By obtaining the three-dimensional object group of building information model and calculating the correlation and weight of the assembly objects, performing segmented assembly, the problem of insufficient structural connection stability of coal gangue concrete beams in the existing technology is solved, and the safety and reliability of construction are improved .
Patent Information
- Application Number
- CN202411260689.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Among the existing intelligent construction methods for coal gangue concrete beams, the design and construction tolerance of prefabricated buildings is low, resulting in insufficient structural connection stability and possible safety hazards, such as water permeability and earthquake resistance failure.
By obtaining the three-dimensional object group of building information model, determining the node connection relationship between assembly objects, calculating the assembly correlation and weight, obtaining and updating the classification and adaptive data group, and using segmented assembly methods to improve the connection stability of component nodes sex.
It effectively avoids installation errors between assembly objects, improves the connection stability between component nodes, and enhances the safety and reliability of the structure.
Smart Images

Figure CN119066752A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of building technology, and more specifically, to a method and system for intelligent construction of gangue concrete beams. More specifically, it is an intelligent application of intelligent construction of gangue concrete beams in existing prefabricated buildings. Background Art
[0002] With the rapid development of information technology, the construction industry is undergoing a profound transformation. Prefabricated buildings, as a new type of construction method, are gradually favored by the industry for their high efficiency and environmental protection. The construction management of residential prefabricated construction projects is a key link to ensure the smooth progress and high-quality completion of the project. With the rapid development and widespread application of prefabricated building technology, the importance of construction management has become increasingly prominent.
[0003] As a building material, gangue concrete beams are used in both intelligent construction and prefabricated construction. Through intelligent construction technology, the production and construction process of gangue concrete beams can be optimized to improve their quality and efficiency. At the same time, prefabricated construction methods also facilitate the application of gangue concrete beams, allowing this environmentally friendly material to be more effectively used in construction.
[0004] In the existing intelligent management methods for the intelligent construction of coal gangue concrete beams, the fault tolerance rate of the design of prefabricated buildings and the intelligent construction of coal gangue concrete beams is low. In actual projects, due to the adjustment of the project product positioning during the building design cycle, or the lag in the conditions for secondary in-depth design such as decoration and intelligence, the components designed in the early stage may not be able to fully meet the requirements of later installation or use. For example, the most important nodes and connections in structural design and construction, if design and construction errors occur, will lead to a decrease in the safety and reliability of the structure, and even safety hazards such as water seepage and leakage, durability and seismic resistance not meeting the requirements. Summary of the invention
[0005] The present application provides a method and system for intelligently constructing a gangue concrete beam, so as to improve the connection stability between the nodes of each component when the gangue concrete beam structure is connected.
[0006] In a first aspect, the present application provides an intelligent management method for the intelligent construction of gangue concrete beams. The method can be executed by a network device, or can also be executed by a chip configured in the network device, and the present application does not limit this.
[0007] Specifically, the method includes:
[0008] Obtaining a three-dimensional object group of a building information model of a gangue concrete beam;
[0009] Determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model;
[0010] Classifying the three-dimensional object group of the building information model according to the assembly relevance and assembly weight respectively corresponding to each assembly object to obtain a plurality of assembly object levels;
[0011] Performing assembly according to each assembly object in the first assembly object level, acquiring an adaptability data group in the assembly process, and determining assembly adaptability entropies corresponding to each assembly object in the first assembly object level according to the adaptability data group;
[0012] The remaining assembly object levels are updated according to the assembly adaptation entropies respectively corresponding to the respective assembly objects in the first assembly object level, and segmented assembly is performed according to the remaining assembly object levels after the update.
[0013] In combination with the first aspect, in some implementations of the first aspect, determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model specifically includes:
[0014] Acquire the node connection relationship between each assembly object in the three-dimensional object group of the building information model;
[0015] According to the node connection relationship between each assembly object, the assembly connection matrix is determined;
[0016] According to the assembly connection matrix, the assembly relevance and assembly weight corresponding to each assembly object are determined.
[0017] In conjunction with the first aspect, in some implementations of the first aspect, assembling according to each assembly object in the first assembly object level specifically includes:
[0018] Obtaining assembly weights corresponding to each assembly object in the first assembly object level;
[0019] The respective assembly objects in the first assembly object level are assembled according to the assembly weights respectively corresponding to the respective assembly objects in the first assembly object level.
