Vertical lifting type installation device and method for large-diameter pipeline in frame
Through the vertical lifting installation device and method of large-diameter pipelines in the frame, the problem of difficulty in vertical lifting of large-diameter pipelines in metallurgical buildings is solved, and rapid installation and construction costs are achieved, and it is suitable for installation under severe environmental conditions.
Patent Information
- Application Number
- CN202411352382.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the metallurgical construction industry, the installation of large-diameter pipelines in sintering plants cannot achieve normal vertical lift due to space structure limitations, resulting in long-distance lateral transportation, which increases the construction time and the use of human-made machines.
A vertical lifting installation device for large diameter pipes in the frame and corresponding installation methods are designed. The pipes are vertically lifted from the inside of the structure by using a crane and an installation device through a wire rope and a hook, including cross beams, end lifting lugs, middle lifting lugs, The hook, main hook and secondary hook can realize the horizontal and tilt adjustment of the pipeline through step-by-step operations, reducing preliminary preparations and temporary measures.
It realizes rapid installation of large-diameter pipelines, reduces the use of machinery and manpower, reduces construction costs, and is suitable for installation under stricter environmental conditions, expands to the rapid improvement of large-diameter pipelines and large-size components inside the frame structure. and repair and renovate.
Smart Images

Figure CN119079776A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pipeline construction technology, and in particular to a vertical lifting installation device and an installation method for a large-diameter pipeline in a frame. Background Art
[0002] In the metallurgical construction industry, the installation of large-diameter pipes in the sintering chamber of a sintering plant has always been a focus of technical discussion and research. Due to the limitation of the spatial structure, there are structures in four directions that hinder normal lifting, making it impossible for the "lifting-rotation-placement" lifting machinery to operate normally.
[0003] The conventional installation methods are as follows: First, a full-length monorail hanging beam is set above the large-diameter pipeline installation platform, and a temporary platform is set at the end of the sintering chamber. The large-diameter pipeline is lifted from one end by an electric hoist and transported horizontally over a long distance to the installation position. Second, two steel rails are temporarily installed on the installation platform, and a platform trolley is set on the steel rails. The large-diameter pipeline is placed on the trolley, and it is pushed by personnel and transported horizontally over a long distance to the installation position. After being lifted by a hand hoist, the trolley is removed to carry out the pipe section installation work.
[0004] The idea adopted by these two solutions is long-distance horizontal transportation, which requires a lot of preliminary preparation work, and consumes a lot of manpower, materials and machines. The unnecessary reciprocating transportation work takes up a lot of construction time. Summary of the invention
[0005] In order to solve the above problems existing in the prior art, the present invention provides a vertical lifting installation device and installation method for a large-diameter pipeline in a frame.
[0006] In a first aspect, the present invention provides a vertical lifting installation device for a large-diameter pipeline in a frame, which adopts the following technical solution: A vertical lifting installation device for large-diameter pipelines in a frame includes a crossbeam, the top surfaces of both ends of the crossbeam are respectively fixedly connected with end lifting ears, the bottom surface in the middle of the crossbeam is fixedly connected with a middle lifting ear, a hook is connected to the middle lifting ear, the hook is connected to the middle of the pipeline, the main hook of the crane is connected to the end lifting ear through a wire rope, and the auxiliary hook of the crane is connected to the end of the pipeline.
[0007] By adopting the above technical solution, the installation device can adjust the horizontal posture and inclined posture of the pipeline, and each component is evenly stressed to meet the requirements of suspending the pipeline.
[0008] Optionally, the crossbeam is an I-beam.
[0009] By adopting the above technical solution, the I-beam has good mechanical properties and is easy to obtain and process.
[0010] Optionally, an end cover plate is fixedly connected to the end of the cross beam, and an intermediate rib plate is fixedly connected to the middle of the cross beam.
[0011] By adopting the above technical solution, the end cover plates and the middle ribs improve the overall structural strength and bending resistance of the beam.
[0012] In a second aspect, the present invention provides a method for vertically lifting and installing a large-diameter pipeline in a frame, comprising the following steps: S1. Open three holes on the upper platform of the installation position and pass the steel wire rope and the auxiliary hook through them, specifically including: two holes for passing the steel wire rope and one hole for passing the auxiliary hook; S2. Raise the main hook to the designed height above the ground and then hover until it reaches a stable state; S3. Lift the auxiliary hook until the pipeline tilts, so that the horizontal distance between the two ends of the pipeline is less than the length of the platform hole; S4. Synchronously lift the main hook and auxiliary hook to the lowest point of the pipeline exceeding the designed height of the platform; S5. Lower the auxiliary hook until the pipeline is horizontal; S6. Move and install pipelines.
