Soft soil foundation pipeline settlement measurement test device and method
By using lifting mechanism and displacement sensors to measure the settlement amount of pipelines on soft soil foundations in the seabed environmental simulation test chamber, the problem of difficult to measure settlement amount in the seabed pipeline is solved, and accurate prediction of the settlement amount of pipelines of different scales is achieved and The improvement of test efficiency provides reliable data support for marine engineering.
Patent Information
- Application Number
- CN202411242183.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-05
AI Technical Summary
In marine engineering, it is difficult to directly measure the settlement status of submarine pipelines on soft soil foundations, which makes it difficult to accurately predict the settlement amount of full-size pipelines, affecting the installation and maintenance efficiency of pipelines. In addition, the existing model test methods have scale reduction problems, which is difficult to Effectively study the sedimentation process.
Design a test device for measuring settlement of soft soil pipelines, including a seabed environment simulation test chamber and lifting mechanism, and use displacement sensors to measure the settlement of pipelines on soft soil foundations in real time, and adjust the lifting mechanism through hydraulic pumps and drive motors to realize Flexible decentralization and measurement of pipelines.
The device can accurately measure the settlement amount of pipes of different scales, improve the prediction accuracy of the settlement amount of full-size pipelines, reduce the complexity of the device, facilitate pipeline installation, improve test efficiency, and provide reliable data support for actual projects.
Smart Images

Figure CN119063695A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of marine engineering, and in particular relates to a soft soil foundation pipeline settlement measurement test device and method. Background Art
[0002] At present, the marine pipeline system is the main mode of transporting offshore oil and gas resources, connecting production wells, offshore platforms and onshore facilities. The stability and safety of the pipeline system in extreme environments are crucial to energy transportation. However, after the pipeline is put into use, it may cause pipeline settlement due to factors such as ultra-soft soil layers. Pipeline settlement will affect the installation method and efficiency of the pipeline.
[0003] Due to the complex seabed environment, it is difficult to directly measure the settlement of pipelines on site. In order to study the settlement of marine pipelines, it is necessary to estimate the settlement of pipelines under specific marine conditions through model tests, so as to achieve early warning and risk management. The research results of pipeline settlement can be used to optimize the design, material selection and layout of marine pipelines, and enhance their stability and durability in harsh environments. At the same time, it can also help develop more effective pipeline monitoring and maintenance strategies, reduce maintenance costs, extend service life, and ensure the continuity and safety of oil and gas transportation.
[0004] Therefore, studying the settlement of marine pipelines is of great significance to ensure the reliability and safety of oil and gas transportation. At present, in the process of studying the settlement of pipelines through model tests, due to the large size of the actual pipelines, it is necessary to predict the settlement process and settlement of the full-size model through scaled model tests. Therefore, in order to accurately study the settlement of pipelines on soft soil foundations and provide effective reference data for the installation of submarine pipelines in actual projects, it is necessary to develop a test scheme for measuring the settlement of pipelines on soft soil foundations. Summary of the invention
[0005] To this end, the present invention provides a soft soil foundation pipeline settlement measurement test device and method, which can study the settlement of the pipeline on the soft soil foundation through model tests, thereby predicting the settlement of the full-size pipeline on the seabed, and providing reliable data support for the installation of actual engineering pipelines.
[0006] In order to achieve the above-mentioned object, the present invention provides the following technical solutions: a soft soil foundation pipeline settlement measurement test device, comprising a seabed environment simulation test box, wherein a soft soil foundation is arranged inside the seabed environment simulation test box; lifting mechanisms are respectively arranged on both sides of the seabed environment simulation test box; a support frame is fixed to the upper end of the lifting mechanism;
[0007] The support frame spans above the seabed environment simulation test box; the side of the support frame is connected to a lower load-bearing rod, one side of the upper end of the support frame is connected to an upper load-bearing rod, and the middle of the upper end of the support frame is connected to a central load-bearing rod; the lower middle of the support frame is connected to a lifting slide rail;
[0008] The lower load-bearing rod is fixed with a traction disk, the upper load-bearing rod is fixed with a first pulley, the central load-bearing rod is fixed with a second pulley, and a displacement sensor is provided at the lower part of the central load-bearing rod; the lifting slide rail is connected with an anti-interference slide cylinder through a lifting slider;
[0009] The traction disc is connected to a traction cable, and the traction cable is connected to the lifting slider after passing through the first pulley and the second pulley;
[0010] The lower end of the anti-interference slide is connected to a pipeline body, and the pipeline body settles on the soft soil foundation in the seabed environment simulation test box; the displacement sensor measures the settlement amount of the pipeline body on the soft soil foundation in real time.
[0011] As a preferred solution for the soft soil foundation pipeline settlement measurement test device, a buffer energy-absorbing layer is provided at the edge of the seabed environment simulation test box, and the buffer energy-absorbing layer is made of a foam board or a hard sponge pad.
