Method for improving operation efficiency of test flow and test system

CN119064757APending Publication Date: 2024-12-03SHANGHAI NCATEST TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411065941.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the existing test flow operation mode, when the branch child nodes have the same test items, each branch will run separately, resulting in wasted time and inefficient testing process.

Method used

By establishing the test root node and child node on the test platform, setting Bin value for each child node, detecting and merging the same test items, forming a common child node, and the child nodes to be tested wait for collection and run together, reducing redundant tests.

Benefits of technology

The test process structure is simplified, the testing efficiency is improved, the redundant testing is reduced, and the overall testing efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064757A_ABST
    Figure CN119064757A_ABST
Patent Text Reader

Abstract

The invention relates to the field of integrated circuit automatic test equipment, in particular to a method for improving the operation efficiency of a test flow and a test system.The method for improving the operation efficiency of the test flow comprises the steps that a test root node and child nodes are established on a test platform, and a corresponding Bin value is set for each child node; all DUTs enter root node test item operation and output test results; after different Bin values are endowed according to test results, all DUTs enter sub-node test items corresponding to the Bin values to run, and after the test results are output, new Bin values are endowed again; detecting and traversing the test items of the to-be-tested sub-nodes of all DUTs before the sub-node test items are operated, and if a plurality of to-be-tested sub-nodes flow into a common sub-node, waiting at the common sub-node until all the to-be-tested sub-nodes are gathered to the common sub-node, and if the plurality of to-be-tested sub-nodes flow into the common sub-node, detecting and traversing the test items of the to-be-tested sub-nodes. Forming a new DUT group to jointly run the common child node test item; and repeating the steps until all the DUTs stop running. According to the method, the test nodes with the same test items are merged and subjected to unified test, so that redundant tests are reduced, and the test efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of integrated circuit automated testing equipment, and in particular to a method and a testing system for improving the operating efficiency of a test flow. Background Art

[0002] In recent years, my country's integrated circuit industry has experienced explosive growth. With the development of chip testing, the requirements for efficiency are increasing. At present, the existing test flow operation mode mainly generates branches downward from the starting root node test items and runs the test items independently until the end.

[0003] The existing test flow running method has the following problems: when the branch sub-nodes have the same test items, each branch will run the node separately once, which makes the overall test flow structure complicated and causes a waste of time.

[0004] To sum up, the existing overall testing process is inefficient and has a complex process structure. Summary of the invention

[0005] In view of some existing problems, the present invention aims to provide a method and a test system for improving the operating efficiency of a test flow, so as to improve the efficiency of the test and simplify the test process structure.

[0006] To achieve the above object, on the one hand, the present invention provides a method for improving the operating efficiency of a test flow, the method comprising:

[0007] Establish a test root node and sub-nodes on the test platform, and set a corresponding Bin value for each of the sub-nodes;

[0008] All DUTs enter the root node test item to run and output the test results;

[0009] After being assigned different Bin values ​​according to the test results, all DUTs enter the sub-node test items corresponding to the Bin values ​​to run and output the test results, and are then assigned new Bin values ​​again;

[0010] Before running the sub-node test items, it is necessary to detect the test items of the sub-nodes to be tested of all DUTs. If there are multiple sub-nodes to be tested flowing into a common sub-node, wait at the common sub-node until all the sub-nodes to be tested are gathered at the common sub-node, and then form a new DUT group to jointly run the common sub-node test items;

[0011] Repeat the above steps until all DUTs terminate operation.

[0012] Preferably, the test platform is ATE equipment.

[0013] Preferably, establishing the test root node and sub-nodes on the test platform includes establishing the required test root node and sub-nodes according to the test scenario, and setting a corresponding Bin value for each of the sub-nodes to form a tree diagram test flow.

[0014] Preferably, the sub-node to be tested is bound to the Bin value of the root node and the upper-level sub-node.

[0015] Preferably, the common sub-node is a node formed by merging test items with the same test scenario.