[0013] Optionally, in S1, an ear plate is welded at the middle of the pipe for connection with the hook, and an ear plate is welded at the end of the pipe for connection with the auxiliary hook.
[0014] Optionally, the pipe in S2 is suspended after the height from the ground is 500 mm.
[0015] Optionally, the lifting is stopped after the lowest point of the pipeline in S4 exceeds the installation platform by 1-2m.
[0016] Optionally, in S6, the pipeline is positioned and installed by dragging by personnel or by slightly swinging the arm of a crane.
[0017] In summary, the present invention includes at least one of the following beneficial technical effects: Use a crane and a set of installation equipment to lift large-diameter pipes vertically from the inside of the structure, change the traditional mindset of horizontal transportation, eliminate a lot of preparatory work, use less temporary measures and materials, reduce the use of machinery and manpower, speed up construction progress, and reduce construction costs; This installation method can be used to install large-diameter pipes inside the structure under more stringent environmental conditions while ensuring installation quality; The application scope of this installation method can be extended to the interior of various frame structures, large-diameter pipelines, rapid lifting of large-size components, maintenance and renovation projects with small operating space for lifting machinery, and projects in similar working environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic structural diagram of a vertical lifting installation device for a large-diameter pipeline in a frame according to an embodiment of the present invention.
[0019] Figure 2 yes Figure 1 Sectional view along AA direction.
[0020] Figure 3 The pipeline hoisting process in the embodiment of the present invention is schematically shown in FIG. Figure 1 .
[0021] Figure 4 The pipeline hoisting process in the embodiment of the present invention is schematically shown in FIG. Figure 2 .
[0022] Figure 5 It is a flow chart of a method for vertically lifting and installing a large-diameter pipeline in a frame according to an embodiment of the present invention.
[0023] Explanation of the reference numerals: 1. cross beam; 10. end cover plate; 11. middle rib plate; 2. end lifting lug; 3. middle lifting lug; 4. hook; 5. main hook; 50. wire rope; 6. auxiliary hook. DETAILED DESCRIPTION
[0024] The following is combined with Figure 1 -Attached Figure 5 The present invention is described in further detail.
[0025] The embodiment of the present invention discloses a vertical lifting installation device and installation method for a large diameter pipeline in a frame. Figure 1 and Figure 2 The vertical lifting installation device for large-diameter pipes in the frame includes a crossbeam 1. The crossbeam 1 can be made of I-beam. End sealing plates 10 are welded to both ends of the crossbeam 1. An intermediate rib plate 11 is welded to the middle of the crossbeam 1 between the upper and lower wing plates. The end sealing plate 10 and the intermediate rib plate 11 both enhance the bending resistance of the crossbeam 1 and improve the overall structural strength.
[0026] Reference Figure 1-Figure 4 An end lifting ear 2 is welded to the top surface of the two ends of the crossbeam 1, and the end lifting ear 2 is used in conjunction with the main hook 5 of the crane. A wire rope 50 is hooked on the main hook 5, and the bottom end of the wire rope 50 is hooked on the end lifting ear 2; a middle lifting ear 3 is welded to the bottom surface of the middle part of the crossbeam 1, and a hook 4 is detachably hooked on the middle lifting ear 3, and the hook 4 is used to hook the middle part of the pipeline; an auxiliary hook 6 is installed on the crane, and the auxiliary hook 6 is used to hook the end of the pipeline.