[0020] In combination with the first aspect, in some implementations of the first aspect, updating the remaining assembly object levels according to the assembly adaptation entropies respectively corresponding to the respective assembly objects in the first assembly object level specifically includes:
[0021] Obtain each assembly object in the remaining assembly object levels, and combine them to obtain an update object set;
[0022] Determine the connection weights corresponding to the respective update objects in the update object set according to the connection relationship between the respective assembly objects in the first assembly level and the update object set;
[0023] Determine the secondary distribution matrix of the update object set according to the connection weights corresponding to the update objects and the assembly adaptation entropies corresponding to the assembly objects;
[0024] The update object set is updated according to the secondary allocation matrix to obtain a plurality of updated assembly object levels.
[0025] In conjunction with the first aspect, in certain implementations of the first aspect, performing segmented assembly according to the remaining assembly object levels after the update specifically includes:
[0026] Assembling according to a first updated assembly object level in the remaining assembly object levels after the update, and determining the assembly adaptation entropies corresponding to the assembly objects in the first updated assembly object level respectively during the assembly process;
[0027] updating the remaining updated assembly object levels according to the assembly adaptation entropies respectively corresponding to the assembly objects in the first updated assembly object level;
[0028] Assembling is performed again according to the first updated assembly object level in the remaining assembly object levels after the update, and the above steps are repeated until all assembly objects have been assembled.
[0029] In combination with the first aspect, in some implementations of the first aspect, a K-means clustering method is used to perform two-dimensional clustering according to the assembly relevance and assembly weight corresponding to each assembly object, thereby obtaining multiple assembly object levels.
[0030] In combination with the first aspect, in some implementations of the first aspect, the node connection relationship between the assembly objects includes a connection point, a connection type, and a connection object of each assembly object.
[0031] In a second aspect, the present application provides an intelligent management system for intelligent construction of coal gangue concrete beams, the system comprising a construction control unit, the construction control unit comprising:
[0032] An acquisition module, used for acquiring a three-dimensional object group of a building information model of a gangue concrete beam;
[0033] A processing module, for determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model;
[0034] The processing module is further used to classify the three-dimensional object group of the building information model according to the assembly relevance and assembly weight corresponding to each assembly object, so as to obtain a plurality of assembly object levels;
[0035] The processing module is further used to perform assembly according to each assembly object in the first assembly object level, obtain an adaptability data group in the assembly process, and determine the assembly adaptability entropy corresponding to each assembly object in the first assembly object level according to the adaptability data group;
[0036] The execution module is used to update the remaining assembly object levels according to the assembly adaptation entropy corresponding to each assembly object in the first assembly object level, and perform segmented assembly according to the remaining assembly object levels after the update.
[0037] In a third aspect, the present application provides a computer terminal device, comprising a memory and a processor, wherein the memory stores codes, and the processor is configured to obtain the codes and execute the above-mentioned intelligent management method for intelligent construction of coal gangue concrete beams.
[0038] In a fourth aspect, the present application provides a computer-readable storage medium storing at least one computer program, which is loaded and executed by a processor to implement the operations performed by the above-mentioned intelligent construction and intelligent management method of coal gangue concrete beams.
[0039] The technical solution provided by the embodiments disclosed in this application has the following beneficial effects:
[0040] In a method and system for intelligent construction of gangue concrete beams provided by the present application, firstly, a three-dimensional object group of a building information model of the gangue concrete beam is obtained; according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model, the assembly relevance and assembly weight corresponding to each assembly object are determined; the three-dimensional object group of the building information model is classified according to the assembly relevance and assembly weight corresponding to each assembly object, so as to obtain a plurality of assembly object levels; according to each assembly object in the first assembly object level, assembly is performed to obtain an adaptability data group in the assembly process, and according to the adaptability data group, the assembly adaptability entropy corresponding to each assembly object in the first assembly object level is determined; according to the assembly adaptability entropy corresponding to each assembly object in the first assembly object level, the remaining assembly object levels are updated, and segmented assembly is performed according to the remaining assembly object levels after the update. In the present application, segmented assembly is performed according to the connection relationship between each assembly object in the gangue concrete beam, thereby avoiding the safety hazard caused by excessive installation errors between assembly objects and improving the connection stability between each component node. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1is an exemplary flow chart of an intelligent management method for intelligent construction of gangue concrete beams according to some embodiments of the present application;
[0042] Figure 2 is a schematic diagram of exemplary hardware and / or software of a construction control unit according to some embodiments of the present application;
[0043] Figure 3 It is a structural schematic diagram of a computer terminal device for implementing an intelligent management method for the intelligent construction of gangue concrete beams according to some embodiments of the present application. DETAILED DESCRIPTION
[0044] The present application first obtains a three-dimensional object group of a gangue concrete beam building information model; determines the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model; classifies the three-dimensional object group of the building information model according to the assembly relevance and assembly weight corresponding to each assembly object, and obtains multiple assembly object levels; assembles according to each assembly object in the first assembly object level, obtains an adaptability data group in the assembly process, and determines the assembly adaptation entropy corresponding to each assembly object in the first assembly object level according to the adaptability data group; updates the remaining assembly object levels according to the assembly adaptation entropy corresponding to each assembly object in the first assembly object level, and performs segmented assembly according to the updated remaining assembly object levels. The present application performs segmented assembly according to the connection relationship between each assembly object in the gangue concrete beam, avoids the safety hazard caused by excessive installation errors between assembly objects, and improves the connection stability between each component node.
