAJ33, MAJ34 and MAJ35 vacuum pump groups has been completed before starting.
[0082] Step 1.7: Start at least one pump, PGE11AP001 or PGE12AP001.
[0083] Step 1.8: Preheat the steam supply pipeline for the steam turbine shaft seal in front of the shaft seal steam regulating valve LBW10AA201. Before supplying sealing steam to the steam turbine shaft seal, strengthen the drainage of the steam main pipe. Manually slightly open the valve LBW01AA101 on site to prevent water hammer. The pressure increase speed should not exceed 0.05MPa / min. The pipeline is observed on site without water hammer. When the pressure of LBW10CP001 rises to the plant steam header pressure of 0.6±0.1MPa, the temperature of LBW10CT001 is approximately the saturation temperature under this pressure. The preheating of the steam supply pipeline for the steam turbine shaft seal in front of the shaft seal steam regulating valve LBW10AA201 is completed.
[0084] Step 1.9: Preheat the shaft seal steam supply pipeline after the shaft seal steam regulating valve LBW10AA201 (the preheating mentioned above is the preheating before the LBW10AA201 valve, and step 1.9 is the preheating after this valve).
[0085] Step 2: Determine whether the steam turbine is in a hot state or a warm state. When the steam turbine is in a warm state or a hot state, proceed to step 3; when the steam turbine is not in a warm state or a hot state, proceed to step 4.
[0086] Step 3: Supply the shaft seal steam first, and adjust the pulse width according to the temperature rise speed of the upper and lower cylinders of the high-pressure cylinder to ensure that: the temperature of the shaft seal steam valve LBW10AA102 LBW10CT002 is controlled at 120±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃. Start vacuuming, start a MAM blower, and start the MAJ33, MAJ34, and MAJ35 vacuum pump groups to vacuum.
[0087] Step 4: Start to evacuate the air, start the vacuum pump group MAJ33, MAJ34, MAJ35 to evacuate the air. When the pressure of the main condenser reaches -10kPa or the pressure is stable and no longer drops, start to supply the shaft seal steam, and pulse open the valve LBW10AA102. In the cold state, the vacuum operation is carried out. Since the shaft seal steam enters the cylinder body from the tail of the high-pressure cylinder and finally converges in the middle to increase the temperature of the high-pressure cylinder, the temperature of the cylinder body will not exceed the exhaust temperature, and the exhaust temperature is sensitive to the opening changes of the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201. The shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 are controlled by the following method:
[0088] Step 4.1: Pulse-adjust the opening of the shaft seal steam valve LBW10AA102, and slowly heat the upper and lower cylinders of the high-pressure cylinder to ensure that: the temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 is controlled at 120±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃. After the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27℃, gradually open the shaft seal steam valve LBW10AA102, and pay attention that the temperature difference should not exceed 27℃.
[0089] Step 4.2: After the shaft seal steam valve LBW10AA102 is fully opened, open the shaft seal steam regulating valve LBW10AA201 smoothly at a speed of 5% per step. Water hammer impact is not allowed. Check the turbine shaft seal on site to prevent steam leakage from the shaft seal. If the upper and lower temperature difference MAA10FT911 of the high-pressure cylinder inlet and the relative expansion difference MAY10CY907 of the high-pressure rotor rise quickly, reduce the pressure increase speed of the shaft seal steam. If the turbine is in a hot state, increase the pressure increase speed of the shaft seal steam.
[0090] Step 4.3: Adjust the opening of the shaft seal steam regulating valve LBW10AA201, adjust the pressure of the shaft seal steam main pipe between 18 and 22 kPa and put it into automatic operation, check the turbine shaft seal, and adjust the manual air supply valve of each turbine shaft seal body when necessary to ensure that the shaft seal does not inhale air and does not leak steam to the outside.
[0091] Step 4.4: When the condenser vacuum is close to the rated value, close the shaft seal steam supply pipe to drain. If the condenser vacuum cannot reach -92kPa, check the vacuum boundary, vacuum pump operation, shaft seal steam supply, etc.
[0092] Step 4.5: The condenser vacuum reaches the rated pressure of -92~100kPa, and the vacuum pumping work of the turbine condenser is completed.
[0093] Step 5: The temperature difference between the upper and lower parts of the high-pressure cylinder begins to decrease, and a vacuum is established.
