Firework base manufacturing method based on 3D printing
Through 3D printing technology, the path is optimized, divided into multiple printing layers and interleaving steps, combined with the outer reinforcement ribs, the fracture and environmental problems of the firework base are solved, and high strength and aesthetics are improved.
Patent Information
- Application Number
- CN202411152662.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-12-06
AI Technical Summary
Most of the existing firework bases are made of disposable corrugated paper, which is unfriendly in the environment. The frequent start and stop of the granular printers when printing lead to poor fracture and structure, which affects strength and aesthetics.
Using 3D printing technology, by optimizing the printing path, it is divided into multiple sequentially connected printing layers and interleaved execution steps to reduce the generation of particle shape structures and strengthen the ribs on the outside to improve strength and aesthetics.
The high strength and environmental protection of the firework base are achieved, the generation of particle shape structure is reduced, the overall aesthetics and strength are improved, and the manufacturing cost is reduced.
Smart Images

Figure CN119085415A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fireworks, and in particular to a method for manufacturing a fireworks base based on 3D printing. Background Art
[0002] Most of the existing firework bases are made of corrugated paper. In order to ensure strength, the number of layers of corrugated paper can be multiple, or the corrugated paper can be soaked in glue and then dried, etc. However, no matter which method is used, these firework bases are disposable and are not environmentally friendly.
[0003] Based on this, the printed base made by 3D printing is a feasible idea, and based on cost considerations, it is more inclined to use a particle printer to produce the firework base. However, the particle printer melts the granular plastic and then outputs it. If it is used for printing, it must be started and stopped every time a cylinder of the firework base is printed, resulting in many fractures and particle-shaped structures in the final formed firework base, which not only affects the appearance, but also reduces the strength of the firework base. Summary of the invention
[0004] In view of the problems of the prior art, the present invention provides a method for manufacturing a firework base based on 3D printing, which reduces the generation of particle-shaped structures as much as possible by optimizing the printing path.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] The present invention provides a method for manufacturing a firework base based on 3D printing, comprising the following steps:
[0007] A. forming a first barrel layer, wherein the first barrel layer includes a plurality of first printing layers connected in sequence, and each first printing layer is formed at one time by 3D printing;
[0008] B. forming a second cylindrical layer on the top of the first cylindrical layer, wherein the second cylindrical layer includes a plurality of second printed layers connected in sequence, and each second printed layer is formed at one time by 3D printing;
[0009] C. forming the first cylinder layer on the top of the second cylinder layer;
[0010] D. Alternate steps B and C for m times, where m is a natural number greater than 1.
[0011] Furthermore, the first printing layer includes a plurality of cylinders arranged side by side, and a first connecting portion is provided between adjacent cylinders; step A specifically includes:
[0012] A1. Forming the first arc structure;
[0013] A2. forming a first connecting portion at the end of the first arc-shaped structure;
[0014] A3. Execute steps A1-A2 several times;
[0015] A4. Forming a cylinder, and then forming a second connecting portion at the end of the cylinder;
[0016] A5. forming a second arc-shaped structure at the end of the second connecting portion, and then forming a second connecting portion at the end of the second arc-shaped structure; wherein the second arc-shaped structure cooperates with the first arc-shaped structure to form a cylinder;
[0017] A6. Repeat step A5 several times, and after the last step A5, form a cylinder at the end of the second connecting portion;
[0018] A7. Forming a first connecting portion at the end of the annular structure in step A6, and then forming a first arc-shaped structure at the end of the first connecting portion;
[0019] A8. Repeat step A7 until all the first arc-shaped structures and all the second arc-shaped structures are matched one by one to form a cylinder;
[0020] A9. forming a first receiving section;
[0021] A10. Repeat steps A1-A9 until the first cylinder layer is formed.
[0022] Furthermore, in step A, adjacent first printing layers are arranged at intervals, and the material receiving portion is located between adjacent first printing layers and is connected to at least one first printing layer;
[0023] The first connection portion and the second connection portion are connected to each other, and the first connection portion and the second connection portion form a first connection structure.
[0024] Furthermore, the first arc-shaped structure and the second arc-shaped structure are both semicircular, and the first material receiving portion overlaps with one of the second trajectories.
