Fabricated concrete frame structure system with joints connected by UHPC (Ultra High Performance Concrete)

By using UHPC connection and nesting overlap technology of embedded box-type cross-section steel and mild steel in the assembled concrete frame structure, the problems of complex node design and poor seismic resistance are solved, and efficient assembly and simplified construction process are achieved. Improves the seismic performance and maintenance convenience of the structure.

CN119083578APending Publication Date: 2024-12-06CHINA RAILWAY 20TH BUREAU GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411313588.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The node design and construction process of the existing prefabricated concrete frame structure are complex, and it is easy to generate concentrated stress at the connection, affecting the overall mechanical properties of the structure, long engineering cycle, poor seismic toughness, and difficult to maintain.

Method used

The prefabricated concrete frame structure system is adopted with UHPC connection. The precast concrete beams, columns and floor bearing plates are combined with the post-cast UHPC column-column node area and the UHPC beam-column node area, and the embedded box cross-section steel and mild steel are used. Nested overlaps and misaligned overlaps simplify steel bar connections and improve assembly efficiency and seismic resistance.

Benefits of technology

Achieve rapid centering positioning, reduce the reinforcement rate at the nodes, improve load-bearing capacity and shear resistance, reduce earthquake response, simplify the construction process, reduce maintenance and repair costs, and improve the overall performance of the structure .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083578A_ABST
    Figure CN119083578A_ABST
Patent Text Reader

Abstract

The invention discloses a fabricated concrete frame structure system with joints connected through UHPC. The fabricated concrete frame structure system comprises a prefabricated concrete beam, a first-layer prefabricated concrete lower column, a first-layer prefabricated concrete upper column, a second-layer prefabricated concrete column and a prestressed steel pipe truss floor support plate. A post-cast UHPC column-column node area is arranged at the joint of the first-layer prefabricated concrete lower column and the first-layer prefabricated concrete upper column; a post-cast UHPC beam-column node area is arranged at the joint of the second-layer prefabricated concrete column, the first-layer prefabricated concrete upper column and the prefabricated concrete beam; the tops of the adjacent precast concrete upper columns are connected with precast concrete beams; and the prestressed steel pipe truss floor support plates are uniformly distributed in a horizontal area defined by the precast concrete beams. The prefabricated assembly type structural system is short in engineering period, good in anti-seismic performance and easy to maintain and repair, and the assembly efficiency and the bearing capacity and the shear capacity of the prefabricated concrete column are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of prefabricated structures and relates to a prefabricated concrete frame structure system whose nodes are connected by UHPC. Background Art

[0002] In recent years, with the advancement of the concept of sustainable development and the progress of construction technology, the advantages of prefabricated concrete structures in green buildings, energy conservation and environmental protection have become more obvious, and have been widely used and promoted. Its core concept is to prefabricate the various components of the building (such as columns, beams, floor slabs, etc.) in the factory and then transport them to the construction site for assembly. The rise of prefabricated building technology is mainly to improve construction efficiency, shorten construction period, reduce on-site labor demand, and improve construction quality and safety. However, the components of the prefabricated concrete frame structure need to be spliced ​​through connection nodes. The design and construction process of these nodes are complicated, and it is easy to produce stress concentration at the connection, affecting the overall mechanical properties of the structure.

[0003] At the same time, under the action of earthquakes, traditional reinforced concrete structures (cast-in-place, prefabricated) dissipate earthquake energy through their own cracking and deformation, which causes large residual deformation and damage after the earthquake. Even if they can achieve "no collapse in a major earthquake", it is difficult to quickly restore the building's use function, but the post-earthquake repairability is poor and the maintenance cost is correspondingly high. The existing prefabricated and assembled structural system still has room for improvement in terms of seismic toughness and ease of maintenance. Therefore, it is crucial to study a prefabricated and assembled structural system with a short engineering cycle, good seismic performance, and easy maintenance and repair. Summary of the invention

[0004] In view of the deficiencies in the prior art, the object of the present invention is to provide a prefabricated concrete frame structure system with nodes connected by UHPC, so as to solve the problems of the existing prefabricated structure system, such as complex node design and construction process, easy stress concentration at the connection, affecting the overall mechanical properties of the structure, long engineering period, poor seismic toughness, and difficult maintenance.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions to achieve the above problems:

[0006] An assembled concrete frame structure system with nodes connected by UHPC, comprising precast concrete beams, a first-floor precast concrete lower column, a first-floor precast concrete upper column, a second-floor precast concrete column, a prestressed steel tube truss floor deck, a post-cast UHPC column-column node area, and a post-cast UHPC beam-column node area;

[0007] The lower end of the first-floor precast concrete lower column is connected to the foundation, and the upper end is connected to the collinear first-floor precast concrete upper column, and the connection between the two is a post-cast UHPC column-column node area; the top of the adjacent first-floor precast concrete upper column is vertically connected to a horizontal precast concrete beam, and the top of the first-floor precast concrete upper column is also connected to the collinear lower end of the second-floor precast concrete column, and the connection between the second-floor precast concrete column, the first-floor precast concrete upper column and the precast concrete beam is a post-cast UHPC beam-column node area; the tops of the adjacent second-floor precast concrete columns are connected to horizontal precast concrete beams; prestressed steel tube truss floor decks are arranged in the horizontal area enclosed by the precast concrete beams connected to the tops of each first-floor precast concrete upper column and the horizontal area enclosed by the precast concrete beams connected to the tops of each second-floor precast concrete column.

[0008] The present invention also includes the following technical features:

[0009] Specifically, a longitudinal lap steel bar I extending downward is reserved at the lower end of the first layer of precast concrete upper column, and a precast box section steel I extending downward is also embedded in the lower part of the first layer of precast concrete upper column, and the lower end surface of the first layer of precast concrete upper column is a keyway and the surface of the keyway is a dense bubble groove;

[0010] The upper end of the first layer of precast concrete lower column is reserved with a longitudinal lap steel bar II extending upward, the upper part of the first layer of precast concrete lower column is also pre-buried with an embedded box-section steel II extending upward, the upper end surface of the first layer of precast concrete lower column is a keyway and the surface of the keyway is a dense bubble groove;

[0011] A layer of precast concrete upper columns and a layer of precast concrete lower columns are nested in the post-cast UHPC column-column node area by inserting the embedded box section steel I into the embedded box section steel II. At the same time, the longitudinal lap steel bars I and the longitudinal lap steel bars II are overlapped in the post-cast UHPC column-column node area and connected by UHPC pouring.

[0012] Specifically, there are multiple longitudinal lap steel bars I and II, which correspond to each other one by one and are arranged in staggered lap joints; the embedded parts of the embedded box-section steel I and the embedded box-section steel II are connected with high-strength shear bolts; the lower part of the embedded box-section steel I is inserted along the inner wall of the embedded box-section steel II to achieve circumferential positioning between the two.

