Full-bridge charge pump circuit
By introducing electrostatic charge conversion branch in the full-bridge charge pump circuit, the electrostatic charge conversion switch tube is used to eliminate the tube pressure drop of the original switch tube, solving the problem of low conversion efficiency of the existing full-bridge charge pump and achieving more efficiency The charge pump conversion efficiency meets the application needs of fast charging products.
Patent Information
- Application Number
- CN202411563841.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The conversion efficiency of the existing full-bridge charge pump cannot meet the application needs of fast charging products, mainly because the tube voltage drop of the original switching tube affects the boost voltage of the charge pump, resulting in low efficiency.
A full-bridge charge pump circuit is designed. By introducing an electrostatic charge conversion branch into the charge pump, three electrostatic charge conversion switch tubes are used to perform on-off operations based on the input voltage and external inverting clock control signals to eliminate the energy storage branch. The influence of the tube voltage drop of the original switching tube in the circuit on the output voltage of the voltage conversion sub-stage improves the conversion efficiency.
By switching the on-off state of the electrostatic charge conversion switch tube, the impact of the tube voltage drop of the original switch tube on the output voltage is avoided, and the conversion efficiency of the full-bridge charge pump is significantly improved, meeting the charging efficiency needs of fast charging products.
Smart Images

Figure CN119070631A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of integrated circuits, and in particular to a full-bridge charge pump circuit. Background Art
[0002] A charge pump is a non-inductive DC / DC converter that uses capacitors as energy storage elements to convert voltage. Because the only losses in the entire circuit are actually caused by wiring and switching, the conversion efficiency of the charge pump is usually high, so it is widely used in fast charging products.
[0003] The existing full-bridge charge pump has become mature, but as fast-charging products have increasingly higher requirements for charging efficiency, the conversion efficiency of the existing full-bridge charge pump can no longer meet the application requirements of fast-charging products. Summary of the invention
[0004] The present application provides a full-bridge charge pump circuit to further improve the conversion efficiency of the full-bridge charge pump and avoid the problem that the conversion efficiency of the existing full-bridge charge pump cannot meet the application requirements of fast charging products.
[0005] The present application provides a full-bridge charge pump circuit, the circuit comprising: A first voltage conversion sub-stage, a second voltage conversion sub-stage and a third voltage conversion sub-stage connected in sequence; The first voltage conversion substage is used to obtain a first output voltage based on an input voltage, the second voltage conversion substage is used to obtain a second output voltage based on the first output voltage, and the third voltage conversion substage is used to obtain a third output voltage based on the second output voltage; The first voltage conversion sub-stage, the second voltage conversion sub-stage and the third voltage conversion sub-stage all include interconnected energy storage branches and electrostatic charge conversion branches, the energy storage branch includes an original switching tube and an energy storage capacitor, and the electrostatic charge conversion branch is used to eliminate the influence of the tube voltage drop of the original switching tube in the energy storage branch on the output voltage of the voltage conversion sub-stage.
[0006] According to a full-bridge charge pump circuit provided in the present application, the electrostatic charge conversion branch includes three electrostatic charge conversion switch tubes, and the electrostatic charge conversion switch tubes perform on-off actions based on the input voltage and the external input inverted clock control signal.
[0007] According to a full-bridge charge pump circuit provided by the present application, the first voltage conversion sub-stage includes a first energy storage branch and a first electrostatic charge conversion branch; the first energy storage branch includes a first original switch tube and a first energy storage capacitor, and the first electrostatic charge conversion branch includes a first electrostatic charge conversion switch tube, a second electrostatic charge conversion switch tube and a third electrostatic charge conversion switch tube; The second voltage conversion sub-stage includes a second energy storage branch and a second electrostatic charge conversion branch; the second energy storage branch includes a second original switch tube and a second energy storage capacitor, and the second electrostatic charge conversion branch includes a fourth electrostatic charge conversion switch tube, a fifth electrostatic charge conversion switch tube and a sixth electrostatic charge conversion switch tube; The third voltage conversion sub-stage includes a third energy storage branch and a third electrostatic charge conversion branch; the third energy storage branch includes a third original switch tube and a third energy storage capacitor, and the third electrostatic charge conversion branch includes a seventh electrostatic charge conversion switch tube, an eighth electrostatic charge conversion switch tube and a ninth electrostatic charge conversion switch tube.