[0025] Furthermore, the second printing layer includes a plurality of cylinders arranged in parallel, a second connecting portion is provided between adjacent cylinders, and the cylinders of the second printing layer are stacked one by one corresponding to the cylinders of the first printing layer; step B specifically includes:
[0026] B1. Forming a third arc structure at the top of a cylinder located at a position other than both ends;
[0027] B2. forming a third connecting portion at the end of the third arc-shaped structure;
[0028] B3. Execute steps B1-B2 several times; wherein each third arc-shaped structure is located on a different cylinder in the same row;
[0029] B4. forming a cylinder, and then forming a fourth connecting portion at the end of the cylinder;
[0030] B5. Forming a fourth arc-shaped structure at the end of the fourth connecting portion, and then forming a fourth connecting portion at the end of the cylinder; wherein the second arc-shaped structure cooperates with the first arc-shaped structure to form the cylinder;
[0031] B6. Repeat step B5 several times, and after the last step B5, form a cylinder at the end of the fourth connecting portion;
[0032] B7. Forming a fourth connecting portion at the end of the cylinder in step B6, and then forming a third arc-shaped structure at the end of the fourth connecting portion;
[0033] B8. Repeat step B7 until all third arc structures and all fourth arc structures are matched one by one to form a cylinder;
[0034] B9. Form the second material receiving section, and then pause 3D printing;
[0035] B10. Repeat steps B1-B9 until the second cylinder layer is formed.
[0036] Furthermore, when executing steps AD, it also includes: forming reinforcing ribs, wherein the reinforcing ribs are located on the outside of the firework base, and the number of reinforcing ribs on the same side is two.
[0037] Further, step A specifically includes:
[0038] 1) forming a fifth arc-shaped structure, and forming a fifth connecting portion at the end of the fifth arc-shaped structure;
[0039] 2) Taking the end of the fifth connecting portion as the starting point, execute step 1);
[0040] 3) Repeat step 2), when a large-sized structure is formed by connecting two fifth arc structures, take the end of the large arc structure as the point and continue to perform steps 1) and 2);
[0041] The fifth connecting portions formed twice adjacently are not located on the same straight line.
[0042] Furthermore, the central angle of the fifth arc-shaped structure is 90° or 60°.
[0043] Further, in step 3), the number of executions is two, so that the four fifth arc-shaped structures cooperate with the four fifth connecting parts to form the first printing layer, and the arc lines of the four fifth arc-shaped structures are all recessed into the sealing structure;
[0044] Step A also includes:
[0045] 4) Repeat step 3) until a first printing layer is formed;
[0046] 5) forming a semicircular sixth arc structure on the periphery of the first printed layer, and then forming a sixth connecting portion at the end of the sixth arc structure;
[0047] Wherein, a sixth arc-shaped structure cooperates with two adjacent fifth arc-shaped structures to form a cylinder.
[0048] Furthermore, before step A, the method further includes:
[0049] A plurality of supporting members are formed, each supporting member is used to support a cylinder, and channels are formed between the plurality of supporting members.
[0050] Beneficial effects of the present invention: The present invention divides a first cylinder layer into several first printing layers, and divides a second cylinder layer into several second printing layers through path planning. Each first printing layer and each second printing layer are formed at one time, thereby reducing the generation of particle structure as much as possible and improving the overall strength and aesthetics of the firework base. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is a flow chart of the present invention.
[0052] Figure 2 It is a schematic diagram of a firework base made by the present invention.
[0053] Figure 3 Schematic diagram of the first printing layer and the second printing layer of Example 1.
[0054] Figure 4 This is a schematic diagram of the first printing layer of Example 2.
[0055] Figure 5 This is a schematic diagram of the molding process of Example 3.
[0056] Figure numerals: 1—first arc structure, 2—first connecting part, 3—second arc structure, 4—second connecting part, 5—third arc structure, 6—third connecting part, 7—fourth arc structure, 8—fourth connecting part, 9—fifth arc structure, 10—fifth connecting part, 11—sixth arc structure, 12—sixth connecting part, 13—first printing layer, 14—second printing layer, 15—firework tube, 16—first material collecting part, 17—second material collecting part, 18—large arc structure, 20—first connecting structure, 21—reinforcing ribs. DETAILED DESCRIPTION
[0057] In order to facilitate the understanding of those skilled in the art, the present invention is further described below in conjunction with the embodiments and drawings, and the contents mentioned in the embodiments are not intended to limit the present invention. The present invention is described in detail below in conjunction with the drawings.
