Power grid dispatching method and system based on multi-resource space-time coupling characteristic
By building a multi-resource coordination scheduling model and optimizing the operation plan of units and UHV DC, the problem that the impact of new energy power generation is not considered is solved, the flexibility and stability of power grid scheduling is improved, and the development needs of new power systems are adapted.
Patent Information
- Application Number
- CN202411193609.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-28
AI Technical Summary
The existing power grid scheduling methods fail to effectively consider the impact of new energy power generation on the entire power grid system in different periods, resulting in untimely dispatch and poor flexibility, especially during the period of high output of new energy, it is difficult to achieve stable operation of the power system.
The power grid scheduling method based on the multi-resource space-time coupling characteristics is adopted, and the multi-resource coordination scheduling model is optimized by constructing coal-electric power unit model, ultra-high voltage DC coupling model and electrical hydrogen load cluster scheduling aggregation model, combining optimization goals such as operating costs and system carbon Emissions, optimize unit start-stop arrangements and UHV DC transmission plans, and achieve coordinated operation of multiple resources.
It has improved the new energy consumption level and overall regulation capabilities of the power system, alleviated the pressure of new energy consumption and power supply guarantee, adapted to the development needs of the new power system, and improved the system regulation capabilities.
Smart Images

Figure CN119070398A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power grid operation dispatching and control, and in particular relates to a power grid dispatching method and system based on multi-resource spatiotemporal coupling characteristics. Background Art
[0002] As the proportion of renewable energy continues to increase, the system equivalent load presents a canyon-shaped curve. The time-space mismatch between source and load and the lack of regulation resources highlight the contradiction between the difficulty of absorbing renewable energy when it is generated in large quantities and the difficulty of ensuring power supply when it is generated in small quantities. The minimum guaranteed output level of renewable energy is low, and it is difficult to ensure power supply. It needs to cooperate with large power grids, backup power sources and other types of flexible regulation resources to achieve power supply guarantee; during the period of low output of renewable energy, the power system needs non-renewable energy units such as conventional power sources to achieve power balance; the long-term high output of renewable energy brings huge challenges to the system absorption.
[0003] With the ultra-high-speed and unexpected development of new energy, power grid dispatching faces the difficult problem of contradiction between consumption and supply guarantee under the high proportion of new energy access. At the same time, the system regulation resources are constantly increasing, and the system flexibility regulation potential is huge. It is urgent to make full use of dispatching resources such as flexible coal-fired power, new energy storage, ultra-high voltage direct current, and adjustable load. At present, the SCUC (Security-Constrained Unit Commitment) model, that is, the security-constrained unit combination model is used in the power system to determine the unit output plan and the energy storage power station charging and discharging plan, aiming to meet the load demand in a specific period of time while reducing costs as much as possible and ensuring the safe and stable operation of the power system; however, the existing methods do not consider the impact of new energy power generation on the entire power grid system in different periods, resulting in untimely grid dispatching and poor flexibility. Especially in real-time dispatching, it is necessary to obtain dispatching results quickly, which puts higher requirements on computing efficiency. Summary of the invention
[0004] The purpose of the present invention is to provide a power grid dispatching method and system based on the spatiotemporal coupling characteristics of multiple resources, so as to overcome the problem that the existing method does not consider the impact of the power generation of renewable energy in different periods on the entire power grid system, resulting in untimely power grid dispatching and poor flexibility.
[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0006] In a first aspect, the present invention provides a power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources, comprising the following steps:
[0007] A multi-resource coordinated optimization scheduling model is constructed based on the coal-fired power unit model, the UHV DC coupling model and the hydrogen production load cluster scheduling aggregation model;
[0008] The multi-resource coordinated optimization scheduling model is optimized based on the operating constraints of coal-fired power units, UHV DC operating constraints and hydrogen production load operating constraints. Based on the optimized multi-resource coordinated optimization scheduling model, the unit start and stop arrangements, UHV DC transmission plan, and multi-resource power generation and consumption plan are obtained.
