Adjustable ballastless track adapting to foundation deformation and adjusting method

By designing an adjustable multi-layer structure and limiting boss system in ballastless tracks, the problem of insufficient track adjustment capability under large deformation of the foundation is solved, efficient vertical and horizontal adjustment of the track plate is achieved, and adjustment costs are reduced. Security risks.

CN119083246APending Publication Date: 2024-12-06CHINA ACADEMY OF RAILWAY SCI CORP LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411328764.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing ballastless track structure is difficult to meet the demand for large adjustments in vertical and horizontal directions of the track structure under large deformation conditions, resulting in diseases such as track geometry exceeding the limit and structural damage, and the adjustment cost is high, time is long, and safety risks. big.

Method used

An adjustable ball-free track that adapts to foundation deformation is designed, using components such as base, prefabricated track plate, multi-layer structure and embedded casing. The height of the track plate is achieved by replacing the height and horizontal adjustment layer of different thicknesses and the height adjustment layer. Horizontal direction adjustment, combined with the design of limit bosses and rectangular limit holes, improve the stability and adjustment ability of the track structure.

Benefits of technology

It significantly improves the high and low adjustment capabilities and horizontal adjustment capabilities of ballastless tracks, solves the problem of insufficient deformation adjustment capabilities during large deformation of the foundation, reduces construction costs and safety risks, and is suitable for the diseases of track construction and operation lines in complex geological sections. Disposal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083246A_ABST
    Figure CN119083246A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of railways, and discloses an adjustable ballastless track adapting to foundation deformation and an adjusting method.The adjustable ballastless track comprises a base on which a plurality of limiting bosses are poured; a plurality of prefabricated track plates, each prefabricated track plate is provided with a first rectangular limiting hole, the first rectangular limiting holes are inserted into the limiting bosses, and each prefabricated track plate is provided with a plurality of height adjusting holes; the height adjusting layer is connected between the base and the prefabricated track plate in a pressing manner; the horizontal adjusting layer is crimped between the first rectangular limiting hole and the limiting boss; the plurality of pre-embedded sleeves are pre-embedded in the corresponding height adjusting holes; and the plurality of height adjusting screw rods are in threaded connection with the corresponding embedded sleeves. By arranging the height adjusting layer and the horizontal adjusting layer, the height and transverse adjusting capacity of the ballastless track is improved, the problem that the deformation adjusting capacity of an existing ballastless track is insufficient when an offline foundation deforms greatly is solved, and the ballastless track deformation adjusting device can be applied to ballastless track construction in a complex geological section and disease treatment caused by operation line foundation deformation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of railway engineering, and more particularly to an adjustable ballastless track adapting to foundation deformation and an adjustment method. Background Art

[0002] The construction of railways in my country's dangerous and complex mountainous areas faces severe challenges such as low oxygen levels on the plateau, large temperature differences, and many extra-long tunnels. The conditions for track construction and maintenance are extremely poor. Ballastless track has the advantages of high stability, high smoothness, long service life, and less daily maintenance work, making it the preferred type of track structure.

[0003] Railways in dangerous and complex mountainous areas usually need to pass through complex geological sections such as high-altitude stress soft rock with large deformation, active fault zones, etc. The plate activities along some lines are intense, geological disasters occur frequently, and the risk of large deformation of the foundation is prominent, which can easily lead to track geometry exceeding the limit, structural damage and other defects, resulting in train speed restrictions or even suspension of operation. This is a forbidden zone for the laying of conventional ballastless tracks.

[0004] The types of conventional ballastless tracks in my country mainly include: prefabricated slab ballastless tracks such as CRTSⅠ, CRTSⅡ, and CRTSⅢ, as well as cast-in-place ballastless tracks such as double-block, long-sleeper embedded, and elastic support block. The deformation adjustment capability of the ballastless track bed was not considered in the structural design of CRTSⅡ, CRTSⅢ slab-type and double-block, long-sleeper embedded ballastless tracks. When foundation deformation occurs and fasteners are difficult to adjust, measures such as cutting the ballast bed slab, base or tunnel invert filling layer have to be adopted to adjust the track geometry. The disease treatment time is long, the cost is high, the safety risk is high, and it causes great interference to the normal operation order. In addition, during the long-term operation, the CRTSⅡ track slab arch deformation, double-block ballastless track slab cracking and arch deformation have occurred. CRTSⅠ slab track and elastic support block ballastless track have certain vertical deformation adjustment capabilities, but still cannot meet the large vertical and horizontal adjustment requirements under the condition of large foundation deformation. In addition, during the long-term operation, the CRTSⅠ slab track has problems such as damage to the large-span beam end limit structure, empty hanging of elastic support blocks and poor track geometry.