[0058] Example 1
[0059] like Figures 1 to 3 As shown, this embodiment provides a method for manufacturing a firework base based on 3D printing, comprising the following steps:
[0060] A. forming a first cylinder layer, wherein the first cylinder layer includes a plurality of first printing layers 13 connected in sequence, and each first printing layer 13 is formed once by 3D printing;
[0061] B. forming a second cylindrical layer on the top of the first cylindrical layer, wherein the second cylindrical layer includes a plurality of second printed layers 14 connected in sequence, and each second printed layer 14 is formed once by 3D printing;
[0062] C. forming the first cylinder layer on the top of the second cylinder layer;
[0063] D. Alternate steps B and C for m times, where m is a natural number greater than 1.
[0064] In this embodiment, the first printing layer 13 includes a plurality of cylinders arranged side by side, and a first connecting portion 2 is provided between adjacent cylinders; the second printing layer 14 includes a plurality of cylinders arranged side by side, and a second connecting portion 4 is provided between adjacent cylinders, and the cylinders of the second printing layer 14 are stacked one by one with the cylinders of the first printing layer 13.
[0065] That is, each time printing is performed, printing can be stopped only after the printing of a column of cylinders is completed, and then the printing is moved to the next position to perform the second printing, so that the particle shape structure generated by each pause in printing is located at the first connecting portion 2, thereby not affecting the appearance and strength of the cylinder; when printing the second cylinder layer, the printing method is changed from one column printing to one row printing, so that the cylinder of the second printing layer 14 overlaps with the cylinder of the first printing layer 13, and the second connecting portion 4 and the first connecting portion 2 are basically not staggered, so that adjacent cylinders can be connected through the first connecting portion 2 / second connecting portion 4, and all the firework tubes 15 after final molding can be regarded as a whole through the first connecting portion 2 and the second connecting portion 4, so as to ensure that each firework tube 15 remains upright and does not collapse or fall over.
[0066] The firework base produced by the present invention is made of plastic, so it has higher strength than the firework base made of corrugated paper and is environmentally friendly because it is recyclable; in addition, since printing is paused after printing a row / column of cylinders each time, not only is the number of particle-shaped structures generated very small, but these particle-shaped structures are located in non-cylinder positions as much as possible, which is beneficial to strengthening the strength of the corresponding first connecting portion 2 / second connecting portion 4.
[0067] In this embodiment, step A specifically includes:
[0068] A1. Forming the first arc-shaped structure 1;
[0069] A2. A first connecting portion 2 is formed at the end of the first arc-shaped structure 1;
[0070] A3. Execute steps A1-A2 several times;
[0071] A4. Forming a cylinder, and then forming a second connecting portion 4 at the end of the cylinder;
[0072] A5. Forming a second arc-shaped structure 3 at the end of the second connecting portion 4, and then forming a second connecting portion 4 at the end of the second arc-shaped structure 3; wherein the second arc-shaped structure 3 cooperates with the first arc-shaped structure 1 to form a cylinder;
[0073] A6. Repeat step A5 several times, and after the last step A5, a cylindrical body is formed at the end of the second connecting portion 4;
[0074] A7. Forming a first connecting portion 2 at the end of the annular structure in step A6, and then forming a first arc-shaped structure 1 at the end of the first connecting portion 2;
[0075] A8. Repeat step A7 until all the first arc-shaped structures 1 and all the second arc-shaped structures 3 are matched one by one to form a cylinder;
[0076] A9. forming a first receiving portion 16;
[0077] A10. Repeat steps A1-A9 until the first cylinder layer is formed.
[0078] For reference Figure 3As shown, the printing method adopted in this embodiment is: first, a semicircular first arc structure 1 is formed, and adjacent first arc structures 1 are connected by a straight-line first connecting portion 2; then, a cylinder is directly formed at the end, which is equivalent to making the forming path "turn around", and the subsequent process only needs to repeat the first connecting portion 2-second arc structure 3-..., during which part of the second arc structure 3 should form a closed annular cylinder with a first arc structure 1; then, after the cylinder is formed at the other end to achieve "turnaround", all the remaining second arc structures 3 are finally formed into closed cylinders by the first connecting portion 2-forming the first arc structure 1... method.
