Lifting appliance, lifting system and lifting method for lifting prefabricated pipe gallery sections
By designing a lifting system for embedded parts and lifting parts in the prefabricated pipe gallery, combining the locking mechanism and roller components, the problem of long lifting time in the prior art is solved, and the effect of fast and stable lifting and resource saving is achieved.
Patent Information
- Application Number
- CN202411344868.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-12-06
AI Technical Summary
In the existing prefabricated pipe gallery components lifting methods, the lifting and installation time is long, and the lifting ring can only be used at one time, resulting in low construction efficiency and waste of resources.
Design a sling system including embedded parts and hoisting parts. The sling parts are vertically buried in the embedded parts of the side wall of the prefabricated pipe corridor, and are lifted using lifting holes and H-shaped hoisting areas, combining locking mechanisms and rollers. Components for fast and stable lifting and optimize segment alignment and installation through positioning devices.
It significantly saves lifting and installation time, improves construction efficiency, reduces resource waste, and ensures the stability and safety of lifting parts.
Smart Images

Figure CN119079780A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pipe gallery engineering construction, and in particular to a hoisting device and a positioning device hoisting method for hoisting prefabricated pipe gallery segments. Background Art
[0002] At present, the hoisting of prefabricated pipe gallery components will use hoists. In the prior art, the hoisting of prefabricated pipe gallery components mainly uses four rigid hoisting rings. After the prefabricated components are hoisted, the hoisting rings exposed on the outer wall of the components are cut off by a cutting machine, and then the waterproof membrane is laid. The hoisting rings can only work once, resulting in construction waste. Invention patent CN207469299U discloses a hoisting fastener for prefabricated pipe gallery components, in which the embedded columns and connecting pipes are connected by threads. However, it takes a certain amount of time to tighten the threads during on-site installation through threaded connections, so the installation is not fast enough. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a hoisting device, a hoisting system and a hoisting method for hoisting prefabricated pipe gallery segments, so as to solve the problem of long hoisting and installation time.
[0004] In order to solve the above technical problems, the present invention provides a lifting device for lifting prefabricated pipe gallery segments, including embedded parts vertically embedded in the side walls of the prefabricated pipe gallery wall and lifting parts that cooperate with the embedded parts for lifting. The embedded parts are provided with lifting holes perpendicular to the side walls of the wall, and the lifting parts can be inserted into the lifting holes. An H-shaped lifting area is also provided on one side of the lifting parts. During lifting, the lifting parts are tightly inserted into the holes of the embedded parts, and the lifting equipment uses hanging ropes to vertically hang multiple H-shaped lifting areas arranged on both sides of the prefabricated pipe gallery, thereby lifting the prefabricated pipe gallery.
[0005] In the preferred solution, the lifting hole is circular, and the lifting part is a round shaft structure that fits the lifting hole; the outer surface cross-section of the embedded part is a rectangular structure, and a plurality of discontinuous rectangular protrusions are provided on both sides of the embedded part prefabricated pipe gallery.
[0006] In a preferred solution, two baffles are provided at a certain distance on the side of the lifting component away from the embedded component, the two baffles and the lifting component form an H-shaped lifting area, and a locking mechanism is also provided on the side where the embedded component and the baffle are close.
[0007] In a preferred embodiment, the locking mechanism includes a locking shaft arranged on the outside of the embedded part and an arc-shaped groove arranged on the baffle and matching the locking shaft. An annular groove is provided on the end of the locking shaft away from the embedded part, and a flange with a thickness matching the annular groove is provided on one side or both sides of the arc-shaped groove. The flange covers part of the arc-shaped groove. When locking, the locking shaft is inserted into one side of the arc-shaped groove and then rotated to the other side, thereby inserting the annular groove into the flange.
[0008] In a preferred solution, a roller assembly is further provided on one side of the H-shaped lifting area, and the roller assembly includes a fixed shaft inserted into the lifting member, a guide wheel provided on one side of the fixed shaft, and a cap for fixing the guide wheel.
[0009] In the preferred solution, a through hole is provided on the hanging part, the fixed shaft passes through the through hole and is fixed by a nut on one side, a bearing is provided inside the guide wheel, the bearing sleeve is mounted on the fixed shaft, a threaded hole is provided on one side of the fixed shaft, the cover cap has a threaded shaft and a circular plate, the cover cap is screwed into the threaded hole through the threaded shaft, and the circular plate presses on the inner ring of the bearing.