[0009] Preferably, the optimization objectives for optimizing the multi-resource coordinated optimization scheduling model include operating costs within the scheduling cycle, new energy power abandonment and system carbon emissions.
[0010] Preferably, the operating costs within the scheduling period include power generation costs, adjustable load regulation costs, electric hydrogen production regulation costs and energy storage charging and discharging compensation costs.
[0011] Preferably, the multi-resource coordinated optimization scheduling model is optimized by converting the amount of abandoned renewable energy and system carbon emissions into costs, and jointly optimizing them with the operating costs within the scheduling cycle. The CPLEX method is used to solve the target optimization according to the objective function of the multi-resource coordinated optimization scheduling model, and the optimized unit start and stop schedule, UHV DC transmission plan, and multi-resource power generation and consumption plan can be obtained.
[0012] Preferably, the coal-fired power unit operation constraints include cost constraints, unit load increase / decrease rate constraints, unit deep peak load regulation minimum operation time constraints, and unit output upper and lower limit constraints.
[0013] Preferably, the UHV DC operation constraints include transmission power limit constraints, transmission power adjustment rate constraints, power cannot be adjusted in the opposite direction in adjacent time periods, UHV DC adjustment times limit constraints, traded power constraints, and constraints on the relationship between the number of coal-fired power units in operation and the transmission power limit.
[0014] Preferably, the hydrogen production load operation constraints include upper and lower limit constraints on hydrogen production load power, load addition and subtraction rate constraints, and hydrogen storage constraints.
[0015] In a second aspect of the present invention, a power grid dispatching system based on the spatiotemporal coupling characteristics of multiple resources includes a model optimization module and a power grid dispatching module;
[0016] Model optimization module, used to build a multi-resource coordinated optimization scheduling model based on the coal-fired power unit model, UHV DC coupling model and hydrogen production load cluster scheduling aggregation model; optimize the multi-resource coordinated optimization scheduling model based on the coal-fired power unit operation constraints, UHV DC operation constraints and hydrogen production load operation constraints;
[0017] The power grid dispatching module is used to obtain the unit start and stop arrangements, UHV DC transmission plans, and multi-resource power generation and consumption plans based on the optimized multi-resource coordinated optimization dispatching model.
[0018] In a third aspect of the present invention, a computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources when executing the computer program.
[0019] A fourth aspect of the present invention is a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned power grid scheduling method based on the spatiotemporal coupling characteristics of multiple resources are implemented.
[0020] Compared with the prior art, the present invention has the following beneficial technical effects:
[0021] The present invention provides a power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources, and constructs a multi-resource coordinated optimization dispatching model based on a coal-fired power unit model, an ultra-high voltage direct current coupling model, and an electric hydrogen production load cluster dispatching aggregation model; the multi-resource coordinated optimization dispatching model is optimized based on the operation constraints of the coal-fired power unit, the ultra-high voltage direct current operation constraints, and the hydrogen production load operation constraints; based on the optimized multi-resource coordinated optimization dispatching model, the unit start-stop arrangement, the ultra-high voltage direct current transmission plan, and the multi-resource power generation and consumption plan are obtained. The present invention fully considers the construction needs of new power systems, and constructs a multi-resource multi-objective optimization dispatching model that considers the deep regulation characteristics of coal-fired power units, new electric hydrogen production resources, and ultra-high voltage direct current regulation capabilities. Through the coordinated operation of multiple resources, the system regulation capability is improved, the pressure of new energy consumption and power supply is alleviated, and the development and application of new power systems are adapted. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 Schematic diagram of the flow of a power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources in an embodiment of the present invention.
[0023] Figure 2 It is a linearization schematic diagram of the non-monotonic incremental cost stage of the unit in an embodiment of the present invention.
