Subway station pile wall laminated structure waterproof performance test device

By designing the waterproof performance test device for the stacked structure of subway station pile walls, the problem of research on the waterproof performance of subway station pile walls is solved, and efficient waterproof performance test is realized, satisfying the simulation of soil and water pressure under actual working conditions and multiple sets Observation of anti-seepage performance, the test site occupies a small area and is low in cost, accurately simulates the difference between prefabricated and cast-in-place components.

CN119083505APending Publication Date: 2024-12-06CHINA STATE CONSTRUCTION ACADEMY CORPERATION LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411086507.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The overlapping structure of subway station walls lacks effective technical standards and research in waterproof performance, which leads to the unclear waterproof mechanism and time-consuming and labor-consuming tests in actual applications, which limits its industrial promotion and application.

Method used

A waterproof performance test device for the stacked structure of subway station pile walls was designed, including square pile models, exterior wall models and transparent top covers. By simulating the soil and water pressure under actual working conditions, an efficient waterproof performance test can be achieved, and multiple observations can be observed at the same time. The permeability of the pile wall overlap structure.

Benefits of technology

This device can simply and efficiently complete the waterproof performance test of the stacked structure of subway station pile walls, simulate the resistance mode of pile walls to water and soil pressure in actual conditions. The test site occupies a small area and is low in cost, and the square piles and exterior walls are poured in batches in batches. The model more accurately simulates the differences between prefabricated and cast-in-place components, ensuring sealing and pressurizing effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083505A_ABST
    Figure CN119083505A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of pile wall laminated structures, and discloses a subway station pile wall laminated structure waterproof performance test device, which comprises a square pile model, an outer wall model and a top cover, the square pile model comprises a rectangular base and square piles erected on the base, N square piles are arranged on each of one group of opposite sides of the base, M square piles are arranged on each of the other group of opposite sides of the base, and the outer wall model is arranged on the top cover. N and M are positive integers, at least one of N and M is larger than 1, the square piles arranged along the four sides of the base form a square pile combination, the square piles do not make contact with one another, and liquid channels are formed by intervals of the square piles; when N and M are both greater than 2, the hollow part of the square pile combination is a rectangular groove communicated with the channel; the inner periphery of the outer wall model and the outer periphery of the square pile combination are fixedly connected together to form a superposed structure; the top cover is packaged at the top end of the overlapping structure and forms a closed space with the overlapping structure and the base; and the top cover is provided with a through hole for filling liquid and pressurizing. According to the invention, the waterproof performance test of the pile wall laminated structure of the subway station can be simply and efficiently completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pile-wall composite structures, and in particular relates to a waterproof performance test device for a pile-wall composite structure of a subway station. Background Art

[0002] The pile-wall prefabricated composite structure can give full play to the dual advantages of factory automated production of prefabricated components and good integrity of on-site casting of cast-in-place structures. The prefabricated parts not only bear the load but also serve as formwork, eliminating the need for external formwork installation, saving building materials and costs. At the same time, because the system contains a continuous cast-in-place concrete body, for example, its joints and the middle part are all made of cast-in-place concrete, it has good self-waterproofing properties.

[0003] However, prefabricated composite structures have many types of interfaces such as composite surfaces, assembly surfaces, transition surfaces, and embedded parts. Their penetration and waterproofing mechanisms are not very clear, which limits their industrial promotion and application in subway station construction. The biggest feature of the pile-wall composite structure used in subway station construction is that it is continuously affected by groundwater and soil pressure, but there is currently a lack of technical standards and research literature corresponding to its waterproof performance. It is very necessary to conduct in-depth research on the waterproof performance of the pile-wall composite structure of subway stations. The non-scaled test of the pile-wall composite structure occupies a large space, especially the anti-seepage test of multiple groups of pile-wall composite structures is time-consuming and labor-intensive. The present invention is aimed at the waterproofing technology of prefabricated composite structures and the characteristics of the pile-wall composite structure of subway stations, and proposes a test device that helps to evaluate the waterproof performance of the prefabricated assembled composite structure of subway stations. Summary of the invention

[0004] In view of this, the present invention provides a subway station pile-wall composite structure waterproof performance test device, which can simply and efficiently complete the subway station pile-wall composite structure waterproof performance test.

