Compensation balance device for eccentric working condition of overwater precast pile cap and construction method
By using prefabricated pile cap eccentric condition compensation balance device in high pile dock construction, the pile cap center of gravity is adjusted using brackets and counterweight blocks, the problem of pile cap installation eccentricity is solved, construction efficiency and safety are improved, and piles are ensured Stable connection between the cap and pile foundation.
Patent Information
- Application Number
- CN202411369133.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-12-06
AI Technical Summary
In the construction of high pile wharf, there is a deviation from the center of gravity of the prefabricated pile caps from the center of the pile foundation, resulting in installation difficulties and instability, affecting construction efficiency and safety.
The eccentric condition compensation balance device of prefabricated pile caps is used to calculate and install appropriate counterweights through the embedded brackets and counterweight blocks, and install them using lifting equipment. The counterweight blocks are removed after the concrete reaches the design strength. and tooling, repair.
It effectively solves the eccentricity problem of pile cap installation, improves installation efficiency and quality, ensures construction safety, and realizes a stable connection between pile cap and pile foundation.
Smart Images

Figure CN119083435A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high-pile wharf construction, and in particular to a compensating balancing device for an eccentric working condition of a prefabricated pile cap on water and a construction method. Background Art
[0002] High-pile docks are an important structural type in the field of water transport engineering. They are suitable for soft soil foundations in coastal areas, and can also be used for various geological conditions such as hard clay, silt, and sand. Pile foundation structure has become one of the best forms of dock structure. As an important process of high-pile docks, pile caps play a role in connecting pile foundations and superstructures, and are very important for the overall stability of docks. As the country has vigorously promoted green construction in recent years, pile caps have been changed from traditional cast-in-place concrete methods to prefabricated installation methods, which not only improves the quality of concrete, but also speeds up the construction progress. At the same time, they are particularly suitable for projects with low pile cap bottom elevations and high construction water levels. In recent years, they have been widely used in high-pile dock construction. However, in actual construction, due to the deviation between the center of gravity of pile caps of different sizes and the center position of the pile foundation, the pile caps cannot be installed or are unstable after installation, resulting in reduced efficiency of component installation, and there are great risks in the construction quality and construction safety of the components. Summary of the invention
[0003] The present invention solves the eccentricity problem of prefabricated pile caps during installation and provides a compensating balancing device and construction method for eccentric working conditions of prefabricated pile caps on water. The present invention can effectively, quickly and accurately complete the installation of eccentric pile caps, avoiding the inability to install pile caps or instability after installation due to the deviation between the center of gravity of pile caps of different sizes and the center of the pile foundation, thus affecting the quality and safety of component installation.
[0004] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a compensating balancing device and construction method for the eccentric working condition of a prefabricated pile cap on water, which is characterized in that tooling is embedded in the process of prefabricating the pile cap, the bracket is installed after the prefabrication is completed, and the appropriate counterweight block is installed in advance according to the eccentricity calculation result, and the concrete pile cap is directly installed by using lifting equipment. After the installation is completed, the concrete at the junction of the prefabricated pile cap and the pile foundation is poured by suspending the bottom mold. After the concrete strength reaches the design requirement, the counterweight block is removed by using lifting equipment, and the tooling embedded in the pile cap is dismantled, and finally the concrete is repaired.
[0005] The specific steps include: Step 1: Determine the weight of the counterweight according to the specific size of the prefabricated pile cap and the position of the pile foundation; According to the different sizes of prefabricated pile caps and the location of the pile caps in the pile foundation, the weight of the counterweight is calculated; Step 2: Design the embedded tooling structure according to the weight of the counterweight block; The bracket is subject to the gravity of the counterweight block above and is fixed to the prefabricated pile cap by bolts. The force of the bracket is calculated as follows: 0.5×γ×l 2 ×b=F x ×c Where: γ—weight of the counterweight, unit: KN / m 3 ; l—the length of the bracket or counterweight, unit: m; b—the spacing of the lower diagonal bars of the bracket, unit: m; F x —Horizontal force on the bracket, unit: KN; c—the distance between two rows of bolts, unit: m; According to the weight of the configured weight block and the size of the pile cap, the stress state of the bracket is calculated, and the tooling and bracket are designed according to the stress principle of structural mechanics; the bracket is connected by bolts by embedding large head nuts in the prefabricated pile cap; Step 3: Pre-embed tooling and pour concrete during the prefabrication of the pile cap; In the process of prefabricating the pile cap, the big head nut is prefabricated on the other side of the pile cap eccentricity. The height and position of the big head nut meet the design requirements of the tooling in the second step. The component form of the bracket, bolt spacing, number of rows of brackets, etc. are determined. After the embedded parts are firmly fixed, the pile cap concrete is poured; Step 4: Install the bracket and counterweight on the pile cap; After the prefabricated pile cap is demoulded, cured and reaches the designed strength, the prepared bracket is connected to the pile cap through the embedded big head nut, and the counterweight is placed in the bracket; Step 5: Install the pile cap to the top of the pile foundation; Use lifting equipment to slowly install the prefabricated pile cap and counterweight on the pile foundation, make fine adjustments to the pile cap position to ensure the pile cap is balanced, weld the extended steel bars of the pile foundation to the steel bars of the pile cap to improve the stability of the pile cap; Step 6: pour wet joints; After the pile cap is installed and stabilized, the concrete pouring construction of the wet joint shall be carried out immediately; Step 7: Remove the counterweight and dismantle the tooling; After the wet joint reaches the designed strength, the counterweight is lifted by lifting equipment and transported to the prefabrication site for reuse; at the same time, the bracket and embedded big-head nuts are removed for recycling; finally, the big-head nut position of the pile cap is repaired to ensure the quality of the concrete.