[0013] Specifically, ordinary steel formwork and movable tongue-and-groove steel formwork are installed on the lower part of the first layer of precast concrete upper columns and the upper side walls of the first layer of precast concrete lower columns, and the post-cast UHPC column-column node area is closed, and the movable tongue-and-groove steel formwork can be used as the node post-casting.

[0014] Specifically, the ordinary steel formwork and the movable tongue-and-groove steel formwork are both provided with bolt holes, so as to be fixed with a layer of precast concrete upper column and a layer of precast concrete lower column side wall by high-strength bolts;

[0015] The upper part of the common steel formwork is closely fixed to the lower side wall of a layer of precast concrete upper column, and the lower part is closely fixed to the upper side wall of a layer of precast concrete lower column, so as to cover the side of the post-cast UHPC column-column node area. There are two common steel formworks, which cover two of the side surfaces respectively.

[0016] The movable tongue-and-groove steel formwork comprises a fixed steel formwork and a movable steel formwork and a hinge connecting the two; the fixed steel formwork is tightly fixed to the upper side wall of a layer of precast concrete lower column; when the movable steel formwork is opened along the hinge, the opening can be used as a node post-casting port; when the UHPC is poured, the movable steel formwork is turned along the hinge to be tightly attached to and fixed to the lower side wall of a layer of precast concrete upper column, and the movable tongue-and-groove steel formwork can cover the side of the post-cast UHPC column-column node area, and there are two movable tongue-and-groove steel formworks corresponding to two of the side surfaces respectively.

[0017] Specifically, the lower end surface of the second-layer precast concrete column is reserved with a longitudinal lap steel bar III extending downward, and an upper mild steel is installed on the bottom surface, the bottom surface of the second-layer precast concrete column is a keyway, and the surface of the keyway is a dense bubble groove; the upper end of the first-layer precast concrete upper column is reserved with a longitudinal lap steel bar IV extending upward, and a lower mild steel is installed on the top surface, the top surface of the first-layer precast concrete upper column is a keyway, and the surface of the keyway is a dense bubble groove;

[0018] The second-floor precast concrete column and the first-floor precast concrete upper column are connected in the post-cast UHPC beam-column node area by inserting the upper mild steel into the lower mild steel, and at the same time, the longitudinal lap steel bars III and the longitudinal lap steel bars IV are overlapped and UHPC is poured in the post-cast UHPC beam-column node area; longitudinal lap steel bars V are reserved on the end face of the precast concrete beam, and the two horizontally opposite precast concrete beams are overlapped and connected in the post-cast UHPC beam-column node area by the longitudinal lap steel bars V and UHPC pouring.

[0019] Specifically, the longitudinal lap steel bars III and the longitudinal lap steel bars IV are in the vertical direction and have multiple lengths; the longitudinal lap steel bars III and the longitudinal lap steel bars IV correspond to each other one by one and are overlapped in a staggered manner; the longitudinal lap steel bars V of the two horizontally opposite precast concrete beams are in the horizontal direction and have multiple lengths; the longitudinal lap steel bars V of the two precast concrete beams correspond to each other one by one and are overlapped in a staggered manner.

[0020] Specifically, the upper soft steel is installed on the bottom surface of the second-layer precast concrete column through the embedded sleeve at the lower end of the second-layer precast concrete column and high-strength bolts; the lower soft steel is installed on the top surface of the first-layer precast concrete upper column through the embedded sleeve at the upper end of the first-layer precast concrete upper column and high-strength bolts;

[0021] The post-cast UHPC beam-column node area formed by the lower part of the second-floor precast concrete column and the upper part of the first-floor precast concrete upper column is supported by ordinary steel formwork.

[0022] Specifically, the upper soft steel is a T-shaped steel, including a flange steel plate I and a web steel plate I vertically arranged thereunder, the upper soft steel material is low yield soft steel, and bolt through holes are reserved on the flange steel plate I; the lower soft steel is a T-shaped steel, including a flange steel plate II and a web steel plate II vertically arranged thereunder, and a vertical through seam is provided in the middle of the web steel plate II, the lower soft steel material is low yield soft steel, and bolt through holes are reserved on the flange steel plate II;

[0023] The flange steel plate I is fixed to the lower end of the second-story precast concrete column by high-strength bolts and embedded sleeves, and the flange steel plate II is fixed to the upper end of the first-story precast concrete upper column by high-strength bolts and embedded sleeves. The web steel plate I can be inserted into the vertical seam on the web steel plate II, and the web steel plate I and the web steel plate II are cross-intersected vertically; when the web steel plate I is inserted into the vertical seam on the web steel plate II, the second-story precast concrete column and the first-story precast concrete upper column can be aligned.

[0024] The construction method of the assembled concrete frame structure system in which the nodes are connected by UHPC comprises the following steps:

[0025] Step 1: Prepare a precast concrete upper column, a precast concrete lower column, a second-floor concrete column, a precast concrete beam, and a prestressed steel tube truss floor deck according to the seismic performance requirements;

[0026] Step 2: Lift and fix the connection between the first layer of precast concrete lower column and the foundation, and short lap joint of steel bar straight anchor;

[0027] Step 3: UHPC pouring and curing;

[0028] Step 4: hoist a layer of precast concrete upper columns, insert the embedded box-section steel I of a layer of precast concrete upper columns into the embedded box-section steel II of a layer of precast concrete lower columns, and the embedded box-section steel I and the embedded box-section steel II are nested; the longitudinal lap steel bars of a layer of precast concrete upper columns and a layer of precast concrete lower columns are directly staggered and overlapped without binding;

[0029] Step 5: Use steel formwork to support the formwork on site. Before supporting the formwork, brush the release agent on the inner side of the steel formwork used. When supporting the formwork of the post-cast UHPC column-column node area, first fix two ordinary steel formworks on opposite sides to close the connection area, and then fix two movable tongue-and-groove steel formworks on opposite sides as the post-casting of the connection area;

[0030] Step 6: Casting UHPC, removing formwork, and curing;

[0031] Step 7: Hoist the precast concrete beams on the first floor. The longitudinal reserved steel bars of the precast concrete beams are directly staggered and overlapped without binding;

[0032] Step 8: Hoist the prestressed steel tube truss floor deck on the first floor, and surround the beam-column node area with steel mesh to prevent ordinary concrete from pouring into the beam-column node area when pouring the surface layer of the prestressed steel tube truss floor deck;

[0033] Step 9: Support the formwork, pour the prestressed steel tube truss floor deck surface layer, remove the formwork, and maintain;

[0034] Step 10: Hoist the second-floor precast concrete column, insert the upper soft steel of the second-floor precast concrete column into the lower soft steel of the first-floor precast concrete upper column in a cross shape; the longitudinal reserved steel bars of the second-floor precast concrete column and the first-floor precast concrete upper column are directly staggered and overlapped without binding;

[0035] Step 11: Ordinary steel formwork is used on site to support the formwork. Before supporting the formwork, the mold release agent should be brushed on the inner side of the steel formwork. When supporting the formwork at different locations, the ordinary steel formwork should be fixed and UHPC post-casting holes should be reserved;

[0036] Step 12: Casting UHPC, removing formwork, and curing;

[0037] Step 13: The hoisting and pouring methods of the precast concrete beams and prestressed steel tube truss floor slabs on the second floor are the same as those on the first floor.

