Dike breach flexible plugging facility and plugging method
Through the permeable wall composed of flexible permeable parts and flexible blocking parts, the problem that the traditional embankment breach sealing method cannot be effectively sealed in the initial stage is solved, and rapid and effective breach sealing is achieved, reducing material usage and economic losses.
Patent Information
- Application Number
- CN202411415298.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-12-06
AI Technical Summary
The traditional method of levee breaking blocking cannot be effectively sealed in the early stage, and the materials and construction costs are high, and the time is long, so the expansion of the breach cannot be quickly controlled, resulting in greater harm to the levee.
A permeable wall consisting of flexible permeable parts and flexible blocking parts. The permeable parts are set at the breach, and the blocking parts are located inside the water flow. The permeable wall can slow down the water flow rate and intercept the released earth and stone materials, and quickly seal the breach.
Regardless of the water breach flow, the permeable wall can effectively intercept earth and stone materials, reduce material usage, improve sealing efficiency, quickly sealing and breaching, and reduce economic losses.
Smart Images

Figure CN119083371A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flood prevention and emergency rescue, and in particular to a flexible plugging facility for dike breach and a plugging method. Background Art
[0002] When a dike is affected by floods or other factors, it may burst, causing some water outside the dike to flow into the dike from the breach and spread to the residents' production and living areas, posing a danger to the safety of life and property of surrounding residents. It will also affect the local natural environment, affect the growth of plants and crops, and destroy the ecological balance.
[0003] In the early stage of a dike breach, the width of the breach is still relatively small. If the breach can be sealed in time, the danger can be quickly controlled and the damage of the flood to the dike can be minimized. If it cannot be sealed in time, the breach will become larger and larger, causing greater damage. At present, the traditional breach sealing method is to transport soil and stone materials to the breach by trucks, and then put the soil and stone materials into the breach, and gradually accumulate the soil and stone materials to seal the breach. However, due to the impact of the water flow, most of the materials put in will be washed away. The current situation shows that in some breaches with fast flow rates, the materials put in at the beginning will basically be washed away and cannot effectively seal the breach. Therefore, it is necessary to wait until the water flow rate slows down before putting materials in, but this reduces the timeliness of rescue, and the long-term flooding into the dike will cause greater economic losses.
[0004] The above shows that the traditional method of plugging breaches is simply to throw a large amount of earth and stone materials, which has a very unsatisfactory plugging effect, and has high material and construction costs, a long time, and cannot be plugged in the early stage of the breach. How to prevent the thrown earth and stone materials from being washed away or washed away by the water flow, and how to quickly plug the breach with a small investment regardless of the water flow of the breach to prevent the breach from further expanding, these are the difficulties of breach plugging, and technical innovation is urgently needed. Summary of the invention
[0005] In view of this, the present invention provides a flexible plugging facility and method for dike breaches to solve the problem that earth and stone materials are directly thrown at the breach and cannot be plugged at the initial stage of the breach. The flexible breach plugging facility can be used regardless of the breach flow conditions, and can block the thrown earth and stone materials to prevent the breach from further expanding, thereby achieving effective plugging of the breach.
[0006] In a first aspect, the present invention provides a flexible plugging facility for dike breaches, comprising:
[0007] A flexible water-permeable member, wherein the flexible water-permeable member comprises a water-permeable wall arranged at the breach, and the water-permeable wall comprises: a flexible water-permeable member and a flexible blocking member;
[0008] The flexible water-permeable member comprises: a water-permeable section and two installation sections, the two installation sections are respectively located at the two ends of the water-permeable section, and the two installation sections are respectively arranged on the embankment top and the slope surface at the two ends of the breach, the water-permeable section is arranged at the breach, and when multiple water-permeable walls are arranged, the corresponding multiple water-permeable sections are arranged at intervals along the water flow direction;
[0009] The flexible blocking member is arranged on the inner side of the water permeable section of the flexible water permeable member facing the water flow.