[0005] Therefore, the existing ballastless track structure in my country can hardly meet the demand for large vertical and horizontal adjustments of the track structure under the condition of large foundation deformation. How to develop a large-adjustment ballastless track and adjustment method that can meet the demand for large foundation deformation adjustment is an urgent problem that technical personnel in this field need to solve. Summary of the invention

[0006] In view of this, the present invention provides an adjustable ballastless track and adjustment method that can adapt to foundation deformation, so as to solve the problems of ballastless track structure construction and precise control of track unevenness under conditions of large offline foundation deformation, and is suitable for the treatment of defects induced by foundation deformation of new railway projects and operating lines under complex geological conditions.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] An adjustable ballastless track adapting to foundation deformation, comprising:

[0009] A base, wherein a plurality of limiting bosses are cast and formed on the top surface of the base;

[0010] Prefabricated track plates, which are multiple prefabricated track plates spliced ​​end to end, are all placed on the top surface of the base, a first rectangular limiting hole is opened in the middle of each prefabricated track plate, the first rectangular limiting hole is plugged into the limiting boss, and each prefabricated track plate is opened with multiple height adjustment holes;

[0011] A height adjustment layer, the height adjustment layer being pressed between the base and the prefabricated track plate;

[0012] A horizontal adjustment layer, wherein the horizontal adjustment layer is pressed between the first rectangular limiting hole and the limiting boss;

[0013] A plurality of pre-buried sleeves, which are respectively pre-buried in the corresponding height adjustment holes;

[0014] A plurality of height adjustment screw rods are respectively penetrated and threadedly connected to the corresponding embedded sleeves.

[0015] It can be known from the above technical scheme that, compared with the prior art, the present invention discloses an adjustable ballastless track that adapts to foundation deformation. When the track is adjusted in height, the horizontal adjustment layer is removed to facilitate the lifting operation of the prefabricated track plate, and then the height adjustment screw is turned to lift the prefabricated track plate to a certain height, and then the height adjustment layer under the prefabricated track plate is removed, and the height adjustment layer to be replaced is placed between the base and the prefabricated track plate, and then the horizontal adjustment layer is reinstalled, thereby completing the height adjustment operation of the prefabricated track plate; when the track is adjusted in level, the horizontal adjustment layer is removed to facilitate the lifting operation of the prefabricated track plate, and then the height adjustment screw is turned to lift the prefabricated track plate to a certain height, and then the height adjustment layer under the prefabricated track plate is removed, and a roller is placed in the gap between the two, and then the prefabricated track plate is adjusted to the set position to the left or right by the jack, and then the roller and the jack are removed, and the height adjustment layer and the horizontal adjustment layer to be replaced are reinstalled, thereby completing the level adjustment operation of the prefabricated track plate.

[0016] Therefore, the ballastless track of the present invention can achieve adjustment of the prefabricated track plate in height and horizontal directions by replacing height adjustment layers of different thicknesses and replacing horizontal adjustment layers of different thicknesses, thereby greatly improving the height adjustment capacity and lateral adjustment capacity of the ballastless track structure, thereby solving the problem of insufficient deformation adjustment capacity of the existing ballastless track when the offline foundation is greatly deformed. It can be applied to the construction of ballastless tracks in complex geological sections and the treatment of diseases caused by deformation of the foundation of operating lines.

[0017] Moreover, the first rectangular limiting hole on the prefabricated track plate can be inserted into the limiting boss on the base, so that the limiting boss can provide horizontal limitation for the prefabricated track plate, greatly improving the structural stability of the prefabricated track plate installed on the base, avoiding large horizontal displacement of the prefabricated track plate, and improving the safety of the track.

[0018] Furthermore, U-shaped limiting holes are respectively opened at both ends of the prefabricated track plates. After the two adjacent prefabricated track plates are spliced ​​end to end, the two U-shaped limiting holes at the spliced ​​position are spliced ​​to form a second rectangular limiting hole. The second rectangular limiting hole is inserted into the corresponding limiting boss, and the horizontal adjustment layer is crimped between the second rectangular limiting hole and the limiting boss.

[0019] The beneficial effect of adopting the above technical solution is that a single track plate can be limited by three limiting bosses at the same time based on the first rectangular limiting hole in the middle and the U-shaped limiting holes at both ends, which can significantly improve the bearing capacity and structural stability of the ballastless track, and better adapt to the difficult and complex mountainous area passenger and freight co-line operation conditions and super-long ramps and other line conditions.

[0020] Furthermore, the first rectangular limiting hole, the U-shaped limiting hole, and the height adjustment hole are all symmetrically arranged along the plane longitudinal center line and the plane transverse center line of the prefabricated track plate.