[0045] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 , which is an exemplary flow chart of an intelligent management method for intelligent construction of gangue concrete beams according to some embodiments of the present application. The intelligent management method 100 for intelligent construction of gangue concrete beams mainly includes the following steps:
[0046] In step S101, a three-dimensional object group of a building information model of a gangue concrete beam is obtained.
[0047] It should be noted that Building Information Modeling (BIM) technology, as a digital modeling tool, is an emerging tool that uses three-dimensional graphics to assist in building construction. Its application in the intelligent construction of coal gangue concrete beams can not only improve construction efficiency, but also optimize design plans and reduce construction costs.
[0048] In some embodiments of the present application, the building information model three-dimensional object group is a collection of all prefabricated assembly component objects in the coal gangue concrete beam. For example, when the assembly of the building information model three-dimensional object group is a shear wall, the assembly component objects in the building information model three-dimensional object group are composed of prefabricated floor slabs, prefabricated shear walls, composite floor slabs, prefabricated stairs, prefabricated balconies, prefabricated air-conditioning panels, etc.
[0049] In step S102, the assembly relevance and assembly weight corresponding to each assembly object are determined according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model.
[0050] Optionally, in some embodiments, determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model specifically includes:
[0051] Acquire the node connection relationship between each assembly object in the three-dimensional object group of the building information model;
[0052] According to the node connection relationship between each assembly object, the assembly connection matrix is determined;
[0053] According to the assembly connection matrix, the assembly relevance and assembly weight corresponding to each assembly object are determined.
[0054] In specific implementation, the node connection relationship between each assembly object includes the connection point, connection type (such as welding, bolt connection, plug-in, etc.) and connection object of each assembly object. In some embodiments, after determining the different connection types existing in the model, an initial weight can be assigned to each connection type, and then the connection properties can be defined, that is, considering factors such as connection strength, connection complexity and construction difficulty, and assigning corresponding assembly property values to each connection type according to the initial weight; the elements in the assembly connection matrix represent the connection relationship and connection type between the assembly objects, the rows and columns of the matrix represent the assembly objects respectively, and the matrix elements represent the assembly property values between two objects.
[0055] Optionally, in some embodiments, the correlation between each assembly object and other objects can be determined based on the assembly connection matrix, wherein the correlation can be defined as the sum of the connection type weights between the assembly object and other objects, and the assembly weight is the ratio between the number of assembly objects connected to the assembly object and the total number of objects in the three-dimensional object group of the building information model.
[0056] In step S103, the three-dimensional object group of the building information model is classified according to the assembly relevance and assembly weight corresponding to each assembly object, so as to obtain a plurality of assembly object levels.
[0057] It should be noted that the assembly object level is a set of assembly objects. Optionally, in some embodiments, a K-means clustering method may be used to perform two-dimensional clustering according to the assembly relevance and assembly weight corresponding to each assembly object, thereby obtaining multiple assembly object levels.
[0058] In step S104, assembly is performed according to each assembly object in the first assembly object level, an adaptability data group in the assembly process is acquired, and assembly adaptability entropies corresponding to each assembly object in the first assembly object level are determined according to the adaptability data group.
