Chip testing method, system and device

By filtering and merging test subitems with the same test conditions, reducing the number of power-up and down times of equipment settings and power supply, the problem of extending chip test time is solved, and a significant shortening of test time and improving production efficiency is achieved.

CN119064763APending Publication Date: 2024-12-03CCID IND & INFORMATION TECH RES INST GRP (SUZHOU) CO LTD

Patent Information

Application Number
CN202411356665.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In existing chip testing technology, test equipment needs to perform detailed equipment setup work when jumping to the next test project, resulting in longer testing time, increasing production costs and reducing production efficiency.

Method used

By optimizing the test process, filtering and merging test sub-items that use the same test conditions, only test conditions are applied to the combined test sub-items, and the power state remains unchanged during the test, reducing the number of repeated equipment settings and power-up and power-off times.

Benefits of technology

It effectively shortens the chip test time, reduces the testing cost, improves production efficiency, and promotes the speed of product launch.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064763A_ABST
    Figure CN119064763A_ABST
Patent Text Reader

Abstract

The invention discloses a chip testing method, system and device, and belongs to the technical field of chip testing. Comprising the following steps: setting test items, test sub-items and test conditions, and making a test plan; screening test subitems using the same test conditions; combining the screened test subitems using the same test condition; and the test subitems are merged and then test is executed. Compared with the prior art, the method has the advantages that the test time of the chip can be saved by optimizing the test items in the test program process, the more test items of the same type or different types using the same test condition are, the more test time is saved, the test time cost of the chip is effectively reduced, and the productivity is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of chip testing technology, and more specifically, to a chip testing method, system and device. Background Art

[0002] With the widespread application of chips in various industries (such as computers, communications, automobiles, medical treatment, military, etc.), the demand for the chip testing industry is also increasing. Chip testing plays a key role in the entire chip manufacturing process. It is not only a means of verifying and evaluating product performance, but also an important guarantee for ensuring product quality and market competitiveness. With the rapid development of emerging technologies, chips need to cope with more complex and diverse application scenarios, which puts higher requirements on chip performance, power consumption, stability, etc. At the same time, industry organizations and standardization agencies have formulated strict testing standards and specifications, and put forward clear requirements for the accuracy of chip testing, prompting enterprises and research institutions to continuously optimize testing technology and improve test accuracy. For this reason, the development trend of the chip testing industry mainly focuses on improving the accuracy of chip testing to meet the requirements of technological progress, market demand, industry standards and emerging technology challenges.

[0003] In the current chip manufacturing process, chip testing, as a key link to ensure product quality, generally relies on advanced automated test equipment (ATE). This process follows a strict test procedure and executes dozens or even hundreds of independent test items in sequence to ensure comprehensive verification of chip functions. However, this test mode of advancing and configuring one by one, although it ensures the detailed and accurate testing, inevitably lengthens the overall test cycle. Every time the test equipment jumps to the next test item, a series of meticulous equipment settings are required, including but not limited to accurately adjusting the opening and closing state of the relay, calibrating the voltage and frequency parameters required for the test, etc. These steps are crucial to maintaining the accuracy and reliability of the test results, but the time cost they accumulate cannot be ignored. These steps are crucial to ensuring test accuracy, but they will also greatly increase the overall test time. And it will further bring negative effects such as increasing production costs, reducing production efficiency, delaying product launch, and reducing the efficiency of test equipment resource utilization.

[0004] In the related art, for example, Chinese patent CN114152864A provides a method and device for parallel testing of multiple chips. The method includes: determining a test group of at least one chip to be tested according to the positions of multiple chips to be tested in a wafer map; testing the chips to be tested in the test group according to a test signal; wherein the phase difference of the test signals corresponding to different chips to be tested is greater than zero. This scheme aims to provide a method for parallel testing of multiple chips to reduce the interference between the test signals of adjacent chips to be tested and improve the accuracy of the test. However, this scheme does not provide any technical inspiration on how to reduce the chip testing time. Summary of the invention

[0005] 1. Technical issues to be solved

[0006] In response to the problem of how to shorten chip testing time to improve testing efficiency in the prior art, the present invention provides a chip testing method, system and device, which can effectively save the testing time of individual test items by optimizing the conditional states between test items in the test process, thereby achieving the purpose of reducing the testing time of the entire chip.

[0007] 2. Technical solution

[0008] The purpose of the present invention is achieved through the following technical solutions.