[0005] The present invention is achieved through the following technical solutions:

[0006] A subway station pile-wall composite structure waterproof performance test device comprises a square pile model, an outer wall model and a top cover; the square pile model comprises a rectangular base and square piles erected on the base, one group of opposite sides of the base are arranged with N square piles, another group of opposite sides of the base are arranged with M square piles, the square piles located at the four corners of the base are shared on both sides, wherein N and M are both positive integers and at least one of them is greater than 1, the square piles arranged along the four sides of the base constitute a square pile combination, the outer edge of the square pile combination is aligned with the edge of the base, the square piles do not contact each other, and the intervals between adjacent square piles constitute a liquid channel; when N and M are both greater than 2, the hollow part of the square pile combination is a rectangular groove connected to the channel; the rectangular groove and the channel are both used for the circulation and holding of liquid.

[0007] The exterior wall model is a U-shaped structure composed of an exterior wall body. The exterior wall model is mounted on the outer periphery of the square pile combination. The inner periphery of the exterior wall model is fixedly connected to the outer periphery of the square pile combination to form a superimposed structure. The top of the exterior wall model and the top of the square pile combination are in the same plane. The top cover is encapsulated on the top of the superimposed structure, and the top cover, the superimposed structure and the base form a closed space. The top cover is provided with a through hole for filling liquid and pressurizing.

[0008] Furthermore, N and M are both 3, and the eight square piles of the square pile combination together with the rectangular groove in the middle of the square pile combination are arranged in a nine-square pattern.

[0009] Furthermore, a protrusion is provided on the bottom surface of the top cover, and the protrusion corresponds to the channel and the rectangular groove.

[0010] Furthermore, the top cover is made of a transparent non-metallic material.

[0011] Furthermore, the square pile model and the exterior wall model are cast in two batches, with the square pile model being the first batch and the exterior wall model being the second batch.

[0012] Furthermore, when the square pile model is cast, several steel bars are evenly arranged around the square pile combination, with one end of the steel bar inside the square pile and the other end extending out; when the exterior wall model is cast, the extending end of the steel bar is fixedly connected to the square pile model.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] 1. The top cover of the present invention, the superimposed structure and the base form a closed space, the surface of the pile-wall superimposed structure in contact with the liquid is the surface that resists the water and soil pressure in actual working conditions, and the liquid is injected and pressurized through the through holes on the top cover, which better simulates the mode of the pile-wall superimposed structure of the subway station being subjected to water and soil pressure in actual conditions; and the present invention can meet the requirement of simultaneously observing the anti-seepage performance of multiple groups of pile-wall superimposed structures in a single test, and complete the test simply and efficiently.

[0015] 2. In the present invention, when N and M are both 3, the 8 square piles of the square pile combination together with the rectangular groove in the middle of the square pile combination are arranged in a nine-square grid. The rectangular grooves of the same size as the square piles can achieve a better pressurization effect while occupying a small area of ​​the test site and having low cost.

[0016] 3. The bottom surface of the top cover of the present invention is provided with protrusions corresponding to the channel and the rectangular groove, which further ensures that the closed space formed by the top cover, the superimposed structure and the base is more sealed.

[0017] 4. The square pile model and the exterior wall model of the present invention are cast in two batches, which better simulates the batch difference between the "prefabricated" and "cast-in-place" components in the prefabricated pile-wall composite structure of the subway station, so the experimental results are more accurate; when the square pile model is cast, a certain length of steel bars is reserved around it, which is more convenient for forming a composite structure when casting the exterior wall model. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the square pile model of the present invention.

[0019] Figure 2 It is a schematic diagram of the exterior wall model of the present invention.

[0020] Figure 3 It is a schematic diagram of the top cover of the present invention.

[0021] Figure 4 Schematic diagrams of the present invention, wherein (a) is a schematic diagram without a top cover installed, and (b) is a schematic diagram with a top cover installed.

[0022] Among them, 1-square pile model, 2-exterior wall model, 3-top cover, 1-1-base, 1-2-square piles, 1-3-rectangular groove, 1-4-channel, 1-5-rebar, 2-1-exterior wall, 3-1-through hole. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0024] The present invention provides a waterproof performance test device for a pile-wall composite structure of a subway station. The device comprises a square pile model 1, an exterior wall model 2 and a top cover 3.

[0025] like Figure 1 As shown, the square pile model 1 is built in imitation of the square piles 1-2 of the prefabricated pile wall superimposed structure of the subway station, including a base 1-1 and square piles 1-2 erected on the base 1-1. The base 1-1 is rectangular, and N square piles are arranged on each of a group of opposite sides of the base 1-1, and M square piles are arranged on each of another group of opposite sides of the base 1-1, wherein N and M are both positive integers and at least one of them is greater than 1. The square piles 1-2 arranged along the four sides of the base 1-1 constitute a square pile combination. The square piles 1-2 located at the four corners of the base 1-1 in the square pile combination share two sides, which belong to both horizontal and vertical sides, that is, the total number of square piles 1-2 in the square pile combination is 2M+2N-4.