[0021] The beneficial effect of adopting the above technical solution is that the reinforcement design of the track plate can be made symmetrical, thereby reducing the types of steel bar processing, simplifying the steel bar skeleton binding process, and facilitating intelligent manufacturing.

[0022] Furthermore, an elastic isolation layer is bonded to the bottom end surface of the prefabricated track plate, the height adjustment layer is located between the base and the elastic isolation layer, elastic buffer pad layers are bonded to the side walls of the first rectangular limiting hole and the U-shaped limiting hole, and the horizontal adjustment layer is located between the elastic buffer pad layer and the limiting boss.

[0023] The beneficial effects of adopting the above technical solution are: the setting of the elastic isolation layer can improve the overall elasticity of the ballastless track structure, buffer the vibration impact of the train load on the height adjustment layer, and improve the durability of the height adjustment layer; and the setting of the elastic buffer layer can buffer the interaction between the limit boss and the prefabricated track plate, coordinate the interlayer deformation, and provide convenient conditions for the height and lateral adjustment of the track during the operation stage.

[0024] Furthermore, two elastic isolation layers are provided along the transverse direction of the prefabricated track plate, which are respectively located on both sides of the first rectangular limiting hole, and the length of the elastic isolation layer is arranged along the longitudinal direction of the prefabricated track plate.

[0025] The beneficial effect of adopting the above technical solution is that there are two elastic isolation layers, that is, two strip-shaped elastic isolation layers are selected instead of a whole elastic isolation layer that matches the entire bottom surface of the prefabricated track slab, which can reduce the material consumption of the elastic isolation layer and improve the economy of the ballastless track structure.

[0026] Furthermore, two height adjustment layers are provided along the transverse direction of the prefabricated track plate, which are respectively located on both sides of the first rectangular limiting hole, and the width of the height adjustment layer is aligned with the elastic isolation layer.

[0027] The beneficial effects of adopting the above technical solution are: the height adjustment layer is arranged in strips, and when the track height is adjusted, the height adjustment layer can be taken out from both sides of the track respectively, avoiding the problem that the height adjustment layer is difficult to take out for height adjustment when it is arranged as a whole at the bottom of the track plate. At the same time, it can also reduce the material consumption of the height adjustment layer and improve the economy of the ballastless track structure.

[0028] Furthermore, the height adjustment layer includes: a pouring bag and a pouring material poured inside the pouring bag, and the pouring material is self-compacting concrete or polymer mortar; the level adjustment layer can also be made by bagged pouring, which includes a pouring bag and resin mortar or polyurethane resin poured inside the bag body.

[0029] The beneficial effects of the above technical solution are as follows: using bagged self-compacting concrete or polymer mortar for height adjustment can solve the problems of high cost and low efficiency caused by using rope saws to cut and thin the ballastless roadbed and grouting and lifting the roadbed when repairing the deformation of the existing ballastless track foundation. At the same time, the height adjustment layer can also adjust the elevation deviation of the offline foundation during the construction phase; the horizontal adjustment layer is bagged resin mortar or bagged polyurethane resin filled in the gap between the first rectangular limit hole and the limit boss, and the second rectangular limit hole and the limit boss. The resin mortar or polyurethane resin material can be mixed on site and can be quickly hardened by adjusting the mix ratio design to meet the maintenance requirements within the skylight time. At the same time, the resin mortar or polyurethane resin material poured on site can effectively avoid the formation of gaps between the first rectangular limit hole, the second rectangular limit hole and the limit boss, thereby effectively avoiding the accumulation of water in the area near the first rectangular limit hole and the second rectangular limit hole and seeping into the bottom of the prefabricated track slab to cause secondary diseases.

[0030] Furthermore, the cross-section and longitudinal section of the prefabricated track slab both gradually increase from top to bottom.

[0031] The beneficial effect of adopting the above technical solution is that when the track plate is placed upright, the longitudinal and cross-sectional shape is small at the top and large at the bottom, which facilitates the demoulding of the track plate and avoids damage such as cracks and falling of the track plate concrete caused by excessive demoulding resistance.

[0032] The present invention provides an adjustable ballastless track adjustment method that adapts to foundation deformation, including a track height adjustment method and a track level adjustment method.