[0038] Compared with the prior art, the present invention has the following technical effects:

[0039] (1) The precast concrete upper column and lower column in the post-cast column-column joint area of ​​the present invention can be quickly aligned and positioned by the upper pre-embedded box-section steel and the lower pre-embedded box-section steel, thereby improving assembly efficiency and reducing the longitudinal reinforcement ratio and stirrup ratio in the post-cast area (densified area).

[0040] (2) The upper pre-buried box-section steel and the lower pre-buried box-section steel of the present invention both pre-buried high-strength shear bolts into the components, which can improve the bearing capacity and shear resistance of the precast concrete column.

[0041] (3) The precast concrete columns in the post-cast beam-column node area of ​​the present invention can be quickly aligned and positioned through the web steel plates of the upper and lower mild steels, thereby improving assembly efficiency.

[0042] (4) The upper and lower soft steels of the present invention can absorb energy in extreme situations such as earthquakes, reduce the seismic response of the structure, improve the seismic performance, provide further energy dissipation capacity for the connection area, and then protect the integrity of the main structural components.

[0043] (5) The upper and lower mild steels of the present invention are replaceable parts of the precast concrete vertical components. If the node area is severely damaged or fails, it can be replaced more conveniently, thereby reducing maintenance and repair costs.

[0044] (6) The interface between the precast concrete beam and the precast concrete column of the present invention is treated as a keyway + bubble groove, which can increase the cross-sectional bonding strength.

[0045] (7) The post-cast column-column node area and the post-cast beam-column node area of ​​the present invention adopt the method of short overlap of steel bars directly anchored and UHPC casting, and utilize the good bonding and anchoring performance between UHPC and steel bars to significantly shorten the anchorage and overlap length of steel bars, simplify the steel bar connection and node structure of prefabricated components, greatly shorten the on-site construction period, and improve construction efficiency.

[0046] (8) The UHPC in the post-cast column-column joint area and the post-cast beam-column joint area of ​​the present invention is a high-performance material. From the perspective of the entire life cycle, the use of UHPC as the pouring material for the steel bar anchorage area can reduce the maintenance and repair costs of the building.

[0047] (9) The precast concrete beams and precast concrete columns of the present invention are both in the shape of a straight line, which is convenient for transportation and reduces transportation costs.

[0048] (10) The floor slab of the present invention adopts a prestressed steel tube truss floor deck; for the longitudinal and transverse frames with a span of less than 6m, there is no need to design secondary beams.

[0049] (11) In the present invention, there is no need to reserve grouting channels in the node area. Instead, a pouring space is reserved around the node area. The composite slab surface layer is poured first, and then the node area is poured, so that the top of the node and the bottom of the prefabricated column are tightly bonded.

[0050] (12) The steel fiber content and stirrup ratio of the UHPC in the node area of ​​the present invention are optimized and combined according to the seismic fortification intensity. Reducing the steel fiber content of the UHPC can effectively reduce the material cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 Schematic diagram of the prefabricated concrete frame structure system with UHPC nodes connected.

[0052] Figure 2 Schematic diagram of the post-cast UHPC column-column joint area.

[0053] Figure 3 Schematic diagram of the column interface in the post-cast UHPC column-column node area.

[0054] Figure 4 Schematic diagram of the post-cast UHPC beam-column node area.

[0055] Figure 5 Schematic diagram of the beam-column interface in the post-cast UHPC beam-column node area.

[0056] Figure 6 Schematic diagram of the finite element model.

[0057] Figure 7 Schematic diagram of the steel skeleton model with short lap joints of steel bars and post-cast UHPC.

[0058] Figure 8 It is a post-cast UHPC with short lap joints of steel bars and a steel skeleton model with soft steel embedded in the upper and lower columns.

[0059] Fig. 9 It is the hysteresis curve result of the specimen.

[0060] Fig.10 Field test photos (a) column-column joint (b) beam-column joint (c) concrete fiber Bragg grating strain gauge (d) steel bar fiber Bragg grating strain gauge (e) displacement meter (f) inspection site as a whole.

[0061] Fig.11 Maximum deflection curve of precast concrete beam in test results.

[0062] Fig.12 For model pictures.

[0063] Fig.13 It is the maximum deflection curve of precast concrete beam in simulation results.

[0064] Fig.14 Schematic diagram of shear specimen dimensions and reinforcement (a) 3D schematic diagram (b) cast-in-place specimen (c) combined specimen (d) combined specimen 1-1 section.

[0065] Fig.15 This is a diagram for pasting large bubble film.

[0066] Fig.16 This is a schematic diagram of pasting small bubble film.

[0067] Fig.17 Schematic diagram of the two keyway specimen.

[0068] Fig.18 A schematic diagram of a three-key slot.

[0069] Fig.19 A schematic diagram of four keyways.

[0070] Fig. 20 Schematic diagram of the loading device (a), loading model (b) loading site.

[0071] The meaning of each number in the figure is:

[0072] 1. Precast concrete beams, 2. Precast concrete lower columns on the first floor, 3. Precast concrete upper columns on the first floor, 4. Precast concrete columns on the second floor, 5. Prestressed steel tube truss floor decking, 6. Post-cast UHPC column-column node area, 7. Post-cast UHPC beam-column node area, 11. Longitudinal lap steel bars V, 20. Keyway, 21. Longitudinal lap steel bars II, 22. Embedded box section steel II, 30. High-strength shear bolts, 31. Longitudinal lap steel bars I, 32. Embedded box section steel I, 40. High-strength bolts, 41. Longitudinal lap steel bars III, 42. Longitudinal lap steel bars IV, 43. Upper mild steel, 44. Lower mild steel, 431. Flange steel plate I, 432. Web steel plate I, 441. Flange steel plate II, 442. Web steel plate II. DETAILED DESCRIPTION

[0073] Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical solution of this application fall within the protection scope of the present invention.