[0010] In the preferred solution, the H-shaped lifting area is an H-shaped roller, which is mounted on the lifting part. An annular boss is provided on the side corresponding to the roller and the embedded part 21, and an annular T-slot is provided on the boss. A through hole matching the locking shaft is provided above the T-slot. When locking, the locking shaft is inserted into the through hole, and then rotated to insert the annular groove into the T-slot.
[0011] A system for hoisting prefabricated pipe gallery segments also includes a positioning device, which includes a mounting frame, a threaded adjustment rod is provided below the mounting frame, a first guide rail matched and fixed with a guide wheel is installed above the mounting frame, and a second guide rail that can be raised and lowered is provided in the extension direction of the first guide rail. When in a retracted state, the height of the second guide rail is consistent with the height of the first guide rail.
[0012] In the preferred solution, a concave platform is provided on the mounting frame, a cylinder is provided on the concave platform, a support plate is provided on the extension rod of the cylinder, and the second guide rail is provided on the support plate; a linear guide rail is provided on one side of the mounting frame, a slider is provided on the linear guide rail, and the slider is connected to the support plate.
[0013] A method for hoisting a prefabricated pipe gallery segment comprises the following steps: S1. Hoist and install the first section of prefabricated pipe gallery; S2. Using the two guide wheels on the first section of the prefabricated pipe gallery as a reference, install the left and right positioning devices. The distance between the first guide rails on the left and right positioning devices is consistent with the distance between the two guide wheels on the left and right sides of the hoisting parts. Adjust the adjustment rod so that the first guide rail on one side of the positioning device is just stuck on the two guide wheels on one side of the first section of the prefabricated pipe gallery. Then fix the positioning device and lift the second guide rail so that the height of the second guide rail is higher than the first guide rail. S3. The crane uses a hanging rope to hoist the second prefabricated pipe gallery segment onto the second guide rail of the positioning device, so that the two guide wheels on the left and right sides are just stuck in the two second guide rails; S4, the crane moves toward the direction of another installed first prefabricated pipe gallery, driving the second prefabricated pipe gallery to dock with the other installed prefabricated pipe gallery; S5. When the two planes of the first prefabricated pipe gallery and the second prefabricated pipe gallery are in contact, the second guide rail is lowered to align the first prefabricated pipe gallery with the second prefabricated pipe gallery, and then the second prefabricated pipe gallery is fixed, the hanging rope is removed, and the crane is used to lift the next prefabricated pipe gallery; at the same time, the adjustment rod of the positioning device is adjusted downward, and then the positioning device is re-fixed with the second prefabricated pipe gallery as the reference, so as to prepare for the installation of the third prefabricated pipe gallery, and the subsequent methods are the same.
[0014] The beneficial effect of the present invention is that since the present invention provides a hoisting device for hoisting prefabricated pipe gallery segments, including embedded parts and hoisting parts buried in the prefabricated pipe gallery, the hoisting parts are directly inserted into the embedded parts and then hoisted, which saves the installation time of the hoisting device and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 is a general axial structural diagram of a first embodiment of the present invention; Figure 2 It is a side view structural diagram of the embedded component of the first embodiment of the present invention; Figure 3 This is a structural diagram of a locking shaft according to a first embodiment of the present invention; Figure 4 This is a side view of the installation structure of the baffle of the first embodiment of the present invention; Figure 5 is a structural diagram of a locking shaft inserted into a flange in a first embodiment of the present invention; Figure 6 1 is a diagram of the installation structure of the hanging member and the roller according to the second embodiment of the present invention; Figure 7 is a cross-sectional view of the installation of the hanging member and the roller according to the second embodiment of the present invention; Figure 8 is a partial enlarged view of the drum of the second embodiment of the present invention; Fig. 9 2. It is a front view of the prefabricated pipe gallery installation structure according to the third embodiment of the present invention; Fig.10 2. It is a side view of the prefabricated pipe gallery installation structure according to the third embodiment of the present invention; Fig.11 is an axonometric view of a mounting bracket according to a third embodiment of the present invention; Fig.12 It is an enlarged side view of the positioning device according to the third embodiment of the present invention.