[0033] The track height adjustment method comprises the following adjustment steps:

[0034] Step 1-1: Loosen the rail fasteners within the adjustment range and remove the fasteners;

[0035] Step 2-1: Use tools to clear the levels adjustment layer;

[0036] Step 3-1: Screw the plurality of height adjustment screws into the plurality of embedded sleeves respectively, and lift the prefabricated track plate to a certain height so that the gap between the prefabricated track plate and the height adjustment layer can accommodate the height adjustment layer removal rod;

[0037] Step 4-1: Use a lever hoist and a height adjustment layer removal rod to remove the height adjustment layer from the bottom of the prefabricated track slab;

[0038] Step 5-1: using the height adjustment screw to raise or lower each of the prefabricated track plates to a set position;

[0039] Step 6-1: placing a new height adjustment layer in the gap between the base and the prefabricated track plate;

[0040] Step 7-1: Reinstall the Levels adjustment layer;

[0041] Step 8-1: Reinstall the fasteners;

[0042] The track level adjustment method comprises the following adjustment steps:

[0043] Step 1-2: Loosen the rail fasteners within the adjustment range and remove the fasteners;

[0044] Step 2-2: Use tools to clear the levels adjustment layer;

[0045] Step 3-2: Screw the plurality of height adjustment screws into the plurality of embedded sleeves respectively, and lift the prefabricated track plate to a certain height so that the gap between the prefabricated track plate and the height adjustment layer can accommodate the height adjustment layer removal rod;

[0046] Step 4-2: Use a lever hoist and a height adjustment layer removal rod to remove the height adjustment layer from the bottom of the prefabricated track slab;

[0047] Step 5-2: placing a roller into the bottom of the prefabricated track slab;

[0048] Step 6-2: placing a jack between the limiting boss and the first rectangular limiting hole, and adjusting the prefabricated track plate to the set position to the left or right;

[0049] Step 7-2: Remove the roller and the jack, and install the height adjustment layer and the new horizontal adjustment layer;

[0050] Step 8-2: Reinstall the fasteners.

[0051] Furthermore, in step 6-1 of the track height adjustment method, the height adjustment layer is installed by laying the pouring bag according to the specifications of each prefabricated track plate and fixing it to the upper surface of the base with an adhesive, and then filling the pouring bag with a pouring material. In step 7-1: reinstalling the horizontal adjustment layer is specifically to put a pouring bag in the gap between the limiting boss and the first rectangular limiting hole, and in the gap between the limiting boss and the second rectangular limiting hole, and pouring resin mortar or polyurethane resin into the pouring bag;

[0052] In step 7-2 of the track horizontal adjustment method, when installing the height adjustment layer, the roller is removed, a pouring bag is laid on the base below the prefabricated track plate, and the pouring bag is fixed to the upper surface of the base with an adhesive, and then the pouring bag is filled with pouring material; when installing the horizontal adjustment layer, a pouring bag is placed between the limiting boss without a jack and the first rectangular limiting hole, and resin mortar or polyurethane resin is poured into the pouring bag, and after curing, the jack is removed, and then a pouring bag is placed between the limiting boss after the jack is removed and the first rectangular limiting hole, and resin mortar or polyurethane resin is poured into the pouring bag, and the same method is used to pour the bagged resin mortar or polyurethane resin between the limiting boss and the second rectangular limiting hole.

[0053] The above adjustment method of the present invention achieves the following technical effects:

[0054] 1. By replacing the height adjustment layer, the height adjustment capacity of the ballastless track structure is significantly improved, and the height adjustment amount can be ≥80mm and ≥100mm respectively.

[0055] 2. By replacing the horizontal adjustment layer, the lateral adjustment capability of the ballastless track structure is significantly improved, and the horizontal adjustment amount can be achieved ≥50mm.

[0056] 3. It solves the problem of insufficient deformation adjustment ability of existing ballastless track when the offline foundation deforms greatly. It can be applied to the construction of ballastless track in complex geological sections and the treatment of diseases caused by foundation deformation of operating lines.

[0057] 4. Prefabricated track slabs, elastic isolation layers, and elastic buffer layers are assembled in the track slab factory without the need for on-site assembly, which can significantly reduce the workload on the construction site and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0059] Figure 1 A cross-sectional view of an adjustable ballastless track adapted to foundation deformation provided by the present invention;

[0060] Figure 2 A plan view of a prefabricated track slab of an adjustable ballastless track adapted to foundation deformation provided by the present invention;

[0061] Figure 3A cross-sectional view of an adjustable ballastless track adapted to foundation deformation provided by the present invention in a height adjustment state;

[0062] Figure 4 A cross-sectional view of an adjustable ballastless track adapted to foundation deformation provided by the present invention in a lowered state;

[0063] Figure 5 A cross-sectional view of an adjustable ballastless track adapted to foundation deformation provided by the present invention in a horizontal adjustment state;

[0064] Figure 6 A schematic diagram of height adjustment of an adjustable ballastless track that adapts to foundation deformation according to the present invention;

[0065] Figure 7 A schematic diagram of horizontal adjustment of an adjustable ballastless track that adapts to foundation deformation according to the present invention;