[0006] In the first step, the counterweight block is a prefabricated concrete block or a water bag, and the weight and size of the counterweight block are calculated by the following moment balance formula: F 1 ×L 1 =F2 ×L 2 Where: F 1 —gravity of the pile cap; L 1 —The horizontal distance between the center of gravity of the pile cap and the center of gravity of the foundation pile; F 2 - The weight of the counterweight and bracket; L 2 —The horizontal distance between the center of gravity of the counterweight block and bracket and the center of gravity of the foundation pile.
[0007] In the second step, the bracket is a triangular bracket made of 16-type I-beam. In addition to the reserved big-head nuts, fixed limit devices are set in the other three directions of the bracket to ensure that the counterweight block is stable on the bracket; the big-head nuts are arranged in two rows, three in each, on the other side of the eccentric pile cap.
[0008] In the fifth step, after the counterweight is installed on the prefabricated pile cap, the lifting equipment needs to be slowly aligned with the center of the pile foundation during the installation process, and the prefabricated pile cap is fine-tuned after falling to a certain height to ensure that the pile cap is balanced after installation, and the pile cap steel bars are immediately welded to the pile foundation steel bars to enhance the temporary reinforcement effect.
[0009] In the seventh step, after the design strength of the wet joint reaches 100%, the counterweight block and the bracket are removed, and a test block with the same curing conditions is reserved on site to determine the removal time of the counterweight block.
[0010] The present invention can adjust the center of gravity of the prefabricated pile cap by a compensating balance method during the installation of the prefabricated pile cap under eccentric working conditions, reduce the deviation from the center position of the pile foundation, thereby achieving a balanced component installation, ensuring construction safety, and improving the quality of the pile cap installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 This is a schematic diagram of a large head nut embedded in a prefabricated pile cap of the present invention; Figure 2 This is a schematic diagram of the application of the prefabricated pile cap of the present invention after being connected with a counterweight block; Figure 3 for Figure 2 Right view; In the figure: prefabricated pile cap 1, pile foundation 2, counterweight block 3, bracket 4, big head nut 5, limit device 6, steel plate 7. DETAILED DESCRIPTION
[0012] The present invention is further described below in conjunction with the accompanying drawings, but the present invention is not limited to the specific embodiments. Example
[0013] A compensating balancing device and construction method for the eccentric working condition of an above-water prefabricated pile cap, wherein tooling is embedded in the process of prefabricating the pile cap, a bracket is installed after prefabrication, and a suitable counterweight is installed in advance according to the eccentricity calculation result, and a lifting device is used to directly install the concrete pile cap. After the installation is completed, concrete is poured at the junction of the prefabricated pile cap and the pile foundation by suspending the bottom mold. After the concrete strength reaches the design requirement, the counterweight is removed by lifting equipment, and the tooling embedded in the pile cap is dismantled, and finally the concrete is repaired.
[0014] The specific steps include: Step 1: Calculate the weight of the counterweight 3 according to the prefabricated pile caps 1 of different sizes and the position of the pile caps of the pile foundation 2; Step 2: Design the embedded tooling structure through the weight of the counterweight block 3; The bracket is subject to the gravity of the counterweight block above and is fixed to the prefabricated pile cap by bolts. The force of the bracket is calculated as follows: 0.5×γ×l 2 ×b=F x ×c Where: γ—weight of counterweight (KN / m 3 ); l—length of bracket (counterweight) (m); b—the spacing of the lower diagonal bars of the bracket (m); F x —Horizontal force on the bracket (KN); c—The distance between two rows of bolts (m).