[0016] Preferably, when there are multiple sub-nodes to be tested flowing into a common sub-node, the sub-node to be tested waits at the common sub-node and returns to run other sub-nodes to be tested connected to the common sub-node until all the sub-nodes to be tested have finished running and converge at the common sub-node.

[0017] Preferably, the condition for the DUT to terminate operation is that the Bin value assigned to the DUT enters a passing node or a failure node.

[0018] Preferably, after the test is completed, the Bin value obtained after the DUT runs in the node is displayed in the log to observe whether the Bin value and the running order of the executed test items are in line with expectations.

[0019] In addition, in another aspect of the present invention, a test system is also proposed, the test system comprising:

[0020] A judgment module, used to judge whether the Bin value of the DUT is consistent with the Bin value of the child node; an execution module, used to execute the test items of the node, output the test results and assign a new Bin value to the DUT;

[0021] The test node generation module is used to generate the required root nodes and child nodes according to the test scenario;

[0022] The data management module is used to store and manage all data generated during the test.

[0023] Preferably, the storage and management of all data generated during the test process includes Bin values ​​of the DUT, test results and test logs.

[0024] Compared with the prior art, the present invention has at least the following beneficial effects:

[0025] The present invention can merge the test items with the same test scenario into a common test node for different test items, thereby simplifying the overall test process. In addition, after different DUTs test different functions, when they flow into the next common test node, all DUTs can be executed together. Compared with the original method (different DUTs will execute the same test node separately), redundant tests are reduced and test efficiency is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 A flowchart of a method for improving the operating efficiency of a test flow in one embodiment of the present invention;

[0028] Figure 2 Another specific flow chart of a method for improving the operating efficiency of a test flow in one embodiment of the present invention. DETAILED DESCRIPTION

[0029] A method and a test system for improving the operating efficiency of a test flow of the present invention will be described in more detail below in conjunction with a schematic diagram, wherein a preferred embodiment of the present invention is shown, and it should be understood that those skilled in the art can modify the present invention described herein while still achieving the advantageous effects of the present invention. Therefore, the following description should be understood as being widely known to those skilled in the art, and not as a limitation of the present invention.

[0030] For the sake of clarity, not all features of the actual embodiments are described. In the following description, well-known functions and structures are not described in detail because they would clutter the invention with unnecessary detail. It should be recognized that in the development of any actual embodiment, a large number of implementation details must be made to achieve the developer's specific goals, such as changing from one embodiment to another according to the limitations of the relevant system or the relevant business. In addition, it should be recognized that such development work may be complex and time-consuming, but it is just a routine task for those skilled in the art.

[0031] The present invention is described in more detail in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become more apparent from the following description and claims. It should be noted that the drawings are in very simplified form and in non-precise proportions, and are only used to facilitate and clearly assist in illustrating the purpose of the embodiments of the present invention.

[0032] As mentioned in the background technology, in the prior art, when each branch subnode has the same test items, each branch will run the node separately once, resulting in a waste of time. In view of this, the present invention designs a test flow branch synchronization operation mode, which can identify nodes with the same test items appearing in different branches, converge branches with the same nodes, and execute them uniformly once.

[0033] The overall idea of ​​the method is to use a code construction algorithm to implement traversal and query of test items of all existing test nodes when the test flow is running. Except for the root node test items, the test items of all nodes (except the root node) will be checked and traversed before running the test items of each node. If the remaining nodes have the same test items as this node, wait to run the test items of other test nodes at this node until it is detected that the unrunning nodes do not have the same test items as this node, and then start running the test items of this node.