[0012] As a preferred solution for the soft soil foundation pipeline settlement measurement test device, the lifting mechanism includes a hydraulic base, upper and lower double scissor arms, a hydraulic top seat, a hydraulic support rod, a drive motor and a hydraulic pump;
[0013] The drive motor and the hydraulic pump are both fixed above the hydraulic base, and the drive motor is connected to the hydraulic pump; the upper ends of the upper and lower double scissor arms are hinged to the hydraulic top seat, and the lower ends of the upper and lower double scissor arms are hinged to the hydraulic base; the hydraulic support rod is connected to the hydraulic pump through a hydraulic pipeline;
[0014] The drive motor is also equipped with a remote controller, which is electrically connected to the drive motor; the remote controller is used to control the start and stop of the drive motor;
[0015] The lower end of the hydraulic base is connected with a universal wheel.
[0016] As a preferred solution of the test device for measuring the settlement of pipelines on soft soil foundation, the maximum lifting height of the lifting mechanism is greater than the sum of the height of the seabed environment simulation test box and the maximum diameter of the pipeline body.
[0017] As a preferred solution of the soft soil foundation pipeline settlement measurement test device, the lower load-bearing rod, the upper load-bearing rod, and the central load-bearing rod are all connected to the support frame through a load-bearing rod adapter sleeve;
[0018] The lengths of the lower load-bearing rod, the upper load-bearing rod and the central load-bearing rod are all greater than the maximum length of the pipe body.
[0019] As a preferred solution for the soft soil foundation pipeline settlement measurement test device, a damper is connected to the bottom end of the lifting slide rail, and the damper adopts a spring damper or a viscous damper; the damper is used to reduce the lowering speed of the pipeline body.
[0020] As a preferred solution for the soft soil foundation pipeline settlement measurement test device, the anti-interference slide cylinder includes a slide rod body, a slide cylinder body, a slide rod adapter and a hook;
[0021] The upper end of the slide rod body is connected to the lifting slider through the slide rod adapter, and the lower end of the slide rod body is connected to the slide cylinder body; the hook is connected to the bottom of the slide cylinder body.
[0022] As a preferred solution of the soft soil foundation pipeline settlement measurement test device, the lifting rail, the lifting slider, and the anti-interference slide cylinder are symmetrically provided in two groups; the pipeline body is connected between the two groups of the anti-interference slide cylinders;
[0023] The traction cable is divided into two sub-traction ropes after passing around the second pulley, and the two sub-traction ropes are respectively connected to the two groups of lifting sliders.
[0024] As a preferred solution of the soft soil foundation pipeline settlement measurement test device, the number of the displacement sensors is at least three;
[0025] The width of the seabed environment simulation test box is 10 times the maximum diameter of the pipeline body, and the length of the seabed environment simulation test box is 5 times the maximum length of the pipeline body.
[0026] The present invention also provides a soft soil foundation pipeline settlement measurement test method, comprising the following steps:
[0027] 1) According to the size of the pipeline used in the actual project, determine the appropriate scale, process the pipeline body model for the test, and prepare a seabed environment simulation test box of the size of the pipeline body model suitable for all tests, and arrange the lifting lugs on the outer wall of the pipeline body;
[0028] 2) According to the size of the test pipeline model and the size of the seabed environment simulation test box, the height of the lifting mechanism is designed to be greater than the height of the seabed environment simulation test box, and the lengths of the lower bearing rod, upper bearing rod and central bearing rod must be greater than the lengths of all test pipeline models;
[0029] 3) Prepare a soft soil foundation according to the seabed soil conditions in the actual project. After the preparation is completed, lay the soft soil foundation layer by layer in the seabed environment simulation test box, and install a buffer energy absorption layer around the seabed environment simulation test box;
[0030] 4) Unlock the universal wheel of the lifting mechanism, move the adjustable pipe body installation and lowering device to the position of the pipe body, lock the universal wheel, adjust the spacing of the support frame according to the size of the test pipe body, and make the spacing of the hooks of the anti-interference slide the same as the spacing of the lugs on the outer wall of the pipe body;
[0031] 5) The hydraulic pump is controlled by the driving motor to make the hydraulic support rod of the lifting mechanism telescopic, and the lifting mechanism is adjusted to the set height, so that the hook under the anti-interference slide is connected to the outer wall ear of the pipeline body. The pipeline body is adjusted to the specified height through the traction plate, and the traction plate is locked;
[0032] 6) Install several displacement sensors under the central load-bearing rod. After installation, drive the motor to control the hydraulic pump to make the hydraulic support rod of the lifting mechanism telescopic, adjust the lifting mechanism to a height higher than the seabed environment simulation test box, unlock the universal wheel, move the pipeline installation and lowering equipment to the top of the seabed environment simulation test box, and lock the universal wheel;
[0033] 7) Unlock the traction plate, control the anti-interference slide cylinder by the traction cable, and lower the pipeline body vertically downward along the lifting slide rail until it is close to the end of the lifting slide rail, use the damper to reduce the lowering speed of the pipeline body, and continue to lower the pipeline body until the pipeline body contacts the soft soil foundation and the pipeline body and the anti-interference slide cylinder are unhooked;
[0034] 8) When the pipeline body is freely settling, use the displacement sensor to collect the settlement of the pipeline body. When the settlement data is stable, stop the test;
[0035] 9) After a single pipeline body settlement simulation test is completed, replace the specified scaled pipeline body model, re-adjust the spacing of the support frame according to the test pipeline body size, and conduct subsequent tests.