[0024] Figure 3 The block diagram of the power grid dispatching system based on the spatiotemporal coupling characteristics of multiple resources in an embodiment of the present invention. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0027] like Figure 1 As shown, the present invention provides a power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources, which is used to coordinate various flexible adjustment resources on the power generation side and the load side. Improving the new energy consumption level and overall adjustment capacity of the power system is the direction of power grid dispatching development, and specifically includes the following steps:
[0028] S1, a multi-resource coordinated optimization scheduling model is constructed based on the coal-fired power unit model with deep regulation characteristics of coal-fired power units, the UHV DC coupling model considering coal-fired power startup mode and UHV external transmission power, and the hydrogen production load cluster scheduling aggregation model. The multi-resource coordinated optimization scheduling model is optimized based on the coal-fired power unit operation constraints, UHV DC operation constraints, and hydrogen production load operation constraints;
[0029] S2, based on the optimized multi-resource coordinated optimization scheduling model, obtains the unit start and stop schedule, UHV DC transmission plan, and multi-resource power generation and consumption plan.
[0030] Specifically, in the specific implementation manner of the present application, the multiple resources specifically include power sources, power grids, adjustable loads in the system, new energy storage in the system and electric hydrogen production loads; the power sources include conventional units and new energy units.
[0031] The optimization objectives in the multi-resource coordinated optimization scheduling model include operating costs, new energy curtailment and system carbon emissions within the scheduling period.
[0032] The operating costs within the scheduling period include power generation costs, adjustable load regulation costs, electric hydrogen production regulation costs and energy storage charging and discharging compensation costs.
[0033] In the specific implementation manner of the present application, the amount of abandoned electricity from new energy sources and the carbon emissions of the system are converted into costs and jointly optimized with the operating costs within the scheduling cycle.
[0034] The objective function F of the constructed multi-resource coordinated optimization scheduling model is:
[0035] F=F 1 +k 2 F 2 +k 3 F 3 +F 4 +F 5 +F 6 (1)
[0036] Among them: F 1 Represents the cost of power generation, including output operating cost and startup cost;
[0037]
[0038] F 2 Indicates the amount of abandoned renewable energy, including abandoned wind and solar power:
[0039]
[0040] F 3 Indicates the system carbon emissions:
[0041]
[0042] F 4 Express the adjustable load adjustment cost:
[0043]
[0044] F 5 The regulation cost of hydrogen production from electricity is:
[0045]
[0046] F 6 Indicates the energy storage charging and discharging compensation cost:
[0047]
[0048] The k in the above objective function is 2 k represents the penalty cost reduction coefficient for wind and solar power abandonment, 3 It represents the system carbon emission cost conversion coefficient. By setting different coefficient values, the system operation cost, new energy consumption and carbon emission can be balanced. In the above formula: T is the number of time periods during the system dispatch; I is the number of thermal power units in the system; p i (t) is the active power of unit i at time t; x i (t) is the continuous start-stop time of unit i at time t, x i (t)>0 means continuous power-on time, x i (t)<0 means continuous downtime; u i (t) is the state of unit i at time t, ui (t) = 1 means power on, u i (t) = 0 means shutdown; C i (p i (t)) is the operating cost (expense) of unit i at time t; S i (x i (t-1),u i (t)) is the startup cost (cost) from period t-1 to period t when the state of unit i changes, which can be in the form of a linear function; W is the number of wind farms in the system, V is the number of photovoltaic power stations in the system; P w (t) represents the predicted value of wind farm w at time t, P v (t) represents the predicted value of the photovoltaic power station v at time t, λ w (t) represents the power abandonment rate of wind farm w at time t, λ v (t) represents the power abandonment rate of the photovoltaic power station v at time t; δ i represents the carbon emission factor of unit i; L is the adjustable load number of the system; C l (t) represents the regulation cost of load l at time t, Δp l (t) represents the regulation amount of load l at time t; H is the number of hydrogen production stations in the system; C h (t) represents the regulation cost of electric hydrogen production h at time t, Δp h (t) represents the regulation amount of electric hydrogen production h at time t; S is the number of energy storage stations in the system; represents the charging compensation cost and discharging compensation cost of energy storage station s at time t, They represent the charging power and discharging power of the energy storage station s at time t respectively.