[0034] For details, please refer to Figure 1 and Figure 2 This embodiment provides a method for improving the running efficiency of a test flow, the method comprising:

[0035] Establish a test root node and sub-nodes on the test platform, and set a corresponding Bin value for each of the sub-nodes;

[0036] All DUTs enter the root node test item to run and output the test results;

[0037] After being assigned different Bin values ​​according to the test results, all DUTs enter the sub-node test items corresponding to the Bin values ​​to run and output the test results, and are then assigned new Bin values ​​again;

[0038] Before running the sub-node test items, it is necessary to detect the test items of the sub-nodes to be tested of all DUTs. If there are multiple sub-nodes to be tested flowing into a common sub-node, wait at the common sub-node until all the sub-nodes to be tested are gathered at the common sub-node, and then form a new DUT group to jointly run the common sub-node test items;

[0039] Repeat the above steps until all DUTs terminate operation.

[0040] In this embodiment, the test platform can be selected as ATE (Automatic Test Equipment) equipment, because ATE equipment has the following advantages: ATE equipment can provide fast and accurate test results, significantly improving production efficiency and product quality; it supports a variety of test items, including functional testing, performance testing and fault diagnosis, to ensure that electronic equipment meets design specifications; the automation characteristics of ATE reduce manual intervention, reduce human errors and testing costs; in addition, ATE equipment is usually highly flexible and scalable, can adapt to different types and scales of testing needs, and is easy to integrate into existing production lines.

[0041] Among them, establishing a test root node and child nodes on the test platform, and setting a corresponding Bin value for each of the child nodes includes: establishing a test root node and child nodes on the test platform includes establishing the required test root nodes and child nodes according to the test scenario, and setting a corresponding Bin value for each of the child nodes to form a tree diagram test flow; the child nodes to be tested are bound to the Bin values ​​of the root node and the upper-level child nodes.

[0042] In this embodiment, the common sub-node is a node formed by merging test items with the same test scenario.

[0043] When there are multiple sub-nodes to be tested flowing into a common sub-node, the sub-node to be tested waits at the common sub-node and returns to run other sub-nodes to be tested connected to the common sub-node until all the sub-nodes to be tested have finished running and converge at the common sub-node.

[0044] Finally, the condition for the DUT to terminate operation is that the Bin value assigned to the DUT enters the pass node (PASS) or the fail node (FAIL).

[0045] After the test is completed, the Bin value obtained after the DUT runs in the node is displayed in the log to observe whether the Bin value and the running order of the executed test items are in line with expectations.

[0046] In a specific embodiment, for example, 16 DUTs are set, each DUT is assigned a value of 1 to 16, and a test flow is set on the test platform, and its root node A project is connected to four projects B, C, D, and E, and the bound Bin values ​​are 0, 1, 2, and 3 respectively; all DUTs are divided into 4 groups through the root node A project, namely 1 to 4, 5 to 8, 9 to 12, and 13 to 16, and enter the B, C, D, and E projects respectively.

[0047] After running the B project, groups 1 to 4 run to the next node F and find that the node F is still connected to other nodes to be tested. At this time, they wait at the node F and return to run groups 5 to 8. When the operation ends and they enter the next node F, they find that the node F is still connected to other nodes to be tested. They wait at the node F and return to run groups 9 to 12. After the operation is completed, they enter the node F. At this time, the node F has no other nodes to be tested connected, and all nodes connected to the node F enter the node F and start running.

[0048] The above four projects B, C, D, and E process the 4 DUTs entering them as follows: the first two DUTs are retained, and the last two DUTs enter the FAIL node; therefore, after executing projects B, C, and D, the first three groups become 1-2, 5-6, and 9-10, while 3-4, 7-8, and 11-12 enter the FAIL node.

[0049] The first three groups are recombined into a new DUT group at the node F, namely (1, 2, 5, 6, 9, 10), which is recorded as the fourth group. After running at the node F, it enters the next node G and finds that the node is also connected to node E. It waits at the node G and returns to run the node E. After running at the node E, the fifth group is obtained, which is 13-14, and 15-16 directly enter the FAIL node. At this time, the node G has no other connected nodes, and all nodes connected to the node G enter the node G and start running.