[0026] The outer edge of the square pile combination is aligned with the edge of the base 1-1, and the square piles 1-2 do not touch each other. The intervals between adjacent square piles 1-2 constitute a liquid channel 1-4, and the liquid can be water. For example, when N is 1 and M is 2, the square pile combination is in the shape of a sun; when N is 2 and M is 2, the square pile combination is in the shape of a field. When both N and M are greater than 2, the square pile combination is in the shape of a back-shaped character, and the hollow part of the back-shaped character is a rectangular groove 1-3 connected to the channel 1-4; the rectangular groove 1-3 and the channel 1-4 are both used for the circulation and holding of liquids; the height of the channel 1-4 and the rectangular groove 1-3 is consistent with the height of the square pile 1-2, and the base 1-1 prevents the liquid from overflowing downward. In this embodiment, the liquid is water. In a specific implementation, the width of the channel 1-4 can be set according to the test conditions. The narrower the small-sized channel 1-4 is, the smaller the space it occupies. The wider the large-sized channel 1-4 is, the more likely it is to affect the casting effect of the exterior wall. Therefore, the width of the channel 1-4 can be set according to the test site and the concrete strength.

[0027] like Figure 2 As shown, the exterior wall model 2 is built in imitation of the exterior wall of the prefabricated pile wall composite structure of the subway station. The exterior wall model 2 is a U-shaped structure composed of an exterior wall body. The exterior wall model 2 is mounted on the outer periphery of the square pile combination. The inner periphery size of the exterior wall model 2 is completely matched with the outer periphery size of the square pile model 1, that is, the square pile model 1 can be embedded in the exterior wall model 2, the inner periphery of the exterior wall model 2 is fitted with the outer periphery of the square pile combination, and the exterior wall model 2 and the square pile combination are fixedly connected together to form a composite structure, and the top of the exterior wall model 2 and the top of the square pile combination are in the same plane.

[0028] like Figure 3 As shown, the top cover 3 is encapsulated at the top of the superimposed structure, and the top cover 3, the superimposed structure and the base 1-1 form a closed space; the top cover 3 is provided with a through hole 3-1 or a conduit for filling liquid and pressurizing. In this embodiment, the top cover 3 is rectangular, and the top cover 3 can also be circular, oval and other shapes. The size of the top cover 3 is consistent with the inner circumference of the exterior wall model 2. The top cover 3 completely covers the square pile combination, and the liquid is sealed in the superimposed structure and the base 1-1. The size of the top cover 3 can also be consistent with the outer circumference of the exterior wall model 2. At this time, the top cover 3 completely covers the entire superimposed structure. According to the test requirements, if it is necessary to observe the penetration effect through the top cover 3, the top cover 3 can be a transparent top cover made of acrylic or glass.

[0029] Preferably, N and M are both 3, that is, 3 square piles are arranged on each of the four sides of the base, and the 8 square piles of the square pile combination together with the rectangular grooves 1-3 in the middle of the square pile combination are arranged in a nine-square arrangement. In the specific implementation, this embodiment has the best test effect. When at least one of N and M is less than 3, the middle part of the square pile combination cannot form a rectangular groove 1-3, and the square pile model 1 has only channels 1-4 for the circulation and storage of liquids; when N and M are both greater than 3, the rectangular groove 1-3 formed in the middle part of the square pile combination is larger in size, the required test site occupies a large area, and the test cost is high. When N and M are both 3, the rectangular groove 1-3 formed in the middle part of the square pile combination is consistent in size with the square pile 1-2, which not only meets the requirement that 8 groups of pile-wall superimposed structures can be observed simultaneously in a single test, but also has a better pressurization effect, and the test site occupies a small area and has a low cost.

[0030] As a further improvement, a convex portion is provided on the bottom surface of the top cover 3. When at least one of N and M is less than 3, the convex portion corresponds to the channel 1-4; when both N and M are greater than 2, the convex portion corresponds to the channel 1-4 and the rectangular groove 1-3. When the top cover 3 is packaged at the top of the stacked structure, the convex portion at the bottom of the top cover 3 further seals the channel 1-4 and the rectangular groove 1-3.

[0031] As a further improvement, in order to reflect the batch differences between the "prefabricated" and "cast-in-place" components and to better simulate the subway station pile-wall composite structure under actual working conditions, the square pile model 1 and the exterior wall model 2 were cast at different times, but in two batches, with the square pile model 1 being cast in the first batch and the exterior wall model 2 being cast in the second batch.