[0008] According to a full-bridge charge pump circuit provided by the present application, the gate and drain of the first original switch tube are connected to receive an input voltage; the source of the first original switch tube is connected to the first end of the first energy storage capacitor to output a first output voltage; the second end of the first energy storage capacitor is used to input the first clock control signal in the inverted clock control signal pair; The source of the first electrostatic charge conversion switch tube is connected to the source of the first original switch tube, the drain of the first electrostatic charge conversion switch tube is connected to the drain of the first original switch tube, and the gate of the first electrostatic charge conversion switch tube is respectively connected to the drains of the second electrostatic charge conversion switch tube and the third electrostatic charge conversion switch tube; The source of the second electrostatic charge conversion switch tube is connected to the drain of the first original switch tube, and the gate of the second electrostatic charge conversion switch tube is connected to the source of the first original switch tube; The gate of the third electrostatic charge conversion switch tube is connected to the source of the first original switch tube.
[0009] According to a full-bridge charge pump circuit provided by the present application, the gate of the second original switch tube is connected to the drain electrode for receiving the first output voltage; the source electrode of the second original switch tube is connected to the first end of the second energy storage capacitor for outputting the second output voltage; the second end of the second energy storage capacitor is used to input the second clock control signal in the inverted clock control signal pair; The source of the fourth electrostatic charge conversion switch tube is connected to the source of the second original switch tube, the drain of the fourth electrostatic charge conversion switch tube is connected to the drain of the second original switch tube, and the gate of the fourth electrostatic charge conversion switch tube is respectively connected to the drains of the fifth electrostatic charge conversion switch tube and the sixth electrostatic charge conversion switch tube; The source of the fifth electrostatic charge conversion switch tube is connected to the drain of the second original switch tube, and the gate of the fifth electrostatic charge conversion switch tube is connected to the source of the second original switch tube; The gate of the sixth electrostatic charge conversion switch tube is connected to the source of the second original switch tube, and the source of the third electrostatic charge conversion switch tube is connected to the source of the second original switch tube.
[0010] According to a full-bridge charge pump circuit provided by the present application, the gate and drain of the third original switch tube are connected to access the second output voltage; the source of the third original switch tube is connected to the first end of the third energy storage capacitor to output the third output voltage; the second end of the third energy storage capacitor is used to input the first clock control signal in the inverted clock control signal pair; The source of the seventh electrostatic charge conversion switch tube is connected to the source of the third original switch tube, the drain of the seventh electrostatic charge conversion switch tube is connected to the drain of the third original switch tube, and the gate of the seventh electrostatic charge conversion switch tube is respectively connected to the drains of the eighth electrostatic charge conversion switch tube and the ninth electrostatic charge conversion switch tube; The source of the eighth electrostatic charge conversion switch tube is connected to the drain of the third original switch tube, and the gate of the eighth electrostatic charge conversion switch tube is connected to the source of the third original switch tube; The gate of the ninth electrostatic charge conversion switch tube is connected to the source of the third original switch tube, and the source of the sixth electrostatic charge conversion switch tube is connected to the source of the third original switch tube.
[0011] According to a full-bridge charge pump circuit provided by the present application, the first voltage conversion sub-stage further includes a first filter branch, the second voltage conversion sub-stage further includes a second filter branch, and the third voltage conversion sub-stage further includes a third filter branch; The first filter branch includes a first filter capacitor, the second filter branch includes a second filter capacitor, and the third filter branch includes a third filter capacitor.