[0066] Figure 8 A schematic diagram of a height adjustment screw rod of an adjustable ballastless track adapted to foundation deformation provided by the present invention;

[0067] Fig. 9 A schematic diagram of a pre-buried casing for a height adjustment hole of an adjustable ballastless track adapted to foundation deformation provided by the present invention;

[0068] Fig.10 A schematic diagram of a height adjustment layer removal rod of an adjustable ballastless track that adapts to foundation deformation provided by the present invention. DETAILED DESCRIPTION

[0069] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0070] The present invention provides an adjustable ballastless track and an adjustment method that can adapt to foundation deformation, so as to solve the problems of ballastless track structure construction and precise control of track unevenness under conditions of large deformation of offline foundations. The method is suitable for the treatment of defects induced by foundation deformation of new railway projects and operating lines under complex geological conditions.

[0071] like Figure 1-Figure 10 As shown, an embodiment of the present invention discloses an adjustable ballastless track adapting to foundation deformation, comprising:

[0072] A base 40, which is cast on-site with reinforced concrete, and has a plurality of limit bosses 41 cast on its top surface;

[0073] Prefabricated track plates 10, which are multiple prefabricated track plates 10 joined end to end, are all placed on the top surface of the base 40, a first rectangular limiting hole 11 is opened in the middle of each prefabricated track plate 10, the first rectangular limiting hole 11 is plugged into the limiting boss 41, and each prefabricated track plate 10 is opened with multiple height adjustment holes 13;

[0074] A height adjustment layer 30, the height adjustment layer 30 is pressed between the base 40 and the prefabricated track plate 10;

[0075] A horizontal adjustment layer 60, which is pressed between the first rectangular limiting hole 11 and the limiting boss 41;

[0076] A plurality of embedded sleeves 100 are respectively embedded in the corresponding height adjustment holes 13. In order to improve the stability of the embedded sleeves 100 embedded in the height adjustment holes 13, the outer wall of the embedded sleeves 100 can be a threaded surface, a toothed surface, etc., so that the bite anchoring ability between the outer wall surface of the embedded sleeves 100 and the prefabricated track slab concrete can be improved, and the firmness of the embedded sleeves 100 embedded in the height adjustment holes 13 can be greatly improved;

[0077] A plurality of height adjustment screw rods 90 are respectively disposed through and threadedly connected to corresponding embedded sleeves 100 .

[0078] A U-shaped limiting hole 12 is respectively opened at both ends of the prefabricated track plate 10. After the two adjacent prefabricated track plates 10 are spliced ​​end to end, the two U-shaped limiting holes 12 at the spliced ​​position are spliced ​​to form a second rectangular limiting hole, and the second rectangular limiting hole is inserted into the corresponding limiting boss 41. A horizontal adjustment layer 60 is crimped between the second rectangular limiting hole and the limiting boss 41.

[0079] The first rectangular limiting hole 11 , the U-shaped limiting hole 12 , and the height adjustment hole 13 are all symmetrically arranged along the plane longitudinal center line 70 and the plane transverse center line 80 of the prefabricated track plate 10 .

[0080] An elastic isolation layer 20 is bonded to the bottom end surface of the prefabricated track plate 10, the height adjustment layer 30 is located between the base 40 and the elastic isolation layer 20, the side walls of the first rectangular limiting hole 11 and the U-shaped limiting hole 12 are bonded with an elastic buffer pad layer 50, and the horizontal adjustment layer 60 is located between the elastic buffer pad layer 50 and the limiting boss 41.

[0081] The elastic isolation layer 20 and the elastic buffer layer 50 can be microporous foamed polyurethane elastomers or microporous foamed rubber elastomers, which can improve the overall elasticity of the ballastless track structure, buffer the vibration impact of the train load on the height adjustment layer 30 and the horizontal adjustment layer 60, improve the durability of the height adjustment layer 30 and the horizontal adjustment layer 60, and extend their service life.

[0082] Of course, in some embodiments, the prefabricated track slab 10, the elastic isolation layer 20, and the elastic buffer layer 50 are assembled in the track slab factory, which can ensure the bonding quality, reduce the workload on the construction site, and improve the construction efficiency.

[0083] Two elastic isolation layers 20 are provided along the transverse direction of the prefabricated track plate 10 , which are respectively located on both sides of the first rectangular limiting hole 11 , and the length of the elastic isolation layer 20 is arranged along the longitudinal direction of the prefabricated track plate 10 .

[0084] Two height adjustment layers 30 are provided along the transverse direction of the prefabricated track plate 10 , which are respectively located on both sides of the first rectangular limiting hole 11 , and the width of the height adjustment layer 30 is aligned with the elastic isolation layer 20 .