[0016] Figure numerals: prefabricated pipe gallery 11; hanging rope 12; embedded part 21; lifting hole 211; protrusion 22; lifting part 23; through hole 241; H-shaped lifting area 25; baffle 26; arc groove 261; locking shaft 31; annular groove 311; flange 32; gap 321; roller 34; boss 35; T-slot 351; through hole 352; roller assembly 4; fixed shaft 41; guide wheel 42; cap 43; threaded shaft 431; round plate 432; nut 44; bearing 45; positioning device 5; mounting frame 51; concave platform 511; threaded adjustment rod 52; first guide rail 53; second guide rail 54; cylinder 55; support plate 56; linear guide rail 57; slider 58. DETAILED DESCRIPTION
[0017] Example 1 See also Figure 1-5 As shown, an embodiment of the present application provides a technical solution: it includes an embedded part 21 vertically buried in the side wall of the prefabricated pipe gallery 11 and a lifting part 23 cooperating with the embedded part 21 for lifting, a lifting hole 211 perpendicular to the side wall of the wall is provided on the embedded part 21, the lifting part 23 can be inserted into the lifting hole 211, and an H-shaped lifting area 25 is also provided on one side of the lifting part 23. During lifting, the lifting part 23 is tightly inserted into the hole of the embedded part 21, and the lifting equipment uses a hanging rope 12 to vertically hang multiple H-shaped lifting areas 25 arranged on both sides of the prefabricated pipe gallery 11, thereby lifting the prefabricated pipe gallery 11.
[0018] The lifting member 23 is directly inserted into the embedded member 21, which is convenient and quick, and the size of the lifting member 23 and the lifting hole 211 are matched, so that the lifting member 23 will not shake inside the lifting hole 211, thereby avoiding the cooperation between the lifting member 23 and the lifting hole 211 to become a point contact, and no bending moment will be generated on the lifting member 23, thereby bending the lifting member 23. This can save the installation time of the lifting member 23 and improve the overall work efficiency.
[0019] In the preferred solution, the lifting hole 211 is circular, and the lifting part 23 is a round shaft structure with a clearance fit with the lifting hole 211; the outer surface cross-section of the embedded part 21 is a rectangular structure, and a plurality of discontinuous rectangular protrusions 22 are provided on both sides of the prefabricated pipe gallery 11 of the embedded part 21. The purpose of setting the hole and the shaft to fit is to facilitate insertion.
[0020] When the outer surface of the embedded part 21 is rectangular, the contact area between the embedded part 21 and the wall of the prefabricated pipe gallery 11 can be enlarged, so that when lifting, the pressure on the wall of the prefabricated pipe gallery 11 is smaller. The purpose of setting the intermittent protrusions 22 is to facilitate the cement to enter between the two protrusions 22 when filling cement. In this way, the embedded part 21 is not easily forced to fall out of the wall of the prefabricated pipe gallery 11, and the embedded part 21 is subjected to the pressure of the lifting part 23.
[0021] In the preferred solution, two baffles 26 are provided at a certain distance on the side of the hanging part 23 away from the embedded part 21. The two baffles 26 and the hanging part 23 form an H-shaped hanging area 25. A locking mechanism is also provided on the side where the embedded part 21 and the baffles 26 are close.
[0022] In this way, the hanging rope 12 is restricted between the two baffles 26, and is not likely to damage the wall of the prefabricated pipe gallery 11, nor is it likely to fall out.
[0023] In the preferred embodiment, the locking mechanism includes a locking shaft 31 arranged on the outside of the embedded part 21 and an arc groove 261 arranged on the baffle 26 and matching the locking shaft 31. An annular groove 311 is provided on the end of the locking shaft 31 away from the embedded part 21, and a flange 32 with a thickness matching the annular groove 311 is provided on one side or both sides of the arc groove 261. The flange 32 covers part of the arc groove 261. When locking, the locking shaft 31 is inserted into one side of the arc groove 261 and then rotated to the other side, thereby inserting the annular groove 311 into the flange 32.
[0024] During installation, the locking shaft 31 is first inserted into the larger diameter of the arc groove 261, and then rotated to clamp the annular groove 311 into the flange 32. The purpose of the locking mechanism is to lock the hanging member 23 so that the hanging member 23 is not easy to fall off.
