By prefabricating the load-bearing components and structural layer modules on the ground, forming a modular assembly unit and installing it to the main purlin, the problems of safety risks and low construction efficiency in traditional metal roof installations are solved, and safety and efficiency are improved.
Patent Information
- Application Number
- CN202411490438.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-10-24
AI Technical Summary
Traditional metal roof installation methods require a large number of high altitude operations, which poses high safety risks, is difficult to construct and inefficient.
Prefabricated load-bearing components and structural layer modules are used to form a modular assembly unit and installed on the main purlin through lifting equipment to reduce high-altitude operations and improve construction efficiency.
It reduces the safety risks of high-altitude operations, simplifies construction difficulty, improves construction efficiency and shortens construction cycle.
Smart Images

Figure CN119083740A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a metal roof installation method. Background Art
[0002] Metal roofs are widely used in large public buildings such as airports, stations, and exhibition halls. The traditional metal roof structure is mainly composed of main purlins, secondary purlins, structural layers, lining purlins, adapters, and upright lock-edge roof layers. The installation of metal roofs usually adopts the outdoor high-altitude scattered assembly method to assemble the above components one by one.
[0003] However, this form of high-altitude scattered assembly requires a large amount of on-site high-altitude operations, which has a high safety risk. In addition, there are many transition structures, welding and nailing processes during high-altitude operations, and the overlap between components requires high precision, which makes the construction difficult and takes a long time, reducing construction efficiency.
[0004] Therefore, it is urgent to propose a metal roof installation method to solve the above technical problems. Summary of the invention
[0005] The purpose of the present invention is to provide a metal roof installation method, which can reduce high-altitude operations, reduce construction difficulty and improve construction efficiency.
[0006] As conceived above, the technical solution adopted by the present invention is:
[0007] The present invention provides a metal roof installation method, comprising:
[0008] Installing C-shaped secondary purlins into the corrugated bottom plate on the ground to form a load-bearing assembly, and processing and assembling a plurality of the load-bearing assemblies;
[0009] Process and combine multiple structural layer modules on the ground;
[0010] Installing the structural layer modules to the bearing components one by one to form a plurality of assembly units;
[0011] Connecting a plurality of the assembly units to the main purlin in sequence, with two adjacent assembly units being connected to each other;
[0012] After the installation of the plurality of assembling units is completed, a superstructure is installed on top of the plurality of assembling units.
[0013] In some embodiments, the corrugated bottom plate includes a bottom wall, a first side wall and a second side wall, the first side wall and the second side wall are located at opposite ends of the bottom wall along its width direction, the first side wall and the second side wall extend vertically upward from the bottom wall, the top end of the first side wall is horizontally bent toward the second side wall to form a first flange, and a first accommodation space is formed between the first flange, the first side wall and the bottom wall;
[0014] Install the C-shaped secondary purlin into the corrugated base plate on the ground, including:
[0015] The C-shaped secondary purlin is inserted into the first accommodating space so that the opening of the C-shaped secondary purlin faces the second side wall.
[0016] In some embodiments, a second accommodation space is formed between the C-shaped secondary purlin, the bottom wall and the second side wall;
[0017] The structural layer modules are mounted one by one to the bearing components to form a plurality of assembly units, specifically:
[0018] The structural layer modules are installed in the second accommodation space in a one-to-one correspondence.
[0019] In some embodiments, a second flange is formed at the top end of the second side wall, and the second flange extends in the same direction as the first flange;
[0020] Connecting the plurality of assembly units to the main purlin in sequence, and connecting two adjacent assembly units to each other, specifically includes:
[0021] Using a lifting device, the plurality of assembly units are sequentially hoisted to preset positions on the main purlin, so that the second flange overlaps the top of the first flange of the adjacent assembly unit;
[0022] The assembly unit is connected to the main purlin by a first fastener, and two adjacent assembly units are connected by a second fastener.
[0023] In some embodiments, before installing the C-shaped secondary purlin into the corrugated base plate on the ground, the method further includes:
[0024] Processing the C-shaped secondary purlin and the corrugated bottom plate according to the roof shape;
[0025] Punching a first hole in the bottom wall, wherein the first hole is for the first fastener to pass through;
[0026] A second hole is punched in the C-shaped secondary purlin, a third hole is punched in the first side wall, and a fourth hole is punched in the second side wall, so that the second fastener can sequentially pass through the second hole, the third hole, and the fourth hole of the second side wall in the adjacent assembly unit, thereby connecting two adjacent assembly units through the second fastener.