[0012] According to a full-bridge charge pump circuit provided by the present application, the first end of the first filter capacitor is connected to the first end of the first energy storage capacitor, and the second end of the first filter capacitor is grounded; The first end of the second filter capacitor is connected to the first end of the second energy storage capacitor, and the second end of the second filter capacitor is grounded; The first end of the third filter capacitor is connected to the first end of the third energy storage capacitor, and the second end of the third filter capacitor is grounded.
[0013] According to a full-bridge charge pump circuit provided in the present application, the first original switch tube, the second original switch tube, the third original switch tube, the first electrostatic charge conversion switch tube, the second electrostatic charge conversion switch tube, the fourth electrostatic charge conversion switch tube, the fifth electrostatic charge conversion switch tube, the seventh electrostatic charge conversion switch tube and the eighth electrostatic charge conversion switch tube are all NMOS tubes, and the third electrostatic charge conversion switch tube, the sixth electrostatic charge conversion switch tube and the ninth electrostatic charge conversion switch tube are all PMOS tubes.
[0014] According to a full-bridge charge pump circuit provided by the present application, the input voltage and the high-level voltages of the first clock control signal and the second clock control signal are all power supply voltages.
[0015] The full-bridge charge pump circuit provided in the present application includes: a first voltage conversion sub-stage, a second voltage conversion sub-stage and a third voltage conversion sub-stage connected in sequence; the first voltage conversion sub-stage is used to obtain a first output voltage based on an input voltage, the second voltage conversion sub-stage is used to obtain a second output voltage based on the first output voltage, and the third voltage conversion sub-stage is used to obtain a third output voltage based on the second output voltage; each voltage conversion sub-stage includes an energy storage branch and an electrostatic charge conversion branch connected to each other, the energy storage branch includes an original switching tube and an energy storage capacitor, and the electrostatic charge conversion branch is used to eliminate the influence of the tube voltage drop of the original switching tube in the energy storage branch on the output voltage of the voltage conversion sub-stage, which can avoid the influence of the tube voltage drop of the original switching tube on the charge pump boost voltage, improve the conversion efficiency of the full-bridge charge pump, and thereby avoid the problem that the conversion efficiency of the existing full-bridge charge pump cannot meet the application requirements of fast charging products. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0017] Figure 1 is a structural schematic diagram of a full-bridge charge pump circuit provided by the present application; Figure 2 It is a structural schematic diagram of an existing full-bridge charge pump circuit; Figure 3 It is a schematic diagram of the connection relationship of the full-bridge charge pump circuit provided in this application. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0019] Figure 1 is a schematic diagram of the structure of the full-bridge charge pump circuit provided by the present application, such as Figure 1 As shown, the circuit comprises: A first voltage conversion sub-stage, a second voltage conversion sub-stage and a third voltage conversion sub-stage connected in sequence; The first voltage conversion substage is used to obtain a first output voltage based on an input voltage, the second voltage conversion substage is used to obtain a second output voltage based on the first output voltage, and the third voltage conversion substage is used to obtain a third output voltage based on the second output voltage; The first voltage conversion sub-stage, the second voltage conversion sub-stage and the third voltage conversion sub-stage all include interconnected energy storage branches and electrostatic charge conversion branches, the energy storage branch includes an original switching tube and an energy storage capacitor, and the electrostatic charge conversion branch is used to eliminate the influence of the tube voltage drop of the original switching tube in the energy storage branch on the output voltage of the voltage conversion sub-stage.
