Ground water level measuring structure for geotechnical engineering investigation

By designing the support frame and measurement mechanism, the floating plate, plug column and motor are used to control the line laying stop, and combined with the mobile wheel to achieve overall support and movement switching, it solves the problem that the groundwater level measurement structure for geotechnical engineering survey in the existing technology cannot be stopped in time. and switching support issues improve the accuracy and ease of use of measurement data.

CN119063818AInactive Publication Date: 2024-12-03DALIAN HUNXINGCHEN CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411242763.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing geotechnical engineering survey groundwater level measurement structure cannot be stopped in time, and it is difficult to switch freely between the overall support of the device and the overall movement, resulting in inaccurate measurement data and inconvenient use.

Method used

A geotechnical engineering survey groundwater level measurement structure including support frame, reel, measuring mechanism and moving wheel was designed. The reel was driven to rotate and release lines through the motor. When the floating barrel and the traction rope were combined with the counterweight block to sink into the groundwater , the floating plate and the column mechanism realize the line-disassembly stop, and the overall support and movement are easily switched through the moving wheel.

Benefits of technology

It realizes automatic stopping of line release when the groundwater level is reached, avoiding the problem of inaccurate measurement data, and convenient switching between overall support and overall movement, improving the convenience of use and measurement accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119063818A_ABST
    Figure CN119063818A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of underground water level measurement, in particular to an underground water level measurement structure for geotechnical engineering investigation, which is provided with a measurement mechanism, when the underground water level is reached during measurement, a warning lamp is turned on to prompt that the underground water level is reached at the moment, and continuous paying-off is not needed; meanwhile, abutting plates on the two sides of the floating barrel move till the abutting plates are fixed to the wall of the exploratory well, the situation that the floating barrel shakes due to movement of underground water, and consequently measurement data are not accurate enough is avoided, a sampling barrel is fixed to the bottom of a balancing weight, and when the floating barrel completely sinks into the underground water, the underground water enters the sampling barrel, and therefore the underground water is sampled; components in underground water can be conveniently detected; and the device can be conveniently moved through the moving wheels, meanwhile, the whole moving wheels can be moved into the supporting frame to form stable supporting, so that switching between overall supporting and overall moving is convenient, and using is more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of groundwater level measurement, and in particular to a groundwater level measurement structure for geotechnical engineering investigation. Background Art

[0002] Geotechnical engineering is to solve rock and soil engineering problems, including foundation and foundation, slope and underground engineering problems, as its own research object. All kinds of engineering on the ground, underground and in water are collectively called civil engineering. The part of civil engineering involving rock, soil, underground and water is called geotechnical engineering. In the process of rock engineering exploration, it is necessary to effectively measure the groundwater level to determine whether the location of the project affects the normal operation of groundwater, so as to meet the construction needs. When conducting geotechnical exploration, in order to know the impact of groundwater level on the project, it is necessary to measure the groundwater level;

[0003] However, in the prior art, most of the groundwater level measurement structures for geotechnical engineering surveys cannot control the length of the line during measurement. When the groundwater level is reached, it is often difficult to stop the line in time. In addition, during the measurement process, the groundwater may cause the measuring device to shake, resulting in inaccurate measurement data. In addition, it is difficult for the device to switch freely between overall support and overall movement, which is inconvenient to use.

[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention

[0005] The purpose of the present invention is to solve the problem that the groundwater level measurement structure in geotechnical engineering survey in the prior art cannot stop laying out the line in time after contacting groundwater, and it is difficult to freely switch between the overall support and the overall movement of the device, and to propose a groundwater level measurement structure for geotechnical engineering survey.

[0006] In order to achieve the above-mentioned objectives, the present invention adopts the following technical scheme: a groundwater level measurement structure for geotechnical engineering investigation, comprising a support frame, a mounting frame is fixed on the upper surface of the support frame, a winding drum is rotatably connected inside the mounting frame, one side of the winding drum passes through and extends to the outside of the mounting frame where a motor is fixed, a traction rope is wound on the outer layer of the winding drum, a warning light is fixed to the bottom end of the traction rope, a measuring mechanism is installed at the bottom of the warning light, a guide ring is sleeved on the outer layer of the traction rope, a screw sleeve is fixed at one end of the guide ring, a first screw rod rotatably connected to the inside of the support frame is passed through the inside of the screw sleeve, a second knob is fixed on one side of the first screw rod passing through and extending to the outside of the support frame, a sliding sleeve is fixed at one end of the screw sleeve, and a guide sliding rod fixed to the inside of the support frame is passed through the inside of the sliding sleeve.