[0049] The multi-resource coordinated optimization scheduling model is optimized based on the operation constraints of coal-fired power units, ultra-high voltage direct current operation constraints and hydrogen production load operation constraints; the operation constraints of coal-fired power units include cost constraints, unit load increase / decrease rate constraints, unit deep peak regulation minimum operation time constraints and unit output upper and lower limit constraints.
[0050] Construct a coal-fired power unit model based on the deep adjustment characteristics of coal-fired power units: after the flexibility of the coal-fired power units is transformed, the low-load operation capability, rapid climbing capability and rapid start-up capability are improved. The marginal cost curve characteristics and the climbing and sliding rates of the constructed coal-fired power unit model also change significantly.
[0051] A coal-fired power unit model that supports non-monotonic increasing marginal cost curves is constructed. Specifically, a non-convex cost curve linearization method is used for linearization, including the following methods:
[0052] Piecewise linearization constraints for non-convex cost functions (used for linearization of non-monotonic increasing incremental cost stages):
[0053] like Figure 2 As shown, F total (P) is the cost function; P is the output of the unit, satisfying the following constraints:
[0054]
[0055]
[0056]
[0057]
[0058] F n =F total (P n )(12)
[0059]
[0060]
[0061]
[0062] (P n+1 -P n )·δ n+1 ≤q n ≤(P n+1 -P n )·δ n ,n=1,2,…,N-1 (16)
[0063] 0≤q N ≤(P N+1 -P N )·δ N (17)
[0064] δ n ={0,1}(n=1,2,…N)(18)
[0065] Unit load increase / decrease rate constraints:
[0066] The rate of load increase / decrease is related to whether the unit is in deep peak regulation. If it is currently in normal operation, that is, the output p i (t) equal to or higher than P i peak , then the maximum value of the add / subtract output is If the current stage is deep peak load regulation, that is, the output p i (t) is less than P i peak , then the maximum value of the add / subtract output is
[0067]
[0068] Minimum operating time constraints for deep peak load regulation of units:
[0069] When a generator set enters the deep peak-shaving period, it needs to run for a certain period of time to avoid damage to the generator set.
[0070]
[0071] Where: It is the minimum operating time for deep peak load regulation of the unit.
[0072] UHVDC operation constraints:
[0073] UHV DC is a flexible regulation resource with a certain regulation capability. Its flexible regulation capability is constrained by the minimum operating power of DC, the number of power adjustments, the transaction power, and the demand factors of the end power grid. Specifically, the UHV DC scheduling model is constructed by the constraints of transmission power limit, transmission power adjustment rate, power cannot be adjusted reversely in adjacent time periods, UHV DC adjustment number limit, transaction power already achieved, and the relationship between the number of coal-fired power units in operation and transmission power limit.
[0074] The transmission power limit constraint is:
[0075]
[0076] Where: P tl (t) They respectively represent the lower and upper limits of the transmission power of UHV DC tl at time t.
[0077] The transmission power adjustment rate constraint is:
[0078]
[0079]
[0080]
[0081] Where: Δ tl Indicates the maximum value of the UHV DC tl power adjustment rate; They represent the upward adjustment state and downward adjustment state of the UHV DC power at time tl, respectively. Indicates upward adjustment.
[0082] Indicates downward adjustment.
[0083] The power constraints cannot be adjusted in the opposite direction during the adjacent time periods:
[0084]
[0085]
[0086] The UHVDC adjustment times limit constraint:
[0087]
[0088] Where: X max Indicates the maximum number of UHV DC adjustment times.
[0089] The electricity constraints of the transactions reached are:
[0090]
[0091] Where: P tl (t) They respectively represent the transaction completed and the maximum power transmitted of the UHV DC tl at time t.
[0092] The constraint on the relationship between the number of coal-fired power units in operation and the transmission power limit (taking the nonlinear relationship between the number of coal-fired power units in operation and the transmission capacity as an example):
[0093]
[0094]
[0095]
[0096]
[0097] Where: M represents the number of coal-fired power units supporting UHV DC tl; P i It indicates the transmission capacity of the UHV DC TL-equipped coal-fired power unit when i units are put into operation.