[0020] Specifically, based on the foregoing content, it can be seen that as fast charging products have increasingly higher requirements for charging efficiency, the conversion efficiency of the existing full-bridge charge pump can no longer meet the application requirements of fast charging products. Figure 2 It is a schematic diagram of the structure of the existing full-bridge charge pump circuit. Figure 2 It can be seen that the conversion efficiency formula is as follows: ; in, is the conversion efficiency, is the output voltage, is the input voltage, is the power supply voltage, M is the ideal boost multiple, is the Fermi potential, is the slope coefficient, is the zero bias voltage (the larger the zero bias voltage, the larger the voltage drop of the switch tube). According to the above formula, it can be seen that the voltage drop of the MOS tube will reduce the conversion efficiency of the charge pump.
[0021] Based on this, the present application proposes the above-mentioned improved full-bridge charge pump circuit, aiming to further improve the conversion efficiency of the full-bridge charge pump and avoid the problem that the conversion efficiency of the existing full-bridge charge pump cannot meet the application requirements of fast charging products. Figure 1It can be seen that the full-bridge charge pump circuit of the embodiment of the present application includes a first voltage conversion sub-stage, a second voltage conversion sub-stage and a third voltage conversion sub-stage connected in sequence, the first voltage conversion sub-stage is used to obtain a first output voltage based on an input voltage, the second voltage conversion sub-stage is used to obtain a second output voltage based on the first output voltage, and the third voltage conversion sub-stage is used to obtain a third output voltage based on the second output voltage. It can be understood that, according to the requirements of the boost multiple, the full-bridge charge pump circuit of the embodiment of the present application can be provided with more voltage conversion sub-stages, and the embodiments of the present application are not exhaustive here. Combined with Figure 1 It can be further known that each voltage conversion sub-stage includes an interconnected energy storage branch and an electrostatic charge conversion branch, the energy storage branch includes an original switching tube and an energy storage capacitor, and the electrostatic charge conversion branch is used to eliminate the influence of the tube voltage drop of the original switching tube in the energy storage branch on the output voltage of the voltage conversion sub-stage, thereby improving the conversion efficiency of the full-bridge charge pump.
[0022] Specifically, the electrostatic charge conversion branch includes three electrostatic charge conversion switch tubes, which perform on-off actions based on the input voltage and the external input inverted clock control signal. Based on this, by switching the on-off state of the electrostatic charge conversion switch tube, the influence of the tube voltage drop of the original switch tube on the output voltage can be avoided, thereby improving the conversion efficiency of the charge pump. More specifically, Figure 3 Schematic diagram of the connection relationship of the full-bridge charge pump circuit provided by the present application. Figure 3 As shown, the first voltage conversion sub-stage includes a first energy storage branch and a first electrostatic charge conversion branch; the first energy storage branch includes a first original switch tube (i.e. Figure 3 MD1) and the first energy storage capacitor (i.e. Figure 3 In C1, the first electrostatic charge conversion branch includes a first electrostatic charge conversion switch tube (i.e. Figure 3 MS1), the second electrostatic charge conversion switch tube (i.e. Figure 3 MN1) and the third electrostatic charge conversion switch tube (i.e. Figure 3 (middle MP1); The second voltage conversion sub-stage includes a second energy storage branch and a second electrostatic charge conversion branch; the second energy storage branch includes a second original switch tube (i.e. Figure 3 MD2) and the second energy storage capacitor (i.e. Figure 3 C2), the second electrostatic charge conversion branch includes a fourth electrostatic charge conversion switch tube (i.e. Figure 3 MS2), the fifth electrostatic charge conversion switch tube (i.e. Figure 3 MN2) and the sixth electrostatic charge conversion switch tube (i.e. Figure 3 (middle MP2); The third voltage conversion sub-stage includes a third energy storage branch and a third electrostatic charge conversion branch; the third energy storage branch includes a third original switch tube (i.e. Figure 3 MD3) and the third energy storage capacitor (i.e. Figure 3 C3), the third electrostatic charge conversion branch includes a seventh electrostatic charge conversion switch tube (i.e. Figure 3 MS3), the eighth electrostatic charge conversion switch tube (i.e. Figure 3 MN3) and the ninth electrostatic charge conversion switch tube (i.e. Figure 3 in MP3).