[0074] Embodiment 1:

[0075] like Figures 1 to 5 As shown, this embodiment provides a prefabricated concrete frame structure system with nodes connected by UHPC, including horizontal precast concrete beams 1, vertical first-layer precast concrete lower columns 2, vertical first-layer precast concrete upper columns 3, vertical second-layer precast concrete columns 4, prestressed steel tube truss floor decks 5, post-cast UHPC column-column node areas 6, and post-cast UHPC beam-column node areas 7; Ultra-high Performance Concrete (UHPC for short) has superior properties such as ultra-high strength, high toughness, and high durability, and has broad application prospects in prefabricated structures. The use of UHPC reduces the anchorage length of longitudinal steel bars, and while improving the shear bearing capacity of the nodes, it can reduce the node stirrup ratio and shorten the anchorage and lap length of the steel bars; the use of "steel direct anchor short lap + UHPC pouring" can eliminate or weaken the problem of dense steel bars at the nodes, simplify the node structure, and effectively solve the technical problem of reliable connection of steel bars in prefabricated concrete structures, with significant social and economic benefits.

[0076] The lower end of the first-floor precast concrete lower column 2 is connected to the foundation, and the upper end is connected to the collinear first-floor precast concrete upper column 3, and the connection between the two is a post-cast UHPC column-column node area 6; the top of the adjacent first-floor precast concrete upper column 3 is vertically connected to the horizontal precast concrete beam 1, and the top of the first-floor precast concrete upper column 3 is also connected to the lower end of the collinear second-floor precast concrete column 4, and the connection between the second-floor precast concrete column 4, the first-floor precast concrete upper column 3 and the precast concrete beam 1 is a post-cast UHPC beam-column node area 7; the top of the adjacent second-floor precast concrete column 4 is connected to the horizontal precast concrete beam 1; prestressed steel tube truss floor decking slabs 5 are arranged in the horizontal area enclosed by the precast concrete beams 1 connected to the tops of each first-floor precast concrete upper column 3 and the horizontal area enclosed by the precast concrete beams 1 connected to the tops of each second-floor precast concrete column 4.

[0077] A longitudinal lap steel bar I31 extending downward is reserved at the lower end of a precast concrete upper column 3, and a precast box-section steel I32 extending downward is also embedded in the lower part of the precast concrete upper column 3. The lower end face of the precast concrete upper column 3 is a keyway 20 and the surface of the keyway 20 is a dense bubble groove.

[0078] A longitudinal lap steel bar II21 extending upward is reserved at the upper end of a precast concrete lower column 2, and an embedded box-section steel II22 extending upward is also embedded in the upper part of the precast concrete lower column 2. The upper end face of the precast concrete lower column 2 is a keyway 20 and the surface of the keyway 20 is a dense bubble groove.

[0079] A layer of precast concrete upper column 3 and a layer of precast concrete lower column 2 are formed in a nested manner by inserting the embedded box section steel I32 into the embedded box section steel II22 in the post-cast UHPC column-column node area 6, and at the same time, the longitudinal lap steel bars I31 and the longitudinal lap steel bars II21 are overlapped in the post-cast UHPC column-column node area 6 and connected by UHPC pouring. The embedded box section steel I32 is inserted into the embedded box section steel II22 to achieve the centering positioning of a layer of precast concrete upper column 3 and a layer of precast concrete lower column 2, which can achieve rapid assembly and reduce the longitudinal reinforcement ratio and stirrup ratio in the post-cast area (densified area).

[0080] There are multiple longitudinal lap steel bars I31 and longitudinal lap steel bars II21, which correspond to each other one by one and are arranged in staggered laps; the embedded parts of the embedded box-section steel I32 and the embedded box-section steel II22 are connected with high-strength shear bolts 30, and the embedded box-section steel embeds the high-strength shear bolts into the components to improve the bearing capacity and shear resistance of the precast concrete column; the lower part of the embedded box-section steel I32 is inserted along the inner wall of the embedded box-section steel II22 to achieve circumferential positioning between the two.

[0081] Ordinary steel formwork and movable tongue-and-groove steel formwork are installed on the lower part of the first layer of precast concrete upper column 3 and the upper side wall of the first layer of precast concrete lower column 2 to close the post-cast UHPC column-column node area 6, and the movable tongue-and-groove steel formwork can be used as the node post-casting.

[0082] Bolt holes are provided on both the common steel formwork and the movable tongue-and-groove steel formwork to be fixed to the side walls of a precast concrete upper column 3 and a precast concrete lower column 2 by high-strength bolts 40 .

[0083] The upper part of the ordinary steel formwork is tightly fixed to the lower side wall of a layer of precast concrete upper column 3, and the lower part is tightly fixed to the upper side wall of a layer of precast concrete lower column 2, thereby covering the side of the post-cast UHPC column-column node area 6. There are two ordinary steel formworks, which cover two of the side surfaces respectively.

[0084] The movable tongue-and-groove steel formwork includes a fixed steel formwork and a movable steel formwork and a hinge connecting the two; the fixed steel formwork is tightly fixed to the upper side wall of a layer of precast concrete lower column 2; when the movable steel formwork is opened along the hinge, the opening can be used as a node post-casting port; when the UHPC is poured, the movable steel formwork is turned along the hinge to be tightly attached to and fixed to the lower side wall of a layer of precast concrete upper column 3, and the movable tongue-and-groove steel formwork can cover the side of the post-cast UHPC column-column node area 6, and there are two movable tongue-and-groove steel formworks corresponding to two of the side surfaces respectively.

[0085] The lower end surface of the second-layer precast concrete column 4 is reserved with a longitudinal lap steel bar III41 extending downward, and an upper soft steel 43 is installed on the bottom surface. The bottom surface of the second-layer precast concrete column 4 is a key groove 20, and the surface of the key groove 20 is a dense bubble groove; the upper end of the first-layer precast concrete upper column 3 is reserved with a longitudinal lap steel bar IV42 extending upward, and a lower soft steel 44 is installed on the top surface. The top surface of the first-layer precast concrete upper column 3 is a key groove 20, and the surface of the key groove 20 is a dense bubble groove.

[0086] The second-floor precast concrete column 4 and the first-floor precast concrete upper column 3 are connected in the post-cast UHPC beam-column node area 7 by inserting the upper soft steel 43 into the lower soft steel 44, and at the same time, the longitudinal lap steel bars III41 and the longitudinal lap steel bars IV42 are overlapped and UHPC poured in the post-cast UHPC beam-column node area 7; longitudinal lap steel bars V11 are reserved on the end face of the precast concrete beam 1, and the two horizontally opposite precast concrete beams 1 are overlapped and UHPC poured in the post-cast UHPC beam-column node area 7.

[0087] There are multiple longitudinal lap steel bars III41 and IV42 along the vertical direction; the longitudinal lap steel bars III41 and IV42 correspond one to one and are staggered; the longitudinal lap steel bars V11 of the two horizontally opposite precast concrete beams 1 are along the horizontal direction and are multiple; the longitudinal lap steel bars V11 of the two precast concrete beams 1 correspond one to one and are staggered.