[0015] According to the weight of the counterweight block 3 and the size of the pile cap, the stress state of the bracket 4 is calculated, and the tooling and the bracket 4 are designed according to the stress principle of structural mechanics; the bracket 4 is connected by bolts by pre-embedding the big head nut 5 in the prefabricated pile cap 1; Step 3: Pre-embed tooling and pour concrete during the prefabrication of the pile cap; In the process of prefabricating the pile cap, the big head nut 5 is prefabricated on the other side of the pile cap eccentricity. The height and position of the big head nut 5 meet the design requirements of the tooling in the second step. The component form of the bracket, the bolt spacing, the number of rows of the bracket, etc. are determined. After the embedded parts are firmly fixed, the pile cap concrete is poured; Step 4: Install the bracket and counterweight on the pile cap; After the prefabricated pile cap 1 is demoulded, cured and reaches the designed strength, the manufactured bracket 4 is connected to the pile cap through the embedded big head nut 5, and the counterweight 3 is placed in the bracket 4; Step 5: Install the pile cap to the upper part of the pile foundation 2; The prefabricated pile cap 1 and the counterweight block 3 are slowly installed on the pile foundation 2 by using lifting equipment. The pile cap is balanced by slightly adjusting its position. The extended steel bars of the pile foundation 2 are welded to the steel bars of the pile cap to improve the stability of the pile cap. Step 6: pour wet joints; After the pile cap is installed and stabilized, the concrete pouring construction of the wet joint shall be carried out immediately; Step 7: Remove the counterweight and dismantle the tooling; After the wet joint reaches the designed strength, the counterweight 3 is lifted by lifting equipment and transported to the prefabrication site for reuse; at the same time, the bracket 4 and the embedded big head nut 5 are removed for recycling; finally, the big head nut 5 position of the pile cap is repaired to ensure the quality of the concrete.
[0016] In the first step, the counterweight block is a prefabricated concrete block or a water bag, and the weight and size of the counterweight block are calculated by the following moment balance formula: F 1 ×L 1 =F 2 ×L 2 Where:
[0017] F 1 —gravity of the pile cap; L 1 —The horizontal distance between the center of gravity of the pile cap and the center of gravity of the foundation pile; F 2 - The weight of the counterweight and bracket; L 2 —The horizontal distance between the center of gravity of the counterweight and bracket and the center of gravity of the foundation pile. In the second step, the bracket 4 is a triangular bracket made of 16-type I-beam. In addition to the reserved big head nut 5, the bracket 4 is provided with fixed limit devices 6 in the other three directions to ensure that the counterweight 3 is stable on the bracket 4; the big head nut 5 is divided into two rows on the other side of the eccentricity of the pile cap, with a spacing of 0.4m, and connected to the pile cap through a 0.25m wide steel plate 7 and a gasket, with 3 arranged in each row, the bottom edge of the lowest row of steel plates 7 is 0.15m away from the bottom edge of the pile cap, and the distance between the adjacent edges of the two rows of steel plates 7 is 0.17m.
[0018] In the fifth step, after the prefabricated pile cap 1 is installed with the counterweight 3, the lifting equipment needs to be slowly aligned with the center of the pile foundation 2 during the installation process, and the prefabricated pile cap 1 is fine-tuned after falling to a certain height to ensure that the pile cap is balanced after installation, and the pile cap steel bars are immediately welded to the pile foundation steel bars to enhance the temporary reinforcement effect.
[0019] In the seventh step, after the design strength of the wet joint reaches 100%, the counterweight block 3 and the bracket 4 are removed, and a test block with the same curing conditions is reserved on site to determine the removal time of the counterweight block. Example
[0020] A compensating balancing device for the eccentric working condition of a prefabricated pile cap on water adopted in the construction method in Example 1 comprises a prefabricated pile cap 1, a counterweight 3, and a bracket 4. The counterweight 3 is connected to the prefabricated pile cap 1 through the bracket 4. A tooling for connecting the bracket 4 is pre-embedded on the prefabricated pile cap 1. The tooling is connected to the other side of the eccentricity of the prefabricated pile cap 1. The bracket 4 comprises a triangular bracket and a limiting device connected to the top of the triangular bracket. The triangular bracket is connected to the prefabricated pile cap 1 through the tooling, and the limiting device is used to place the counterweight 3.
[0021] The tooling is a big-head nut 5, which is divided into two rows on the other side of the eccentric pile cap, with a spacing of 0.4m, and connected to the pile cap through a 0.25m wide steel plate 7 and a gasket, with 3 nuts arranged in each row. The bottom edge of the lowest row of steel plates 7 is 0.15m away from the bottom edge of the pile cap, and the distance between adjacent edges of the two rows of steel plates 7 is 0.17m.
[0022] The limiting device 6 is a guardrail structure, and the triangular bracket is made of 16-type I-beam.