[0007] Furthermore, the measuring mechanism includes a float fixed to the bottom of the warning light, a float plate is provided on the top layer inside the float, two first guide slide blocks penetrating through and extending into the float are symmetrically fixed on both sides of the float plate, first guide grooves are provided at positions corresponding to the first guide slide blocks inside both sides of the float, and plug posts are fixed on the upper surface of the float plate.

[0008] Furthermore, a counterweight block is fixed to the inner top of the floating barrel, two sampling tubes are symmetrically fixed on both sides of the bottom of the counterweight block, and two support rods are fixed to the upper surface of the counterweight block, a gear is rotatably connected between the tops of the two support rods, and a gear plate is fixed at the position of the bottom of the floating plate corresponding to the gear.

[0009] Furthermore, two second screw rods are symmetrically fixed on both sides of the gear and pass through and extend to the outside of the support rod. A first connecting rod is sleeved on the outer layer of one side of the second screw rod. A spring is fixed on the inner side of the first connecting rod. A second connecting rod is fixed on one side of the spring and passes through and extends to the outside of the first connecting rod. A back plate is fixed on one side of the second connecting rod and extends to the outside of the float. A number of rubber bumps are equidistantly fixed on one side of the back plate.

[0010] Furthermore, a slot is provided at the bottom of the warning light at the position corresponding to the plug post, a support plate is arranged inside the slot, two second guide sliders are symmetrically fixed on both sides of the support plate and penetrate into the warning light, second guide grooves are provided on both sides of the interior of the warning light at the positions corresponding to the second guide sliders, an electrical connection column is fixed on the upper surface of the support plate, and an electrical socket is fixed on the inner top layer of the slot at the position corresponding to the electrical connection column.

[0011] Furthermore, two rotating shafts are symmetrically connected to the front and rear ends of the bottom end of the support frame for rotation, and pulleys are fixed on one side of the two rotating shafts that pass through and extend to the outside of the support frame. A belt is rotatably connected between the two pulleys, and a first knob is fixed on one side of one of the pulleys. Two first bevel gears are symmetrically sleeved on the outer layers of both sides of the rotating shaft inside the support frame, a second bevel gear is arranged below the first bevel gear, and a third screw rod that passes through and extends to the inside of the bottom end of the support frame is fixed to the bottom of the second bevel gear, a sleeve is sleeved on the outer layer of the bottom of the third screw rod, and a moving wheel that passes through and extends to the outside of the support frame is fixed to the bottom of the sleeve.

[0012] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0013] 1. The present invention is provided with a measuring mechanism. When measuring, the winding drum is driven by a motor to rotate to release the line. The floating bucket gradually sinks into the groundwater with the traction rope and the counterweight block. When the floating bucket is completely sunk into the groundwater, the floating plate is subjected to buoyancy and cooperates with the first guide slider and the first guide slot to vertically rise. As the floating plate rises, the plug column is inserted into the slot, and the support plate is lifted up by the plug column, thereby driving the electrical connection column to be inserted into the electrical socket. At this time, the warning light is on, indicating that the groundwater position has been reached and there is no need to continue releasing the line. At the same time, the tooth plate is driven to rise during the rising process of the floating plate. The rising of the tooth plate drives the gear to rotate. The rotation of the gear drives the second screw rod to rotate. The rotation of the second screw rod drives the connecting rod to move. The connecting rod is extended to drive the abutment plate to move until it is fixed to the wall of the exploration well, so as to avoid the shaking of the floating bucket due to the movement of the groundwater, resulting in inaccurate measurement data. A sampling cylinder is fixed at the bottom of the counterweight block. When the floating bucket is completely sunk into the groundwater, the groundwater enters the sampling cylinder, thereby sampling the groundwater, which is convenient for detecting the components inside the groundwater.