[0098] The hydrogen production load operation constraints are:
[0099] The operating constraints of hydrogen production load include upper and lower limit constraints of hydrogen production load power, load addition and subtraction rate constraints and hydrogen storage constraints.
[0100] The upper and lower limits of the hydrogen production power are as follows:
[0101] p h (t) = P h (t)+Δp h (t) (34)
[0102]
[0103] Where: P h (t) represents the hydrogen production power baseline of the electric hydrogen production station h at time t, Δph (t) represents the regulation value of the electric hydrogen production station h at time t; p h They represent the upper and lower limits of the hydrogen production power of the electric hydrogen production station h; u h (t) indicates whether to start hydrogen production, u h (t) = 1 means hydrogen production, u h (t) = 0 means shutdown.
[0104] The ramp rate constraint is:
[0105] 20-Δ h ≤p h (t)-p h (t-1)≤△ h (36)
[0106] Where: h Indicates the maximum value of the power addition or subtraction of the electric hydrogen production station h.
[0107] The hydrogen storage constraints:
[0108] E h (t) = E h (t-1)+η h p h (t)-O h (t) (37)
[0109]
[0110] Where: E h (t) represents the hydrogen storage capacity of the electric hydrogen production station h at time t; η h represents the hydrogen production conversion rate; O h (t) represents the hydrogen usage plan of the electric hydrogen production station h at time t; E h , They respectively represent the lower and upper limits of the energy storage capacity h of the electric hydrogen production station.
[0111] In a specific implementation manner of the present application, the hydrogen production load operation constraints also include wind and solar operation constraints, adjustable load operation constraints, energy storage operation constraints, system operation constraints and grid security constraints.
[0112] In the specific implementation of this application, the wind and solar operation constraints specifically refer to the upper and lower limits of power generation:
[0113] p w (t) = P w (t)(1-λ w (t)) (39)
[0114] 0≤λ w (t)≤1 (40)
[0115] p v (t) = P v (t)(1-λ v (t)) (41)
[0116] 0≤λ v (t)≤1 (42)
[0117] Adjustable load operation constraints include upper and lower limits of power consumption, ramp rate constraints, and daily power consumption constraints.
[0118] Specifically, the upper and lower limits of the power consumption are:
[0119] p l (t) = P l (t)+Δp l (t) (43)
[0120]
[0121] Where: P l (t) represents the power baseline of the adjustable load l at time t, Δp l (t) represents the adjustment amount of the adjustable load l at time t; p l They respectively represent the upper and lower limits of the adjustable load l hydrogen production power.
[0122] The ramp rate constraints are:
[0123] -△ l ≤p h (t)-p h (t-1)≤△ l (45)
[0124] Where: l Indicates the maximum value of the adjustable load l plus or minus power.
[0125] The daily power consumption constraint can make the daily power consumption before and after the load optimization the same:
[0126]
[0127] Where: T 1 This is the number of time periods during the system's first day of scheduling, and so on for subsequent days.
[0128] The energy storage operation constraints include charge and discharge state constraints, charge power constraints, discharge power constraints, state of charge (SOC) constraints, charge and discharge amount constraints, and charge and discharge number constraints.
[0129] The charge and discharge state constraints:
[0130]
[0131] Where: They represent the charging state and discharging state of the energy storage s at time t, respectively. Indicates charging. Indicates discharge.
[0132] Charging power constraints:
[0133]
[0134] Where: They represent the upper and lower limits of the charging power of the energy storage s respectively.
[0135] The discharge power constraint:
[0136]
[0137] Where: They represent the upper and lower limits of the charging power of the energy storage s respectively.
[0138] The state of charge (SOC) constraints:
[0139]
[0140]
[0141] Where: Respectively represent the charging conversion efficiency and discharging conversion efficiency of energy storage; C s represents the capacity of energy storage s; S s , They represent the lower and upper limits of the state of charge of the energy storage s respectively.
[0142] The charge and discharge capacity constraints are:
[0143] In order to ensure continuity in the use of energy storage, it is agreed that the charge state remains unchanged at the end of each day.
[0144]
[0145] Where: T 1 This is the number of time periods during the system's first day of scheduling, and so on for subsequent days.