[0010] Beneficial Effects
[0011] When this type of flexible plugging facility for dike breach is installed at the dike breach, first connect the two installation sections of the flexible permeable member to the dike top and slope at both ends of the breach, and then place the permeable section at the breach. The permeable section allows water to flow through, but can slow down the flow rate of the water flow. The most important thing is that it can block the flexible blocking member and provide an installation environment for the flexible blocking member. The flexible blocking member is arranged on the inner side of the permeable section of the flexible permeable member facing the water flow. The flexible permeable member and the flexible blocking member are combined to form a permeable wall, and then soil, stone and other materials are placed into the breach. The soil and stone materials will be intercepted by the permeable wall, and the soil and stone materials can be accumulated faster at the breach, gradually blocking the breach. The amount of material used is greatly reduced, and the blocking efficiency is improved. Regardless of the water flow conditions at the breach, the breach can be blocked.
[0012] In an optional embodiment, two permeable walls are provided at the breach.
[0013] Beneficial Effects
[0014] After setting up two permeable walls, throwing soil and stone materials between the two permeable walls can block the soil and stone materials from both sides, which can better prevent the loss of soil and stone materials. Then the soil and stone materials can quickly block the breach.
[0015] In an optional embodiment, the flexible water-permeable member includes: a mesh body, and the mesh body includes a plurality of connecting ropes spaced apart along the length direction and height direction thereof.
[0016] Beneficial Effects
[0017] The flexible mesh has a small blocking capacity for water flow and is easy to be arranged at the breach. Moreover, the flexible water-permeable member can be cut into a mesh of suitable length according to the required length when in use, so as to meet the use of breaches of various sizes.
[0018] In an optional embodiment, the flexible water-permeable member also includes a rolling mechanism, which includes: a base, a column and a reel, the column is arranged on the base, the reel is sleeved on the column and can rotate around the axial direction of the column, and one end of the mesh body is connected to the reel.
[0019] Beneficial Effects
[0020] The net can be retracted and unfolded by rotating the reel, and the flexible water-permeable parts can be quickly opened and arranged when in use, meeting the needs of rapid response to flood conditions. After use, the flexible water-permeable parts can be rolled up without taking up too much space, making them easy to store.
[0021] In an optional embodiment, the length of the permeable section is greater than the width of the breach.
[0022] Beneficial Effects
[0023] After the permeable section is arranged at the breach, with the impact of water flow, the permeable section in the flexible permeable member becomes a net bag shape, which has a better blocking effect on the flexible blocking member.
[0024] In an optional embodiment, the flexible barrier comprises a plurality of binding members.
[0025] Beneficial Effects
[0026] The number of bundles can be adaptively adjusted according to the size of the breach to comprehensively intercept the released materials, save materials and improve the sealing efficiency.
[0027] In an optional embodiment, the binding member includes: a plurality of branches and a binding member for binding the branches.
[0028] Beneficial Effects
[0029] This type of bundle made of tree branches is easy to obtain, has a low production cost, is relatively easy to produce, and is easy to store.
[0030] In an optional embodiment, the flexible sealing facility for embankment breach further includes a posture adjustment component, which includes: a buoyancy block and a gravity block, a plurality of the buoyancy blocks are arranged at intervals on the top of the permeable section, a plurality of the gravity blocks are arranged at intervals on the bottom of the permeable section, and a plurality of the gravity blocks are arranged at the bottom of the flexible barrier.
[0031] Beneficial Effects
[0032] By arranging buoyancy blocks and gravity blocks above and below the permeable section net, the permeable section is pulled up and down to be in a vertical position, which can better block the flexible permeable member and prevent the flexible permeable member from being impacted by the water flow and flowing through the top and bottom of the permeable section. Arranging a gravity block at the bottom of the flexible blocking member also enables it to be in an upright position in the water. Under the action of the water flow, it is closely combined with the permeable section net to form a permeable wall, which can better intercept the soil and stone materials put in.
[0033] In a second aspect, the present invention further provides a dike breach sealing method, comprising:
[0034] Arrange permeable walls at breach locations;
[0035] Earth and stone materials are placed inside the permeable wall until the breach is sealed.