[0050] The DUTs of the fourth group are recombined with the DUTs of the fifth group at the node G to form a new group, namely (1, 2, 5, 6, 9, 10, 13, 14), which is recorded as the sixth group.

[0051] The nodes of the sixth group are finally divided into two after running at the node G. The first four enter the PASS node, that is, (1, 2, 5, 6) enter the PASS node, and the last four enter the FAIL node, that is, (9, 10, 13, 14) enter the FAIL node. At this time, all nodes have entered the PASS node or the FAIL node, and the entire process ends.

[0052] To sum up, in a method and test system for improving the operating efficiency of a test flow provided in an embodiment of the present invention, in order to verify the operating mode of the test flow branch synchronization, it is necessary to consider the same node of the verification test. After different DUTs test different functions, when the next test item is the same content, all DUTs can be executed together. Compared with the original method, redundant tests are reduced, and the test efficiency, effectiveness, and efficiency are improved, and it can also be adapted to various test scenarios.

[0053] The above is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any technician in the relevant technical field, without departing from the scope of the technical solution of the present invention, makes any form of equivalent replacement or modification to the technical solution and technical content disclosed in the present invention, which does not depart from the content of the technical solution of the present invention and still falls within the protection scope of the present invention.

Claims

1. A method for improving the operating efficiency of a test flow, characterized in that: The method comprises: Establish a test root node and sub-nodes on the test platform, and set a corresponding Bin value for each of the sub-nodes; All DUTs enter the root node test item to run and output the test results; After being assigned different Bin values ​​according to the test results, all DUTs enter the sub-node test items corresponding to the Bin values ​​to run and output the test results, and are then assigned new Bin values ​​again; Before running the sub-node test items, it is necessary to detect the test items of the sub-nodes to be tested of all DUTs. If there are multiple sub-nodes to be tested flowing into a common sub-node, wait at the common sub-node until all the sub-nodes to be tested are gathered at the common sub-node, and then form a new DUT group to jointly run the common sub-node test items; Repeat the above steps until all DUTs terminate operation.

2. The method for improving the operating efficiency of the test flow according to claim 1, characterized in that: The test platform is ATE equipment.

3. The method for improving the operating efficiency of the test flow according to claim 1, characterized in that: The establishment of the test root node and sub-nodes on the test platform includes establishing the required test root node and sub-nodes according to the test scenario, and setting a corresponding Bin value for each of the sub-nodes to form a tree diagram test flow.

4. The method for improving the operating efficiency of the test flow according to claim 1, characterized in that: The sub-node to be tested is bound to the Bin value of the root node and the upper-level sub-node.

5. The method for improving the operating efficiency of the test flow according to claim 1, characterized in that: The common sub-node is a node formed by merging test items with the same test scenario.

6. The method for improving the operating efficiency of a test flow according to claim 1, characterized in that: When there are multiple sub-nodes to be tested flowing into a common sub-node, the sub-node to be tested waits at the common sub-node and returns to run other sub-nodes to be tested connected to the common sub-node until all the sub-nodes to be tested have finished running and converge at the common sub-node.

7. The method for improving the operating efficiency of a test flow according to claim 1, characterized in that: The condition for the DUT to terminate operation is that the Bin value assigned to the DUT enters a passing node or a failing node.

8. The method for improving the operating efficiency of a test flow according to claim 1, characterized in that: After the test is completed, the Bin value obtained after the DUT runs in the node is displayed in the log to observe whether the Bin value and the order of the executed test items are in line with expectations.

9. A testing system, characterized in that: include: A judgment module, used to judge whether the Bin value of the DUT is consistent with the Bin value of the child node; The execution module is used to execute the test items of the node, output the test results and assign new Bin values ​​to the DUT; The test node generation module is used to generate the required root nodes and child nodes according to the test scenario; The data management module is used to store and manage all data generated during the test.

10. The test system according to claim 9, characterized in that: The storage and management of all data generated during the test includes the Bin value of the DUT, the test results and the test log.