[0079] After the above-mentioned path forming, a first receiving portion 16 is formed at the end of the path. The first receiving portion 16 can be "L"-shaped, and its part is connected to the starting point of the path to close the first printing layer 13. The turning point is used as the position to form a "granular structure" when the print head is paused.
[0080] By setting the first material receiving section 16, the particle-shaped structure is not located in the main path of the first printing layer 13, and when the second printing layer 14 starts to be produced, the corresponding position of the second printing layer 14 can overlap with the particle-shaped structure, further reducing the generation of the particle-shaped structure.
[0081] Specifically, in step A, adjacent first printing layers 13 are spaced apart from each other, and the material receiving portion is located between adjacent first printing layers 13 and is connected to at least one first printing layer 13;
[0082] The first connection portion 2 and the second connection portion 4 are connected to each other, and the first connection portion 2 and the second connection portion 4 form a first connection structure 20 .
[0083] That is, the first connection portion 2 and the second connection portion 4 can be connected to each other or overlap each other, so as to form a first connection structure 20 with greater strength, so as to achieve the effect of strengthening the strength of the firework base.
[0084] Specifically, the first arc structure 1 and the second arc structure 3 are both semicircular, and the first material receiving portion 16 coincides with one of the second trajectories.
[0085] That is, the present invention divides a cylinder into two semicircles for molding, thereby realizing that the molding of a first printing layer 13 can be completed when 3D printing is performed according to one path, so that a firework base with basically no graininess can be printed using a particle printer, thereby reducing the manufacturing cost.
[0086] In this embodiment, step B specifically includes:
[0087] B1. A third arc-shaped structure 5 is formed at the top of a cylinder located at a position other than both ends;
[0088] B2. A third connecting portion 6 is formed at the end of the third arc-shaped structure 5;
[0089] B3. Execute steps B1-B2 several times; wherein each third arc-shaped structure 5 is located on different cylinders in the same row;
[0090] B4. Forming the cylinder, and then forming the fourth connecting portion 8 at the end of the cylinder;
[0091] B5. Forming a fourth arc-shaped structure 7 at the end of the fourth connecting portion 8, and then forming a fourth connecting portion 8 at the end of the cylinder; wherein the second arc-shaped structure 3 cooperates with the first arc-shaped structure 1 to form the cylinder;
[0092] B6. Repeat step B5 several times, and after the last step B5, a cylindrical body is formed at the end of the fourth connecting portion 8;
[0093] B7. Forming a fourth connecting portion 8 at the end of the cylinder in step B6, and then forming a third arc-shaped structure 5 at the end of the fourth connecting portion 8;
[0094] B8. Repeat step B7 until all third arc structures 5 and all fourth arc structures 7 are matched one by one to form a cylinder;
[0095] B9. Forming the second material receiving portion 17, and then pausing 3D printing;
[0096] B10. Repeat steps B1-B9 until the second cylinder layer is formed.
[0097] The shape of the first printing layer 13 is substantially the same as that of the second printing layer 14 , and the main difference lies in the printing path, so that the second printing layer 14 and the first printing layer 13 are perpendicular to each other in the projection of a plane.
[0098] Since part of the structure of the first material receiving portion 16 is perpendicular to the first connecting portion 2, when the second printed layer 14 is formed, a second connecting portion 4 will inevitably overlap with part of the structure of the material receiving portion, so that the two form a connected whole, and the particle-shaped structure is further transformed into a structure for improving the strength of the firework base, thereby achieving the effect of improving the aesthetics and strength at the same time.
[0099] In this embodiment, when executing steps AD, it also includes: forming reinforcing ribs 21, wherein the reinforcing ribs 21 are located on the outer side of the firework base, and the number of reinforcing ribs 21 on the same side is two.
[0100] That is, at the corresponding position of the firework base, it is also necessary to form a reinforcing rib 21, which can be formed separately, or formed together with the first print layer 13 / second print layer 14 after the paths of the specific first print layer 13 and the second print layer 14 are adjusted.
[0101] The function of the reinforcing ribs 21 is to "hold" each firework tube 15 so that the firework tube 15 will not fall outward, further improving the strength and maintaining the upright posture of the firework tube 15.