[0009] The content of this application is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this application is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0010] Some embodiments of the present application propose a chip testing method, system and device to solve the technical problems mentioned in the above background technology section.

[0011] As a first aspect of the present application, some embodiments of the present application provide a chip testing method, comprising the following steps: setting test items and test conditions, and formulating a test plan; wherein the test items include at least one test sub-item; screening test sub-items using the same test conditions; merging the screened test sub-items using the same test conditions; and performing the test after the test sub-items are merged.

[0012] Furthermore, in the step of screening the test sub-items using the same test condition, the test sub-items using the same test condition refer to the test sub-items having the same test condition in the same test item.

[0013] Furthermore, in the step of screening the test sub-items using the same test conditions, the test sub-items using the same test conditions refer to the test sub-items with the same test conditions in adjacent test items.

[0014] Furthermore, in the step of screening test sub-items using the same test conditions, the test sub-items using the same test conditions refer to test sub-items with the same test conditions in non-adjacent test items.

[0015] Furthermore, the process of merging the screened test sub-items that use the same test conditions includes: determining whether the test sub-items that use the same test conditions are test sub-items in the same test item; if the test sub-items that use the same test conditions are test sub-items in the same test item, merging the test sub-items that use the same test conditions; if the test sub-items that use the same test conditions are not test sub-items in the same test item, determining whether the test sub-items that use the same test conditions are test sub-items in adjacent test items.

[0016] Furthermore, the process of merging the screened test sub-items using the same test condition includes: determining whether the test sub-items using the same test condition are test sub-items in adjacent test items; if the test sub-items using the same test condition are test sub-items in adjacent test items, merging the test sub-items using the same test condition; if the test sub-items using the same test condition are not test sub-items in adjacent test items, determining whether the test sub-items using the same test condition in non-adjacent test items can be merged; if the test sub-items using the same test condition in non-adjacent test items can be merged, merging the test sub-items using the same test condition; if the test sub-items using the same test condition in non-adjacent test items cannot be merged, not merging the test sub-items and ending.

[0017] Furthermore, the process of determining whether test sub-items using the same test conditions in non-adjacent test items can be merged is as follows: determining whether there is a dependency relationship between the test sub-items with the same test conditions in non-adjacent test items; if there is a dependency relationship between the test sub-items with the same test conditions in non-adjacent test items, the test sub-items cannot be merged; if there is no dependency relationship between the test sub-items with the same test conditions in non-adjacent test items, the test sub-items can be merged.

[0018] Furthermore, the process of executing the test is: applying test conditions to the first test sub-item in the merged test sub-items, and not applying test conditions to the remaining test sub-items; setting the merged test sub-items not to power off each other during the test process; and performing chip testing according to the test procedure.

[0019] As a second aspect of the present application, some embodiments of the present application provide a chip testing system, including a test plan formulation module: setting test items, test sub-items and test conditions to formulate a test plan; a test sub-item screening module: screening test sub-items that use the same test conditions according to the formulated test plan; a test sub-item merging module: merging the screened test sub-items that use the same test conditions; and a test execution module: executing tests according to the test plan after the test sub-items are merged.

[0020] As a third aspect of the present application, some embodiments of the present application provide a chip testing device, including one or more processors and a memory, the memory storing a program and configured to have one or more processors perform the following steps: setting test items and test conditions, and formulating a test plan; the test items include at least one test sub-item; according to the formulated test plan, the test sub-items using the same test conditions are screened; the screened test sub-items using the same test conditions are merged; and the test is executed according to the test plan after the test sub-items are merged.

[0021] 3. Beneficial effects

[0022] Compared with the prior art, the advantages of the present invention are: the chip testing method, system and device of the present invention can save chip testing time by optimizing the test items in the test program flow. The more different types of test items of the same type or using the same test conditions, the more test time is saved, which effectively reduces the chip testing time cost and improves production capacity. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A schematic diagram of the overall process of a chip testing method in one embodiment of the present invention;

[0024] Figure 2 A schematic diagram of a determination flow of a chip testing method according to an embodiment of the present invention;

[0025] Figure 3 FIG. 4 is a schematic diagram of a determination flow of another chip testing method in an embodiment of the present invention. DETAILED DESCRIPTION

[0026] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0027] like Figures 1 to 3 As shown, a chip testing method of the present invention comprises the following steps:

[0028] S1. Develop a test plan

[0029] Determine the test scope according to the test objectives, that is, determine the test items in the test flow, such as functional testing, performance testing, and reliability testing, based on the test objectives aimed at verifying the chip's functions, performance, and reliability.