[0059] Optionally, in some embodiments, assembling according to each assembly object in the first assembly object level specifically includes:
[0060] Obtaining assembly weights corresponding to each assembly object in the first assembly object level;
[0061] The respective assembly objects in the first assembly object level are assembled according to the assembly weights respectively corresponding to the respective assembly objects in the first assembly object level.
[0062] It should be noted that the adaptability data group is a set of adaptability data of each assembly object in the first assembly object level when assembling, and the adaptability data includes the following data:
[0063] Position error data: The error between the expected position and the actual position of each assembly object.
[0064] Time consumption data: assembly time of each assembly object.
[0065] Resource consumption data: resource consumption of each assembly object (such as manpower and materials).
[0066] It should be noted that the assembly adaptation entropy is the degree of adaptability of the connection between the assembly object and the other assembly objects. In some embodiments, the adaptability data corresponding to each assembly object can be weightedly fused by setting corresponding position weights, time weights, and resource weights to obtain the assembly adaptation entropies corresponding to the assembly objects in the first assembly object level.
[0067] In step S105, the remaining assembly object levels are updated according to the assembly adaptation entropies respectively corresponding to the respective assembly objects in the first assembly object level, and segmented assembly is performed according to the remaining assembly object levels after the update.
[0068] Optionally, in some embodiments, updating the remaining assembly object levels according to the assembly adaptation entropy corresponding to each assembly object in the first assembly object level specifically includes:
[0069] Obtain each assembly object in the remaining assembly object levels, and combine them to obtain an update object set;
[0070] Determine the connection weights corresponding to the respective update objects in the update object set according to the connection relationship between the respective assembly objects in the first assembly level and the update object set;
[0071] Determine the secondary distribution matrix of the update object set according to the connection weights corresponding to the update objects and the assembly adaptation entropies corresponding to the assembly objects;
[0072] The update object set is updated according to the secondary allocation matrix to obtain a plurality of updated assembly object levels.
[0073] Optionally, in some embodiments, performing segmented assembly according to the remaining assembly object levels after the update specifically includes:
[0074] Assembling according to a first updated assembly object level in the remaining assembly object levels after the update, and determining the assembly adaptation entropies corresponding to the assembly objects in the first updated assembly object level respectively during the assembly process;
[0075] updating the remaining updated assembly object levels according to the assembly adaptation entropies respectively corresponding to the assembly objects in the first updated assembly object level;
[0076] Assembling is performed again according to the first updated assembly object level in the remaining assembly object levels after the update, and the above steps are repeated until all assembly objects have been assembled.
[0077] In addition, in another aspect of the present application, in some embodiments, the present application provides an intelligent management system for intelligent construction of coal gangue concrete beams, the system comprising a construction control unit, referring to Figure 2 , which is a schematic diagram of exemplary hardware and / or software of a construction control unit according to some embodiments of the present application, the construction control unit 200 includes: an acquisition module 201, a processing module 202 and an execution module 203, which are described as follows:
[0078] Acquisition module 201, in some specific embodiments of the present application, the acquisition module 201 is mainly used to acquire a three-dimensional object group of a building information model of a gangue concrete beam;
[0079] Processing module 202, in some specific embodiments of the present application, the processing module 202 is used to determine the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model;
[0080] The processing module 202, in some specific embodiments of the present application, is further used to classify the three-dimensional object group of the building information model according to the assembly relevance and assembly weight respectively corresponding to each assembly object, to obtain a plurality of assembly object levels;
[0081] The processing module 202 is further used in some specific embodiments of the present application to assemble according to each assembly object in the first assembly object level, obtain an adaptability data group in the assembly process, and determine the assembly adaptability entropy corresponding to each assembly object in the first assembly object level according to the adaptability data group;
[0082] Execution module 203, in some specific embodiments of the present application, the execution module 203 is mainly used to update the remaining assembly object levels according to the assembly adaptation entropy corresponding to each assembly object in the first assembly object level, and perform segmented assembly according to the remaining assembly object levels after the update.
[0083] The above describes in detail an example of a method and system for intelligent construction of gangue concrete beams provided in an embodiment of the present application. It can be understood that in order to realize the above functions, the corresponding device includes hardware structures and / or software modules corresponding to executing each function.