[0102] Specifically, before step A, the method further includes:
[0103] A plurality of supporting parts are formed, each supporting part is used to support a cylinder, and a channel is formed between the supporting parts. The supporting parts play the role of positioning the cylinder and supporting the fireworks, and the channel at the bottom is mainly used to make way for the fuse of the fireworks.
[0104] For ease of understanding, Figure 3 In the figure, the present invention uses thick lines to show the second printing layer, but in fact the shape, thickness, size, etc. of the cylinder of the first printing layer and the second printing layer are consistent.
[0105] Example 2
[0106] like Figure 4 As shown, the main difference between this embodiment and embodiment 1 is step A, specifically: step A specifically includes:
[0107] 1) forming a fifth arc-shaped structure 9, and forming a fifth connecting portion 10 at the end of the fifth arc-shaped structure 9;
[0108] 2) Taking the end of the fifth connecting portion 10 as the starting point, execute step 1);
[0109] 3) Repeat step 2), when a large arc structure 18 is formed by connecting two fifth arc structures 9, the end of the large arc structure 18 is used as a point to shape the large arc structure 18 to form a cylinder, or continue to perform steps 1) and 2);
[0110] The fifth connecting portions 10 formed twice adjacently are not located on the same straight line.
[0111] Based on this embodiment, the central angle of the fifth arc structure 9 is 90° or 60°. Figure 4 Taking the fifth arc structure 9 with a central angle of 90° as an example, that is, the fifth arc structure 9 is a quarter circle. Every time a fifth arc structure 9 is completed, it is necessary to form a fifth connecting portion 10 at its end, and then form another fifth arc structure 9...Through the above-mentioned continuous method, the effect of one-time forming of the first printing layer 13 can also be achieved.
[0112] In this embodiment, the specific steps of step B are similar to those of step A, and the main difference is that: in step A, multiple cylinders formed at one time are arranged in parallel, while in step B, multiple cylinders formed at one time are arranged in parallel, and the cylinder formed in step B is located directly above the cylinder formed in step A. In addition, the trajectory of step B is basically the same as that of step A, or slightly different, and those skilled in the art can set the trajectory path of step B based on the trajectory path of step A, which will not be repeated here.
[0113] Example 3
[0114] like Figure 5 As shown, this embodiment is a variation based on Embodiment 2, and the difference from Embodiment 2 is that:
[0115] In step 3), the operation is performed twice, so that the four fifth arc structures 9 cooperate with the four fifth connecting parts 10 to form the first printing layer 13, and the arc lines of the four fifth arc structures 9 are all recessed into the sealing structure;
[0116] Step A also includes:
[0117] 4) Repeat step 3) until a first printed layer 13 is formed;
[0118] 5) forming a semicircular sixth arc structure 11 on the periphery of the first printed layer 13, and then forming a sixth connecting portion 12 at the end of the sixth arc structure 11;
[0119] Among them, a sixth arc-shaped structure 11 cooperates with two adjacent fifth arc-shaped structures 9 to form a cylinder.
[0120] That is, based on this embodiment, each molding is as follows Figure 5 The jigsaw puzzle structure shown in the figure is then formed into a sixth arc structure 11, which is connected with two adjacent fifth arc structures 9 (the two fifth arc structures 9 belong to two jigsaw puzzle structures respectively) to form a cylinder. Similarly, the first cylinder layer can be layered with as few start and stop times as possible.
[0121] Similarly, in this embodiment, the second cylinder layer may be formed in a similar manner to the first cylinder layer, which will not be described in detail herein.
[0122] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention is disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with the profession can make some changes or modifications to equivalent embodiments of equivalent changes by using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent changes and modifications made to the above embodiments according to the technology of the present invention are within the scope of the technical solution of the present invention without departing from the content of the technical solution of the present invention.
Claims
1. A method for manufacturing a firework base based on 3D printing, characterized in that: The following steps are involved: A. forming a first barrel layer, wherein the first barrel layer includes a plurality of first printing layers connected in sequence, and each first printing layer is formed at one time by 3D printing; B. forming a second cylindrical layer on the top of the first cylindrical layer, wherein the second cylindrical layer includes a plurality of second printed layers connected in sequence, and each second printed layer is formed at one time by 3D printing; C. forming the first cylinder layer on the top of the second cylinder layer; D. Alternate steps B and C for m times, where m is a natural number greater than 1.