[0036] Beneficial Effects
[0037] By setting up a permeable wall at the breach, the subsequently released earth and stone materials can be intercepted and will not be washed away by the water flow, thereby reducing the further expansion of the breach and being able to quickly seal the breach. At the same time, less material is used and will not be wasted, saving time and reducing economic costs.
[0038] In an optional embodiment, the step of arranging a permeable wall at the breach includes:
[0039] The two installation sections of the flexible water-permeable member are arranged on the embankment top and the slope surface at both ends of the breach, the water-permeable section is arranged at the breach, and a buoyancy block is installed on the top of the water-permeable section and a gravity block is arranged at the bottom thereof;
[0040] The gravity block is arranged at the bottom of the flexible blocking member, and the flexible blocking member is arranged on the inner side of the flexible water-permeable member, and the two together form a water-permeable wall.
[0041] Beneficial Effects
[0042] By setting buoyancy blocks and gravity blocks in the permeable section of the flexible permeable member, and setting a gravity block at the bottom of the flexible barrier, the permeable section and the flexible barrier can be kept in a vertical state. The two together construct a permeable wall, which can better block the injected earth and stone materials, so as to seal the breach more quickly. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0044] Figure 1 It is a layout diagram of the flexible water-permeable parts in the flexible plugging facility for dike breach of the present invention;
[0045] Figure 2 It is a layout diagram of the flexible blocking member in the flexible plugging facility for dike breach of the present invention;
[0046] Figure 3 It is a cross-sectional view of the first permeable wall in the flexible plugging facility for dike breach of the present invention;
[0047] Figure 4 It is a plan layout diagram of two permeable walls of the flexible plugging facility for dike breach of the present invention;
[0048] Figure 5 It is a schematic diagram of the deployment of the flexible water-permeable member in the flexible plugging facility for dike breach of the present invention;
[0049] Figure 6 It is a schematic diagram of a reeling mechanism in a flexible water-permeable member of a flexible plugging facility for dike breaches of the present invention;
[0050] Figure 7 It is a top view of the reeling mechanism in the flexible water-permeable member of the flexible plugging facility for dike breach of the present invention;
[0051] Figure 8 It is a schematic diagram of the connection between the base and the column of the winding mechanism in the flexible water-permeable member of the flexible plugging facility for dike breach of the present invention;
[0052] Fig. 9 It is a schematic diagram of the bundled parts in the flexible plugging facility for dike breach of the present invention;
[0053] Fig.10 It is a schematic diagram of a buoyancy block in a posture adjustment assembly of a flexible plugging facility for dike breaches of the present invention;
[0054] Fig.11 It is a schematic diagram of a gravity block in a posture adjustment assembly of a flexible plugging facility for dike breaches according to the present invention.
[0055] Description of reference numerals:
[0056] 1. Permeable wall, 11. Flexible permeable member, 111. Permeable section; 112. Installation section, 113. Net body, 1131. Connecting rope, 114. Winding mechanism, 1141. Base, 1142. Post, 1143. Reel, 1144. Steel ball, 12. Flexible blocking member, 121. Binding member, 1211. Branch, 1212. Binding member;
[0057] 2. The top and slope of the embankment;
[0058] 31. Buoyancy block, 32. Gravity block. DETAILED DESCRIPTION
[0059] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0061] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0062] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0063] The present application proposes a flexible sealing facility for sealing embankment breaches, so as to improve the blocking effect of the placed earth and stone materials, reduce the amount of earth and stone materials used, and at the same time, seal the breach at the early stage of occurrence, with a faster sealing speed, thus avoiding greater losses in the embankment caused by water entering the breach.