Claims
1. A compensating balance device and construction method for eccentric working conditions of prefabricated pile caps on water, characterized in that: During the prefabrication of the pile cap, tooling is embedded. After prefabrication is completed, the bracket is installed, and the appropriate counterweight is installed in advance according to the eccentricity calculation results. The concrete pile cap is installed directly using lifting equipment. After the installation is completed, the concrete at the junction of the prefabricated pile cap and the pile foundation is poured by suspending the bottom formwork. When the concrete strength reaches the design requirements, the counterweight is removed by lifting equipment, and the tooling embedded in the pile cap is dismantled, and finally the concrete is repaired.
2. The compensating balancing device and construction method for the eccentric working condition of the prefabricated pile cap on water according to claim 1 is characterized in that: The specific steps include: Step 1: Determine the weight of the counterweight according to the specific size of the prefabricated pile cap and the position of the pile foundation; According to the different sizes of prefabricated pile caps and the location of the pile caps in the pile foundation, the weight of the counterweight is calculated; Step 2: Design the embedded tooling structure according to the weight of the counterweight block; The bracket is subject to the gravity of the counterweight block above and is fixed to the prefabricated pile cap by bolts. The force of the bracket is calculated as follows: 0.5×γ×l 2 ×b=F x ×c Where: γ—weight of the counterweight, unit: KN / m 3 ; l—the length of the bracket or counterweight, unit: m; b—the spacing of the lower diagonal bars of the bracket, unit: m; F x —Horizontal force on the bracket, unit: KN; c—the distance between two rows of bolts, unit: m; According to the weight of the configured weight block and the size of the pile cap, the stress state of the bracket is calculated, and the tooling and bracket are designed according to the stress principle of structural mechanics; the bracket is connected by bolts by embedding large head nuts in the prefabricated pile cap; Step 3: Pre-embed tooling and pour concrete during the prefabrication of the pile cap; During the prefabrication of the pile cap, the big head nut is prefabricated on the other side of the pile cap eccentricity. The height and position of the big head nut meet the design requirements of the tooling in the second step. The component form of the bracket, the bolt spacing, and the number of rows of the bracket are determined. After the embedded parts are firmly fixed, the pile cap concrete is poured; Step 4: Install the bracket and counterweight on the pile cap; After the prefabricated pile cap is demoulded, cured and reaches the designed strength, the prepared bracket is connected to the pile cap through the embedded big head nut, and the counterweight is placed in the bracket; Step 5: Install the pile cap to the top of the pile foundation; Use lifting equipment to slowly install the prefabricated pile cap and counterweight on the pile foundation, make fine adjustments to the pile cap position to ensure the pile cap is balanced, weld the extended steel bars of the pile foundation to the steel bars of the pile cap to improve the stability of the pile cap; Step 6: pour wet joints; After the pile cap is installed and stabilized, the concrete pouring construction of the wet joint shall be carried out immediately; Step 7: Remove the counterweight and dismantle the tooling; After the wet joint reaches the designed strength, the counterweight is lifted by lifting equipment and transported to the prefabrication site for reuse; at the same time, the bracket and embedded big-head nuts are removed for recycling; finally, the big-head nut position of the pile cap is repaired to ensure the quality of the concrete.
3. The compensating balancing device and construction method for eccentric working condition of prefabricated pile cap on water according to claim 1, characterized in that: In the first step, the counterweight block is a prefabricated concrete block or a water bag, and the weight and size of the counterweight block are calculated by the following moment balance formula: F1×L1=F2×L2 Where: F1—gravity of pile cap; L1—Horizontal distance between the center of gravity of the pile cap and the center of gravity of the foundation pile; F2—the weight of the counterweight and bracket; L2—The horizontal distance between the center of gravity of the counterweight block and bracket and the center of gravity of the foundation pile.
4. The compensating balancing device and construction method for eccentric working condition of prefabricated pile cap on water according to claim 1 is characterized in that: In the second step, the bracket is a triangular bracket made of 16-type I-beam. In addition to the reserved big-head nuts, fixed limit devices are set in the other three directions of the bracket to ensure that the counterweight block is stable on the bracket; the big-head nuts are arranged in two rows, three in each, on the other side of the eccentric pile cap.
5. The compensating balancing device and construction method for eccentric working condition of prefabricated pile cap on water according to claim 1 is characterized in that: In the fifth step, after the counterweight is installed on the prefabricated pile cap, the lifting equipment needs to be slowly aligned with the center of the pile foundation during the installation process, and the prefabricated pile cap is fine-tuned after falling to a certain height to ensure that the pile cap is balanced after installation, and the pile cap steel bars are immediately welded to the pile foundation steel bars to enhance the temporary reinforcement effect.
6. The compensating balancing device and construction method for eccentric working condition of prefabricated pile cap on water according to claim 1 is characterized in that: In the seventh step, after the design strength of the wet joint reaches 100%, the counterweight block and the bracket are removed, and a test block with the same curing conditions is reserved on site to determine the removal time of the counterweight block.