[0146] The charge and discharge times constraint:
[0147]
[0148]
[0149] Where: Nc 、N d They represent the daily limit on charging times and discharging times, and so on for subsequent days.
[0150] The system operation constraints include load balance constraints and spinning reserve constraints.
[0151] The load balancing constraints:
[0152]
[0153] Where: P d (t) represents the system load at time t; p tl (t) represents the output power of tie line tl at time t.
[0154] The spinning reserve constraints:
[0155]
[0156]
[0157] Where: The upward spinning reserve provided for unit i at time t; The upward spinning reserve requirement for the system at time t; r i (t) is the downward spinning reserve provided by unit i at time t; p r (t) is the downward spinning reserve demand of the system at time t.
[0158] The power grid safety constraints include branch power flow constraints and tie line section power flow constraints.
[0159] The branch power flow constraint is:
[0160]
[0161] Where: p ij , Represent the power flow and upper limit of branches i and j respectively.
[0162] The tie line section flow constraints:
[0163]
[0164] Where: P ij , They represent the power flow and upper limit of the tie line sections i and j respectively.
[0165] In the specific implementation manner of the present application, the amount of abandoned electricity from renewable energy and the carbon emissions of the system are converted into costs, which are jointly optimized with the operating costs within the scheduling cycle. Then, the CPLEX method is used to solve the target optimization according to the objective function of the multi-resource coordinated optimization scheduling model, so as to obtain the optimized unit start and stop schedule, UHV DC transmission plan, and multi-resource power generation and consumption plan, thereby realizing the coordinated and optimized operation of multiple types of active resources such as coal-fired power units, electric hydrogen production, UHV DC, new energy, and energy storage.
[0166] See also Figure 3 ,In another embodiment of the present invention, a power grid dispatching system based on the spatiotemporal coupling characteristics of multiple resources is provided, including a model optimization module and a power grid dispatching module;
[0167] Model optimization module, which builds a multi-resource coordinated optimization scheduling model based on the coal-fired power unit model, UHV DC coupling model and hydrogen production load cluster scheduling aggregation model; optimizes the multi-resource coordinated optimization scheduling model based on the coal-fired power unit operation constraints, UHV DC operation constraints and hydrogen production load operation constraints;
[0168] The power grid dispatching module obtains the unit start and stop arrangements, UHV DC transmission plan, and multi-resource power generation and consumption plan based on the optimized multi-resource coordinated optimization dispatching model.
[0169] In a further specific implementation method, it is necessary to optimize the multi-resource coordinated optimization scheduling model, wherein the optimization objectives include the operating cost within the scheduling cycle, the amount of abandoned new energy, and the carbon emissions of the system.
[0170] The operating costs within the scheduling period include power generation costs, adjustable load regulation costs, electric hydrogen production regulation costs and energy storage charging and discharging compensation costs.
[0171] The optimization of the multi-resource coordinated optimization scheduling model is to convert the amount of abandoned renewable energy and the system carbon emissions into costs, and jointly optimize them with the operating costs within the scheduling cycle. The CPLEX method is used to solve the target optimization according to the objective function of the multi-resource coordinated optimization scheduling model to obtain the optimized unit start and stop arrangements, UHV DC transmission plans, and multi-resource power generation and consumption plans.
[0172] The coal-fired power unit operation constraints include cost constraints, unit load increase / decrease rate constraints, unit deep peak load regulation minimum operation time constraints, and unit output upper and lower limit constraints.
[0173] In another embodiment of the present invention, a terminal device is provided, the terminal device includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, which are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding functions; the processor described in the embodiment of the present invention can be used for the operation of the power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources.
[0174] In another embodiment of the present invention, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It can be understood that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of the power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources in the above embodiment.
[0175] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0176] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0177] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0178] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0179] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources, characterized in that: The following steps are involved: A multi-resource coordinated optimization scheduling model is constructed based on the coal-fired power unit model, the UHV DC coupling model and the hydrogen production load cluster scheduling aggregation model; the multi-resource coordinated optimization scheduling model is optimized based on the coal-fired power unit operation constraints, the UHV DC operation constraints and the hydrogen production load operation constraints; Based on the optimized multi-resource coordinated optimization scheduling model, the unit start and shutdown arrangements, UHV DC transmission plan, and multi-resource power generation and consumption plan are determined.