[0036] The invention has the following advantages: a soft soil foundation is arranged inside the seabed environment simulation test box; lifting mechanisms are arranged on both sides of the seabed environment simulation test box; a support frame is fixed on the upper end of the lifting mechanism; the support frame spans the upper part of the seabed environment simulation test box; a lower load-bearing rod is connected to the side of the support frame, an upper load-bearing rod is connected to one side of the upper end of the support frame, and a central load-bearing rod is connected to the middle part of the upper end of the support frame; a lifting slide rail is connected to the lower middle part of the support frame; a traction disc is fixedly arranged on the lower load-bearing rod, a first pulley is fixedly arranged on the upper load-bearing rod, a second pulley is fixedly arranged on the central load-bearing rod, and a displacement sensor is arranged at the lower part of the central load-bearing rod; the lifting slide rail is connected to an anti-interference slide cylinder through a lifting slider; the traction disc is connected to a traction cable, and the traction cable is connected to the lifting slider after passing around the first pulley and the second pulley; the lower end of the anti-interference slide cylinder is connected to a pipeline body, and the pipeline body settles on the soft soil foundation in the seabed environment simulation test box; the displacement sensor measures the settlement amount of the pipeline body on the soft soil foundation in real time. The present invention can flexibly control movement and adjust spacing, significantly improving the applicability to pipelines of different scales, so that it can be used to study the settlement of pipelines of different scales and more accurately predict the settlement of full-size pipelines; the device can be lowered to facilitate the installation of the pipeline and further improve the test efficiency; it can be effectively applied to the study of the settlement of pipelines on soft soil foundations, providing a valuable reference basis for pipeline lowering tests and providing reliable data support for the settlement of pipelines in actual projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0038] Figure 1 It is a three-dimensional schematic diagram of a soft soil foundation pipeline settlement measurement test device provided in an embodiment of the present invention;
[0039] Figure 2 A schematic side view of a soft soil foundation pipeline settlement measurement test device provided in an embodiment of the present invention;
[0040] Figure 3 It is a front view schematic diagram of a soft soil foundation pipeline settlement measurement test device provided in an embodiment of the present invention;
[0041] Figure 4 The present invention is a flowchart of a method for measuring the settlement of a pipeline on a soft soil foundation according to an embodiment of the present invention.
[0042] In the figure, 1. Seabed environment simulation test box; 2. Soft soil foundation; 3. Lifting mechanism; 4. Support frame; 5. Lower load-bearing rod; 6. Upper load-bearing rod; 7. Center load-bearing rod; 8. Lifting slide rail; 9. Towing plate; 10. First pulley; 11. Second pulley; 12. Displacement sensor; 13. Lifting slider; 14. Anti-interference slide cylinder; 15. Towing cable; 16. Pipeline body; 17. Buffer energy absorption layer; 18. Hydraulic base; 19. Upper and lower double scissor arms; 20. Hydraulic top seat; 21. Hydraulic support rod; 22. Drive motor; 23. Hydraulic pump; 24. Universal wheel; 25. Load-bearing rod adapter sleeve; 26. Damper; 27. Slide rod body; 28. Slide cylinder body; 29. Slide rod adapter; 30. Hook; 31. Sub-traction rope. DETAILED DESCRIPTION
[0043] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] See also Figure 1 , Figure 2 and Figure 3 The embodiment of the present invention provides a soft soil foundation pipeline settlement measurement test device, comprising a seabed environment simulation test box 1, wherein a soft soil foundation 2 is provided inside the seabed environment simulation test box 1; lifting mechanisms 3 are respectively provided on both sides of the seabed environment simulation test box 1; a support frame 4 is fixed to the upper end of the lifting mechanism 3;
[0045] Among them, the support frame 4 spans above the seabed environment simulation test box 1; the side of the support frame 4 is connected to a lower load-bearing rod 5, one side of the upper end of the support frame 4 is connected to an upper load-bearing rod 6, and the middle of the upper end of the support frame 4 is connected to a central load-bearing rod 7; the lower middle part of the support frame 4 is connected to a lifting slide rail 8;
[0046] Among them, the lower load-bearing rod 5 is fixed with a traction disc 9, the upper load-bearing rod 6 is fixed with a first pulley 10, the central load-bearing rod 7 is fixed with a second pulley 11, and the lower part of the central load-bearing rod 7 is provided with a displacement sensor 12; the lifting slide rail 8 is connected to an anti-interference slide cylinder 14 through a lifting slider 13;
[0047] The traction disc 9 is connected with a traction cable 15, and the traction cable 15 passes through the first pulley 10 and the second pulley 11 and then connects to the lifting slider 13;
[0048] The lower end of the anti-interference slide 14 is connected to a pipeline body 16 , and the pipeline body 16 settles on the soft soil foundation 2 in the seabed environment simulation test box 1 ; the displacement sensor 12 measures the settlement of the pipeline body 16 on the soft soil foundation 2 in real time.