[0014] 2. The present invention is provided with a moving wheel, through which the device can be conveniently moved. When the device moves to the target position, the first knob is rotated to cooperate with the belt and the pulley to drive the two rotating shafts to rotate. The rotation of the rotating shaft cooperates with the first bevel gear and the second bevel gear to drive the third screw to rotate. The rotation of the third screw drives the sleeve to rise. The rising of the sleeve drives the moving wheel to rise, and then the entire moving wheel is moved to the inside of the support frame to form a stable support, so that it is convenient to switch between overall support and overall movement, which is more convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0016] Figure 2 It is a schematic diagram of the structure inside the floating bucket of the present invention;

[0017] Figure 3 for Figure 2 The enlarged view of point A in the middle;

[0018] Figure 4 It is a structural schematic diagram of the guide ring of the present invention;

[0019] Figure 5 It is a schematic diagram of the structure of the bottom layer of the warning light of the present invention;

[0020] Figure 6 A combined view of the second connecting rod and the spring of the present invention;

[0021] Figure 7 It is a schematic diagram of the structure inside the bottom layer of the support frame of the present invention;

[0022] Figure 8 It is a combined view of the first bevel gear and the second bevel gear of the present invention.

[0023] Reference numerals: 1, support frame; 2, mounting frame; 3, take-up drum; 4, motor; 5, pulley; 6, belt; 7, first knob; 8, first screw rod; 9, measuring mechanism; 10, moving wheel; 11, floating barrel; 12, rubber bump; 13, counterweight; 14, support rod; 15, sampling tube; 16, stop plate; 17, first guide slide groove; 18, first guide slider; 19, plug column; 20, floating plate; 21, second screw rod; 22, tooth plate; 23, gear; 24. First connecting rod; 25. Guide ring; 26. Warning light; 27. Towing rope; 28. Second knob; 29. ​​Guide slide rod; 30. Sleeve; 31. Screw sleeve; 32. Second guide slide groove; 33. Support plate; 34. Electrical connection column; 35. Second guide slide block; 36. Slot; 37. Electrical socket; 38. Rotating shaft; 39. First bevel gear; 40. Second bevel gear; 41. Sleeve; 42. Third screw rod; 43. Spring; 44. Second connecting rod. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Embodiment 1: This embodiment aims to solve the problem that the groundwater level measurement structure in geotechnical engineering survey in the prior art is mostly unable to control the length of the line during measurement, and it is often difficult to stop the line in time when the groundwater level is reached. At the same time, during the measurement process, the groundwater may cause the measuring device to shake, resulting in inaccurate measurement data.

[0026] like Figure 1-6 As shown, a groundwater level measurement structure for geotechnical engineering investigation comprises a support frame 1, a mounting frame 2 is fixed on the upper surface of the support frame 1, a winding drum 3 is rotatably connected inside the mounting frame 2, a motor 4 is fixed on one side of the winding drum 3 passing through and extending to the outside of the mounting frame 2, a traction rope 27 is wound on the outer layer of the winding drum 3, a warning light 26 is fixed on the bottom end of the traction rope 27, a guide ring 25 is sleeved on the outer layer of the traction rope 27, a screw sleeve 31 is fixed on one end of the guide ring 25, a first screw rod 8 rotatably connected to the inside of the support frame 1 is passed through the inside of the screw sleeve 31, a second knob 28 is fixed on one side of the first screw rod 8 passing through and extending to the outside of the support frame 1, a sliding sleeve 30 is fixed on one end of the screw sleeve 31, a guide slide rod 29 fixed to the inside of the support frame 1 is passed through the inside of the sliding sleeve 30;

[0027] A measuring mechanism 9 is installed at the bottom of the warning light 26. The measuring mechanism 9 includes a floating barrel 11 fixed to the bottom of the warning light 26. A floating plate 20 is arranged on the top layer inside the floating barrel 11. The floating plate 20 is made of a material with extremely high buoyancy. Two first guide sliders 18 that penetrate and extend into the inside of the floating barrel 11 are symmetrically fixed on both sides of the floating plate 20. First guide slots 17 are provided at positions corresponding to the first guide sliders 18 on both sides of the floating barrel 11. A plug post 19 is fixed on the upper surface of the floating plate 20. A slot 36 is provided at the bottom of the warning light 26 at a position corresponding to the plug post 19. A support plate 33 is provided inside the slot 36. Two second guide sliders 35 that penetrate and extend into the inside of the warning light 26 are symmetrically fixed on both sides of the support plate 33. Second guide slots 32 are provided at positions corresponding to the second guide sliders 35 on both sides of the inside of the warning light 26. An electrical connection column 34 is fixed on the upper surface of the support plate 33. An electrical socket 37 is fixed at the position of the electrical connection column 34 on the top layer inside the slot 36.