[0023] More specifically, combined Figure 3 It can be seen that the gate and drain of the first original switch tube are connected to receive the input voltage; the source of the first original switch tube is connected to the first end of the first energy storage capacitor (ie Figure 3 The upper middle end) is connected to output the first output voltage (i.e. Figure 3 V1); the second end of the first energy storage capacitor (ie Figure 3 The lower middle end) is used to input the first clock control signal (i.e. Figure 3 clk); The source of the first electrostatic charge conversion switch tube is connected to the source of the first original switch tube, the drain of the first electrostatic charge conversion switch tube is connected to the drain of the first original switch tube, and the gate of the first electrostatic charge conversion switch tube is respectively connected to the drains of the second electrostatic charge conversion switch tube and the third electrostatic charge conversion switch tube; The source of the second electrostatic charge conversion switch tube is connected to the drain of the first original switch tube, and the gate of the second electrostatic charge conversion switch tube is connected to the source of the first original switch tube; The gate of the third electrostatic charge conversion switch tube is connected to the source of the first original switch tube.
[0024] Furthermore, the gate and drain of the second original switch tube are connected to access the first output voltage; the source of the second original switch tube is connected to the first end of the second energy storage capacitor (ie Figure 3 The upper middle end) is connected to output the second output voltage (i.e. Figure 3 V2); the second end of the second energy storage capacitor (ie Figure 3 The lower middle end) is used to input the second clock control signal in the inverted clock control signal pair (i.e. Figure 3 clk_bar); The source of the fourth electrostatic charge conversion switch tube is connected to the source of the second original switch tube, the drain of the fourth electrostatic charge conversion switch tube is connected to the drain of the second original switch tube, and the gate of the fourth electrostatic charge conversion switch tube is respectively connected to the drains of the fifth electrostatic charge conversion switch tube and the sixth electrostatic charge conversion switch tube; The source of the fifth electrostatic charge conversion switch tube is connected to the drain of the second original switch tube, and the gate of the fifth electrostatic charge conversion switch tube is connected to the source of the second original switch tube; The gate of the sixth electrostatic charge conversion switch tube is connected to the source of the second original switch tube, and the source of the third electrostatic charge conversion switch tube is connected to the source of the second original switch tube.
[0025] The gate and drain of the third original switch tube are connected to access the second output voltage; the source of the third original switch tube is connected to the first end (i.e. Figure 3 The upper middle end) is connected to output the third output voltage (i.e. Figure 3 V3); the second end of the third energy storage capacitor (i.e. Figure 3 The lower middle end) is used for inputting the first clock control signal of the inverted clock control signal pair; The source of the seventh electrostatic charge conversion switch tube is connected to the source of the third original switch tube, the drain of the seventh electrostatic charge conversion switch tube is connected to the drain of the third original switch tube, and the gate of the seventh electrostatic charge conversion switch tube is respectively connected to the drains of the eighth electrostatic charge conversion switch tube and the ninth electrostatic charge conversion switch tube; The source of the eighth electrostatic charge conversion switch tube is connected to the drain of the third original switch tube, and the gate of the eighth electrostatic charge conversion switch tube is connected to the source of the third original switch tube; The gate of the ninth electrostatic charge conversion switch tube is connected to the source of the third original switch tube, and the source of the sixth electrostatic charge conversion switch tube is connected to the source of the third original switch tube.
[0026] It is worth noting that the first to third original switch tubes, the first to second electrostatic charge conversion switch tubes, the fourth to fifth electrostatic charge conversion switch tubes and the seventh to eighth electrostatic charge conversion switch tubes are all NMOS tubes, and the third electrostatic charge conversion switch tube, the sixth electrostatic charge conversion switch tube and the ninth electrostatic charge conversion switch tube are all PMOS tubes. At the same time, the input voltage and the high level voltages of the first clock control signal and the second clock control signal are all power supply voltages. The low level voltages of the first clock control signal and the second clock control signal are both ground (i.e., 0).