[0088] The upper soft steel 43 is installed on the bottom surface of the second-layer precast concrete column 4 through the embedded sleeve at the lower end of the second-layer precast concrete column 4 and the high-strength bolt 40; the lower soft steel 44 is installed on the top surface of the first-layer precast concrete upper column 3 through the embedded sleeve at the upper end of the first-layer precast concrete upper column 3 and the high-strength bolt 40; the upper and lower soft steels realize structural deformation, energy absorption and dispersion in extreme situations such as earthquakes. The upper and lower soft steels of the precast concrete column are replaceable, reducing maintenance and repair costs.

[0089] The post-cast UHPC beam-column node area 7 formed by the lower part of the second-floor precast concrete column 4 and the upper part of the first-floor precast concrete upper column 3 is supported by ordinary steel formwork.

[0090] The upper soft steel 43 is a T-shaped steel, including a flange steel plate I431 and a web steel plate I432 vertically arranged thereunder. The material of the upper soft steel 43 is low-yield soft steel, and bolt through holes are reserved on the flange steel plate I431. The lower soft steel 44 is a T-shaped steel, including a flange steel plate II441 and a web steel plate II442 vertically arranged thereunder, and a vertical through seam is provided in the middle of the web steel plate II442. The material of the lower soft steel 44 is low-yield soft steel, and bolt through holes are reserved on the flange steel plate II441.

[0091] The flange steel plate I431 is fixed to the lower end of the second-floor precast concrete column 4 by high-strength bolts 40 and embedded sleeves, the flange steel plate II441 is fixed to the upper end of the first-floor precast concrete upper column 3 by high-strength bolts 40 and embedded sleeves, the web steel plate I432 can be inserted into the vertical seam on the web steel plate II442, and the web steel plate I432 and the web steel plate II442 are cross-intersected vertically; when the web steel plate I432 is inserted into the vertical seam on the web steel plate II442, the second-floor precast concrete column 4 and the first-floor precast concrete upper column 3 can be centered.

[0092] Embodiment 2:

[0093] This embodiment provides a construction method for a prefabricated concrete frame structure system in which nodes are connected by UHPC, comprising the following steps:

[0094] Step 1: Prepare the first-floor precast concrete upper column, the first-floor precast concrete lower column, the second-floor concrete column, the precast concrete beam, and the prestressed steel tube truss floor deck according to the seismic performance requirements; the precast components are all fully manufactured in the factory and transported to the site, and the components must not be damaged during the transportation process;

[0095] Step 2: Lift and fix the connection between the first layer of precast concrete lower column and the foundation, and short lap joint of steel bar straight anchor;

[0096] Step 3: UHPC pouring and curing;

[0097] Step 4: hoist a layer of precast concrete upper columns, insert the embedded box-section steel I of a layer of precast concrete upper columns into the embedded box-section steel II of a layer of precast concrete lower columns, and the embedded box-section steel I and the embedded box-section steel II are nested; the longitudinal lap steel bars of a layer of precast concrete upper columns and a layer of precast concrete lower columns are directly staggered and overlapped without binding;

[0098] Step 5: Use steel formwork to support the formwork on site, and fix it by inserting bolts into the embedded sleeves on the prefabricated components; brush the release agent on the inner side of the steel formwork before supporting the formwork; when supporting the formwork of the post-cast UHPC column-column node area, first fix two ordinary steel formworks against each other to close the connection area, and then fix two movable tongue-and-groove steel formworks against each other as the post-casting of the connection area;

[0099] Step 6: Casting UHPC, removing formwork, and curing;

[0100] Step 7: Hoist the precast concrete beams on the first floor. The longitudinal reserved steel bars of the precast concrete beams are directly staggered and overlapped without binding;

[0101] Step 8: Hoist the prestressed steel tube truss floor deck on the first floor, and surround the beam-column node area with steel mesh to prevent ordinary concrete from pouring into the beam-column node area when pouring the surface layer of the prestressed steel tube truss floor deck;

[0102] Step 9: Support the formwork, pour the prestressed steel tube truss floor deck surface layer, remove the formwork, and maintain;

[0103] Step 10: Hoist the second-floor precast concrete column, insert the web steel plate of the upper soft steel of the second-floor precast concrete column into the web steel plate with vertical seams of the lower soft steel of the first-floor precast concrete upper column, and the web steel plate and the web steel plate with vertical seams are in a cross shape; the longitudinal reserved steel bars of the second-floor precast concrete column and the first-floor precast concrete upper column are directly staggered and overlapped without binding;

[0104] Step 11: Ordinary steel formwork is used on site to support the formwork. Before supporting the formwork, the mold release agent should be brushed on the inner side of the steel formwork. When supporting the formwork at different locations, the ordinary steel formwork should be fixed and UHPC post-casting holes should be reserved;

[0105] Step 12: Casting UHPC, removing formwork, and curing;

[0106] Step 13: The hoisting and pouring methods of the precast concrete beams and prestressed steel tube truss floor slabs on the second floor are the same as those on the first floor.

[0107] (I) Finite element simulation of post-cast UHPC beam-column joints

[0108] The present invention establishes three finite element numerical models, including: 1) cast-in-place reinforced concrete nodes; 2) reinforced concrete nodes with short lap joints of steel bars in the node area and UHPC cast-in-place; 3) reinforced concrete nodes with short lap joints of steel bars in the node area and UHPC cast-in-place, and with soft steel embedded in the upper and lower columns. The details are as follows:

[0109] 1. Material constitutive model:

[0110] (1) Ordinary concrete constitutive structure

[0111] The damage plasticity model is selected to simulate the concrete material, and the "Concrete Structure Design Code" is adopted.

[0112] (GB50010-2010).

[0113] 1) Under tension

[0114] σ=(1-d t )E c ε (1)

[0115]

[0116] σ—tensile stress of tensile concrete;

[0117] ε—tensile strain of tensile concrete;

[0118] x、ρ t — intermediate parameters;

[0119] E c — elastic modulus of concrete in tension;

[0120] α t —reference value of the descending section of the concrete uniaxial tensile stress-strain curve;

[0121] f t,r —Representative value of uniaxial tensile strength of concrete;

[0122] ε t,r — and the representative value of uniaxial tensile strength f t,r The corresponding peak tensile strain of concrete;

[0123] d t —Damage evolution parameters of concrete under uniaxial tension.

[0124] 2) When under pressure

[0125] σ=(1-d c )E c ε (5)

[0126]

[0127] σ—compressive stress of compressed concrete;

[0128] ε—compressive strain of concrete under compression;

[0129] E c — elastic modulus of concrete under compression;

[0130] x, n, ρ c — intermediate parameters;

[0131] α c —reference value of the descending section of the concrete uniaxial compressive stress-strain curve;

[0132] f c,r —Representative value of uniaxial compressive strength of concrete;

[0133] ε c,r — and uniaxial compressive strength f c,r The corresponding peak compressive strain of concrete;

[0134] d c —Damage evolution parameters of concrete under uniaxial compression.