[0049] In this embodiment, the width of the seabed environment simulation test box 1 is 10 times the diameter of the largest pipe body 16, and the length of the seabed environment simulation test box 1 is 5 times the length of the largest pipe body 16. The edge of the seabed environment simulation test box 1 is provided with a buffer energy absorption layer 17, and the buffer energy absorption layer 17 adopts a foam board or a hard sponge pad, so as to reduce the boundary effect generated by the seabed environment simulation test box 1 and reduce the test error.
[0050] In this embodiment, the lifting mechanism 3 includes a hydraulic base 18, an upper and lower double scissor arm 19, a hydraulic top seat 20, a hydraulic support rod 21, a drive motor 22 and a hydraulic pump 23; the drive motor 22 and the hydraulic pump 23 are both fixed above the hydraulic base 18, and the drive motor 22 is connected to the hydraulic pump 23; the upper ends of the upper and lower double scissor arms 19 are hinged to the hydraulic top seat 20, and the lower ends of the upper and lower double scissor arms 19 are hinged to the hydraulic base 18; the hydraulic support rod 21 is connected to the hydraulic pump 23 through a hydraulic pipeline; the drive motor 22 is also equipped with a remote control, and the remote control and the drive motor 22 are electrically connected; the remote control is used to control the start and stop of the drive motor 22; the lower end of the hydraulic base 18 is connected to a universal wheel 24.
[0051] Specifically, the hydraulic base 18 and the hydraulic top seat 20 play the role of installing the upper and lower double scissor arms 19. The upper end of the hydraulic top seat 20 is fixed to the support frame 4. The remote control controls the start and stop of the driving motor 22, and then controls the hydraulic pump 23, so that the hydraulic support rod 21 of the lifting mechanism 3 can be telescopically moved, and the lifting mechanism 3 is adjusted to the set height, thereby driving the support frame 4 to rise and fall, so that the hook 30 below the anti-interference slide 14 is connected to the outer wall ear of the pipeline body 16. And the lifting mechanism 3 can realize the lowering device, so as to facilitate the installation of the pipeline body 16 to the test device, further improving the test efficiency. In addition, the overall movement of the lifting mechanism 3 can be realized by unlocking and fixing the universal wheel 24, so as to facilitate the movement of the test device to any position.
[0052] In this embodiment, the maximum lifting height of the lifting mechanism 3 is greater than the sum of the height of the seabed environment simulation test box 1 and the diameter of the maximum pipe body 16, ensuring that the test device can be moved above the seabed environment simulation test box 1 after installing the pipe body 16.
[0053] In this embodiment, the lower load-bearing rod 5, the upper load-bearing rod 6, and the center load-bearing rod 7 are all connected to the support frame 4 through the load-bearing rod adapter sleeve 25; the lengths of the lower load-bearing rod 5, the upper load-bearing rod 6, and the center load-bearing rod 7 are all greater than the length of the maximum pipe body 16.
[0054] Specifically, two lower bearing rods 5 are provided, which are installed on both sides of the lower part of the support frame 4, two upper bearing rods 6 are provided, which are installed on both sides of the upper part of the support frame 4, and one central bearing rod 7 is provided, which is installed in the middle of the upper end of the support frame 4. The lengths of the lower bearing rods 5 and the upper bearing rods 6 between the bearing rod adapter sleeves 25 can be flexibly adjusted through the bearing rod adapter sleeves 25, thereby adjusting the spacing of the support frames 4. The lengths of the lower bearing rods 5, the upper bearing rods 6, and the central bearing rods 7 should be greater than the length of the pipeline body 16, which greatly improves the applicability to pipeline bodies 16 of different scales. In addition, at least three displacement sensors 12 are installed below the central bearing rod 7 to record the settlement of the pipeline body 16 model in real time after it is lowered.
[0055] In this embodiment, a damper 26 is connected to the bottom end of the lifting rail 8, and the damper 26 is a spring damper 26 or a viscous damper 26; the damper 26 is used to reduce the lowering speed of the pipeline body 16. When the pipeline body 16 is lowered vertically downward along the lifting rail 8 and lowered to near the end of the lifting rail 8, the damper 26 is used to reduce the lowering speed of the pipeline body 16, and the pipeline body 16 is continuously lowered, so that the pipeline body 16 can contact with the soft soil foundation 2, and the pipeline body 16 and the anti-interference slide cylinder 14 are decoupled.