[0025] In a preferred solution, a roller assembly 4 is further provided on one side of the H-shaped hoisting area 25, and the roller assembly 4 includes a fixed shaft 41 inserted into the hoisting member 23, a guide wheel 42 provided on one side of the fixed shaft 41, and a cap 43 for fixing the guide wheel 42. The cap 43 is used to fix the guide wheel 42 to prevent the guide wheel 42 from moving sideways.
[0026] In the preferred embodiment, a through hole 241 is provided on the hanging part 23, the fixed shaft 41 passes through the through hole 241, and a nut 44 is installed on one side to fix it, a bearing 45 is provided inside the guide wheel 42, the bearing 45 is mounted on the fixed shaft 41, a threaded hole is provided on one side of the fixed shaft 41, the cover cap 43 has a threaded shaft 431 and a circular plate 432, the cover cap 43 is screwed into the threaded hole through the threaded shaft 431, and the circular plate 432 presses on the inner ring of the bearing 45.
[0027] In this way, the guide wheel 42 can be easily rotated around the fixed shaft 41, and the guide wheel 42 is a V-shaped guide wheel.
[0028] Example 2 Further illustrate with reference to Example 1; The H-shaped lifting area 25 is an H-shaped roller 34, which is mounted on the lifting part 23. An annular boss 35 is provided on the side of the roller 34 corresponding to the embedded part 21, and an annular T-shaped slot 351 is provided on the boss 35. A through hole 352 matching the locking shaft 31 is provided above the T-shaped slot 351. When locking, the locking shaft 31 is inserted into the through hole 352, and then rotated to clamp the annular groove 311 into the T-shaped slot 351.
[0029] The purpose of providing the rotatable drum 34 is that when the hanging rope is hung on the H-shaped hoisting area 25 with one side longer and the other side shorter, there is no need to manually adjust the hanging rope. The hanging rope can be adjusted to the same length on the left and right sides by rotating the drum 34 itself.
[0030] Example 3 Further explanation is given in conjunction with Examples 1 and 2; A system for hoisting prefabricated pipe gallery segments also includes a positioning device 5, which includes a mounting frame 51, a threaded adjustment rod 52 is provided below the mounting frame 51, a first guide rail 53 matched and fixed with a guide wheel 42 is installed above the mounting frame 51, and a liftable second guide rail 54 is provided in the extension direction of the first guide rail 53. When in the retracted state, the height of the second guide rail 54 is consistent with the height of the first guide rail 53.
[0031] The purpose of setting the positioning device 5 is to facilitate the alignment of the two prefabricated pipe gallery segments. When docking, the first guide rail 53 and the second guide rail 54 are flush left and right and up and down. The guide grooves of the first guide rail 53, the second guide rail 54 and the guide wheel 42 are matched, and the guide wheel 42 can roll along the guide rail.
[0032] The adjustment rod 52 is used to adjust the height of the entire positioning device 5 .
[0033] In the preferred solution, a concave platform 511 is provided on the mounting frame 51, a cylinder 55 is provided on the concave platform, a support plate 56 is provided on the extending rod of the cylinder 55, and the second guide rail 54 is arranged on the support plate 56; a linear guide rail 57 is provided on one side of the mounting frame 51, a slider 58 is provided on the linear guide rail 57, and the slider 58 is connected to the support plate 56.
[0034] The oil cylinder 55 can extend and retract, thereby increasing the height of the second guide rail 54. When retracted, the second guide rail 54 is flush with the first guide rail 53. When the second guide rail 54 is raised to a certain height, it is convenient to lower and position the prefabricated pipe gallery segment, provide a certain installation space, and avoid interference with the surroundings when the prefabricated pipe gallery segment has not been installed in place.