[0135] The relevant parameters of the concrete damage constitutive model in the model are shown in Table 1:

[0136] Table 1 Concrete plasticity parameter settings

[0137] Parameter settings ψ <![CDATA[ε o ]]> <![CDATA[f b0 / f c0 ]]> <![CDATA[K c ]]> μ Value 30 0.1 1.16 0.6667 0.005

[0138] ψ—expansion angle;

[0139] ε o — eccentricity;

[0140] f b0 / f c0 —Plastic damage model parameters;

[0141] K c —Coulomb friction angle;

[0142] μ—cohesion coefficient.

[0143] (2) UHPC constitutive structure

[0144] 1) Determination of UHPC tensile and compressive stress-strain relationship curves

[0145] The specific expression of its stress-strain relationship is as follows:

[0146]

[0147] ε co=(11.788f co +2522.5)×10 -6 (80MPa≤f co ≤220MPa) (12)

[0148] x=ε c / ε co (13)

[0149] y=σ c / σ co (14)

[0150]

[0151] σ co —UHPC peak stress;

[0152] ε co —UHPC peak strain;

[0153] f co —Axial compressive strength of UHPC prism;

[0154] E c —UHPC elastic modulus.

[0155] Referring to the tensile stress-strain relationship of concrete in the Code for Design of Concrete Structures (GB50010-2010) as the tensile constitutive structure of UHPC, the specific expression is as follows:

[0156]

[0157] x=ε / ε to (17)

[0158] y=σ / σ to (18)

[0159] σ to —UHPC peak tensile stress;

[0160] ε to —The strain corresponding to the peak tensile stress of UHPC;

[0161] α t —Parameter values ​​of the descending section of the UHPC uniaxial tensile stress-strain curve.

[0162] UHPC plasticity parameter settings are shown in Table 2:

[0163] Table 2 UHPC plasticity parameter settings

[0164] Parameter settings ψ <![CDATA[ε o ]]> <![CDATA[f b0 / f c0 ]]> <![CDATA[K c ]]> μ Value 56 0.1 1.049 0.605 0.0005

[0165] ψ—expansion angle;

[0166] ε o — eccentricity;

[0167] f b0 / f c0 —Plastic damage model parameters;

[0168] K c —Coulomb friction angle;

[0169] μ—cohesion coefficient.

[0170] 2) Concrete plastic damage model

[0171] The damage coefficient d is based on Birtel and Mark and The elastoplastic damage model.

[0172]

[0173] d t —Tensile damage coefficient of concrete;

[0174] d c —Compression damage to concrete.

[0175] (3) Steel bar structure

[0176] The steel bar constitutive model adopts the three-fold line strengthening model recommended by the Code for Design of Concrete Structures (GB50010-2010). The stress-strain relationship of the steel bar is shown in the following formula:

[0177]

[0178] E s —elastic modulus of steel bars;

[0179] σ s — steel bar strain;

[0180] ε s — steel bar strain;

[0181] f y , r —Representative value of yield strength of steel bars;

[0182] k—slope of the steel bar hardening section;

[0183] ε uy —Strain at the starting point of steel bar hardening;

[0184] ε y —with f y , r The corresponding steel bar yield strain;

[0185] ε u —with f y , r The corresponding steel bar peak strain.

[0186] 2. Cell selection and mesh division:

[0187] (1) Unit selection

[0188] The concrete and UHPC of precast beams, columns and post-cast sections of nodes are simulated using C3D8R continuous solid elements.

[0189] The T3D2 element is used to simulate the axial stress and strain state of the steel bar.

[0190] Mild steel is simulated using shell element S4R.

[0191] (2) Meshing and finite element modeling

[0192] The grid is uniformly divided into 50mm grids.

[0193] 3. Interactions and boundary conditions of various components:

[0194] (1) Interaction

[0195] The connections between the prefabricated part and UHPC, between the upper and lower mild steel, and between the upper and lower mild steel and UHPC are simulated by setting the action of binding (Tie) constraints; coupling constraints are applied to the steel bars in the concrete beam-column nodes.

[0196] (2) Boundary conditions

[0197] The hinge connection between the top of the prefabricated column and the actuator is simulated by column end line loading. In order to prevent out-of-plane displacement, constraints are imposed on the displacement freedom of the column end out of the plane. Corresponding line constraints are set at the beam ends on both sides to limit the vertical displacement in the plane and the out-of-plane displacement. In terms of loading method, column end line loading is adopted, displacement controlled loading, and the test loading termination displacement and the limit loading displacement are both set to 56mm.

[0198] like Figure 6 Finite element model, (a) is the overall modeling, (b) is the steel skeleton modeling, and (c) is the overall finite element schematic diagram; Figure 7 It is a steel skeleton model with short lap joints of steel bars and post-cast UHPC; Figure 8 It is a post-cast UHPC with short lap joints of steel bars and a steel skeleton model with soft steel embedded in the upper and lower columns.

[0199] Result analysis: Fig. 9It can be seen that the pinching law of the hysteresis curve of the assembled node specimens with UHPC post-casting is basically consistent with that of the cast-in-place node specimens, indicating that the assembly connection method of "short lap joint of steel bar direct anchor" and UHPC post-casting can ensure the working performance of the steel bar, which is basically consistent with the bond performance of reinforced concrete in cast-in-place node specimens, and the slip is small. In addition, the hysteresis loop of the node with mild steel is obviously full, indicating that its energy dissipation capacity is significantly better than the other two nodes.

[0200] (II) Test and simulation results of prefabricated concrete frame structures with UHPC nodes

[0201] The site is loaded in stages according to Article 5.3.3 of GB / T50152-2012 "Standard for Test Methods of Concrete Structures". Before reaching the design load of the normal service limit state, each level of loading is 20% of the load value of the layer under the normal service limit state; after exceeding the design load of the normal service limit state, each level of loading is 10% of the load value of the layer under the normal service limit state. The duration of each level of loading is not less than 5 minutes. For one layer, according to the design requirements of the building structure load specification, the loading is loaded to 280kg / m 2 After stabilization for 1 hour, load to 560kg / m 2 , and then observe for 1 hour before unloading. For the second floor, load to 420kg / m according to the design requirements of the building structure load specification. 2 , after stabilizing for 1 hour, load to 600kg / m 2 , and then observe for 1 hour before unloading. See the field test photos for Fig.10 ; In the test results, the maximum mid-span deflection-load curve of precast concrete beams is shown in Fig.11 .

[0202] A finite element numerical model was established for the present invention (see the model picture). Fig.12 ), including: 1) reinforced concrete column-column joint with short lap joint of steel bar direct anchor, post-casting of UHPC, keyway + bubble film interface treatment; 3) reinforced concrete beam-column joint with short lap joint of steel bar direct anchor, post-casting of UHPC, keyway + bubble film interface treatment, and pre-embedded mild steel in the upper and lower columns. In the simulation results, the maximum mid-span deflection-load curve of precast concrete beam is shown in Fig.13 .