[0056] In this embodiment, the anti-interference slide 14 includes a slide rod body 27, a slide rod body 28, a slide rod adapter 29 and a hook 30; the upper end of the slide rod body 27 is connected to the lifting slider 13 through the slide rod adapter 29, and the lower end of the slide rod body 27 is connected to the slide rod body 28; the hook 30 is connected to the bottom of the slide rod body 28.
[0057] Specifically, the anti-interference slide 14 greatly reduces the shaking of the pipeline body 16 during the lowering process. The hook 30 is connected to the pipeline body 16, and the traction cable 15 is connected to the traction disc 9 through the first pulley 10 and the second pulley 11 to realize the lifting and lowering of the pipeline body 16. When the pipeline body 16 is lowered to contact the soft soil foundation 2, the damper 26 is used to slow down the speed of the pipeline body 16, while the anti-interference slide 14 still maintains the original speed drop, that is, the hook 30 is separated from the pipeline body 16, which is convenient for unhooking.
[0058] In this embodiment, the lifting rail 8, the lifting slider 13, and the anti-interference slide cylinder 14 are symmetrically arranged in two groups; the pipeline body 16 is connected between the two groups of anti-interference slide cylinders 14; the traction cable 15 is divided into two traction ropes 31 after passing around the second pulley 11, and the two traction ropes 31 are respectively connected to the two groups of lifting sliders 13.
[0059] Specifically, two groups of lifting sliders 13 can be pulled simultaneously by two strands of pulling ropes 31 . The two groups of lifting sliders 13 move on two groups of lifting rails 8 and pull both ends of the pipe body 16 at the same time, thereby improving the stability of the pipe body 16 in descending.
[0060] See also Figure 4 The embodiment of the present invention further provides a method for measuring the settlement of a pipeline on a soft soil foundation. A device for measuring the settlement of a pipeline on a soft soil foundation based on the above embodiment comprises the following steps:
[0061] S1. According to the size of the pipeline used in the actual project, determine the appropriate scale, process the pipeline body 16 model for the test, and prepare a seabed environment simulation test box 1 of the size of the pipeline body 16 model suitable for all tests, and arrange the lifting lugs on the outer wall of the pipeline body 16;
[0062] S2. According to the size of the test pipeline body 16 model and the size of the seabed environment simulation test box 1, the height of the lifting mechanism 3 is designed to be greater than the height of the seabed environment simulation test box 1, and the lengths of the lower bearing rod 5, the upper bearing rod 6, and the center bearing rod 7 must be greater than the lengths of all the test pipeline body 16 models;
[0063] S3, prepare a soft soil foundation 2 according to the seabed soil conditions in the actual project, and after the preparation is completed, lay the soft soil foundation 2 layer by layer in the seabed environment simulation test box 1, and install a buffer energy absorption layer 17 around the seabed environment simulation test box 1;
[0064] S4, unlock the universal wheel 24 of the lifting mechanism 3, move the adjustable pipe body 16 installation and lowering device to the position of the pipe body 16, lock the universal wheel 24, adjust the spacing of the support frame 4 according to the size of the test pipe body 16, and make the spacing of the hooks 30 of the anti-interference slide 14 the same as the spacing of the outer wall ears of the pipe body 16;
[0065] S5. Control the hydraulic pump 23 by driving the motor 22 to make the hydraulic support rod 21 of the lifting mechanism 3 telescopically move, adjust the lifting mechanism 3 to the set height, and connect the hook 30 below the anti-interference slide 14 with the outer wall ear of the pipeline body 16. Adjust the pipeline body 16 to the specified height through the traction plate 9, and lock the traction plate 9;
[0066] S6. Install several displacement sensors 12 under the central load-bearing rod 7. After installation, drive the motor 22 to control the hydraulic pump 23 to make the hydraulic support rod 21 of the lifting mechanism 3 perform telescopic movement, adjust the lifting mechanism 3 to a height higher than the seabed environment simulation test box 1, unlock the universal wheel 24, move the pipeline installation and lowering equipment to the top of the seabed environment simulation test box 1, and lock the universal wheel 24.
[0067] S7, unlock the traction plate 9, control the anti-interference slide cylinder 14 through the traction cable 15, and lower the pipeline body 16 vertically downward along the lifting slide rail 8 until it is close to the end of the lifting slide rail 8, use the damper 26 to reduce the lowering speed of the pipeline body 16, and continue to lower the pipeline body 16 until the pipeline body 16 contacts the soft soil foundation 2, and the pipeline body 16 and the anti-interference slide cylinder 14 are unhooked;
[0068] S8, when the pipeline body 16 is freely settling, the displacement sensor 12 is used to collect the settlement amount of the pipeline body 16, and when the settlement data is stable, the test is stopped;
[0069] S9. After a single pipe body 16 settlement simulation test is completed, the designated scaled pipe body 16 model is replaced, and the spacing of the support frames 4 is re-adjusted according to the size of the test pipe body 16 to conduct subsequent tests.