[0084] Those skilled in the art should easily realize that, in combination with the units and algorithm steps of each example described in the embodiments disclosed in this document, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a certain function in the application is executed in hardware or in a computer software-driven hardware manner depends on the specific application and design constraints of the technical solution. Therefore, professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0085] In addition, the present application also provides a computer terminal device, which includes a memory and a processor, the memory stores code, and the processor is configured to obtain the code and execute the above-mentioned intelligent construction and intelligent management method of coal gangue concrete beams.
[0086] In some embodiments, reference Figure 3 , which is a schematic diagram of the structure of a computer terminal device using a method for intelligent construction and intelligent management of gangue concrete beams according to some embodiments of the present application. The method for intelligent construction and intelligent management of gangue concrete beams in the above embodiment can be Figure 3 The computer terminal device 300 shown in the figure is implemented, and the computer terminal device 300 includes at least one communication bus 301, a communication interface 302, a processor 303 and a memory 304.
[0087] Processor 303 can be a general-purpose central processing unit (CPU), an application-specific integrated circuit (ASIC) or one or more processors for controlling the execution of an intelligent management method for intelligent construction of coal gangue concrete beams in the present application.
[0088] The communication bus 301 may include a path for transmitting information between the above-mentioned components.
[0089] The memory 304 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, an optical disc storage (including a compressed optical disc, a laser disc, an optical disc, a digital versatile disc, a Blu-ray disc, etc.), a disk or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of an instruction or data structure and can be accessed by a computer, but is not limited thereto. The memory 304 may exist independently and be connected to the processor 303 via the communication bus 301. The memory 304 may also be integrated with the processor 303.
[0090] The memory 304 is used to store the program code for executing the solution of the present application, and the execution is controlled by the processor 303. The processor 303 is used to execute the program code stored in the memory 304. The program code may include one or more software modules. The determination of the assembly adaptation entropy in the above embodiment can be implemented by the processor 303 and one or more software modules in the program code in the memory 304.
[0091] The communication interface 302 uses any transceiver or other device for communicating with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area networks (WLAN), etc.
[0092] Optionally, the computer terminal device 300 may further include a power supply 305 for providing power to various devices or circuits in the real-time computer terminal device.
[0093] In a specific implementation, as an embodiment, a computer terminal device may include multiple processors, each of which may be a single-CPU processor or a multi-CPU processor. The processor here may refer to one or more devices, circuits, and / or processing cores for processing data (e.g., computer program instructions).
[0094] The computer terminal device may be a general-purpose computer terminal device or a dedicated computer terminal device. In a specific implementation, the computer terminal device may be a desktop computer, a portable computer, a network server, a personal digital assistant (PDA), a mobile phone, a tablet computer, a wireless terminal device, a communication device or an embedded device. The embodiment of the present application does not limit the type of computer terminal device.
[0095] In addition, in other aspects of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores at least one computer program, and the computer program is loaded and executed by a processor to implement the operations performed by the above-mentioned intelligent construction and intelligent management method of coal gangue concrete beams.
[0096] In summary, in a method and system for intelligent construction of gangue concrete beams disclosed in an embodiment of the present application, first, a three-dimensional object group of a building information model of a gangue concrete beam is obtained; according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model, the assembly relevance and assembly weight corresponding to each assembly object are determined; the three-dimensional object group of the building information model is classified according to the assembly relevance and assembly weight corresponding to each assembly object, so as to obtain a plurality of assembly object levels; according to each assembly object in the first assembly object level, assembly is performed to obtain an adaptability data group in the assembly process, and according to the adaptability data group, the assembly adaptation entropy corresponding to each assembly object in the first assembly object level is determined; according to the assembly adaptation entropy corresponding to each assembly object in the first assembly object level, the remaining assembly object levels are updated, and segmented assembly is performed according to the remaining assembly object levels after the update. The present application performs segmented assembly according to the connection relationship between each assembly object in the gangue concrete beam, thereby improving the connection stability between each component node.
[0097] The above is only an embodiment of the present application, and the common knowledge such as the specific technical scheme or characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical scheme of the present application, several modifications and improvements can be made, which should also be regarded as the scope of protection of the present application, and these will not affect the effect of the implementation of the present application and the practicality of the patent.
[0098] The scope of protection claimed by this application shall be based on the content of its claims. The specific implementation methods and other records in the specification can be used to interpret the content of the claims. Obviously, those skilled in the art can make various changes and modifications to this application without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of this application fall within the scope of the claims of this application and their equivalents, this application is also intended to include these modifications and variations.