[0064] Combine the following Figures 1 to 11 An embodiment of the present invention is described. On the one hand, the present embodiment provides a flexible plugging facility for dike breach. The flexible plugging facility for dike breach includes a permeable wall 1 arranged at the breach, and the permeable wall 1 includes: a flexible permeable member 11 and a flexible blocking member 12. The flexible permeable member 11 includes: a permeable section 111 and two mounting sections 112, the two mounting sections 112 are respectively located at the two ends of the permeable section 111, and the two mounting sections 112 are respectively arranged on the dike top and the slope 2 at the two ends of the breach, the permeable section 111 is arranged at the breach, and when multiple permeable walls 1 are arranged, the corresponding multiple permeable sections 111 are arranged at intervals along the water flow direction. The flexible blocking member 12 is arranged on the inner side of the permeable section 111 of the flexible permeable member 11 facing the water flow.
[0065] Specifically, the permeable wall 1 arranged at the breach can be one or more, and is selected according to the actual conditions such as the size of the breach and the water flow speed. And when multiple permeable walls 1 are provided, the multiple permeable sections 111 corresponding to the multiple flexible permeable members 11 are arranged at intervals along the water flow direction at the breach, that is, there is an interval between the permeable sections 111 of two adjacent permeable walls 1. The corresponding multiple installation sections 112 are all covered on the embankment top and slope 2 at both ends of the breach. The installation section 112 is sleeved on the short piles driven into the embankment top and slope 2, thereby fixing the entire flexible permeable member 11, so that the permeable section 111 will not be washed away by the impact of the water flow. The flexible blocking member 12 is arranged on the inner side of the flexible permeable member 11, and is supported by the permeable section 111.
[0066] After the permeable wall 1 is set up, soil and stone materials can be placed to intercept the soil and stone materials through the permeable wall 1. The soil and stone materials can be quickly piled up at the breach to block the breach and prevent the materials from being washed away by the water flow. In this way, the amount of materials can be greatly saved when blocking the breach, and the speed of blocking the breach can be greatly accelerated. And no matter what the water flow conditions are at the initial stage of the breach, this flexible blocking facility can be used for blocking to ensure the timeliness of emergency rescue. The flexible permeable member 11 set in the permeable wall 1 is mainly used to provide an installation environment for the flexible blocking member 12. Therefore, the flexible permeable member 11 has good permeability, so that the water flow at the breach can pass through the flexible permeable member 11. In this way, the impact force of the water flow on the arrangement of the flexible permeable member 11 is relatively small, and it is easier to arrange. Although the flexible permeable member 11 is permeable, it can also play a role in slowing down the water flow. The flexible blocking member 12 is mainly provided to block the materials subsequently thrown into the breach. Moreover, after the flexible blocking member 12 is provided, the materials will not directly impact the flexible water-permeable member 11, and the flexible water-permeable member 11 will no longer be easily damaged.
[0067] In this embodiment, if Figures 1 to 4 As shown, two permeable walls 1 are arranged at the breach.
[0068] This arrangement encloses a space at the breach through two permeable walls 1. Regardless of whether the breach is at a flat water level or has a water level difference, materials placed in this space will not be lost. It has a good blocking effect on materials and is suitable for various breach environments.
[0069] In other embodiments, the number of permeable walls 1 can be specifically selected according to the breach size and hydraulic conditions.
[0070] In some embodiments, Figure 5 As shown, the flexible water-permeable member 11 comprises a mesh body 113, wherein the mesh body 113 comprises a plurality of connecting ropes 1131 spaced apart along the length direction and the height direction thereof.
[0071] Specifically, the connecting ropes 1131 can be divided into vertical connecting ropes 1131 arranged at intervals along the length direction of the net body 113, and transverse connecting ropes 1131 arranged at intervals along the height direction of the net body 113, and the mesh is formed by these vertical connecting ropes 1131 and transverse connecting ropes 1131. In addition, the vertical connecting ropes 1131 and the transverse connecting ropes 1131 are also divided into main ropes and secondary ropes, the main ropes are relatively thick, and the secondary ropes are relatively thin. The main ropes in the vertical connecting ropes 1131 are arranged at intervals, and multiple secondary ropes are arranged between two adjacent main ropes. The upper edge, middle position and lower edge of the net body 113 in the transverse connecting ropes 1131 are main ropes, and the rest are secondary ropes.