[0085] The height adjustment layer 30 includes: a pouring bag 31 and a pouring material 32 poured inside the pouring bag 31, wherein the pouring bag 31 is made of air-permeable and water-impermeable non-woven fabric, and the pouring material 32 is self-compacting concrete or polymer mortar. The thickness of the height adjustment layer 30 is determined according to the expected lowering amount. When the lowering amount is 80 mm, the thickness of the height adjustment layer 30 should not be less than 100 mm; the horizontal adjustment layer 60 includes a pouring bag and a resin mortar or polyurethane resin poured inside the bag body. The resin mortar or polyurethane resin material poured on site can effectively avoid the formation of gaps between the first limiting hole 11, the second limiting hole and the prefabricated limiting boss 41, thereby effectively avoiding the accumulation of water in the area near the first limiting hole 11 and the second limiting hole and then seeping into the bottom of the prefabricated track plate 10 to cause secondary damage. The thickness of the horizontal adjustment layer 60 is determined according to the expected adjustment amount. When the adjustment demand is 50 mm, the thickness of the horizontal adjustment layer 60 should not be less than 55 mm.

[0086] In the above embodiment, the cross-sectional and longitudinal sections of the prefabricated track plate 10 gradually increase from top to bottom, that is, the prefabricated track plate 10 is in the shape of a cone, so that when the track plate is placed upright, the longitudinal and cross-sectional shapes are small at the top and large at the bottom, which facilitates the demoulding of the track plate and avoids damage such as cracks and falling of the track plate concrete caused by excessive demoulding resistance.

[0087] The present invention provides an adjustable ballastless track adjustment method that adapts to foundation deformation, including a track height adjustment method and a track level adjustment method.

[0088] The track height adjustment method includes the following adjustment steps:

[0089] Step 1-1: Based on the track geometry measurement data (height, level, track direction, etc.) under large deformation of the foundation, calculate the deformation adjustment length and the height adjustment or lowering amount of each prefabricated track plate 10; determine the size and quantity of the pouring bag 31 according to the height adjustment or lowering amount of the track, then loosen the rail fasteners within the adjustment range and remove the fasteners;

[0090] Step 2-1: Use tools such as a flat drill and a spatula to remove the horizontal adjustment layer 60;

[0091] Step 3-1: Screw a plurality of height adjustment screws 90 into a plurality of embedded sleeves 100 respectively, and lift the prefabricated track plate 10 to a certain height so that the gap between the prefabricated track plate 10 and the height adjustment layer 30 can accommodate the height adjustment layer removal rod 130;

[0092] Step 4-1: Use the lever hoist and the height adjustment layer removal rod 130 together to remove the height adjustment layer 30 from the bottom of the prefabricated track plate 10; one end of the height adjustment layer removal rod 130 is provided with a hanging hole for hanging the lifting rope of the lever hoist, and the other end is a hook, so that the height adjustment layer removal rod 130 can be dragged outward by the lever hoist, and the height adjustment layer 30 can be removed from the bottom of the prefabricated track plate by using the hook on the height adjustment layer removal rod 130;

[0093] Step 5-1: Use the height adjustment screw 90 to raise or lower each prefabricated track plate 10 to a set position;

[0094] Step 6-1: placing a new height adjustment layer 30 in the gap between the base 40 and the prefabricated track plate 10;

[0095] Step 7-1: Reinstall the horizontal adjustment layer 60;

[0096] Step 8-1: Reinstall the fasteners;

[0097] The track level adjustment method includes the following adjustment steps:

[0098] Step 1-2: Based on the track geometry measurement data (height, level, track direction, etc.) under large foundation deformation, calculate the deformation adjustment length and the horizontal adjustment amount of each prefabricated track plate 10, and mark the left and right adjustment directions; determine the number of horizontal adjustment layers 60 according to the adjustment length range, then loosen the rail fasteners within the adjustment range and remove the fasteners;

[0099] Step 2-2: Use a flat drill, a spatula or other tool to remove the horizontal adjustment layer 60;

[0100] Step 3-2: Screw a plurality of height adjustment screws 90 into a plurality of embedded sleeves 100 respectively, and lift the prefabricated track plate 10 to a certain height so that the gap between the prefabricated track plate 10 and the height adjustment layer 30 can accommodate the height adjustment layer removal rod 130;

[0101] Step 4-2: Use the lever hoist and the height adjustment layer removal rod 130 to remove the height adjustment layer 30 from the bottom of the prefabricated track plate 10;

[0102] Step 5-2: Place the roller 120 into the bottom of the prefabricated track plate 10;

[0103] Step 6-2: Place an ultra-thin jack 110 between the limiting boss 41 and the first rectangular limiting hole 11, and adjust the prefabricated track plate 10 to the set position to the left or right;

[0104] Step 7-2: Remove the roller 120 and the jack 110, and install the height adjustment layer 30 and the new horizontal adjustment layer 60;

[0105] Step 8-2: Reinstall the fasteners.