Claims
1. An intelligent management method for intelligent construction of gangue concrete beams, characterized in that: include: Obtaining a three-dimensional object group of a building information model of a gangue concrete beam; Determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model; Classifying the three-dimensional object group of the building information model according to the assembly relevance and assembly weight respectively corresponding to each assembly object to obtain a plurality of assembly object levels; Performing assembly according to each assembly object in the first assembly object level, acquiring an adaptability data group in the assembly process, and determining assembly adaptability entropies corresponding to each assembly object in the first assembly object level according to the adaptability data group; The remaining assembly object levels are updated according to the assembly adaptation entropies respectively corresponding to the respective assembly objects in the first assembly object level, and segmented assembly is performed according to the remaining assembly object levels after the update.
2. The method according to claim 1, characterized in that Determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model specifically includes: Acquire the node connection relationship between each assembly object in the three-dimensional object group of the building information model; Determine the assembly connection matrix according to the node connection relationship between each assembly object; According to the assembly connection matrix, the assembly relevance and assembly weight corresponding to each assembly object are determined.
3. The method according to claim 1, characterized in that The assembly according to each assembly object in the first assembly object level specifically includes: Obtaining assembly weights corresponding to each assembly object in the first assembly object level; The respective assembly objects in the first assembly object level are assembled according to the assembly weights respectively corresponding to the respective assembly objects in the first assembly object level.
4. The method according to claim 1, characterized in that Updating the remaining assembly object levels according to the assembly adaptation entropies corresponding to the respective assembly objects in the first assembly object level specifically includes: Obtain each assembly object in the remaining assembly object levels, and combine them to obtain an update object set; Determine the connection weights corresponding to the respective update objects in the update object set according to the connection relationship between the respective assembly objects in the first assembly level and the update object set; Determine the secondary distribution matrix of the update object set according to the connection weights corresponding to the update objects and the assembly adaptation entropies corresponding to the assembly objects; The update object set is updated according to the secondary allocation matrix to obtain a plurality of updated assembly object levels.
5. The method according to claim 1, characterized in that The segmented assembly according to the remaining assembly object level after the update specifically includes: Assembling according to a first updated assembly object level in the remaining assembly object levels after the update, and determining the assembly adaptation entropies corresponding to the assembly objects in the first updated assembly object level respectively during the assembly process; updating the remaining updated assembly object levels according to the assembly adaptation entropies respectively corresponding to the assembly objects in the first updated assembly object level; Assembling is performed again according to the first updated assembly object level in the remaining assembly object levels after the update, and the above steps are repeated until all assembly objects have been assembled.
6. The method according to claim 1, characterized in that The K-means clustering method is used to perform two-dimensional clustering according to the assembly relevance and assembly weight corresponding to each assembly object, thereby obtaining multiple assembly object levels.
7. The method according to claim 1, characterized in that The node connection relationship between each assembly object includes the connection point, connection type and connection object of each assembly object.
8. An intelligent management system for intelligent construction of coal gangue concrete beams, the system includes a construction control unit, characterized in that: The construction control unit comprises: An acquisition module, used for acquiring a three-dimensional object group of a building information model of a gangue concrete beam; A processing module, for determining the assembly relevance and assembly weight corresponding to each assembly object according to the node connection relationship between each assembly object in the three-dimensional object group of the building information model; The processing module is further used to classify the three-dimensional object group of the building information model according to the assembly relevance and assembly weight corresponding to each assembly object, so as to obtain a plurality of assembly object levels; The processing module is further used to perform assembly according to each assembly object in the first assembly object level, obtain an adaptability data group in the assembly process, and determine the assembly adaptability entropy corresponding to each assembly object in the first assembly object level according to the adaptability data group; The execution module is used to update the remaining assembly object levels according to the assembly adaptation entropy corresponding to each assembly object in the first assembly object level, and perform segmented assembly according to the remaining assembly object levels after the update.
9. A computer terminal device, characterized in that: The computer terminal device includes a memory and a processor, the memory stores codes, and the processor is configured to obtain the codes and execute the intelligent construction and intelligent management method of coal gangue concrete beams as described in any one of claims 1 to 7.
10. A computer-readable storage medium storing at least one computer program, characterized in that: The computer program is loaded and executed by a processor to implement the operations performed by the intelligent construction management method for coal gangue concrete beams as described in any one of claims 1 to 7.