[0035] Example 4 Combined with Examples 1, 2, and 3, further described; A method for hoisting a prefabricated pipe gallery segment comprises the following steps: S1, hoist and install the first section of prefabricated pipe gallery 11; S2, with the two guide wheels 42 on the first section of the prefabricated pipe gallery 11 as a reference, install the left and right positioning devices 5, the distance between the first guide rails 53 on the left and right positioning devices 5 is consistent with the distance between the two guide wheels 42 on the left and right sides of the hanging member 23, adjust the adjusting rod 52, so that the first guide rail 53 on one side of the positioning device 5 is just stuck on the two guide wheels 42 on one side of the first section of the prefabricated pipe gallery 11, and then fix the positioning device 5, lift the second guide rail 54, so that the height of the second guide rail 54 is higher than the first guide rail 53; S3, the crane uses the hanging rope 12 to hoist the second section of the prefabricated pipe gallery 11 onto the second guide rail 54 of the positioning device 5, so that the two guide wheels 42 on the left and right sides are just stuck in the two second guide rails 54; S4, the crane moves toward another installed first prefabricated pipe gallery 11, driving the second prefabricated pipe gallery 11 to dock with another installed prefabricated pipe gallery 11; S5. When the two planes of the first prefabricated pipe gallery 11 and the second prefabricated pipe gallery 11 are in contact, the second guide rail 54 is lowered, the first prefabricated pipe gallery 11 and the second prefabricated pipe gallery 11 are aligned, and then the second prefabricated pipe gallery 11 is fixed, the hanging rope 12 is removed, and the crane is used to hoist the next prefabricated pipe gallery 11; at the same time, the adjustment rod 52 of the positioning device 5 is adjusted downward, and then the positioning device 5 is re-fixed with the second prefabricated pipe gallery 11 as a reference, so as to prepare for the installation of the third prefabricated pipe gallery 11, and the subsequent methods are consistent.
[0036] In the preferred scheme, the method for adjusting the height and distance of the guide rails 53 on the two positioning devices 5 is to install the lifting parts 23 on the already installed prefabricated pipe gallery 11, and use the guide grooves of the guide wheels 42 on the two lifting parts 23 on one side as a reference to make the guide rails 53 on the positioning device 5 on one side snap into the guide grooves of the two guide wheels 42 at the same time, so that the lower surface of the guide rails 53 is tangent to the guide grooves of the two guide wheels 42, and the positioning device 5 on the other side is adjusted in the same way.
[0037] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A hoisting device for hoisting prefabricated pipe gallery segments, characterized in that: The invention comprises an embedded part (21) vertically embedded in the side wall of a prefabricated pipe gallery (11) and a lifting part (23) cooperating with the embedded part (21) for lifting. The embedded part (21) is provided with a lifting hole (211) vertical to the side wall of the wall. The lifting part (23) can be inserted into the lifting hole (211). An H-shaped lifting area (25) is also provided on one side of the lifting part (23). During lifting, the lifting part (23) is tightly inserted into the hole of the embedded part (21). The lifting device uses a hanging rope (12) to vertically hang a plurality of H-shaped lifting areas (25) arranged on both sides of the prefabricated pipe gallery (11), thereby lifting the prefabricated pipe gallery (11).
2. A hoisting device for hoisting prefabricated pipe gallery segments according to claim 1, characterized in that: The lifting hole (211) is circular, and the lifting part (23) is a round shaft structure that is clearance-matched with the lifting hole (211); the outer surface cross-section of the embedded part (21) is a rectangular structure, and a plurality of discontinuous rectangular protrusions (22) are provided on both sides of the prefabricated pipe gallery (11) of the embedded part (21).
3. A hoisting device for hoisting prefabricated pipe gallery segments according to claim 1, characterized in that: Two baffles (26) are provided at a certain distance on a side of the hanging component (23) away from the embedded component (21); the two baffles (26) and the hanging component (23) form an H-shaped hanging area (25); and a locking mechanism is also provided on a side where the embedded component (21) and the baffles (26) are close to each other.
4. A hoisting device for hoisting prefabricated pipe gallery segments according to claim 3, characterized in that: The locking mechanism comprises a locking shaft (31) arranged outside the embedded part (21) and an arc-shaped groove (261) arranged on the baffle (26) and matching with the locking shaft (31); an annular groove (311) is arranged at one end of the locking shaft (31) away from the embedded part (21); a flange (32) having a thickness matching with the annular groove (311) is arranged on one side or both sides of the arc-shaped groove (261); the flange (32) covers a part of the arc-shaped groove (261); when locking, the locking shaft (31) is inserted into one side of the arc-shaped groove (261) and then rotated to the other side, thereby locking the annular groove (311) into the flange (32).