[0030] Analyze test items and set test conditions (Test Condition), and develop a test plan.

[0031] In a specific embodiment, the test flow specifically includes:

[0032] (1) Requirements analysis: Clarify the test objectives and scope based on chip specifications and application requirements;

[0033] (2) Develop a test strategy: select appropriate test types, such as functional testing, performance testing, reliability testing, etc., and determine the focus and priority of the test;

[0034] (3) Select test equipment: Select appropriate test instruments and equipment according to test requirements, such as automatic test equipment (ATE), oscilloscopes, and logic analyzers;

[0035] (4) Design test fixtures and probes: Design and manufacture test fixtures and probes suitable for the chip to ensure good electrical connection and signal transmission;

[0036] (5) Writing test programs: Write test programs or scripts according to the test plan, usually using a specific test language (such as VC++, Python, LabVIEW, etc.) to guide the operation of the test equipment and data collection.

[0037] Specifically, the test conditions include: power supply voltage (VDD) or drive and comparison voltage (VIL / VIH / VOL / VOH), relay switching state (Relay), and timing state (timing waveform format and clock frequency of each pin), etc. These conditions are set to comprehensively evaluate the performance, function and reliability of the chip.

[0038] More specifically, the power supply voltage (VDD) can determine the power supply voltage range and stability required by the chip during the test, so it is necessary to test the performance and function of the chip under different VDD conditions. The driving and comparison voltages (VIL, VIH, VOL, VOH) specifically include VIL (input low level voltage), which is the maximum voltage when the input pin is correctly identified as a low level; VIH (input high level voltage), which is the minimum voltage when the input pin is correctly identified as a high level; VOL (output low level voltage), which is the maximum voltage of the output pin when it outputs a low level; VOH (output high level voltage), which is the minimum voltage of the output pin when it outputs a high level. These parameters determine the input and output logic level range of the chip, so they need to be verified during the test. The relay switching state (Relay), including parameters such as the relay's opening time, closing time, and switching frequency, when the chip is connected to an external device through a relay, it is necessary to test the chip performance of the relay under different switching states. Timing state (timing waveform format and clock frequency of each pin) determines the timing requirements of each pin of the chip under different working states, including the rise time, fall time, hold time, setup time, etc. of the signal. Since the clock frequency is one of the important parameters of chip operation, it is necessary to test the performance and stability of the chip at different frequencies. During the test, it is necessary to use an oscilloscope and other equipment to capture and analyze these timing waveforms to ensure that they meet the design requirements.

[0039] S2. Screening test sub-items

[0040] This step is to filter out test sub-items that use the same test conditions.

[0041] In a specific embodiment, the specific process of screening test items is: according to the definition of the test flow in the chip test specification, query and screen out test items using the same test conditions or test sub-items.

[0042] Among them, the chip test specification (Test Spec for short) is a detailed document formulated for chip testing activities. It contains key information such as the test environment, test items, test methods, and test time intervals, aiming to ensure that the chip meets the design specifications and quality standards during the manufacturing process. The chip test specification is an important guiding document in the chip testing process. It describes in detail how to test the chip, including the test content, methods, standards, and required test equipment and environment. Its main purpose is to ensure that the chip can work stably and reliably in actual applications and meet the design requirements.

[0043] Test flow is defined in the chip test specification as a series of orderly test steps and processes used to verify the performance, function and reliability of the chip under different stages and conditions. This flow is the core part of the chip testing process, which ensures that the chip meets the established quality standards and performance requirements throughout its life cycle from design to manufacturing to final application.

[0044] Specifically, the test sub-items using the same test conditions refer to the test sub-items of the same test item, or the test sub-items using the same test conditions in different test items.

[0045] In a specific embodiment, the test sub-items of the same test condition include the following three situations:

[0046] (1) Test sub-items with the same test conditions in the same test item;

[0047] (2) Test sub-items with the same test conditions in adjacent test items;

[0048] (3) Test sub-items with the same test conditions in non-adjacent test items.