[0094] Therefore, the present invention provides a method for controlling the temperature difference between the upper and lower parts of the high-pressure cylinder when the turbine condenser is evacuated, and the hot steam heats the upper cylinder of the high-pressure cylinder and the steam condensate heats the lower cylinder synchronously, so that the temperature difference between the upper and lower parts of the high-pressure cylinder is controlled within the range required by the regulations. The present invention provides a method for controlling the system parameters of the shaft seal steam system when evacuating, and balances the influence of the shaft seal steam system on the vacuum boundary and the temperature difference between the upper and lower parts of the high-pressure cylinder, and finds the balance point and control method.
[0095] The present invention develops an advanced system operation control scheme for evacuating a steam turbine condenser, thereby improving the accuracy and effectiveness of system parameter control.
[0096] The efficiency of the present invention is higher than that of the original design method, the vacuum pumping time of the steam turbine condenser is shortened, the manpower cost and material consumption of the overhaul start-up of the unit are reduced, the overhaul period is shortened, and the economic benefits of the power station are improved.
[0097] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for shortening the vacuum pumping time of a steam turbine condenser, characterized in that: During the overhaul, three vacuum pumps are put into use at the same time. The vacuum pumps keep working when the vacuum is started, steam is discharged to the condenser and the steam turbine is running. When the pressure of the main condenser is stable and no longer drops, the shaft seal steam is supplied, and the shaft seal steam valve LBW10AA102 is opened by pulse. The temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 is monitored. The opening of the shaft seal steam regulating valve LBW10AA201 is adjusted according to the temperature rise of the high-pressure cylinder exhaust port. If the temperature of the high-pressure cylinder exhaust port is relatively stable, the shaft seal steam regulating valve LBW10AA201 is appropriately opened; if the temperature rise rate of the high-pressure cylinder exhaust port is accelerated, the opening of the shaft seal steam regulating valve LBW10AA201 is kept unchanged or the valve opening is reduced.
2. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1, characterized in that: By adjusting the opening of the shaft seal steam regulating valve LBW10AA201, the exhaust temperature of the high-pressure cylinder is ensured not to exceed 80°C, so as to ensure that the upper cylinder temperature does not exceed 80°C.
3. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1 or 2, characterized in that: The method for controlling the opening of the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 is as follows: If the lower cylinder temperature MAA10CT012 is less than 30°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to be the lower cylinder temperature MAA10CT012+50°C; If the lower cylinder temperature MAA10CT012 is greater than 30°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to 80°C; If the lower cylinder temperature MAA10CT012 is greater than 50°C, the maximum value of the high-pressure cylinder exhaust temperature is controlled to be the lower cylinder temperature MAA10CT012+30°C; If the lower cylinder temperature MAA10CT012 is greater than 60℃, the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201 can be gradually opened.
4. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 3, characterized in that: Pulse-regulate the opening of the shaft sealing steam valve LBW10AA102, slowly heat the upper and lower cylinders of the high-pressure cylinder, control the temperature LBW10CT002 behind the shaft sealing steam valve LBW10AA102 at 120±10℃, and at the same time, the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃; after the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27℃, gradually open the shaft sealing steam valve LBW10AA102, and control the temperature difference between the upper and lower cylinders of the high-pressure cylinder not to exceed 27℃. After the shaft sealing steam valve LBW10AA102 is fully opened, slowly open the shaft sealing steam regulating valve LBW10AA201 at 5% per step.
5. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 4, characterized in that: The temperature difference between the upper and lower cylinders at the high-pressure cylinder inlet MAA10FT911 and the relative expansion difference of the high-pressure rotor MAY10CY907, if they rise quickly, reduce the pressure increase rate of the shaft seal steam. If the turbine is in a hot state, increase the pressure increase rate of the shaft seal steam. Adjust the opening of the shaft seal steam regulating valve LBW10AA201 and adjust the pressure of the shaft seal steam main pipe between 18-22kPa.
6. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1 or 5, characterized in that: When evacuating, adjust the opening of the shaft seal steam regulating valve LBW10AA201. If the temperature rises steadily at the high-pressure cylinder exhaust port, open the shaft seal steam regulating valve LBW10AA201 appropriately. If the rising rate accelerates, keep the valve opening unchanged or reduce the valve opening to ensure that the temperature at the high-pressure cylinder exhaust port does not exceed 80°C.
7. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1, characterized in that: The monitoring parameters of the turbine high-pressure cylinder include the upper cylinder temperature, the lower cylinder temperature, the temperature difference between the upper and lower cylinders, and the high-pressure cylinder exhaust port temperature.
8. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1, characterized in that: The method specifically includes: Step 1: Preheating of shaft seal steam; Step 2: Determine whether the steam turbine is in a hot state or a warm state. When the steam turbine is in a warm state or a hot state, proceed to step 3; when the steam turbine is not in a warm state or a hot state, proceed to step 4; Step 3: Supply the shaft seal steam first, and adjust the pulse width according to the temperature rise speed of the upper and lower cylinders of the high-pressure cylinder to ensure that: the temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 is controlled at 120±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃. Start vacuuming, start a MAM blower, and start the MAJ33, MAJ34, and MAJ35 vacuum pump groups to vacuum; Step 4: Start vacuuming, start the MAJ33, MAJ34, MAJ35 vacuum pump group to vacuum, start supplying shaft seal steam when the pressure of the main condenser reaches -10kPa or the pressure is stable and no longer drops, open the shaft seal steam valve LBW10AA102 by pulse, vacuum operation under cold state, the shaft seal steam gathers in the middle to increase the temperature of the high-pressure cylinder, control the opening of the shaft seal steam valve LBW10AA102 and the shaft seal steam regulating valve LBW10AA201; Step 5: The temperature difference between the upper and lower parts of the high-pressure cylinder begins to decrease, and a vacuum is established.
9. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1, characterized in that: Step 1 specifically includes: Step 1.1: Determine whether the steam turbine is in warm and hot state. If so, perform shaft seal steam preheating. If not, start a MAM blower when the steam turbine is cold, and then enter shaft seal steam preheating; Step 1.2: When the condensate system is running, cooling water is supplied to the shaft seal steam cooler MAM10AC001, and the flow rate is greater than 152 kg / s. The water seal of the drain pipe of the shaft seal steam cooler MAM10AC001 has been established, and the water seal pressure MAM20CP501 is greater than 20 kPa; Step 1.3: The turbine shaft seal exhaust system has been put online, and a MAM blower is started; Step 1.4: At least two circulating water pumps are in operation to supply cooling water to the two sets of condensers respectively; Step 1.5: Execute the operation sheet to put the oil motor cooling water into operation; Step 1.6: Complete the pre-startup inspection of the MAJ33, MAJ34, and MAJ35 vacuum pump groups; Step 1.7: Start the pumps PGE11AP001 and PGE12AP001 that supply cooling water to the MAJ33, MAJ34, and MAJ35 vacuum pump groups, and keep at least one pump running; Step 1.8: Before supplying sealing steam to the turbine shaft seal, strengthen the drainage of the steam main pipe and open the valve LBW01AA101 to prevent water hammer. The pressure rise rate should not exceed 0.05MPa / min. When the pressure of LBW10CP001 rises to the plant steam header pressure of 0.6±0.1MPa, observe on-site that there is no water hammer in the pipeline. Step 1.9: Preheat the shaft seal steam supply pipeline after the shaft seal steam regulating valve LBW10AA201.
10. The method for shortening the vacuum pumping time of a steam turbine condenser according to claim 1, characterized in that: Step 4 specifically includes: Step 4.1: Pulse-regulate the opening of the shaft seal steam valve LBW10AA102, slowly heat the upper and lower cylinders of the high-pressure cylinder, so that the temperature LBW10CT002 behind the shaft seal steam valve LBW10AA102 is controlled at 120±10℃, and the temperature of the upper cylinder of the high-pressure cylinder is less than 79℃; after the temperature difference between the upper and lower cylinders of the high-pressure cylinder gradually decreases and is less than 27℃, gradually open the LBW10AA102 valve, and the temperature difference does not exceed 27℃; Step 4.2: After the shaft seal steam valve LBW10AA102 is fully opened, the shaft seal steam regulating valve LBW10AA201 is opened smoothly at a speed of 5% per step. If the upper and lower temperature difference MAA10FT911 of the high-pressure cylinder inlet and the relative expansion difference MAY10CY907 of the high-pressure rotor increase rapidly, the pressure increase speed of the shaft seal steam is reduced. If the steam turbine is in a hot state, the pressure increase speed of the shaft seal steam is increased. Step 4.3: Adjust the opening of the shaft seal steam regulating valve LBW10AA201, adjust the pressure of the shaft seal steam main pipe between 18 and 22 kPa and put it into automatic mode, and check the turbine shaft seal; Step 4.4: When the condenser vacuum is close to the rated value, close the shaft seal steam supply pipe to drain. If the condenser vacuum cannot reach -92kPa, check the vacuum boundary, vacuum pump operation, and shaft seal steam supply; Step 4.5: The condenser vacuum reaches the rated pressure of -92~100kPa, and the vacuum pumping work of the turbine condenser is completed.