[0106] In step 6-1 of the track height adjustment method, the height adjustment layer 30 is installed by laying the pouring bag 31 corresponding to each prefabricated track plate 10 according to its specifications and fixing it to the upper surface of the base 40 with an adhesive, and then filling the pouring bag 31 with a pouring material 32. In step 7-1: reinstalling the level adjustment layer 60, the pouring bag is placed in the gap between the limiting boss 41 and the first rectangular limiting hole 11, and the gap between the limiting boss 41 and the second rectangular limiting hole, and resin mortar or polyurethane resin is poured into the pouring bag;

[0107] In step 7-2 of the track horizontal adjustment method, when installing the height adjustment layer 30, remove the roller 120, lay a pouring bag 31 on the base 40 below the prefabricated track plate 10, and use an adhesive to fix the pouring bag 31 to the upper surface of the base 40, and then fill the pouring bag 31 with a pouring material 32; when installing the horizontal adjustment layer 60, put a pouring bag between the limiting boss 41 without the jack 110 and the first rectangular limiting hole 11, and pour resin mortar or polyurethane resin into the pouring bag, and then after curing, remove the jack 110, and then put a pouring bag between the limiting boss 41 after the jack 110 is removed and the first rectangular limiting hole 11, and pour resin mortar or polyurethane resin into the pouring bag, and the same method is used to pour the bagged resin mortar or polyurethane resin between the limiting boss 41 and the second rectangular limiting hole.

[0108] The present invention can solve the problems of ballastless track structure construction and precise control of track unevenness under conditions of large offline foundation deformation, and is suitable for the treatment of defects induced by foundation deformation in new railway projects and operating lines under complex geological conditions.

[0109] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0110] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An adjustable ballastless track adapting to foundation deformation, characterized in that: include: A base (40), wherein a plurality of limiting bosses (41) are cast on the top surface of the base (40); Prefabricated track plates (10), the prefabricated track plates (10) are multiple and are joined end to end, and are all placed on the top surface of the base (40); a first rectangular limiting hole (11) is opened in the middle of each prefabricated track plate (10), and the first rectangular limiting hole (11) is plugged into the limiting boss (41); and a plurality of height adjustment holes (13) are opened on each prefabricated track plate (10); A height adjustment layer (30), the height adjustment layer (30) being pressed between the base (40) and the prefabricated track plate (10); A horizontal adjustment layer (60), the horizontal adjustment layer (60) being pressed between the first rectangular limiting hole (11) and the limiting boss (41); A plurality of pre-buried sleeves (100), which are respectively pre-buried in the corresponding height adjustment holes (13); A plurality of height adjustment screw rods (90) are respectively passed through and threadedly connected to the corresponding embedded sleeves (100).

2. The adjustable ballastless track adapted to foundation deformation according to claim 1, characterized in that: The two ends of the prefabricated track plate (10) are respectively provided with U-shaped limiting holes (12); after the two adjacent prefabricated track plates (10) are spliced ​​end to end, the two U-shaped limiting holes (12) at the spliced ​​position are spliced ​​to form a second rectangular limiting hole; the second rectangular limiting hole is plugged into the corresponding limiting boss (41); and the horizontal adjustment layer (60) is crimped between the second rectangular limiting hole and the limiting boss (41).

3. The adjustable ballastless track adapted to foundation deformation according to claim 2, characterized in that: The first rectangular limiting hole (11), the U-shaped limiting hole (12), and the height adjustment hole (13) are all symmetrically arranged along a plane longitudinal center line (70) and a plane transverse center line (80) of the prefabricated track plate (10).

4. The adjustable ballastless track adapting to foundation deformation according to claim 2, characterized in that: An elastic isolation layer (20) is bonded to the bottom end surface of the prefabricated track plate (10), the height adjustment layer (30) is located between the base (40) and the elastic isolation layer (20), elastic buffer layers (50) are bonded to the side walls of the first rectangular limiting hole (11) and the U-shaped limiting hole (12), and the horizontal adjustment layer (60) is located between the elastic buffer layer (50) and the limiting boss (41).

5. The adjustable ballastless track adapted to foundation deformation according to claim 4, characterized in that: Two elastic isolation layers (20) are arranged along the transverse direction of the prefabricated track plate (10), which are respectively located on both sides of the first rectangular limiting hole (11), and the length of the elastic isolation layer (20) is arranged along the longitudinal direction of the prefabricated track plate (10).