[0072] In this embodiment, the mesh of the net body 113 is woven in a square shape using nylon rope, and the nylon rope is also the connecting rope 1131. The shape of the mesh is square, and the size of the mesh can be determined according to needs. In this embodiment, the mesh is selected as a square mesh of 300×300 mm. The size of the mesh should be determined according to the material and the requirements for reducing the flow rate. The smaller the mesh, the better the effect of blocking the water flow, that is, the stronger the effect of slowing down the water flow. Moreover, when the width of the embankment breach is large and the strength of the single-layer net body 113 cannot meet the use requirements, a double-layer net can be formed by superposition method to increase the strength of the net body 113, and the tying points are determined at equal intervals between the two pieces of the net body 113 for tying.
[0073] According to conventional use requirements, the net body 113 can be made into two height specifications of 3.0m and 5.0m, and the length of the net body 113 is not limited, and can be cut on site according to the required width of the breach. If the length of the net body 113 is not enough during use, two net bodies 113 can be tied together to make up the total length.
[0074] In actual use, the height of the net 113 does not need to be equal to the water depth at the breach, and the net 113 can be used when the height is greater than or less than the water depth, and can have a blocking effect. For example, a net 113 with a height of 3m can be used in a water depth of 2m or 4m, and the net 113 has a wide range of applications.
[0075] In other embodiments, the mesh 113 may be formed by weaving nylon ropes in a hexagonal shape, and the mesh may also be in a honeycomb shape.
[0076] In some embodiments, the flexible water-permeable member 11 further includes a rolling mechanism 114, and the rolling mechanism 114 is used to roll up the net body 113 so that the net body 113 can be rolled up when not in use for easy storage.
[0077] In this embodiment, Figures 6 to 8As shown, the winding mechanism 114 includes: a base 1141, a column 1142 and a reel 1143, the column 1142 is arranged on the base 1141, the reel 1143 is sleeved on the column 1142 and can rotate around the axial direction of the column 1142, and one end of the net body 113 is connected to the reel 1143.
[0078] Specifically, the base 1141 is disc-shaped, the column 1142 is cylindrical, the column 1142 and the base 1141 are coaxially arranged, and the diameter of the base 1141 is larger than the diameter of the column 1142 to maintain the stability of the winding mechanism 114. One end of the net body 113 is connected to the reel 1143, and when the reel 1143 rotates, the net body 113 can be rolled up, and the rolled up net body 113 can be opened by pulling from the other end of the net body 113. To facilitate the rotation of the reel 1143, a circle of steel balls 1144 are respectively arranged at the top and bottom of the column 1142 to reduce the friction force when the reel 1143 rotates.
[0079] After the reeling mechanism 114 is arranged, the net body 113 is better stored, and the reeled net body 113 occupies less space in the warehouse. When in use, the net body 113 can be quickly opened to meet the demand for rapid response to flood conditions, and the net bodies 113 will not be entangled with each other.
[0080] In other embodiments, a motor may be provided on the base 1141 to drive the reel 1143 to rotate, thereby eliminating the need for manual operation to reel in or unfold the net 113 .
[0081] In some embodiments, the length of the permeable section 111 is greater than the width of the breach. In this way, the permeable section 111 is arranged at the breach to form a net bag shape, which is basically consistent with the original embankment width to meet the breach sealing requirements.
[0082] Specifically, in this embodiment, the length of the permeable section 111 is equal to the breach width plus twice the levee width. In this way, the permeable section 111 is biased downstream under the action of water flow to form a concave net bag to provide space for earth and stone materials to block.
[0083] In an optional embodiment, the flexible blocking member 12 includes a plurality of binding members 121. The plurality of binding members 121 are arranged along the width direction of the breach, and the binding members 121 are small in size and easy to arrange, and finally form a flexible blocking member 12 with a width equivalent to the breach.