[0027] Furthermore, the full-bridge charge pump circuit of the embodiment of the present application is further provided with a filtering subcircuit. Specifically, the first voltage conversion substage further includes a first filtering branch, the second voltage conversion substage further includes a second filtering branch, and the third voltage conversion substage further includes a third filtering branch; The first filter branch includes a first filter capacitor (i.e. Figure 3 In Cp1, the second filter branch includes a second filter capacitor (ie Figure 3 Cp2), the third filtering branch includes a third filtering capacitor (i.e. Figure 3 (in Cp3).
[0028] Combination Figure 3 It can be known that the first end of the first filter capacitor is connected to the first end of the first energy storage capacitor, and the second end of the first filter capacitor is grounded; The first end of the second filter capacitor is connected to the first end of the second energy storage capacitor, and the second end of the second filter capacitor is grounded; The first end of the third filter capacitor is connected to the first end of the third energy storage capacitor, and the second end of the third filter capacitor is grounded.
[0029] Based on this, the impact of ripple on the charge pump circuit can be avoided to the greatest extent. Figure 3 It can be seen that the first to third original switch tubes (ie, MD1-MD3) will always be in the on state. Based on this, the working process of the full-bridge charge pump circuit in the embodiment of the present application is divided into two stages: Phase 1: clk is GND, clk_bar is the power supply voltage. At this time, MN1 and MN3 are disconnected, MN2 is turned on, MS2 and MP2 are disconnected, MS1, MS3, MP1 and MP3 are turned on, the power supply voltage charges C1, the voltage at the first end of C1 is the power supply voltage, and the voltage at the second end is GND; The second stage: clk is the power supply voltage, clk_bar is GND, at this time, MN1 and MN3 are turned on, MN2 is turned off, MS2 and MP2 are turned on, MS1, MS3, MP1 and MP3 are turned off, the second end voltage of C1 is raised to the power supply voltage, and the first end voltage of C1 is the sum of the power supply voltage and △V, △V is the voltage difference after C1 releases part of the charge after being charged in the first stage.
[0030] At the same time, V1 charges C2, and the voltage at the first terminal of C2 becomes the sum of the power supply voltage and △V, and the voltage at the second terminal is GND; afterwards, the voltage at the second terminal of C2 is raised to the power supply voltage. At this time, the voltage at the forward terminal of C2 is the sum of the power supply voltage and twice △V, that is, V2 is the sum of the power supply voltage and twice △V.
[0031] Afterwards, V2 charges C3, which is similar to the process of V1 charging C2. Finally, V3 is equal to the sum of the power supply voltage and three times △V.
[0032] In summary, through the on-off control of the first to ninth electrostatic charge conversion switch tubes, the full-bridge charge pump circuit of the embodiment of the present application can avoid the influence of the tube voltage drop of the original switch tube caused by the current flowing through the original switch tube on the charge pump boost voltage. The conversion efficiency of the charge pump finally obtained is: ; It can be seen from the above formula that the conversion efficiency of the full-bridge charge pump circuit in the embodiment of the present application is compared with the existing full-bridge charge pump, eliminating the influence of the original switch tube voltage drop, and the conversion efficiency is further improved.
[0033] The circuit provided in the embodiment of the present application includes: a first voltage conversion sub-stage, a second voltage conversion sub-stage and a third voltage conversion sub-stage connected in sequence; the first voltage conversion sub-stage is used to obtain a first output voltage based on an input voltage, the second voltage conversion sub-stage is used to obtain a second output voltage based on the first output voltage, and the third voltage conversion sub-stage is used to obtain a third output voltage based on the second output voltage; each voltage conversion sub-stage includes an energy storage branch and an electrostatic charge conversion branch connected to each other, the energy storage branch includes an original switching tube and an energy storage capacitor, and the electrostatic charge conversion branch is used to eliminate the influence of the tube voltage drop of the original switching tube in the energy storage branch on the output voltage of the voltage conversion sub-stage, which can avoid the influence of the tube voltage drop of the original switching tube on the charge pump boost voltage, improve the conversion efficiency of the full-bridge charge pump, and thereby avoid the problem that the conversion efficiency of the existing full-bridge charge pump cannot meet the application requirements of fast charging products.