6. The adjustable ballastless track adapting to foundation deformation according to claim 4, characterized in that: Two height adjustment layers (30) are arranged along the transverse direction of the prefabricated track plate (10), which are respectively located on both sides of the first rectangular limiting hole (11), and the width of the height adjustment layer (30) is aligned with the elastic isolation layer (20).

7. An adjustable ballastless track adapting to foundation deformation according to any one of claims 1 to 6, characterized in that: The height adjustment layer (30) comprises: a pouring bag (31) and a pouring material (32) poured into the pouring bag (31), wherein the pouring material (32) is self-compacting concrete or polymer mortar; and the level adjustment layer (60) comprises a pouring bag and resin mortar or polyurethane resin poured into the bag body.

8. An adjustable ballastless track adapting to foundation deformation according to any one of claims 1 to 6, characterized in that: The cross-section and longitudinal section of the prefabricated track plate (10) both gradually increase from top to bottom.

9. A method for adjusting an adjustable ballastless track adapted to foundation deformation according to any one of claims 1 to 8, characterized in that: Including track height adjustment method and track level adjustment method, The track height adjustment method comprises the following adjustment steps: Step 1-1: Loosen the rail fasteners within the adjustment range and remove the fasteners; Step 2-1: Use a tool to clear the level adjustment layer (60); Step 3-1: Screw the plurality of height adjustment screw rods (90) into the plurality of embedded sleeves (100) respectively, and lift the prefabricated track plate (10) to a certain height so that the gap between the prefabricated track plate (10) and the height adjustment layer (30) can accommodate the height adjustment layer removal rod (130); Step 4-1: Using a lever hoist and a height adjustment layer removal rod (130) in combination, remove the height adjustment layer (30) from the bottom of the prefabricated track plate (10); Step 5-1: using the height adjustment screw rod (90) to raise or lower each of the prefabricated track plates (10) to a set position; Step 6-1: placing a new height adjustment layer (30) in the gap between the base (40) and the prefabricated track plate (10); Step 7-1: Reinstall the horizontal adjustment layer (60); Step 8-1: Reinstall the fasteners; The track level adjustment method comprises the following adjustment steps: Step 1-2: Loosen the rail fasteners within the adjustment range and remove the fasteners; Step 2-2: Use a tool to clear the level adjustment layer (60); Step 3-2: Screw the plurality of height adjustment screw rods (90) into the plurality of embedded sleeves (100) respectively, and lift the prefabricated track plate (10) to a certain height so that the gap between the prefabricated track plate (10) and the height adjustment layer (30) can accommodate the height adjustment layer removal rod (130); Step 4-2: Using a lever hoist in conjunction with a height adjustment layer removal rod (130), remove the height adjustment layer (30) from the bottom of the prefabricated track slab (10); Step 5-2: placing the roller (120) into the bottom of the prefabricated track plate (10); Step 6-2: placing a jack (110) between the limiting boss (41) and the first rectangular limiting hole (11), and adjusting the prefabricated track plate (10) to the left or right to a set position; Step 7-2: removing the roller (120) and the jack (110), and installing the height adjustment layer (30) and the new horizontal adjustment layer (60); Step 8-2: Reinstall the fasteners.

10. The method for adjusting an adjustable ballastless track adapted to foundation deformation according to claim 9, characterized in that: In step 6-1 of the track height adjustment method, the height adjustment layer (30) is installed by laying the pouring bag (31) corresponding to each prefabricated track plate (10) according to its specifications and fixing it to the upper surface of the base (40) with an adhesive, and then filling the pouring bag (31) with a pouring material (32). In step 7-1, the horizontal adjustment layer (60) is reinstalled by placing a pouring bag in the gap between the limiting boss (41) and the first rectangular limiting hole (11), and in the gap between the limiting boss (41) and the second rectangular limiting hole, and pouring resin mortar or polyurethane resin into the pouring bag; In step 7-2 of the track level adjustment method, when installing the height adjustment layer (30), the roller (120) is removed, a pouring bag (31) is laid on the base (40) below the prefabricated track plate (10), and the pouring bag (31) is fixed to the upper surface of the base (40) with an adhesive, and then the pouring material (32) is filled into the pouring bag (31); when installing the level adjustment layer (60), the limit boss (41) without the jack (110) and the A pouring bag is placed between the first rectangular limiting holes (11), and resin mortar or polyurethane resin is poured into the pouring bag. After solidification, the jack (110) is removed, and then a pouring bag is placed between the limiting boss (41) after the jack (110) is removed and the first rectangular limiting hole (11), and resin mortar or polyurethane resin is poured into the pouring bag. The same method is used to pour the bagged resin mortar or polyurethane resin between the limiting boss (41) and the second rectangular limiting hole.