[0049] There is a clear hierarchical relationship between test items and test sub-items. Test items are upper-level concepts that represent the overall direction and goals of the test; while test sub-items are lower-level concepts that specifically implement the goals and requirements of the test items. Test items and test sub-items are interdependent. The implementation of test items depends on the detailed test results of test sub-items; and the design of test sub-items also needs to be based on the goals and requirements of the test items.

[0050] Among them, test items belong to a larger category in the test process of chip testing, which represents a specific type of test content or target. Test items usually cover multiple aspects such as chip function, performance and reliability, and are used to comprehensively evaluate the quality and characteristics of the chip. For example, functional testing, electrical characteristics testing and reliability testing are all test items. Test items are mainly used to determine whether the performance or characteristics of a chip in a certain aspect meet the design requirements or industry standards. Through test items, chips can be preliminarily classified and screened to provide a basis for subsequent testing.

[0051] Test sub-items refer to the specific test content or steps under the test item, which are used to achieve the goal of the test item in more detail. Each test item may contain multiple test sub-items, which test different aspects or parameters of the chip. For example, functional testing will include test sub-items such as input and output port testing and internal logic circuit verification. Test sub-items are the specific implementation and refinement of test items. Through specific test steps and methods, various aspects of the chip are tested in detail. The results of test sub-items will directly affect the judgment and evaluation of the test items, and are an important means to ensure chip quality and reliability.

[0052] S3. Combine test sub-items

[0053] Merge test subitems with the same test conditions.

[0054] Specifically, according to the screening result of step S2, the test sub-items with the same test conditions in the test program of the chip test are merged to optimize the test sub-items in the test program of the chip test, thereby optimizing the conditional states between the test items. By optimizing the conditional states between the test items in the test process, the test time of each test item can be effectively saved, thereby reducing the test time of the entire chip test program.

[0055] More specifically, merging means testing the items together in order in the test flow. At this time, you only need to apply test conditions once to the first test item / test sub-item of the "merged" test item, and the power will not be turned off after the test. The subsequent test items / test sub-items do not need to apply test conditions again and can be tested directly.

[0056] like Figure 2 As shown, the merge test sub-item specifically includes the following steps:

[0057] S301, determining whether the test sub-items using the same test conditions are test sub-items in the same test item;

[0058] If yes, execute S304;

[0059] If not, execute 302.

[0060] S302, determining whether the test sub-items using the same test condition are test sub-items in adjacent test items;

[0061] If yes, execute S304;

[0062] If not, the test sub-items with the same test condition are test sub-items in non-adjacent test items, and step 303 is executed.

[0063] S303, determining whether test sub-items using the same test conditions in non-adjacent test items can be merged;

[0064] If yes, execute S304;

[0065] If not, do not merge the test subitems and end.

[0066] S304. Combine test sub-items that use the same test conditions.

[0067] Specifically, in chip testing, the design of test logic usually needs to take into account the dependencies between test items, especially when the read operation of some test items depends on the write results of the previous test items. This dependency is very important in test design because it directly affects the accuracy and efficiency of the test. According to the dependency, it can ensure that the test items are executed in the correct order, which usually means that before executing the read test items that depend on specific write results, the corresponding write test items must be executed first. In the automated testing framework, this is ensured by the writing order of the test program or the scheduling strategy of the test execution engine.

[0068] More specifically, in chip testing, the dependency between test items mainly refers to a logical or data order and correlation. This dependency is specifically manifested in the following aspects: (1) Data dependency, for example, some test items may need to write specific data to the chip or register before they can be correctly read; or for example, the chip state (such as working mode, configuration parameters, etc.) may be set by the previous test item and affect the execution results of subsequent test items; (2) Logical dependency, for example, there may be strict execution order requirements between test items, that is, a test item must be executed after another test item to ensure the correctness of the test logic; for example, the execution of some test items may depend on the results of the previous test items, for example: if the previous test item detects an error or abnormality, it may skip or modify the execution of the subsequent test items; (3) Resource dependency, for example, in chip testing, multiple test items may share certain resources (such as memory, bus, interface, etc.), so the execution between test items may need to coordinate the allocation and use of these resources to avoid conflicts or competition conditions.

[0069] Therefore, in step S303, for test sub-items with the same test conditions in non-adjacent test items, it is necessary to determine whether the test sub-items can be merged.