[0028] A counterweight 13 is fixed to the top of the inner part of the floating barrel 11, and two sampling tubes 15 are symmetrically fixed on both sides of the bottom of the counterweight 13. When the counterweight 13 is completely sunk into the groundwater, the water overflows the position of the sampling tube 15 and immerses it, so as to collect and sample the groundwater, and two support rods 14 are fixed to the upper surface of the counterweight 13, and a gear 23 is rotatably connected between the tops of the two support rods 14. A toothed plate 22 is fixed at the bottom of the floating plate 20 at the position corresponding to the gear 23, and two second screw rods 21 that penetrate and extend to the outside of the support rod 14 are symmetrically fixed on both sides of the gear 23;

[0029] The outer layer of one side of the second screw rod 21 is sleeved with the first connecting rod 24, and a spring 43 is fixed on one side of the inner part of the first connecting rod 24. A second connecting rod 44 is fixed on one side of the spring 43, which penetrates and extends to the outside of the first connecting rod 24. A sufficient inner cavity space is provided inside the first connecting rod 24 at the position corresponding to the spring 43. The elastic coefficient of the spring 43 is less than the buoyancy. When the inner space of the exploration well is small, the elastic contraction of the spring 43 is relied on. When the floating plate 20 is still floating and the abutment plate 16 is in contact with the wall of the exploration well, there is a certain inner cavity space to maintain the continuous floating of the floating plate 20, so as to avoid motion interference. It can be used in exploration wells within a certain size range. One side of the second connecting rod 44 penetrates and extends to the outside of the floating barrel 11 and is fixed with the abutment plate 16. A number of rubber bumps 12 are equidistantly fixed on one side of the abutment plate 16.

[0030] When the support frame 1 moves to the target area, the second knob 28 is rotated to drive the first screw rod 8 to rotate. The rotation of the first screw rod 8 cooperates with the sliding sleeve 30 and the guide sliding rod 29 to drive the screw sleeve 31 to move. The movement of the screw sleeve 31 drives the guide ring 25 to move. The movement of the guide ring 25 drives the traction rope 27 to move, so as to adjust the line-releasing position, start the motor 4 to drive the winding drum 3 to rotate, and then start to release the line. As the traction rope 27 continues to release the line, the float 11 continues to descend into the groundwater, and the float 11 enters the groundwater. The floating plate 20 is vertically lifted by the buoyancy of the water in cooperation with the first guide slot 17 and the first guide slider 18. The lifting of the floating plate 20 drives the plug post 19 to lift up until it is inserted into the slot 36. The support plate 33 is lifted by the plug post 19. The support plate 33 cooperates with the second guide slot 32 and the second guide slider 35 to vertically lift up the electrical connection post 34 until the electrical connection post 34 is inserted into the electrical socket 37. At this time, the warning light 26 lights up, indicating that the groundwater position has been reached, and then the motor 4 can be turned off.

[0031] As the floating plate 20 rises, it drives the tooth plate 22 to rise. The rising of the tooth plate 22 drives the gear 23 to rotate. The rotation of the gear 23 drives the second screw rod 21 to rotate. The rotation of the second screw rod 21 drives the first connecting rod 24 to move. The movement of the first connecting rod 24 drives the abutment plate 16 to move until the abutment plate 16 fits against the wall of the exploration well to form a relatively stable support, thereby avoiding the shaking of the floating barrel 11 due to the fluctuation of groundwater, which leads to inaccurate measurement results.

[0032] Embodiment 2: This embodiment aims to solve the problem that the groundwater level measurement structure in geotechnical engineering investigation in the prior art is difficult to switch freely between overall support and overall movement, which is inconvenient to use.