[0034] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0035] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A full-bridge charge pump circuit, characterized in that: The circuit comprises: A first voltage conversion sub-stage, a second voltage conversion sub-stage and a third voltage conversion sub-stage connected in sequence; The first voltage conversion substage is used to obtain a first output voltage based on an input voltage, the second voltage conversion substage is used to obtain a second output voltage based on the first output voltage, and the third voltage conversion substage is used to obtain a third output voltage based on the second output voltage; The first voltage conversion sub-stage, the second voltage conversion sub-stage and the third voltage conversion sub-stage all include interconnected energy storage branches and electrostatic charge conversion branches, the energy storage branch includes an original switching tube and an energy storage capacitor, and the electrostatic charge conversion branch is used to eliminate the influence of the tube voltage drop of the original switching tube in the energy storage branch on the output voltage of the voltage conversion sub-stage.
2. The full-bridge charge pump circuit according to claim 1, characterized in that: The electrostatic charge conversion branch includes three electrostatic charge conversion switch tubes, and the electrostatic charge conversion switch tubes perform on-off actions based on an input voltage and an externally input inverted clock control signal.
3. The full-bridge charge pump circuit according to claim 2, characterized in that: The first voltage conversion sub-stage includes a first energy storage branch and a first electrostatic charge conversion branch; the first energy storage branch includes a first original switch tube and a first energy storage capacitor, and the first electrostatic charge conversion branch includes a first electrostatic charge conversion switch tube, a second electrostatic charge conversion switch tube and a third electrostatic charge conversion switch tube; The second voltage conversion sub-stage includes a second energy storage branch and a second electrostatic charge conversion branch; the second energy storage branch includes a second original switch tube and a second energy storage capacitor, and the second electrostatic charge conversion branch includes a fourth electrostatic charge conversion switch tube, a fifth electrostatic charge conversion switch tube and a sixth electrostatic charge conversion switch tube; The third voltage conversion sub-stage includes a third energy storage branch and a third electrostatic charge conversion branch; the third energy storage branch includes a third original switch tube and a third energy storage capacitor, and the third electrostatic charge conversion branch includes a seventh electrostatic charge conversion switch tube, an eighth electrostatic charge conversion switch tube and a ninth electrostatic charge conversion switch tube.
4. The full-bridge charge pump circuit according to claim 3, characterized in that: The gate and drain of the first original switch tube are connected to receive the input voltage; the source of the first original switch tube is connected to the first end of the first energy storage capacitor to output the first output voltage; the second end of the first energy storage capacitor is used to input the first clock control signal in the inverted clock control signal pair; The source of the first electrostatic charge conversion switch tube is connected to the source of the first original switch tube, the drain of the first electrostatic charge conversion switch tube is connected to the drain of the first original switch tube, and the gate of the first electrostatic charge conversion switch tube is respectively connected to the drains of the second electrostatic charge conversion switch tube and the third electrostatic charge conversion switch tube; The source of the second electrostatic charge conversion switch tube is connected to the drain of the first original switch tube, and the gate of the second electrostatic charge conversion switch tube is connected to the source of the first original switch tube; The gate of the third electrostatic charge conversion switch tube is connected to the source of the first original switch tube.