[0084] Specifically, in this embodiment, Fig. 9As shown, the binding member 121 includes: a plurality of branches 1211 and a binding member 1212 for binding the branches 1211. The length of the branches 1211 should be matched with the height of the net, and can be slightly smaller than the height of the net body 113. The binding member 1212 can be made of nylon rope, and the plurality of branches 1211 in each group of binding members 121 are tied tightly by no less than two nylon ropes. The bundled branches 1211 are thrown from the breach and then blocked by the flexible water-permeable member 11. Finally, the plurality of binding members 121 form a flexible blocking member 12 in front of the flexible water-permeable member 11, and the flexible blocking member 12 and the flexible water-permeable member 11 form a permeable wall 1. When the soil and stone materials are thrown, the materials can be blocked by the permeable wall 1 to prevent the soil and stone materials from being washed away by water.
[0085] In other embodiments, the binding member 121 may also be formed by binding a plurality of corn stalks, wheat stalks, etc. It can also block soil and stone materials and has water permeability.
[0086] In another optional embodiment, the flexible barrier 12 may also be an integral part, that is, a plurality of branches 1211 are bundled into a row in advance and dropped into the breach together.
[0087] In an optional embodiment, the flexible blocking facility further includes a posture adjustment component, such as Fig.10 , Fig.11 As shown, the posture adjustment component includes: a buoyancy block 31 and a gravity block 32. A plurality of buoyancy blocks 31 are arranged at intervals on the top of the water-permeable section 111, a plurality of gravity blocks 32 are arranged at intervals on the bottom of the water-permeable section 111, and a plurality of gravity blocks 32 are arranged at the bottom of the flexible blocking member 12.
[0088] Specifically, the buoyancy block 31 is a foam board, and is connected to the flexible water-permeable member 11 through a connector. The connector can be a nylon rope, which is passed through the center of the foam board and connected to the connecting rope 1131 at the top of the mesh 113 of the water-permeable section 111 through the nylon rope.
[0089] The gravity block 32 is a prism-shaped column, with a size of small at the top and large at the bottom, and a weight of light at the top and heavy at the bottom, so that the gravity block 32 will not roll under the water flow. The gravity block 32 is prefabricated with concrete, and a lifting ring is embedded when the gravity block 32 is prefabricated, so as to connect the gravity block 32 and the flexible water-permeable member 11 through a connecting member. The connecting member can be a nylon rope, and the length of the nylon rope is not less than 300mm. One end of the nylon rope is connected to the lifting ring, and the other end is connected to the connecting rope 1131 at the bottom of the net body 113. In addition to arranging the gravity block 32 in the water-permeable section 111, the flexible water-permeable member 11 also arranges the gravity block 32 at the bottom of the two installation sections 112.
[0090] When the water depth is greater than the height of the net 113, the length of the buoyancy block 31 can be lengthened. Although the net 113 is completely submerged in the water, the top of the net 113 is still pulled upward by the buoyancy block 31, and the bottom is also pulled downward by the gravity block 32, so the net 113 can still stand vertically in the water. When the net height is greater than the water depth, it does not affect the interception, but the size of the net bag is different, which does not affect the interception effect. Therefore, the net 113 has a wider range of applications.
[0091] By setting the buoyancy block 31 and the gravity block 32 in the water-permeable section 111, the bottom of the water-permeable section 111 is pulled down by the gravity block 32, and the top is pulled up by the buoyancy block 31. The water-permeable section 111 will stand upright in the water. Compared with a single net body 113 set in the water, it has stronger impact resistance. The net body 113 can meet various deformations and has a better blocking effect.
[0092] Based on the same principle, a gravity block 32 is also provided at the bottom of the flexible blocking member 12, that is, at the bottom of each binding member 121, so as to make the binding member 121 vertical in the water instead of floating on the water surface, so that the binding member 121 can better play the role of blocking materials.
[0093] According to an embodiment of the present invention, on the other hand, a dike breach plugging method is also provided, which can be applied to the dike breach flexible plugging facility in the above embodiment.