[0070] like Figure 3 As shown, the judgment process is as follows:

[0071] Determine whether there is a dependency relationship between test sub-items with the same test conditions in non-adjacent test items;

[0072] If there is a dependency between test sub-items with the same test conditions in non-adjacent test items, they cannot be merged;

[0073] If there is no dependency between test sub-items with the same test conditions in non-adjacent test items, they can be merged.

[0074] S4. Execute the test

[0075] A test condition is applied to the first test sub-item in the merged test sub-items, and no test condition is applied to the remaining test sub-items. The merged test sub-items are set not to be powered off during the test process; and the chip test is performed according to the test procedure.

[0076] Specifically, according to the order of the test program and the merging result of step S3, for adjacent test items using the same test condition or test sub-items in the same test item, the test condition is applied only to the first test sub-item, and the power is not turned off after the test of the first test sub-item is completed; no test condition is applied to the remaining identical test sub-items and the test is continued;

[0077] For test sub-items in non-adjacent test items using the same test conditions, it is determined whether these test sub-items can be merged. If these test sub-items can be merged, the test conditions are only applied to the first test sub-item, and the power is not turned off after the test of the first test sub-item is completed; for the remaining identical test sub-items, no test conditions are applied and the test continues.

[0078] Specifically, after ATE applies the test conditions once, the status of the power pin (DPSPIN) or the digital board (PPMU\PE) pin of the test machine will be maintained as long as the power is not cut off in the middle. Therefore, by merging adjacent test items with the same test conditions or test sub-items in the same test item and not cutting off the power during the test process, the frequent power on and off of the same test sub-items and the time of applying test conditions can be saved.

[0079] Among them, the so-called "the pin status will always be maintained" means that after the previous test item is completed, the voltage (level) and timing status (timing) of the chip pins will remain in a certain state because the same test conditions are used and the power is not turned off after the test item is completed. For example: the level of a certain pin TX is 3.3V (maintaining a logic high level), the level of a certain pin Pin is 0V (maintaining a logic low level), the frequency of a certain clock pin CLK is 10M, the clock waveform format is RZ (Return Zero), the VOH (output high level) / VOL (output low level) of a certain output pin are 2.8V and 2V respectively, the clock adopts a period of 10Mhz, and the sampling H / L duty cycle is 40%.

[0080] Specifically, the chip test time (Test Time) refers to the execution time of the test flow (Test Flow) of a single chip running a test program. This time covers the total time required from the start of the test program to the completion of all scheduled test items. It consists of the first test item (1), the second test item (2), the third test item (3 or including test sub-items 3.1, 3.2, 3.3, ... 3.N), the fourth test item (4) ... until the end of the last test item. The total test time of the entire test flow is the test time of a single chip.

[0081] The chip testing method of this scheme does not power off the test sub-items of the same type or different types of test sub-items using the same test conditions, and only applies the test conditions (switching relays, voltage levels, timing) to the first test item of the same type or different types of test sub-items using the same test conditions once, and the subsequent test sub-items are directly tested without applying the test conditions. This can save the time for applying the test conditions for the subsequent test items, such as the time for switching relays (Relay) and applying voltage (level) and configuring the chip timing state (timing). The more test sub-items of the same type or different types of test sub-items using the same test conditions in the test program, the more test time is saved, thereby effectively reducing the chip testing time cost and improving mass production efficiency.

[0082] In a specific embodiment, as shown in Table 1, the specific content of the Test Flow defined according to the test specification is:

[0083] Table 1 Specific content of Test Flow

[0084]

[0085] Among them, SN is the serial number of the test item, O / S Test refers to open circuit (Open) and short circuit (Short) test, usually referred to as O / S test, which is used to detect whether there is an open circuit or short circuit between the chip pins; Leakage Test refers to the leakage current test of the input pin, including: input low level leakage current (IIL input leakage low) and input high level leakage current (IIH input leakage high), which is to detect the weak leakage current level generated by the chip during normal operation when the maximum voltage (VDDmax) is applied to the power supply; Scan Test is a scan test, which is a test method used to detect whether the digital logic function of the chip is correct; Mbist Test refers to the memory built-in self-test (Memory Built-In Self-Test), which is used to automatically detect memory failures when the chip is powered on or reset; WriteID Test is a write ID information test, whose purpose is to write one or more unique identifiers (ID) to a certain storage unit (such as register, specific memory, etc.) inside the chip during the chip production or testing process: RAM Test is a random access memory test, which is a test of the random access memory (Random Access Memory) integrated inside the chip A series of test operations performed on the chip (RAM) are designed to verify the functional integrity, performance stability and reliability of the RAM to ensure that the chip can correctly store and access data during operation; the Read ID Test refers to the read operation of the identifier (ID) stored inside the chip to verify the correctness and existence of the ID.