[0027] In some embodiments, processing and assembling a plurality of structural layer modules on the ground specifically includes:
[0028] The roof vapor barrier, thermal insulation rock wool, sound insulation rock wool and thermal insulation film are sequentially combined from bottom to top to form the structural layer module.
[0029] In some embodiments, after the roof vapor barrier, thermal insulation rock wool, sound insulation rock wool, and thermal insulation film are sequentially combined from bottom to top to form the structural layer module, the following further comprises:
[0030] The joints in the structural layer modules are sealed.
[0031] In some embodiments, after the plurality of assembly units are installed, a superstructure is installed on top of the plurality of assembly units, specifically comprising:
[0032] Laying metal roofing bottom plates and waterproofing membranes on the tops of the plurality of assembly units in sequence;
[0033] After the metal roofing base plate and the waterproofing membrane are laid, a standing seam roof is laid on top of the waterproofing membrane.
[0034] In some embodiments, after the waterproof membrane is laid, the joints of the waterproof membrane are processed by hot air welding.
[0035] In some embodiments, before installing the C-shaped secondary purlin into the corrugated base plate on the ground, the method further includes:
[0036] Install the purlin brackets together with the main steel structure;
[0037] Installing the main purlin adapter on the purlin bracket;
[0038] The main purlin is installed to the main purlin adapter.
[0039] Beneficial effects of the present invention:
[0040] The metal roof installation method provided by the present invention converts most of the original high-altitude operations into ground operations by prefabricating and combining load-bearing components and structural layer modules on the ground, assembling the load-bearing components and the structural layer modules on the ground to form assembly units, and finally installing multiple modular assembly units on the main purlins, thereby reducing high-altitude operations and reducing the safety risks of independent high-altitude construction of various components in the load-bearing components and the structural layer modules. In addition, the construction difficulty of ground operations is low, which is conducive to improving construction efficiency and shortening construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the contents of the embodiments of the present invention and these drawings without paying any creative work.
[0042] Figure 1 is a schematic structural diagram of a bearing assembly provided by an embodiment of the present invention;
[0043] Figure 2 is a schematic structural diagram of an assembly unit provided by an embodiment of the present invention;
[0044] Figure 3 is a schematic diagram of the connection between the main purlin and the main steel structure provided by an embodiment of the present invention;
[0045] Figure 4 is a schematic diagram of the installation process of the assembly unit provided in an embodiment of the present invention;
[0046] Figure 5 It is a schematic diagram of the metal roofing provided by the embodiment of the present invention after installation.
[0047] In the figure:
[0048] 1. C-type secondary purlin;
[0049] 2. profiled bottom plate; 21. bottom wall; 22. first side wall; 23. second side wall; 24. first flange; 25. second flange;
[0050] 3. Main purlin;
[0051] 4. Purlin support;
[0052] 5. Main purlin adapter;
[0053] 100, load-bearing components; 200, structural layer modules; 300, assembly units; 400, superstructure; 500, main steel structure. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0055] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0057] In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or are the positions or positional relationships in which the inventive product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0058] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0059] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0060] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0061] like Figure 1 to Figure 5 As shown, the metal roof installation method provided in this embodiment includes:
[0062] Install the C-shaped secondary purlin 1 into the corrugated bottom plate 2 on the ground to form a load-bearing assembly 100, and process and assemble a plurality of load-bearing assemblies 100;
[0063] Processing and assembling a plurality of structural layer modules 200 on the ground;
[0064] Install the structural layer modules 200 to the bearing assembly 100 one by one to form a plurality of assembly units 300;
[0065] Connecting a plurality of assembly units 300 to the main purlin 3 in sequence, and connecting two adjacent assembly units 300 to each other;
[0066] After the installation of the plurality of assembling units 300 is completed, the upper structure 400 is installed on the top of the plurality of assembling units 300 .
[0067] Among them, the C-shaped secondary purlin 1 can be a hot-dip galvanized C-shaped steel pipe, and the corrugated bottom plate 2 can be a double-sided aluminum-zinc-magnesium corrugated steel plate. The C-shaped secondary purlin 1 and the corrugated bottom plate 2 are combined into a load-bearing component 100, and the load-bearing component 100 is then formed together with the assembled structural layer module 200 to form an assembly unit 300. The processing and formation of multiple assembly units 300 are all completed on the ground. Then, multiple assembly units 300 are installed to the main purlin in sequence, and the upper structure 400 is installed on the top of the multiple assembled units 300, and the overall installation of the metal roof is completed.