[0070] In a possible embodiment, the appropriate scale ratio is determined to be controlled within a range of 2:1 to 10:1, the width of the seabed environment simulation test box 1 is 10 times the diameter of the largest pipeline body 16 , and the length of the seabed environment simulation test box 1 is 5 times the length of the largest pipeline body 16 .
[0071] In a possible embodiment, since the pipeline body 16 is a pipeline of uniform quality, the displacement sensor 12 is used to interpolate the size to verify the uniformity of the test preparation of the soft soil foundation 2 and the reliability of the test results. If the data results collected by different displacement sensors 12 differ within 5%, it is considered that the layers of the soft soil foundation 2 are uniform and the results are reliable. If it exceeds 5%, it is necessary to re-prepare the soft soil foundation 2 and re-conduct the test.
[0072] In summary, the seabed environment simulation test box 1 of the present invention is provided with a soft soil foundation 2 inside; lifting mechanisms 3 are respectively provided on both sides of the seabed environment simulation test box 1; a support frame 4 is fixed to the upper end of the lifting mechanism 3; the support frame 4 spans the top of the seabed environment simulation test box 1; the side of the support frame 4 is connected to a lower load-bearing rod 5, one side of the upper end of the support frame 4 is connected to an upper load-bearing rod 6, and the middle part of the upper end of the support frame 4 is connected to a central load-bearing rod 7; the lower middle part of the support frame 4 is connected to a lifting slide rail 8; the lower load-bearing rod 5 is fixed with a traction disc 9, and the upper load-bearing rod 6 is fixed with a first slide Wheel 10, the central load-bearing rod 7 is fixedly provided with a second pulley 11, and a displacement sensor 12 is provided at the lower part of the central load-bearing rod 7; the lifting slide rail 8 is connected to an anti-interference slide cylinder 14 through a lifting slider 13; the traction disc 9 is connected to a traction cable 15, and the traction cable 15 is connected to the lifting slider 13 after passing around the first pulley 10 and the second pulley 11; the lower end of the anti-interference slide cylinder 14 is connected to a pipeline body 16, and the pipeline body 16 settles on the soft soil foundation 2 in the seabed environment simulation test box 1; the displacement sensor 12 measures the settlement amount of the pipeline body 16 on the soft soil foundation 2 in real time. During the test, according to the size of the pipeline used in the actual project, the appropriate scale is determined, the pipeline body 16 model for the test is processed, and a seabed environment simulation test box 1 of the size of the pipeline body 16 model suitable for all tests is prepared, and the lifting lugs are arranged on the outer wall of the pipeline body 16; according to the size of the test pipeline body 16 model and the size of the seabed environment simulation test box 1, the height of the lifting mechanism 3 is designed to be greater than the height of the seabed environment simulation test box 1, and the lengths of the lower bearing rod 5, the upper bearing rod 6, and the center bearing rod 7 need to be greater than the lengths of all test pipeline body 16 models; according to the seabed soil conditions in the actual project, a soft soil foundation 2 is prepared, and after the preparation is completed, it is placed layer by layer on the seabed environment simulation test box A soft soil foundation 2 is laid in the test box 1, and a buffer energy-absorbing layer 17 is installed around the seabed environment simulation test box 1; the universal wheel 24 of the lifting mechanism 3 is unlocked, the adjustable pipeline body 16 installation and lowering equipment is moved to the position of the pipeline body 16, the universal wheel 24 is locked, and the spacing of the support frame 4 is adjusted according to the size of the test pipeline body 16, so that the spacing of the hooks 30 of the anti-interference slide 14 is the same as the spacing of the outer wall ears of the pipeline body 16; the hydraulic pump 23 is controlled by the driving motor 22 to make the hydraulic support rod 21 of the lifting mechanism 3 telescopic movement, and the lifting mechanism 3 is adjusted to the set height, so that the hook 30 below the anti-interference slide 14 is connected to the outer wall ear of the pipeline body 16.Adjust the pipeline body 16 to the specified height through the traction plate 9, and lock the traction plate 9; install a number of displacement sensors 12 under the central load-bearing rod 7. After the installation is completed, the hydraulic pump 23 is controlled by the driving motor 22 to make the hydraulic support rod 21 of the lifting mechanism 3 telescopically move, and the lifting mechanism 3 is adjusted to a height exceeding the seabed environment simulation test box 1. Unlock the universal wheel 24 to move the pipeline installation and lowering equipment to the top of the seabed environment simulation test box 1, and lock the universal wheel 24; unlock the traction plate 9, and control the anti-interference slide 14 through the traction cable 15 to make the pipeline body 16 move vertically along the lifting slide rail 8. Lower down, lower to near the end of the lifting slide rail 8, use the damper 26 to reduce the lowering speed of the pipeline body 16, continue to lower the pipeline body 16, until the pipeline body 16 contacts the soft soil foundation 2, and the pipeline body 16 and the anti-interference slide cylinder 14 are unhooked; when the pipeline body 16 is freely settled, use the displacement sensor 12 to collect the settlement of the pipeline body 16, and when the settlement data is stable, stop the test; after the single pipeline body 16 settlement simulation test is completed, replace the specified scaled pipeline body 16 model, re-adjust the spacing of the support frame 4 according to the size of the test pipeline body 16, and conduct subsequent tests. The present invention can flexibly control the movement and adjust the spacing, significantly improve the applicability to pipelines of different scales, so that it can be used to study the settlement of pipelines of different scales and more accurately predict the settlement of full-size pipelines; the device can be lowered to facilitate the installation of the pipeline, and further improve the test efficiency; it can be effectively applied to the study of the settlement of pipelines on soft soil foundation 2, provide a valuable reference basis for pipeline lowering tests, and provide reliable data support for the settlement of pipelines in actual projects.