[0086] IO pins refer to input / output pins on integrated circuits (such as microcontrollers, chips, etc.). Setting the IO pin voltage to 0V means adjusting the voltage on these pins to 0V, which is usually applied by the PPMU digital channel of the ATE tester to ensure that the IO pins are in a 0V voltage state during the test.

[0087] ISVM and VSIM of IO pins refer to applying current measurement voltage or voltage measurement current to IO pins through the PPMU of ATE tester. Vscan is scan voltage, which refers to the voltage value applied to chip pins during the test. Tscan refers to the time series or timing relationship (Timing) of the voltage applied to Scan pins during the test, which usually includes: clock signal period (T), waveform format (Wave Format), drive edge Drive / signal sampling Strobe time point. Vmbist refers to the voltage value applied to chip pins through MBIST (built-in self-test, Memory Built-In Self-Test) technology during the test; Tmbist refers to the timing relationship of voltage signal application during MBIST test. V(wr) is the voltage value applied to a certain pin of the chip (possibly write pin WR or other related pins) in a specific operation (such as write operation); T(wr) refers to the timing parameters related to voltage V(wr) during the write operation. It defines how voltage signals change over time, including the rise time, fall time, duration, and synchronization relationship with other signals (such as clock signals). V(ram) refers to the voltage value applied to a specific pin (such as a data pin, address pin, or control pin) of a random access memory (RAM) chip during operation; T(ram) refers to the timing parameters related to voltage signals in the operation of RAM chips. It defines how voltage signals change over time, including the rise time, fall time, duration, and synchronization relationship with other signals (such as clock signals, control signals, etc.). V(rd) refers to the voltage value applied to a pin of a chip (usually the read pin RD or other pins related to reading) during a read operation; T(rd) refers to the timing parameters related to voltage V(rd) during a read operation. It defines how voltage signals change over time, including the rise time, fall time, duration, and synchronization relationship with other signals (such as clock signals, data signals, etc.).

[0088] Conventional DC testing, also known as direct current testing, is an important testing method in the field of electronic engineering. It is used to verify whether the performance of electronic components, modules or systems under direct current conditions meets the design requirements or specifications. This testing method is widely used in the testing of electronic products such as semiconductor devices, integrated circuits, chips, power supplies, and DC-DC converters.

[0089] According to the chip testing method of this solution, the specific steps are as follows:

[0090] S1. Develop a test plan:

[0091] According to the test conditions of each test item in the Test Spec, sort out the test items for each situation as shown in Table 1 and develop a test plan. Including:

[0092] Test item 1: O / S test, which is a conventional DC test item, and the voltage is set to Vos;

[0093] Test item 2: Leakage test, which is a regular DC test item, and the voltage is set to Vleakage;

[0094] Test item 3: Scan test, including: test sub-item 3.1 (Scan test1), test sub-item 3.2 (Scan test2), ..., test sub-item 3.N (Scan testN);

[0095] The voltage is set to V(scan) and the time sequence is set to T(scan);

[0096] Run scan pattern1, scan pattern2, ..., scan patternN; N is a natural number;

[0097] Test item 4: Mbist test, including: test item Mbist test, voltage set to V(mbist), timing set to T(mbist), run Mbist pattern;

[0098] Test item 5: WriteID test, including: test item WriteID test, voltage set to V(wr), Timing set to T(wr), run Write pattern;

[0099] Test item 6: RAM test, including: test item RAM test, voltage set to V(ram), timing set to T(ram), run RAM pattern;

[0100] Test item 7: Read ID Test, including: Test item Read ID Test, voltage set to V(rd), Timing set to T(rd), run Read pattern.

[0101] S2. Screening test sub-items:

[0102] The test conditions of each test item (test item 1 to test item 7) are sorted out according to the Test Spec, including switching relays, applying voltage, and timing.