[0094] The dike breach sealing method includes the following steps:
[0095] Step 1: Arrange a permeable wall 1 at the breach;
[0096] The number of permeable walls 1 arranged at the breach can be one or more, and the number of permeable walls 1 required to be arranged is determined according to the breach width and water flow conditions, and generally two permeable walls 1 are suitable. In this embodiment, two permeable walls 1 are arranged, and after the two permeable walls 1 are arranged, soil and stone materials are placed between the two permeable walls 1 to better block the soil and stone materials.
[0097] Specifically, arranging the permeable wall 1 at the breach includes the following steps:
[0098] (1) The two installation sections 112 of the flexible water-permeable member 11 are arranged on the embankment top and the slope surface 2 at both ends of the breach, the water-permeable section 111 is arranged at the breach, and a buoyancy block 31 is installed on the top of the water-permeable section 111, and a gravity block 32 is arranged at the bottom thereof;
[0099] The flexible water-permeable member 11 and the flexible blocking member 12 are prepared flood prevention materials, which are usually stored in a warehouse and can be transported to the breach of the dike when a flood occurs. In addition, the buoyancy block 31 and the gravity block 32 are not installed on the flexible water-permeable member 11 stored in the warehouse, and the gravity block 32 is not installed on each binding member 121 in the flexible blocking member 12. Instead, the corresponding buoyancy block 31 and the gravity block 32 are installed before the flexible water-permeable member 11 and the flexible blocking member 12 are launched into the water.
[0100] Furthermore, the flexible water-permeable member 11 in the first permeable wall 1, i.e., the flexible water-permeable member 11 in the outermost permeable wall 1, is first arranged. The winding mechanism 14 is placed upright on the top of the embankment on one side of the breach, i.e., the base 1141 of the winding mechanism 114 is placed on the top of the embankment, and then the net body 113 is pulled to the other side of the breach by the boat. Piles are driven on the top of the embankment and the slope 2 on the other side of the breach, and the flexible water-permeable member 11 is laid on a section located on the top of the embankment and the slope 2 on this side, i.e., the installation section 112 and connected with the short piles, and then the gravity block 32 is connected at the bottom. Then, buoyancy blocks 31 are installed at intervals on the top of the permeable section 111 at the breach, and gravity blocks 32 are installed at intervals on the bottom. Then, the permeable section 111 is placed in the water, and finally, the reeling mechanism 114 is returned to the top of the dike on the side where the reeling mechanism 114 is set, and the net body 113 of appropriate length is cut as needed. Pile is also driven on the top of the dike on this side, and then the installation section 112 of the flexible permeable member 11 is laid on the top of the dike and the slope 2 and connected with the short pile. Then, the gravity block 32 is connected at the bottom of the installation section 112. In this way, both installation sections 112 are fixed, and the permeable section 111 forms a net bag at the breach. In this way, the installation of the flexible permeable member 11 in the first permeable wall 1 is completed.
[0101] (2) A gravity block 32 is arranged at the bottom of the flexible blocking member 12 , and the flexible blocking member 12 is arranged on the inner side of the flexible water-permeable member 11 , and the two together form a water-permeable wall 1 .
[0102] Then, the binding member 121 is deployed at the breach by boat, and the gravity block 32 is connected to the bottom of the binding member 121 before the binding member 121 is deployed, so that the binding member 121 is placed in the water in a vertical posture, and finally a flexible barrier is formed on the inner side of the permeable section 111 of the flexible permeable member 11 facing the water flow to suppress the water flow. In this way, the setting of the first permeable wall 1 is completed.
[0103] When it is impossible to call for a ship at the breach, one or more drones may be used to complete the arrangement of the flexible water-permeable member 11 and the placement of the binding member 121.
[0104] The steps for setting the second permeable wall 1 are the same as those for setting the first permeable wall 1 , so they will not be described in detail.
[0105] Step 2: Place soil and stone materials inside the permeable wall 1 until the breach is sealed.