[0203] According to Article 3.4.3 of the Code for Design of Concrete Structures GB50010-2010 (2015 Edition), when the member is calculated to have a span of l 0 When the deflection is less than 7m, the deflection limit is l 0 / 200. Comparison of the maximum deflection-load curves in the test and simulation results shows that both meet the specifications.

[0204] (III) UHPC-conventional concrete interface bond-slip test results

[0205] This test adopts a single-sided push shear test, which is designed as a double "L" type shear specimen. All specimen materials are UHPC and C40 concrete. The specimen length × width × height is 200mm × 100mm × 400mm. The effective interface area is rectangular with a size of 200mm × 100mm. The detailed information of the specimen size and reinforcement is as follows Fig.14 shown.

[0206] A total of 24 specimens were designed for this test, including 21 UHPC-NC combination specimens and 3 integral casting specimens. Three specimens were designed for each set of parameters. Three different keyways were selected for interface treatment (keyway depth was 15 mm, width was 30 mm, and the angle between the bevel of the keyway and the bonding surface was 83°), such as Fig.15 and Fig.16 , 2 different sizes of bubble films (the large bubble film adopts 25mm specifications, and the small bubble film adopts 10mm specifications), and a combination of the two.

[0207] The keyway test piece is made of stainless steel to form the required keyway shape at the joint surface. After the test piece is formed and the mold is removed, the joint surface is serrated. The specific keyway size is as follows Fig.17 , Fig.18 and Fig.19 shown.

[0208] This test uses a 100t range pressure testing machine. Before formal loading, the specimen must be preloaded with a preload of 5kN to eliminate the gap between the specimen and the press. The values ​​of the concrete strain gauges on the UHPC side and the NC side of the specimen are observed. The difference is no more than 5%. Otherwise, the specimen position is readjusted and preloaded again until the requirements are met and formal loading begins. Formal loading uses displacement loading. When the load is less than 30kN, the loading rate is 0.1mm / min. When the load reaches 30kN, the loading rate is 0.05mm / min. When the specimen is split into two, it marks the destruction of the specimen and the loading ends. The loading equipment is as follows: Fig. 20 shown.

[0209] According to the test phenomena and the ultimate bearing capacity of each specimen, the influence of different interface treatment methods was analyzed and compared. The results show that under the same bonding area, the keyway treatment method is more effective than the bubble film treatment in improving the interface bonding force and delaying interface damage; under the keyway plus bubble film treatment method, as the number of keyways increases, the bubble film specifications become smaller and the bearing capacity increases.

[0210] The effect of interface treatment on interface bonding strength and shear stiffness was studied. The results show that as the keyway spacing and bubble film specifications become smaller, the interface bonding strength and shear stiffness increase accordingly. Under the condition that the volume loss rate of the test block is not too large, the rougher the interface treatment, the greater the friction and van der Waals force between the materials, and the better it can withstand external shear loads.

Claims

1. An assembled concrete frame structure system with nodes connected by UHPC, characterized in that: It comprises a precast concrete beam (1), a first-layer precast concrete lower column (2), a first-layer precast concrete upper column (3), a second-layer precast concrete column (4), a prestressed steel tube truss floor deck (5), a post-cast UHPC column-column node area (6), and a post-cast UHPC beam-column node area (7); The lower end of the first-layer precast concrete lower column (2) is connected to the foundation, and the upper end is connected to the collinear first-layer precast concrete upper column (3), and the connection between the two is a post-cast UHPC column-column node area (6); the top of the adjacent first-layer precast concrete upper column (3) is vertically connected to the horizontal precast concrete beam (1), and the top of the first-layer precast concrete upper column (3) is also connected to the lower end of the collinear second-layer precast concrete column (4), and the connection between the second-layer precast concrete column (4), the first-layer precast concrete upper column (3) and the precast concrete beam (1) is a post-cast UHPC beam-column node area (7); the top of the adjacent second-layer precast concrete column (4) is connected to the horizontal precast concrete beam (1); prestressed steel tube truss floor decking (5) is arranged in the horizontal area enclosed between the precast concrete beams (1) connected to the top of each first-layer precast concrete upper column (3) and the horizontal area enclosed between the precast concrete beams (1) connected to the top of each second-layer precast concrete column (4).

2. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 1 is characterized in that: A longitudinal lap steel bar I (31) extending downward is reserved at the lower end of the first layer of precast concrete upper column (3), and a pre-buried box-section steel I (32) extending downward is also pre-buried at the lower part of the first layer of precast concrete upper column (3), and the lower end surface of the first layer of precast concrete upper column (3) is a keyway (20) and the surface of the keyway (20) is a dense bubble groove; The upper end of the first layer of precast concrete lower column (2) is reserved with a longitudinal lap steel bar II (21) extending upward, the upper part of the first layer of precast concrete lower column (2) is also pre-buried with a pre-buried box-section steel II (22) extending upward, the upper end surface of the first layer of precast concrete lower column (2) is a keyway (20) and the surface of the keyway (20) is a dense bubble groove; A layer of precast concrete upper column (3) and a layer of precast concrete lower column (2) are formed in a nested manner at a post-cast UHPC column-column joint area (6) by inserting a pre-buried box-section steel I (32) into a pre-buried box-section steel II (22), and at the same time, longitudinal lap steel bars I (31) and longitudinal lap steel bars II (21) are overlapped at the post-cast UHPC column-column joint area (6) and connected by UHPC pouring.

3. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 2 is characterized in that: The longitudinal lap steel bars I (31) and the longitudinal lap steel bars II (21) are provided in plurality, corresponding to each other and arranged in staggered lap arrangement; the embedded parts of the embedded box-section steel I (32) and the embedded box-section steel II (22) are both connected with high-strength shear bolts (30); the lower part of the embedded box-section steel I (32) is inserted along the inner wall of the embedded box-section steel II (22) to achieve circumferential positioning between the two.

4. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 2 is characterized in that: Common steel formwork and movable tongue-and-groove steel formwork are installed on the lower part of the first layer of precast concrete upper column (3) and the upper part of the first layer of precast concrete lower column (2) to seal the post-cast UHPC column-column node area (6), and the movable tongue-and-groove steel formwork can serve as a node post-casting port.

5. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 4 is characterized in that: The ordinary steel formwork and the movable tongue-and-groove steel formwork are both provided with bolt holes for fixing to the side walls of a precast concrete upper column (3) and a precast concrete lower column (2) through high-strength bolts (40); The upper part of the common steel formwork is closely fixed to the lower side wall of a layer of precast concrete upper column (3), and the lower part is closely fixed to the upper side wall of a layer of precast concrete lower column (2), so as to cover the side of the post-cast UHPC column-column node area (6), and there are two common steel formworks, which respectively cover two of the side surfaces; The movable tongue-and-groove steel formwork comprises a fixed steel formwork and a movable steel formwork and a hinge connecting the two; the fixed steel formwork is tightly fixed to the upper side wall of a layer of precast concrete lower column (2); when the movable steel formwork is opened along the hinge, the opening can be used as a node post-casting gate; When the UHPC is poured, the movable steel formwork is rotated along the hinge to be closely attached to and fixed on the lower side wall of a precast concrete upper column (3), and the movable tongue-and-groove steel formwork can cover the side of the post-cast UHPC column-column joint area (6). There are two movable tongue-and-groove steel formworks, which correspond to two of the side surfaces respectively.

6. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 1 is characterized in that: The lower end surface of the second-layer precast concrete column (4) is reserved with a longitudinal lap steel bar III (41) extending downward, and an upper soft steel (43) is installed on the bottom surface. The bottom surface of the second-layer precast concrete column (4) is a keyway (20), and the surface of the keyway (20) is a dense bubble groove; the upper end of the first-layer precast concrete upper column (3) is reserved with a longitudinal lap steel bar IV (42) extending upward, and a lower soft steel (44) is installed on the top surface. The top surface of the first-layer precast concrete upper column (3) is a keyway (20), and the surface of the keyway (20) is a dense bubble groove; The second-floor precast concrete column (4) and the first-floor precast concrete upper column (3) are connected in the post-cast UHPC beam-column node area (7) by inserting the upper soft steel (43) into the lower soft steel (44), and at the same time, the longitudinal lap steel bars III (41) and the longitudinal lap steel bars IV (42) are overlapped and UHPC is poured in the post-cast UHPC beam-column node area (7); the end surface of the precast concrete beam (1) is reserved with longitudinal lap steel bars V (11), and the two horizontally opposite precast concrete beams (1) are overlapped and UHPC is poured in the post-cast UHPC beam-column node area (7).

7. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 6 is characterized in that: The longitudinal lap steel bars III (41) and the longitudinal lap steel bars IV (42) are arranged in a vertical direction and are multiple in number; the longitudinal lap steel bars III (41) and the longitudinal lap steel bars IV (42) correspond one to one and are overlapped in a staggered manner; the longitudinal lap steel bars V (11) of the two horizontally opposed precast concrete beams (1) are arranged in a horizontal direction and are multiple in number; the longitudinal lap steel bars V (11) of the two precast concrete beams (1) correspond one to one and are overlapped in a staggered manner.

8. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 6 is characterized in that: The upper soft steel (43) is installed on the bottom surface of the second-layer precast concrete column (4) through the pre-buried sleeve at the lower end of the second-layer precast concrete column (4) and the high-strength bolt (40); the lower soft steel (44) is installed on the top surface of the first-layer precast concrete upper column (3) through the pre-buried sleeve at the upper end of the first-layer precast concrete upper column (3) and the high-strength bolt (40); The post-cast UHPC beam-column node area (7) formed by the lower part of the second-story precast concrete column (4) and the upper part of the first-story precast concrete upper column (3) is supported by ordinary steel formwork.

9. The assembled concrete frame structure system with nodes connected by UHPC as claimed in claim 8, characterized in that: The upper soft steel (43) is a T-shaped steel, including a flange steel plate I (431) and a web steel plate I (432) vertically arranged thereunder, the upper soft steel (43) is made of low-yield soft steel, and bolt through holes are reserved on the flange steel plate I (431); the lower soft steel (44) is a T-shaped steel, including a flange steel plate II (441) and a web steel plate II (442) vertically arranged thereunder, and a vertical through seam is arranged in the middle of the web steel plate II (442), the lower soft steel (44) is made of low-yield soft steel, and bolt through holes are reserved on the flange steel plate II (441); The flange steel plate I (431) is fixed to the lower end of the second-story precast concrete column (4) by high-strength bolts (40) in conjunction with embedded sleeves, and the flange steel plate II (441) is fixed to the upper end of the first-story precast concrete upper column (3) by high-strength bolts (40) in conjunction with embedded sleeves. The web steel plate I (432) can be inserted into the vertical seam on the web steel plate II (442), and the web steel plate I (432) and the web steel plate II (442) intersect each other vertically in a cross. When the web steel plate I (432) is inserted into the vertical seam on the web steel plate II (442), the second-floor precast concrete column (4) and the first-floor precast concrete upper column (3) can be aligned.

10. The construction method of the assembled concrete frame structure system with nodes connected by UHPC according to claim 1, characterized in that: The following steps are involved: Step 1: Prepare a precast concrete upper column, a precast concrete lower column, a second-floor concrete column, a precast concrete beam, and a prestressed steel tube truss floor deck according to the seismic performance requirements; Step 2: Lift and fix the connection between the first layer of precast concrete lower column and the foundation, and short lap joint of steel bar straight anchor; Step 3: UHPC pouring and curing; Step 4: hoist a layer of precast concrete upper columns, insert the embedded box-section steel I of a layer of precast concrete upper columns into the embedded box-section steel II of a layer of precast concrete lower columns, and the embedded box-section steel I and the embedded box-section steel II are nested; the longitudinal lap steel bars of a layer of precast concrete upper columns and a layer of precast concrete lower columns are directly staggered and overlapped without binding; Step 5: Use steel formwork to support the formwork on site. Before supporting the formwork, brush the release agent on the inner side of the steel formwork used. When supporting the formwork of the post-cast UHPC column-column node area, first fix two ordinary steel formworks on opposite sides to close the connection area, and then fix two movable tongue-and-groove steel formworks on opposite sides as the post-casting of the connection area; Step 6: Casting UHPC, removing formwork, and curing; Step 7: Hoist the precast concrete beams on the first floor. The longitudinal reserved steel bars of the precast concrete beams are directly staggered and overlapped without binding; Step 8: Hoist the prestressed steel tube truss floor deck on the first floor, and surround the beam-column node area with steel mesh to prevent ordinary concrete from pouring into the beam-column node area when pouring the surface layer of the prestressed steel tube truss floor deck; Step 9: Support the formwork, pour the prestressed steel tube truss floor deck surface layer, remove the formwork, and maintain; Step 10: Hoist the second-floor precast concrete column, insert the upper soft steel of the second-floor precast concrete column into the lower soft steel of the first-floor precast concrete upper column in a cross shape; the longitudinal reserved steel bars of the second-floor precast concrete column and the first-floor precast concrete upper column are directly staggered and overlapped without binding; Step 11: Ordinary steel formwork is used on site to support the formwork. Before supporting the formwork, the mold release agent should be brushed on the inner side of the steel formwork. When supporting the formwork at different locations, the ordinary steel formwork should be fixed and UHPC post-casting holes should be reserved; Step 12: Casting UHPC, removing formwork, and curing; Step 13: The hoisting and pouring methods of the precast concrete beams and prestressed steel tube truss floor slabs on the second floor are the same as those on the first floor.