[0103] Find test subitems that use the same test condition:

[0104] The test sub-items Scan Test1, Scan test2, ..., Scan test N in the test item 3 Scan Test are test sub-items of the same test condition;

[0105] Find the test sub-items with the same test conditions in adjacent test items:

[0106] According to the test situation, test item 3: Scan Test and test item 4: Mbist Test are two adjacent test items, and test item 4: Mbist Test and test item 3: Scan Test use the same test conditions.

[0107] Find test sub-items with the same test condition in non-adjacent test items:

[0108] According to the test situation, test item 6: RAM Test and test item 3: Scan Test use the same test conditions, but test item 6: RAM Test and test item 3: Scan Test are not adjacent test items; test item 7: Read ID Test and test item 3: Scan Test also use the same test conditions but are not adjacent and logically the read ID test item should be tested immediately after the write ID test item.

[0109] S3. Combine test sub-items:

[0110] According to the judgment process of combining test sub-items, the test sub-items with the same test conditions in the three cases screened in S2 are judged, and the following results are obtained:

[0111] The test sub-items Scan Test1, Scan test2, ..., Scan test N in test item 3 Scan Test are test sub-items in the same test item and are merged; test item 4: Mbist Test and test item 3: Scan Test are test sub-items in adjacent test items and are merged; test item 6: RAM Test and test item 3: Scan Test are not adjacent test items, use the same test conditions and have no logical association, and are merged;

[0112] Test item 7: Read ID Test and test item 3: Scan Test are test sub-items in non-adjacent test items. It is further determined that there is a dependency relationship between test sub-items with the same test conditions in the non-adjacent test items, and they are not merged.

[0113] Specifically, the "merge" in this solution means: in the test program flow (Test Flow), the tests are put together in order. At this time, you only need to apply the test conditions once to the first test item of the "merged" test items, and the power will not be turned off after the test. The subsequent test items do not need to apply the test conditions again and can be tested directly.

[0114] S4. Execute the test:

[0115] The test conditions are applied to the first test sub-item in the combined test sub-items, and are not applied to the remaining test sub-items, and the combined test sub-items are set not to be powered off during the test process; and the chip test is performed according to the test procedure.

[0116] In a specific embodiment, a chip test system of the present invention includes a test plan formulation module, a test sub-item screening module, a test sub-item merging module and a test execution module. Among them, the test plan formulation module is used to set test items, test sub-items and test conditions to formulate a test plan; the test sub-item screening module is used to filter the test sub-items using the same test conditions according to the formulated test plan; the test sub-item merging module is used to merge the screened test sub-items using the same test conditions; the test execution module is used to execute the test according to the test plan after the test sub-items are merged.

[0117] The device for chip testing may be a hardware device, including one or more processors and a memory, wherein the memory stores a program and is configured such that the one or more processors execute the following steps:

[0118] Set test items, test sub-items and test conditions, and formulate a test plan; according to the formulated test plan, filter the test sub-items that use the same test conditions; merge the filtered test sub-items that use the same test conditions; execute the test according to the test plan after the test sub-items are merged.

[0119] Specifically, the chip testing device can be ATE, which executes the test flow to perform functional testing on the chip, and evaluates the performance, function and reliability of the chip by applying stimulus signals and monitoring chip output signals. ATE can control the entire test process, run test programs and collect test data, and is a key means to ensure chip quality. In a specific solution, ATE will output a Datalog (data query language) to display the test results after the test is completed.

[0120] The chip testing method, system and device of this solution achieves a significant reduction in chip testing time by optimizing each test item in the test program flow. This optimization strategy is particularly effective in scenarios involving a large number of test items of the same type or different types of test items using the same test conditions, and the test time saved increases exponentially with the increase in the number of test items.

[0121] The strategy of this solution not only significantly shortens the chip testing cycle, but also demonstrates its outstanding value and far-reaching impact in multiple dimensions. With the increase in the number of the same type of test items or different types of test items using the same test conditions, this solution achieves a proportional reduction in test time, thereby greatly reducing the time cost of chip testing. This effect can promote the improvement of production efficiency, allowing enterprises to respond more calmly when facing large-scale production needs, and effectively improve overall production capacity and market competitiveness. The technical solution of the present invention has shown far-reaching positive impacts in improving production efficiency, optimizing resource allocation, strengthening quality control, reducing costs, accelerating product launches, and promoting environmental friendliness. It is a powerful tool to promote the high-quality development of the chip manufacturing industry.