[0068] The metal roof installation method provided in the present embodiment converts most of the original high-altitude operations into ground operations by prefabricating and combining the load-bearing component 100 and the structural layer module 200 on the ground, assembling the load-bearing component 100 and the structural layer module 200 on the ground to form an assembly unit 300, and finally installing multiple modular assembly units 300 on the main purlin 3, thereby reducing the high-altitude operations and the safety risks of independent high-altitude construction of each component in the load-bearing component 100 and the structural layer module 200. In addition, the construction difficulty of the ground operation is low, which is conducive to improving construction efficiency and shortening the construction period.
[0069] In other possible embodiments, after the bearing components 100 and the structural layer modules 200 are prefabricated, multiple bearing components 100 may be connected to the main purlin 3 in sequence, and then multiple structural layer modules 200 may be installed one by one to the bearing components 100 on the main purlin 3. The specific construction steps may be determined according to actual conditions.
[0070] like Figure 1 As shown, in some embodiments, the corrugated bottom plate 2 includes a bottom wall 21, a first side wall 22 and a second side wall 23, the first side wall 22 and the second side wall 23 are located at opposite ends of the bottom wall 21 along its own width direction, the first side wall 22 and the second side wall 23 extend vertically upward from the bottom wall 21, and the top end of the first side wall 22 is horizontally bent toward the second side wall 23 to form a first flange 24, and a first accommodating space is formed between the first flange 24, the first side wall 22 and the bottom wall 21.
[0071] Installing the C-shaped secondary purlin 1 into the corrugated base plate 2 on the ground specifically includes:
[0072] The C-shaped secondary purlin 1 is inserted into the first accommodation space so that the opening of the C-shaped secondary purlin 1 faces the second side wall 23 .
[0073] Through such an arrangement, the C-shaped secondary purlin 1 is hidden in the corrugated base plate 2. When the assembly unit 300 is connected to the main purlin 3, the bottom wall 21 of the corrugated base plate 2 is directly overlapped with the main purlin 3. Compared with the traditional installation structure of the metal roof, the lining purlin and the "J"-shaped adapter can be omitted, thereby saving steel and shortening the construction time.
[0074] In addition, a second accommodation space is formed between the C-shaped secondary purlin 1, the bottom wall 21 and the second side wall 23;
[0075] The structural layer modules 200 are installed one by one to the bearing assembly 100 to form a plurality of assembly units 300, specifically:
[0076] The structural layer modules 200 are installed in the second accommodation space in a one-to-one correspondence.
[0077] The second accommodating space provides a dedicated embedding area for the structural layer module 200, making the positioning and installation of the structural layer module 200 more convenient. The structural layer module 200 and the bearing assembly 100 can be quickly docked and fixed, reducing the complexity of adjustment and alignment.
[0078] like Figure 1 As shown, in some embodiments, a second flange 25 is formed at the top end of the second side wall 23 , and the second flange 25 extends in the same direction as the first flange 24 .
[0079] Connecting a plurality of assembly units 300 to the main purlin 3 in sequence, and connecting two adjacent assembly units 300 to each other, specifically includes:
[0080] The plurality of assembly units 300 are sequentially hoisted to the preset positions on the main purlin 3 by hoisting equipment, so that the second flange 25 overlaps the top of the first flange 24 of the adjacent assembly unit 300;
[0081] The assembling unit 300 is connected to the main purlin 3 by a first fastener, and two adjacent assembling units 300 are connected by a second fastener.
[0082] Through such an arrangement, the design of the second flange 25 overlapping the first flange 24 provides a natural alignment guide for the two adjacent assembly units 300, which is conducive to simplifying the installation process; in addition, the first fastener can make the assembly unit 300 stably and firmly connected to the main purlin 3, and the second fastener can further enhance the connection strength of the two adjacent assembly units 300. Compared with the traditional welding method, the use of fasteners is more convenient for on-site control of installation quality.
[0083] Optionally, the first fastener and the second fastener may be bolts, screws, etc., which are not specifically limited herein.
[0084] Optionally, the lifting equipment may be a vehicle-mounted crane, a crane, etc., which is not specifically limited here.