[0106] The earth and stone materials for blocking the breach are transported to the top of the embankment on both sides of the breach, and then the earth and stone materials are placed in the water between the two permeable walls 1. The two permeable walls 1 can block the earth and stone materials. As the earth and stone materials gradually accumulate at the breach, the stagnant flow effect can be achieved quickly to block the breach.
[0107] After the plugging work is completed and the flood situation subsides, the short piles, the bundle of branches 1211, the buoyancy blocks 31, the gravity blocks 32, etc. can be recycled, and the net body 113 can be rewound on the reel 1143, and finally these materials are placed in a warehouse for storage. It can be seen that the recycling rate of the flexible plugging facilities for dike breaches is also relatively high and can be reused.
[0108] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A flexible plugging facility for dike breach, characterized in that: The invention comprises a water-permeable wall (1) arranged at a breach, wherein the water-permeable wall (1) comprises: a flexible water-permeable member (11) and a flexible blocking member (12); The flexible water-permeable member (11) comprises: a water-permeable section (111) and two installation sections (112), the two installation sections (112) being located at two ends of the water-permeable section (111), respectively, and the two installation sections (112) being arranged at the top of the embankment and the slope surface (2) at two ends of the breach, respectively, the water-permeable section (111) being arranged at the breach, and when a plurality of the water-permeable walls (1) are arranged, the corresponding plurality of water-permeable sections (111) are arranged at intervals along the water flow direction; The flexible blocking member (12) is arranged on the inner side of the water permeable section (111) of the flexible water permeable member (11) facing the water flow.
2. The flexible plugging facility for dike breach according to claim 1 is characterized in that: Two permeable walls (1) are arranged at the breach.
3. The flexible plugging facility for dike breach according to claim 2 is characterized in that: The flexible water-permeable member (11) comprises a mesh body (113), wherein the mesh body (113) comprises a plurality of connection ropes (1131) arranged at intervals along its length direction and height direction.
4. The flexible plugging facility for dike breach according to claim 3 is characterized in that: The flexible water-permeable member (11) further comprises a reeling mechanism (114), the reeling mechanism (114) comprising: a base (1141), a column (1142) and a reel (1143), the column (1142) being arranged on the base (1141), the reel (1143) being sleeved on the column (1142) and being rotatable around the axial direction of the column (1142), and one end of the net body (113) being connected to the reel (1143).
5. The flexible plugging facility for dike breach according to claim 1 is characterized in that: The length of the water-permeable section (111) is greater than the width of the breach.
6. The flexible plugging facility for dike breach according to claim 2 is characterized in that: The flexible blocking member (12) comprises a plurality of binding members (121).
7. The flexible plugging device for dike breach according to claim 6 is characterized in that: The binding member (121) comprises: a plurality of branches (1211) and a binding member (1212) for binding the branches (1211).
8. The flexible plugging facility for dike breach according to any one of claims 1 to 7, characterized in that: It also includes a posture adjustment component, which includes: a buoyancy block (31) and a gravity block (32), a plurality of the buoyancy blocks (31) are arranged at intervals on the top of the water-permeable section (111), a plurality of the gravity blocks (32) are arranged at intervals on the bottom of the water-permeable section (111), and a plurality of the gravity blocks (32) are arranged at the bottom of the flexible blocking member (12).
9. A dike breach sealing method, characterized in that: The following steps are involved: Arrange a permeable wall (1) at the breach; Earth and stone materials are placed inside the permeable wall (1) until the breach is sealed.
10. The dike breach sealing method according to claim 9, characterized in that: The step of arranging a permeable wall (1) at the breach comprises: The two installation sections (112) of the flexible water-permeable member (11) are arranged on the embankment top and the slope surface (2) at both ends of the breach, the water-permeable section (111) is arranged at the breach, and a buoyancy block (31) is installed on the top of the water-permeable section (111), and a gravity block (32) is arranged at the bottom thereof; The gravity block (32) is arranged at the bottom of the flexible blocking member (12), and the flexible blocking member (12) is arranged on the inner side of the flexible water-permeable member (11), and the two together form a water-permeable wall (1).