5. A hoisting device for hoisting prefabricated pipe gallery segments according to claim 1 or 3, characterized in that: A roller assembly (4) is also provided on one side of the H-shaped lifting area (25), and the roller assembly (4) comprises a fixed shaft (41) inserted into the lifting member (23), a guide wheel (42) provided on one side of the fixed shaft (41), and a cap (43) for fixing the guide wheel (42).
6. A hoisting device for hoisting prefabricated pipe gallery segments according to claim 4, characterized in that: A through hole (241) is provided on the hanging member (23), the fixed shaft (41) passes through the through hole (241) and is fixed by a nut (44) installed on one side. A bearing (45) is provided inside the guide wheel (42), the bearing (45) is sleeved on the fixed shaft (41), a threaded hole is provided on one side of the fixed shaft (41), a cover cap (43) has a threaded shaft (431) and a circular plate (432), the cover cap (43) is screwed into the threaded hole through the threaded shaft (431), and the circular plate (432) presses the inner ring of the bearing (45).
7. A hoisting device for hoisting prefabricated pipe gallery segments according to claim 6, characterized in that: The H-shaped hoisting area (25) is an H-shaped roller (34), which is sleeved on the hoisting part (23). An annular boss (35) is provided on the side of the roller (34) corresponding to the embedded part 21, and an annular T-shaped groove (351) is provided on the boss (35). A through hole (352) matching the locking shaft (31) is provided above the T-shaped groove (351). When locking, the locking shaft (31) is inserted into the through hole (352), and then rotated to clamp the annular groove (311) into the T-shaped groove (351).
8. A system for hoisting prefabricated pipe gallery segments, comprising the hoisting device according to any one of claims 1 to 7, characterized in that: The invention also comprises a positioning device (5), the positioning device (5) comprising a mounting frame (51), a threaded adjustment rod (52) being provided below the mounting frame (51), a first guide rail (53) being mounted above the mounting frame (51) and being matched and fixed with the guide wheel (42), a second guide rail (54) being provided in a direction extending from the first guide rail (53) and being able to be raised and lowered, and in a retracted state, a height of the second guide rail (54) being consistent with a height of the first guide rail (53).
9. A system for hoisting prefabricated pipe gallery segments according to claim 8, characterized in that: A concave platform (511) is provided on the mounting frame (51), a cylinder (55) is provided on the concave platform, a support plate (56) is provided on the extension rod of the cylinder (55), and the second guide rail (54) is provided on the support plate (56); a linear guide rail (57) is provided on one side of the mounting frame (51), a slider (58) is provided on the linear guide rail (57), and the slider (58) is connected to the support plate (56).
10. A method for hoisting a prefabricated pipe gallery segment, comprising the following steps: S1, hoisting and installing the first section of prefabricated pipe gallery (11); S2, using the two guide wheels (42) on the first section of the prefabricated pipe gallery (11) as a reference, installing the left and right positioning devices (5), the distance between the first guide rails (53) on the left and right positioning devices (5) being consistent with the distance between the two guide wheels (42) on the left and right sides of the hanging member (23), adjusting the adjusting rod (52) so that the first guide rail (53) on one side of the positioning device (5) is just stuck on the two guide wheels (42) on one side of the first section of the prefabricated pipe gallery (11), and then fixing the positioning device (5), lifting the second guide rail (54), so that the height of the second guide rail (54) is higher than the first guide rail (53); S3, the crane uses a hanging rope (12) to hoist the second section of the prefabricated pipe gallery (11) onto the second guide rail (54) of the positioning device (5), so that the two guide wheels (42) on the left and right sides are just inserted into the two second guide rails (54); S4, the crane moves toward another installed first prefabricated pipe gallery (11), driving the second prefabricated pipe gallery (11) to dock with another installed prefabricated pipe gallery (11); S5. When the two planes of the first prefabricated pipe gallery (11) and the second prefabricated pipe gallery (11) are in contact, the second guide rail (54) is lowered, the first prefabricated pipe gallery (11) and the second prefabricated pipe gallery (11) are aligned, and then the second prefabricated pipe gallery (11) is fixed, the hanging rope (12) is removed, and the crane is used to lift the next prefabricated pipe gallery (11); at the same time, the adjustment rod (52) of the positioning device (5) is adjusted downward, and then the positioning device (5) is re-fixed with the second prefabricated pipe gallery (11) as a reference, so as to prepare for the installation of the third prefabricated pipe gallery (11), and the subsequent methods are the same.