[0073] Although the present invention has been described in detail above by general description and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the present invention. Therefore, these modifications or improvements made without departing from the spirit of the present invention all belong to the scope of protection claimed by the present invention.
Claims
1. A soft soil foundation pipeline settlement measurement test device, characterized in that: The invention comprises a seabed environment simulation test box (1), wherein a soft soil foundation (2) is provided inside the seabed environment simulation test box (1); lifting mechanisms (3) are provided on both sides of the seabed environment simulation test box (1); and a support frame (4) is fixed to the upper end of the lifting mechanism (3); The support frame (4) spans above the seabed environment simulation test box (1); a lower load-bearing rod (5) is connected to the side of the support frame (4); an upper load-bearing rod (6) is connected to one side of the upper end of the support frame (4); a central load-bearing rod (7) is connected to the middle of the upper end of the support frame (4); and a lifting slide rail (8) is connected to the lower middle of the support frame (4); The lower load-bearing rod (5) is fixedly provided with a traction disk (9), the upper load-bearing rod (6) is fixedly provided with a first pulley (10), the central load-bearing rod (7) is fixedly provided with a second pulley (11), and a displacement sensor (12) is provided at the lower part of the central load-bearing rod (7); the lifting rail (8) is connected to an anti-interference slide cylinder (14) via a lifting slider (13); The traction disc (9) is connected to a traction cable (15), and the traction cable (15) passes around the first pulley (10) and the second pulley (11) and then connects to the lifting slider (13); The lower end of the anti-interference slide cylinder (14) is connected to a pipeline body (16), and the pipeline body (16) settles on the soft soil foundation (2) in the seabed environment simulation test box (1); the displacement sensor (12) measures the settlement amount of the pipeline body (16) on the soft soil foundation (2) in real time.
2. The soft soil foundation pipeline settlement measurement test device according to claim 1 is characterized in that: The edge of the seabed environment simulation test box (1) is provided with a buffering energy-absorbing insulation layer (17), and the buffering energy-absorbing insulation layer (17) is made of a foam board or a hard sponge pad.
3. The soft soil foundation pipeline settlement measurement test device according to claim 1 is characterized in that: The lifting mechanism (3) comprises a hydraulic base (18), upper and lower double scissor arms (19), a hydraulic top seat (20), a hydraulic support rod (21), a driving motor (22) and a hydraulic pump (23); The drive motor (22) and the hydraulic pump (23) are both fixed above the hydraulic base (18), and the drive motor (22) is connected to the hydraulic pump (23); the upper ends of the upper and lower double scissor arms (19) are hinged to the hydraulic top seat (20), and the lower ends of the upper and lower double scissor arms (19) are hinged to the hydraulic base (18); the hydraulic support rod (21) is connected to the hydraulic pump (23) through a hydraulic pipeline; The drive motor (22) is also equipped with a remote controller, and the remote controller is electrically connected to the drive motor (22); the remote controller is used to control the start and stop of the drive motor (22); The lower end of the hydraulic base (18) is connected with a universal wheel (24).
4. The soft soil foundation pipeline settlement measurement test device according to claim 3 is characterized in that: The maximum lifting height of the lifting mechanism (3) is greater than the sum of the height of the seabed environment simulation test box (1) and the maximum diameter of the pipeline body (16).
5. The soft soil foundation pipeline settlement measurement test device according to claim 1, characterized in that: The lower load-bearing rod (5), the upper load-bearing rod (6), and the central load-bearing rod (7) are all connected to the support frame (4) via a load-bearing rod adapter sleeve (25); The lengths of the lower load-bearing rod (5), the upper load-bearing rod (6), and the central load-bearing rod (7) are all greater than the maximum length of the pipe body (16).
6. The soft soil foundation pipeline settlement measurement test device according to claim 1, characterized in that: The bottom end of the lifting slide rail (8) is connected to a damper (26), and the damper (26) is a spring damper (26) or a viscous damper (26); the damper (26) is used to reduce the lowering speed of the pipeline body (16).