[0032] As a further improvement, when the square pile model 1 is cast, several steel bars 1-5 are evenly arranged around the square pile combination, with one end of the steel bar 1-5 inside the square pile 1-2 and the other end extending out; when the exterior wall model 2 is cast, it is fixedly connected to the square pile model 1 through the extended end of the steel bar 1-5; that is, when the square pile model 1 is cast, a certain length of the steel bars 1-5 around it should be reserved so as to form a superimposed structure when the exterior wall model 2 is cast.

[0033] As a further improvement, the present invention may also include a reaction floor system, a pressurization system, and a leakage monitoring system. The reaction floor system is used to fix the test device and prevent the components from being suddenly damaged during the pressurization period; the pressurization system may be any conventional pressurization pump, connected to the through hole 3-1 of the top cover 3 or a conduit for pressurization; the present invention is suitable for all kinds of non-destructive leakage monitoring solutions. If it is necessary to pre-embed sensors, the corresponding equipment is pre-arranged and installed before pouring.

[0034] Through the test device of the present invention, the waterproof performance test of the pile-wall composite structure of the subway station can be selected to be scaled or not. Under real working conditions, the pile-wall composite structure of the subway station resists external water and soil pressure. The present invention forms the pile-wall composite structure into a closed "container". The side of the pile-wall composite structure that resists water and soil pressure in actual working conditions is used as the inner wall of the "container". Water is added to the "container" through the through hole 3-1 on the top cover 3. After the rectangular groove 1-3 starts to be filled with water, the channel 1-4 connected to the rectangular groove 1-3 will also be filled with water, which better simulates the mode of the square pile 1-2 being subjected to water pressure on multiple sides in actual conditions. The present invention applies water pressure from the inside to the outside to the pile-wall composite structure, which is equivalent to the actual pile-wall composite structure resisting external water and soil pressure, and the present invention can meet the requirements of simultaneously observing the anti-seepage performance of multiple groups of pile-wall composite structures in a single test.

[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A subway station pile wall composite structure waterproof performance test device, characterized in that: Including square pile model, exterior wall model and top cover; The square pile model comprises a rectangular base and square piles erected on the base, wherein N square piles are arranged on each of a group of opposite sides of the base, and M square piles are arranged on each of another group of opposite sides of the base, and the square piles located at the four corners of the base are shared on both sides, wherein N and M are both positive integers and at least one of them is greater than 1, and the square piles arranged along the four sides of the base constitute a square pile combination, the outer edge of the square pile combination is aligned with the edge of the base, the square piles do not contact each other, and the intervals between adjacent square piles constitute a liquid channel; when N and M are both greater than 2, the hollow part of the square pile combination is a rectangular groove connected to the channel; the rectangular groove and the channel are both used for the circulation and holding of liquid; The exterior wall model is a U-shaped structure composed of an exterior wall body, the exterior wall model is mounted on the outer periphery of the square pile combination, the inner periphery of the exterior wall model and the outer periphery of the square pile combination are fixedly connected together to form a superimposed structure, and the top of the exterior wall model and the top of the square pile combination are in the same plane; The top cover is sealed on the top of the stacked structure, and the top cover, the stacked structure and the base form a closed space; the top cover is provided with a through hole for filling liquid and pressurizing.

2. The waterproof performance test device for the pile-wall composite structure of a subway station according to claim 1, characterized in that: N and M are both 3, and the 8 square piles of the square pile combination together with the rectangular groove in the middle of the square pile combination are arranged in a nine-square pattern.

3. The waterproof performance test device for the pile-wall composite structure of a subway station as claimed in claim 1, characterized in that: The bottom surface of the top cover is provided with a raised portion, and the raised portion corresponds to the channel and the rectangular groove.

4. The waterproof performance test device for the pile-wall composite structure of a subway station as claimed in claim 1, characterized in that: The top cover is made of a transparent non-metallic material.

5. The waterproof performance test device for pile-wall composite structure of subway station according to any one of claims 1 to 4, characterized in that: The square pile model and the exterior wall model are cast in two batches, wherein the square pile model is cast in the first batch and the exterior wall model is cast in the second batch.

6. The waterproof performance test device for the pile-wall composite structure of a subway station as claimed in claim 5, characterized in that: When the square pile model is cast, several steel bars are evenly arranged around the square pile combination, with one end of the steel bar inside the square pile and the other end extending out; when the exterior wall model is cast, the extending end of the steel bar is fixedly connected to the square pile model.