[0085] Furthermore, before installing the C-shaped secondary purlin 1 into the corrugated bottom plate 2 on the ground, it also includes:
[0086] Processing C-shaped secondary purlins 1 and corrugated bottom plates 2 according to the shape of the roof;
[0087] Punching a first hole in the bottom wall 21, the first hole being for a first fastener to pass through;
[0088] A second hole is punched in the C-shaped secondary purlin 1, a third hole is punched in the first side wall 22, and a fourth hole is punched in the second side wall 23, so that the second fastener can pass through the second hole, the third hole, and the fourth hole of the second side wall 23 in the adjacent assembly unit 300 in sequence, thereby connecting two adjacent assembly units 300 through the second fastener.
[0089] By pre-punching holes in the C-shaped secondary purlin 1 and the corrugated base plate 2, they can be accurately set according to the design drawings, which helps to reduce or avoid hole position deviation problems. In this way, when installing the assembly unit 300, construction workers can quickly install the first fastener and the second fastener directly through the reserved holes, which helps to speed up the construction.
[0090] In some embodiments, processing and assembling a plurality of structural layer modules 200 on the ground specifically includes:
[0091] The roof vapor barrier, thermal insulation rock wool, sound insulation rock wool, and thermal insulation film are sequentially combined from bottom to top to form a structural layer module 200.
[0092] Roof vapor barriers are the bottom layer, preventing water vapor from penetrating upwards and protecting the insulation. Thermal insulation wool is located above the roof vapor barrier, providing thermal insulation and preventing heat loss. Acoustic insulation wool is usually located above the insulation layer to help reduce noise transmission. Thermal insulation membrane is the top layer, protecting the materials below and providing additional insulation.
[0093] Furthermore, after the roof vapor barrier, thermal insulation rock wool, sound insulation rock wool, and heat insulation film are sequentially combined from bottom to top to form the structural layer module 200, the method further includes:
[0094] The seams in the structural layer modules 200 are sealed.
[0095] Specifically, sealant or special tape may be used during the sealing process to prevent moisture leakage.
[0096] In some embodiments, after the multiple assembly units 300 are installed, the upper structure 400 is installed on the top of the multiple assembly units 300, which specifically includes:
[0097] Laying metal roofing bottom plates and waterproofing membranes on the tops of the multiple assembly units 300 in sequence;
[0098] After the metal roof base plate and waterproof membrane are laid, the vertical lock seam roof is laid on the top of the waterproof membrane.
[0099] That is, the upper structure 400 includes the metal roofing base plate, waterproofing membrane and standing seam roof from bottom to top. The metal roofing base plate provides a solid supporting structure for the roof, and the laying of waterproofing membrane and the design of standing seam roof together form a multi-layer waterproof system, which significantly improves the waterproof performance of the roof and effectively prevents rainwater from penetrating. In addition, the standing seam roof further enhances the overall rigidity and helps to resist wind loads and other external pressures.
[0100] Furthermore, after the waterproofing membrane is laid, the joints of the waterproofing membrane are treated by hot air welding to form a continuous waterproof layer.
[0101] Optionally, the waterproof membrane includes but is not limited to TPO (thermoplastic polyolefin) waterproof membrane.
[0102] In some embodiments, before installing the C-shaped secondary purlin 1 into the corrugated base plate 2 on the ground, the method further includes:
[0103] The purlin bracket 4 is installed together with the main steel structure 500; the main steel structure 500 is installed on the building foundation and is the main load-bearing frame of the building;
[0104] Install the main purlin adapter 5 on the purlin bracket 4;
[0105] Install the main purlin 3 to the main purlin adapter 5.
[0106] The purlin bracket 4 and the main purlin adapter 5 provide a stable supporting foundation for the subsequent main purlin 3, thereby enhancing the stability and bearing capacity of the entire roof structure.
[0107] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A metal roof installation method, characterized in that: include: Installing a C-shaped secondary purlin (1) into a corrugated base plate (2) on the ground to form a load-bearing assembly (100), and processing and assembling a plurality of the load-bearing assemblies (100); Processing and assembling a plurality of structural layer modules (200) on the ground; The structural layer modules (200) are mounted one by one on the bearing assembly (100) to form a plurality of assembly units (300); Connecting a plurality of the assembling units (300) to the main purlin (3) in sequence, with two adjacent assembling units (300) being connected to each other; After the installation of the plurality of assembling units (300) is completed, a superstructure (400) is installed on top of the plurality of assembling units (300).