[0033] like Figure 7-8 As shown, the embodiment is a groundwater level measurement structure for geotechnical engineering investigation, and there are two rotating shafts 38 symmetrically connected to the front and rear ends of the bottom of the support frame 1, one side of the two rotating shafts 38 passes through and extends to the outside of the support frame 1, and pulleys 5 are fixed thereto, and a belt 6 is rotatably connected between the two pulleys 5, and a first knob 7 is fixed to one side of one of the pulleys 5, and two first bevel gears 39 are symmetrically sleeved on the outer layers of both sides of the rotating shaft 38 inside the support frame 1, and a second bevel gear 40 is arranged below the first bevel gear 39, and a third screw rod 42 passing through and extending to the inside of the bottom end of the support frame 1 is fixed to the bottom of the second bevel gear 40, and a sleeve 41 is sleeved on the outer layer of the bottom of the third screw rod 42, and a moving wheel 10 passing through and extending to the outside of the support frame 1 is fixed to the bottom of the sleeve 41, and a limited position placement cavity is opened at the position corresponding to the moving wheel 10 inside the bottom layer of the support frame 1 to facilitate the lifting and lowering movement of the moving wheel 10.

[0034] When the support frame 1 moves to the target area, the first knob 7 is rotated to cooperate with the pulley 5 and the belt 6 to drive the two rotating shafts 38. The rotating shaft 38 rotates to cooperate with the first bevel gear 39 and the second bevel gear 40 to drive the third screw rod 42 to rotate. The third screw rod 42 rotates to drive the sleeve 41 to rise. The sleeve 41 drives the moving wheel 10 to rise to the inside of the support frame 1, thereby forming a transition from overall movement to overall support, which is more convenient to use.

[0035] The working process and principle of the present invention are as follows:

[0036] Step 1: After the support frame 1 moves to the target area, rotate the first knob 7 to cooperate with the pulley 5 and the belt 6 to drive the two rotating shafts 38. The rotating shaft 38 rotates to cooperate with the first bevel gear 39 and the second bevel gear 40 to drive the third screw rod 42 to rotate. The third screw rod 42 rotates to drive the sleeve 41 to rise. The sleeve 41 drives the moving wheel 10 to rise to the inside of the support frame 1, thereby forming a transition from overall movement to overall support, which is more convenient to use.

[0037] Step 2: When the support frame 1 moves to the target area, the second knob 28 is rotated to drive the first screw rod 8 to rotate. The first screw rod 8 rotates to cooperate with the sliding sleeve 30 and the guide sliding rod 29 to drive the screw sleeve 31 to move. The movement of the screw sleeve 31 drives the guide ring 25 to move. The movement of the guide ring 25 drives the traction rope 27 to move, so as to adjust the line release position, start the motor 4 to drive the winding drum 3 to rotate, and then start to release the line. As the traction rope 27 continues to release the line, the float bucket 11 continues to descend into the groundwater, and the float bucket 11 enters the groundwater. Inside, the floating plate 20 is vertically lifted by the buoyancy of the water in cooperation with the first guide slot 17 and the first guide slider 18. The lifting of the floating plate 20 drives the plug post 19 to lift up until it is inserted into the slot 36. The support plate 33 is lifted by the plug post 19. The support plate 33 cooperates with the second guide slot 32 and the second guide slider 35 to vertically lift up the electrical connection post 34 until the electrical connection post 34 is inserted into the electrical socket 37. At this time, the warning light 26 lights up, indicating that the groundwater position has been reached, and then the motor 4 can be turned off.

[0038] As the floating plate 20 rises, it drives the tooth plate 22 to rise. The rising of the tooth plate 22 drives the gear 23 to rotate. The rotation of the gear 23 drives the second screw rod 21 to rotate. The rotation of the second screw rod 21 drives the first connecting rod 24 to move. The movement of the first connecting rod 24 drives the abutment plate 16 to move until the abutment plate 16 fits against the wall of the exploration well to form a relatively stable support, thereby avoiding the shaking of the floating barrel 11 due to the fluctuation of groundwater, which leads to inaccurate measurement results.