[0027] Reference Figure 5 In the embodiment of the present invention, the vertical lifting installation method of a large diameter pipeline in a frame includes the following steps: S1. Three holes are opened on the upper platform of the installation position and the steel wire rope 50 and the auxiliary hook 6 are passed through. Specifically, two of the three holes are used to pass the steel wire rope 50, and the other hole is used to pass the auxiliary hook 6. The upper end of the steel wire rope 50 is connected to the main hook 5 of the crane, and the lower end of the steel wire rope 50 is connected to the end lifting lug 2. A lifting lug is welded in the middle and the end of the pipeline, wherein the lifting lug in the middle of the pipeline is connected to the lifting hook 4, and the lifting lug at the end of the pipeline is connected to the auxiliary hook 6; S2, lifting the main hook 5 to the designed height above the ground and then hovering it to a stable state, specifically including: slowly lifting the main hook 5 until the pipeline is 500 mm above the ground and then hovering it, and continuing to lift it to an appropriate position and stop after it is stable; S3, lifting the auxiliary hook 6 until the pipeline is tilted, so that the horizontal distance between the two ends of the pipeline is less than the length of the platform hole, specifically comprising: slowly lifting the auxiliary hook 6, driving the pipeline to tilt, until the horizontal distance between the left and right ends of the pipeline is less than the length of the platform hole; S4, synchronously lifting the main hook 5 and the auxiliary hook 6 until the lowest point of the pipeline exceeds the design height of the platform, specifically including: synchronously lifting the main hook 5 and the auxiliary hook 6, and the pipeline moves upward at an angle until the lowest point of the pipeline exceeds the installation platform by 1-2m and then stops; S5, lowering the auxiliary hook 6 until the pipeline is in a horizontal state, specifically including: the auxiliary hook 6 is slowly lowered, and the pipeline gradually returns to a horizontal state; S6. Move and install the pipeline, specifically including: simply dragging by personnel or slightly swinging the arm of the crane to achieve the positioning and installation of the pipeline.
[0028] The same installation method is repeated for large-diameter pipes in other locations of the plant. By using a crane and a set of installation equipment, the large-diameter pipes are lifted vertically from the inside of the structure, changing the traditional mode of thinking about horizontal transportation, eliminating a lot of preliminary preparation work, using less temporary measures and materials, reducing the use of machinery and manpower, speeding up the construction progress, and reducing construction costs. By using this installation method, it is possible to meet more stringent environmental conditions and install large-diameter pipes inside the structure while ensuring the installation quality.
[0029] The application scope of the installation method in the embodiment of the present invention can be extended to the interior of various frame structures, large-diameter pipelines, large-size components that are quickly lifted, maintenance and renovation projects with small lifting machinery operating space, and projects in similar working environments.
[0030] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A vertical lifting installation device for large diameter pipes in a frame. Features: The invention comprises a cross beam (1), the top surfaces of both ends of the cross beam (1) are respectively fixedly connected with end lifting ears (2), the bottom surface of the middle part of the cross beam (1) is fixedly connected with a middle lifting ear (3), the middle lifting ear (3) is connected with a hook (4), the hook (4) is connected to the middle part of the pipeline, the main hook (5) of the crane is connected to the end lifting ears (2) through a steel wire rope (50), and the auxiliary hook (6) of the crane is connected to the end of the pipeline.
2. The vertical lifting installation device for large diameter pipelines in a frame according to claim 1, Features: The crossbeam (1) is an I-beam.
3. The vertical lifting installation device for large diameter pipelines in a frame according to claim 2, Features: An end cover plate (10) is fixedly connected to the end of the cross beam (1), and an intermediate rib plate (11) is fixedly connected to the middle of the cross beam (1).
4. A method for installing a vertical lifting installation device for a large-diameter pipe in a frame according to any one of claims 1 to 3, Features: The steps include: S1, three holes are opened on the upper platform of the installation position and the steel wire rope (50) and the auxiliary hook (6) are passed through, specifically including: two holes are used for passing the steel wire rope (50), and one hole is used for passing the auxiliary hook (6); S2, lifting the main hook (5) to the designed height above the ground and then hovering it to a stable state; S3, lifting the auxiliary hook (6) until the pipeline is tilted so that the horizontal distance between the two ends of the pipeline is less than the length of the platform hole; S4, synchronously lifting the main hook (5) and the auxiliary hook (6) to the lowest point of the pipeline exceeding the design height of the platform; S5, lower the auxiliary hook (6) until the pipeline is in a horizontal state; S6. Move and install pipelines.
5. The installation method according to claim 4, Features: In S1, an ear plate is welded at the middle of the pipe for connecting with the hook (4), and an ear plate is welded at the end of the pipe for connecting with the auxiliary hook (6).
6. The installation method according to claim 4, Features: In S2, the pipe is suspended at a height of 500 mm above the ground.
7. The installation method according to claim 4, Features: In S4, the lifting stops after the lowest point of the pipeline exceeds the installation platform by 1-2m.
8. The installation method according to claim 4, Features: In S6, the pipelines are positioned and installed by dragging by personnel or by slightly swinging the crane arm.
Citation Information
Patent Citations
Installation method of indoor horizontal large flue of large sintering plant
CN111379900A
Method for pile turning of large-diameter single pile through full-rotation crane ship
CN112897339A
Hoisting posture adjusting method for giant side inclined truss structure
CN114180456A
Turnover lowering device and mounting method thereof
CN118062787A
Mounting method of ladle turret
CN118206033A