2. The power grid dispatching method based on multi-resource spatiotemporal coupling characteristics according to claim 1 is characterized in that: In the step of optimizing the multi-resource coordinated optimization scheduling model based on the operation constraints of coal-fired power units, ultra-high voltage direct current operation constraints and hydrogen production load operation constraints, the optimization objectives of optimizing the multi-resource coordinated optimization scheduling model include the operation cost within the scheduling period, the amount of abandoned new energy and the system carbon emissions.
3. The power grid dispatching method based on multi-resource spatiotemporal coupling characteristics according to claim 2 is characterized in that: The operating costs within the scheduling period include power generation costs, adjustable load regulation costs, electric hydrogen production regulation costs and energy storage charging and discharging compensation costs.
4. The power grid dispatching method based on multi-resource spatiotemporal coupling characteristics according to claim 2 is characterized in that: In the step of optimizing the multi-resource coordinated optimization scheduling model based on the coal-fired power unit operation constraints, the UHV DC operation constraints and the hydrogen production load operation constraints, the multi-resource coordinated optimization scheduling model is optimized specifically by converting the new energy curtailment power and the system carbon emissions into costs, and jointly optimizing them with the operation costs within the scheduling cycle. The CPLEX method is used to perform target optimization and solve the objective function of the multi-resource coordinated optimization scheduling model to obtain the optimized unit start and stop arrangements, the UHV DC transmission plan, and the multi-resource power generation and consumption plan.
5. The power grid dispatching method based on multi-resource spatiotemporal coupling characteristics according to claim 2, characterized in that: The coal-fired power unit operation constraints include cost constraints, unit load increase / decrease rate constraints, unit deep peak load regulation minimum operation time constraints, and unit output upper and lower limit constraints.
6. The power grid dispatching method based on multi-resource spatiotemporal coupling characteristics according to claim 2, characterized in that: The UHV DC operation constraints include transmission power limit constraints, transmission power adjustment rate constraints, constraints on the inability to reversely adjust power in adjacent time periods, constraints on the number of UHV DC adjustments, constraints on traded power, and constraints on the relationship between the number of coal-fired power units in operation and the transmission power limit.
7. The power grid dispatching method based on multi-resource spatiotemporal coupling characteristics according to claim 2, characterized in that: The operating constraints of hydrogen production load include upper and lower limit constraints of hydrogen production load power, load addition and subtraction rate constraints and hydrogen storage constraints.
8. A power grid dispatching system based on the spatiotemporal coupling characteristics of multiple resources, characterized in that: Including model optimization module and power grid dispatching module; Model optimization module, used to build a multi-resource coordinated optimization scheduling model based on the coal-fired power unit model, UHV DC coupling model and hydrogen production load cluster scheduling aggregation model; optimize the multi-resource coordinated optimization scheduling model based on the coal-fired power unit operation constraints, UHV DC operation constraints and hydrogen production load operation constraints; The power grid dispatching module is used to determine the unit start and stop arrangements, UHV DC transmission plans, and multi-resource power generation and consumption plans based on the optimized multi-resource coordinated optimization dispatching model.
9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the power grid scheduling method based on the spatiotemporal coupling characteristics of multiple resources are implemented as described in any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the power grid dispatching method based on the spatiotemporal coupling characteristics of multiple resources as claimed in any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Power system multi-resource dispatching method considering multi-stage state transition of thermal power units
CN109118024A
Power grid voltage sag optimization method under new energy background
CN111146777A
Power grid peak regulation resource coordinated optimization method and system
CN111384728A
Power system flexibility evaluation method considering comprehensive regulation of coal power and new energy
CN117134316A
Park integrated energy system low-carbon optimization scheduling method considering carbon capture-electricity-to-gas low-carbon characteristics
CN118523388A