[0039] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A groundwater level measurement structure for geotechnical engineering investigation, comprising a support frame (1), a mounting frame (2) being fixed on the upper surface of the support frame (1), a winding drum (3) being rotatably connected inside the mounting frame (2), a motor (4) being fixed on one side of the winding drum (3) passing through and extending to the outside of the mounting frame (2), It is characterized in that The outer layer of the winding drum (3) is wound with a traction rope (27), the bottom end of the traction rope (27) is fixed with a warning light (26), the bottom of the warning light (26) is installed with a measuring mechanism (9), the outer layer of the traction rope (27) is sleeved with a guide ring (25), one end of the guide ring (25) is fixed with a screw sleeve (31), the interior of the screw sleeve (31) is penetrated by a first screw rod (8) rotatably connected to the inside of the support frame (1), one side of the first screw rod (8) penetrates and extends to the outside of the support frame (1) and is fixed with a second knob (28), one end of the screw sleeve (31) is fixed with a sliding sleeve (30), and the interior of the sliding sleeve (30) is penetrated by a guide sliding rod (29) fixed to the inside of the support frame (1).

2. A groundwater level measurement structure for geotechnical engineering investigation according to claim 1, It is characterized in that The measuring mechanism (9) comprises a floating barrel (11) fixed to the bottom of the warning light (26); a floating plate (20) is arranged on the top layer inside the floating barrel (11); two first guide slide blocks (18) penetrating through and extending into the interior of the floating barrel (11) are symmetrically fixed on both sides of the floating plate (20); first guide grooves (17) are provided at positions corresponding to the first guide slide blocks (18) inside the two sides of the floating barrel (11); and plug posts (19) are fixed on the upper surface of the floating plate (20).

3. A groundwater level measurement structure for geotechnical engineering investigation according to claim 2, It is characterized in that A counterweight (13) is fixed to the top of the inner part of the floating barrel (11), two sampling tubes (15) are symmetrically fixed on both sides of the bottom of the counterweight (13), and two support rods (14) are fixed on the upper surface of the counterweight (13), a gear (23) is rotatably connected between the tops of the two support rods (14), and a toothed plate (22) is fixed to the bottom of the floating plate (20) at a position corresponding to the gear (23).

4. A groundwater level measurement structure for geotechnical engineering investigation according to claim 3, It is characterized in that Two second screw rods (21) penetrating through and extending to the outside of the support rod (14) are symmetrically fixed on both sides of the gear (23); a first connecting rod (24) is sleeved on the outer layer of one side of the second screw rod (21); a spring (43) is fixed on the inner side of the first connecting rod (24); a second connecting rod (44) penetrating through and extending to the outside of the first connecting rod (24) is fixed on one side of the spring (43); a stop plate (16) is fixed on one side of the second connecting rod (44) penetrating through and extending to the outside of the float (11); and a plurality of rubber bumps (12) are equidistantly fixed on one side of the stop plate (16).

5. A groundwater level measurement structure for geotechnical engineering investigation according to claim 2, It is characterized in that A slot (36) is provided at the bottom of the warning light (26) at a position corresponding to the plug post (19), a support plate (33) is provided inside the slot (36), two second guide sliders (35) penetrating through and extending into the warning light (26) are symmetrically fixed on both sides of the support plate (33), second guide grooves (32) are provided at positions corresponding to the second guide sliders (35) on both sides of the interior of the warning light (26), an electrical connection post (34) is fixed on the upper surface of the support plate (33), and an electrical socket (37) is fixed at a position corresponding to the electrical connection post (34) on the internal top layer of the slot (36).

6. A groundwater level measurement structure for geotechnical engineering investigation according to claim 1, It is characterized in that Two rotating shafts (38) are symmetrically connected to the front and rear ends of the bottom of the support frame (1), and pulleys (5) are fixed on one side of the two rotating shafts (38) to extend to the outside of the support frame (1). A belt (6) is rotatably connected between the two pulleys (5), and a first knob (7) is fixed on one side of one of the pulleys (5). Two first bevel gears (39) are symmetrically sleeved on the outer layers of the two sides of the rotating shaft (38) inside the support frame (1), and a second bevel gear (40) is arranged below the first bevel gear (39). A third screw rod (42) is fixed to the bottom of the second bevel gear (40) and extends to the bottom of the support frame (1). A sleeve (41) is sleeved on the outer layer of the bottom of the third screw rod (42), and a moving wheel (10) is fixed to the bottom of the sleeve (41) and extends to the outside of the support frame (1).