5. The full-bridge charge pump circuit according to claim 4, characterized in that: The gate and drain of the second original switch tube are connected to receive the first output voltage; the source of the second original switch tube is connected to the first end of the second energy storage capacitor to output the second output voltage; the second end of the second energy storage capacitor is used to input the second clock control signal in the inverted clock control signal pair; The source of the fourth electrostatic charge conversion switch tube is connected to the source of the second original switch tube, the drain of the fourth electrostatic charge conversion switch tube is connected to the drain of the second original switch tube, and the gate of the fourth electrostatic charge conversion switch tube is respectively connected to the drains of the fifth electrostatic charge conversion switch tube and the sixth electrostatic charge conversion switch tube; The source of the fifth electrostatic charge conversion switch tube is connected to the drain of the second original switch tube, and the gate of the fifth electrostatic charge conversion switch tube is connected to the source of the second original switch tube; The gate of the sixth electrostatic charge conversion switch tube is connected to the source of the second original switch tube, and the source of the third electrostatic charge conversion switch tube is connected to the source of the second original switch tube.
6. The full-bridge charge pump circuit according to claim 5, characterized in that: The gate and drain of the third original switch tube are connected to receive the second output voltage; the source of the third original switch tube is connected to the first end of the third energy storage capacitor to output the third output voltage; the second end of the third energy storage capacitor is used to input the first clock control signal in the inverted clock control signal pair; The source of the seventh electrostatic charge conversion switch tube is connected to the source of the third original switch tube, the drain of the seventh electrostatic charge conversion switch tube is connected to the drain of the third original switch tube, and the gate of the seventh electrostatic charge conversion switch tube is respectively connected to the drains of the eighth electrostatic charge conversion switch tube and the ninth electrostatic charge conversion switch tube; The source of the eighth electrostatic charge conversion switch tube is connected to the drain of the third original switch tube, and the gate of the eighth electrostatic charge conversion switch tube is connected to the source of the third original switch tube; The gate of the ninth electrostatic charge conversion switch tube is connected to the source of the third original switch tube, and the source of the sixth electrostatic charge conversion switch tube is connected to the source of the third original switch tube.
7. The full-bridge charge pump circuit according to claim 6, characterized in that: The first voltage conversion substage further includes a first filter branch, the second voltage conversion substage further includes a second filter branch, and the third voltage conversion substage further includes a third filter branch; The first filter branch includes a first filter capacitor, the second filter branch includes a second filter capacitor, and the third filter branch includes a third filter capacitor.
8. The full-bridge charge pump circuit according to claim 7, characterized in that: The first end of the first filter capacitor is connected to the first end of the first energy storage capacitor, and the second end of the first filter capacitor is grounded; The first end of the second filter capacitor is connected to the first end of the second energy storage capacitor, and the second end of the second filter capacitor is grounded; The first end of the third filter capacitor is connected to the first end of the third energy storage capacitor, and the second end of the third filter capacitor is grounded.
9. The full-bridge charge pump circuit according to claim 8, characterized in that: The first original switch tube, the second original switch tube, the third original switch tube, the first electrostatic charge conversion switch tube, the second electrostatic charge conversion switch tube, the fourth electrostatic charge conversion switch tube, the fifth electrostatic charge conversion switch tube, the seventh electrostatic charge conversion switch tube and the eighth electrostatic charge conversion switch tube are all NMOS tubes, and the third electrostatic charge conversion switch tube, the sixth electrostatic charge conversion switch tube and the ninth electrostatic charge conversion switch tube are all PMOS tubes.
10. The full-bridge charge pump circuit according to claim 9, characterized in that: The input voltage and high-level voltages of the first clock control signal and the second clock control signal are all power supply voltages.
Citation Information
Patent Citations
Positive high-voltage charge pump
CN102710122A
CTS2 charge pump
CN103219882A
N-type switching tube power switching circuit
CN112636586A
High-frequency resonant converter circuit with high-level and low-level voltage-multiplying circuit switching function
CN114204820A
Drive circuit of charge pump, charge pump, chip and fast charging system
CN117578871A