2. The metal roof installation method according to claim 1, characterized in that: The corrugated bottom plate (2) comprises a bottom wall (21), a first side wall (22) and a second side wall (23); the first side wall (22) and the second side wall (23) are located at opposite ends of the bottom wall (21) along its width direction; the first side wall (22) and the second side wall (23) extend vertically upward from the bottom wall (21); the top end of the first side wall (22) is horizontally bent toward the second side wall (23) to form a first flange (24); a first accommodating space is formed between the first flange (24), the first side wall (22) and the bottom wall (21); Installing the C-shaped secondary purlin (1) into the corrugated base plate (2) on the ground, specifically includes: The C-shaped secondary purlin (1) is inserted into the first accommodating space so that the opening of the C-shaped secondary purlin (1) faces the second side wall (23).
3. The metal roof installation method according to claim 2, characterized in that: A second accommodation space is formed between the C-shaped secondary purlin (1), the bottom wall (21) and the second side wall (23); The structural layer modules (200) are mounted one by one on the bearing assembly (100) to form a plurality of assembly units (300), specifically: The structural layer modules (200) are installed in the second accommodation space in a one-to-one correspondence.
4. The metal roof installation method according to claim 2, characterized in that: A second flange (25) is formed at the top end of the second side wall (23), and the second flange (25) and the first flange (24) extend in the same direction; Connecting a plurality of the assembly units (300) to the main purlin (3) in sequence, and connecting two adjacent assembly units (300) to each other, specifically includes: Using a lifting device, the plurality of assembly units (300) are sequentially lifted to preset positions on the main purlin (3), so that the second flange (25) overlaps the top of the first flange (24) of the adjacent assembly unit (300); The assembling unit (300) is connected to the main purlin (3) by a first fastener, and two adjacent assembling units (300) are connected by a second fastener.
5. The metal roof installation method according to claim 4, characterized in that: Before installing the C-shaped secondary purlin (1) into the corrugated base plate (2) on the ground, the method further includes: Processing the C-shaped secondary purlin (1) and the corrugated bottom plate (2) according to the shape of the roof; Punching a first hole in the bottom wall (21), wherein the first hole is for the first fastener to pass through; A second hole is punched in the C-shaped secondary purlin (1), a third hole is punched in the first side wall (22), and a fourth hole is punched in the second side wall (23), so that the second fastener can sequentially pass through the second hole, the third hole, and the fourth hole of the second side wall (23) in the adjacent assembly unit (300), thereby connecting two adjacent assembly units (300) through the second fastener.
6. The metal roof installation method according to claim 1, characterized in that: Processing and assembling a plurality of structural layer modules (200) on the ground, specifically comprising: The roof vapor barrier, thermal insulation rock wool, sound insulation rock wool and thermal insulation film are sequentially combined from bottom to top to form the structural layer module (200).
7. The metal roof installation method according to claim 6, characterized in that: After the roof vapor barrier, thermal insulation rock wool, sound insulation rock wool and thermal insulation film are sequentially combined from bottom to top to form the structural layer module (200), the method further comprises: The joints in the structural layer module (200) are sealed.
8. The metal roof installation method according to claim 1, characterized in that: After the installation of the plurality of assembling units (300) is completed, a superstructure (400) is installed on top of the plurality of assembling units (300), which specifically includes: Laying metal roofing bottom plates and waterproofing coiled materials in sequence on the top of the plurality of assembly units (300); After the metal roofing base plate and the waterproofing membrane are laid, a standing seam roof is laid on top of the waterproofing membrane.
9. The metal roof installation method according to claim 8, characterized in that: After the waterproofing coiled material is laid, the joints of the waterproofing coiled material are processed by hot air welding.
10. The metal roof installation method according to any one of claims 1 to 9, characterized in that: Before installing the C-shaped secondary purlin (1) into the corrugated base plate (2) on the ground, the method further includes: Install the purlin bracket (4) together with the main steel structure (500); Installing a main purlin adapter (5) on the purlin bracket (4); The main purlin (3) is mounted on the main purlin adapter (5).
Citation Information
Patent Citations
Composite roof steel bearing metal plate system provided with metal purlines and construction method
CN108149850A
Embedded double-curved-surface continuously-welded stainless steel metal roof and construction method thereof
CN114482418A
Vertical lockrand metal roof system
CN212506976U
Modular roof structure
CN214614904U
Fixing elements for roof skins and to the use of such fixing elements in the production of sealed thermally insulated roofs
GB1427969A