[0122] The above schematically describes the invention and its implementation methods, which is not restrictive. Without departing from the spirit or basic features of the invention, the invention can be implemented in other specific forms. What is shown in the accompanying drawings is only one of the implementation methods of the invention. The actual structure is not limited to this, and any figure mark in the claims should not limit the claims involved. Therefore, if a person of ordinary skill in the art is inspired by it, without departing from the purpose of the invention, a structural method and an embodiment similar to the technical solution are designed without creativity, which should all fall within the scope of protection of this patent. In addition, the word "including" does not exclude other elements or steps, and the word "one" before the element does not exclude the inclusion of "multiple" elements. The multiple elements stated in the product claim can also be implemented by one element through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any specific order.

Claims

1. A chip testing method, comprising the following steps: Set test items and test conditions, and develop test plans; Wherein, the test item includes at least one test sub-item; Filter test sub-items that use the same test conditions; Merge the selected test sub-items that use the same test conditions; Execute the test after the test subitems are merged.

2. The chip testing method according to claim 1, characterized in that: In the step of filtering test sub-items that use the same test condition, the test sub-items that use the same test condition refer to test sub-items with the same test condition in the same test item.

3. The chip testing method according to claim 1, characterized in that: In the step of filtering test sub-items using the same test condition, the test sub-items using the same test condition refer to test sub-items having the same test condition in adjacent test items.

4. The chip testing method according to claim 1, characterized in that: In the step of filtering test sub-items using the same test condition, the test sub-items using the same test condition refer to test sub-items having the same test condition in non-adjacent test items.

5. The chip testing method according to any one of claims 2 to 4, characterized in that: The process of merging filtered test subitems that use the same test criteria includes: Determine whether the test sub-items using the same test conditions are test sub-items in the same test item; If the test sub-items using the same test conditions are test sub-items in the same test item, the test sub-items using the same test conditions are merged; If the test sub-items using the same test condition are not test sub-items in the same test item, it is determined whether the test sub-items using the same test condition are test sub-items in adjacent test items.

6. The chip testing method according to claim 5, characterized in that: The process of merging the screened test sub-items using the same test condition includes: determining whether the test sub-items using the same test condition are test sub-items in adjacent test items; If the test sub-items using the same test conditions are test sub-items in adjacent test items, the test sub-items using the same test conditions are merged; If the test sub-items using the same test condition are not test sub-items in adjacent test items, then determine whether the test sub-items using the same test condition in non-adjacent test items can be merged; If the test sub-items using the same test conditions in non-adjacent test items can be merged, the test sub-items using the same test conditions are merged; If the test sub-items in non-adjacent test items that use the same test conditions cannot be merged, the test sub-items are not merged and the process ends.

7. The chip testing method according to claim 6, characterized in that: The process of determining whether test sub-items using the same test conditions in non-adjacent test items can be merged is as follows: Determine whether there is a dependency relationship between test sub-items with the same test conditions in non-adjacent test items; If there is a dependency between test sub-items with the same test conditions in non-adjacent test items, they cannot be merged; If there is no dependency between test sub-items with the same test conditions in non-adjacent test items, they can be merged.

8. The chip testing method according to claim 1, characterized in that: The process of performing the test includes: Apply the test condition to the first test sub-item in the merged test sub-items, and do not apply the test condition to the remaining test sub-items; Set the merged test sub-items to not be powered off during the test; Perform chip testing according to the test procedures.

9. A chip testing system, characterized in that: include, Test plan making module: set test items, test sub-items and test conditions, and make test plans; Test sub-item screening module: based on the developed test plan, screen the test sub-items that use the same test conditions; Test sub-item merging module: merges the screened test sub-items that use the same test conditions; Test execution module: executes the test according to the test plan after completing the merging of test sub-items.

10. A chip testing device, characterized in that: The device comprises one or more processors and a memory, wherein the memory stores a program and is configured to execute the following steps by the one or more processors: Setting test items and test conditions and formulating a test plan; the test items include at least one test sub-item; According to the developed test plan, screen the test sub-items that use the same test conditions; Merge the selected test sub-items that use the same test conditions; Execute the test according to the test plan after completing the merging of the test sub-items.

Citation Information

Patent Citations

  • Multi-chip parallel test method and device

    CN114152864A

Cited By

  • Chip batch test method and system based on power supply switching, equipment and medium

    CN119575149A

  • Chip batch testing method based on power supply switching, and its system, device, and medium

    CN119575149B