7. The soft soil foundation pipeline settlement measurement test device according to claim 1, characterized in that: The anti-interference slide cylinder (14) comprises a slide rod body (27), a slide cylinder body (28), a slide rod adapter (29) and a hook (30); The upper end of the slide rod body (27) is connected to the lifting slider (13) via the slide rod adapter (29), and the lower end of the slide rod body (27) is connected to the slide cylinder body (28); the hook (30) is connected to the bottom of the slide cylinder body (28).
8. The soft soil foundation pipeline settlement measurement test device according to claim 1, characterized in that: The lifting rail (8), the lifting slider (13), and the anti-interference slide cylinder (14) are symmetrically provided in two groups; the pipeline body (16) is connected between the two groups of the anti-interference slide cylinders (14); The traction cable (15) is divided into two sub-traction ropes (31) after passing around the second pulley (11), and the two sub-traction ropes (31) are respectively connected to the two groups of lifting sliders (13).
9. The soft soil foundation pipeline settlement measurement test device according to claim 1, characterized in that: The number of the displacement sensors (12) is at least three; The width of the seabed environment simulation test box (1) is 10 times the maximum diameter of the pipeline body (16), and the length of the seabed environment simulation test box (1) is 5 times the maximum length of the pipeline body (16).
10. A test method for measuring the settlement of a pipeline on a soft soil foundation (2), characterized in that: The following steps are involved: 1) According to the size of the pipeline used in the actual project, determine the appropriate scale, process the pipeline body (16) model for the test, prepare a seabed environment simulation test box (1) of the size of the pipeline body (16) model suitable for all tests, and arrange the lifting lugs on the outer wall of the pipeline body (16); 2) According to the size of the test pipeline body (16) model and the size of the seabed environment simulation test box (1), the height of the lifting mechanism (3) is designed to be greater than the height of the seabed environment simulation test box (1), and the lengths of the lower bearing rod (5), the upper bearing rod (6), and the center bearing rod (7) must be greater than the lengths of all the test pipeline body (16) models; 3) preparing a soft soil foundation (2) according to the seabed soil conditions in the actual project, laying the soft soil foundation (2) layer by layer in the seabed environment simulation test box (1) after the preparation is completed, and installing a buffer energy absorption layer (17) around the seabed environment simulation test box (1); 4) unlocking the universal wheel (24) of the lifting mechanism (3), moving the adjustable pipe body (16) installation and lowering device to the position of the pipe body (16), locking the universal wheel (24), adjusting the spacing of the support frame (4) according to the size of the test pipe body (16), so that the spacing of the hooks (30) of the anti-interference slide (14) is the same as the spacing of the lugs on the outer wall of the pipe body (16); 5) Control the hydraulic pump (23) through the driving motor (22) to make the hydraulic support rod (21) of the lifting mechanism (3) perform telescopic movement, adjust the lifting mechanism (3) to a set height, and connect the hook (30) below the anti-interference slide cylinder (14) to the outer wall ear of the pipeline body (16). Adjust the pipeline body (16) to a specified height through the traction plate (9), and lock the traction plate (9); 6) Install a plurality of displacement sensors (12) below the central load-bearing rod (7). After installation, control the hydraulic pump (23) through the driving motor (22) to make the hydraulic support rod (21) of the lifting mechanism (3) perform telescopic movement, adjust the lifting mechanism (3) to a height exceeding the seabed environment simulation test box (1), unlock the universal wheel (24), move the pipeline installation and lowering equipment to the top of the seabed environment simulation test box (1), and lock the universal wheel (24); 7) unlocking the traction disc (9), controlling the anti-interference slide cylinder (14) by means of the traction cable (15), so that the pipeline body (16) is lowered vertically downward along the lifting slide rail (8), and lowered to near the end of the lifting slide rail (8), and the damper (26) is used to reduce the lowering speed of the pipeline body (16), and the pipeline body (16) is continued to be lowered until the pipeline body (16) contacts the soft soil foundation (2), and the pipeline body (16) and the anti-interference slide cylinder (14) are unhooked; 8) When the pipeline body (16) is freely settling, the displacement sensor (12) is used to collect the settlement amount of the pipeline body (16), and when the settlement data is stable, the test is stopped; 9) After a single pipe body (16) settlement simulation test is completed, a designated scaled pipe body (16) model is replaced, the spacing of the support frames (4) is re-adjusted according to the size of the test pipe body (16), and subsequent tests are carried out.
Citation Information
Patent Citations
Method and device for simulating axial interaction between undersea pipe system structure and seabed soil body
CN103969068A
Scissor arm assembly for a scissor lift of aerial work platform
CN107531470A
Testing device and method for analyzing the influence of ground subsidence on pipe-soil interaction
CN108896513A
Wave stability testing method and device for near-bottom, shallow-buried and buried pipelines
CN116754018A
Auxiliary electricity testing device
CN210051817U
Cited By
A method for measuring the elevation of a sea-crossing bridge under a surge environment
CN119756293A