2. The method for manufacturing a firework base based on 3D printing according to claim 1, characterized in that: The first printing layer includes a plurality of cylinders arranged side by side, and a first connecting portion is provided between adjacent cylinders; step A specifically includes: A1. Forming the first arc structure; A2. forming a first connecting portion at the end of the first arc-shaped structure; A3. Execute steps A1-A2 several times; A4. Forming a cylinder, and then forming a second connecting portion at the end of the cylinder; A5. forming a second arc-shaped structure at the end of the second connecting portion, and then forming a second connecting portion at the end of the second arc-shaped structure; wherein the second arc-shaped structure cooperates with the first arc-shaped structure to form a cylinder; A6. Repeat step A5 several times, and after the last step A5, form a cylinder at the end of the second connecting portion; A7. Forming a first connecting portion at the end of the annular structure in step A6, and then forming a first arc-shaped structure at the end of the first connecting portion; A8. Repeat step A7 until all the first arc-shaped structures and all the second arc-shaped structures are matched one by one to form a cylinder; A9. forming a first receiving section; A10. Repeat steps A1-A9 until the first cylinder layer is formed.
3. The method for manufacturing a firework base based on 3D printing according to claim 2, characterized in that: In step A, adjacent first printing layers are spaced apart, and the material receiving portion is located between adjacent first printing layers and is connected to at least one first printing layer; The first connection portion and the second connection portion are connected to each other, and the first connection portion and the second connection portion form a first connection structure.
4. The method for manufacturing a firework base based on 3D printing according to claim 2, characterized in that: The first arc structure and the second arc structure are both semicircular, and the first material receiving portion overlaps with one of the second tracks.
5. The method for manufacturing a firework base based on 3D printing according to claim 1, characterized in that: The second printing layer includes a plurality of cylinders arranged in parallel, a second connecting portion is provided between adjacent cylinders, and the cylinders of the second printing layer are stacked one by one with the cylinders of the first printing layer; step B specifically includes: B1. Forming a third arc structure at the top of a cylinder located at a position other than both ends; B2. forming a third connecting portion at the end of the third arc-shaped structure; B3. Execute steps B1-B2 several times; wherein each third arc-shaped structure is located on a different cylinder in the same row; B4. forming a cylinder, and then forming a fourth connecting portion at the end of the cylinder; B5. Forming a fourth arc-shaped structure at the end of the fourth connecting portion, and then forming a fourth connecting portion at the end of the cylinder; wherein the second arc-shaped structure cooperates with the first arc-shaped structure to form the cylinder; B6. Repeat step B5 several times, and after the last step B5, form a cylinder at the end of the fourth connecting portion; B7. Forming a fourth connecting portion at the end of the cylinder in step B6, and then forming a third arc-shaped structure at the end of the fourth connecting portion; B8. Repeat step B7 until all third arc structures and all fourth arc structures are matched one by one to form a cylinder; B9. Form the second material receiving section, and then pause 3D printing; B10. Repeat steps B1-B9 until the second cylinder layer is formed.
6. The method for manufacturing a firework base based on 3D printing according to claim 1, characterized in that: When executing steps AD, the method further includes: forming reinforcing ribs, wherein the reinforcing ribs are located on the outside of the firework base, and the number of reinforcing ribs on the same side is two.
7. The method for manufacturing a firework base based on 3D printing according to claim 1, characterized in that: Step A specifically includes: 1) forming a fifth arc-shaped structure, and forming a fifth connecting portion at the end of the fifth arc-shaped structure; 2) Taking the end of the fifth connecting portion as the starting point, execute step 1); 3) Repeat step 2), when a large-sized structure is formed by connecting two fifth arc structures, take the end of the large arc structure as the point and continue to perform steps 1) and 2); The fifth connecting portions formed twice adjacently are not located on the same straight line.
8. The method for manufacturing a firework base based on 3D printing according to claim 7, characterized in that: The central angle of the fifth arc-shaped structure is 90° or 60°.
9. The method for manufacturing a firework base based on 3D printing according to claim 1, characterized in that: In step 3), the number of executions is two, so that the four fifth arc-shaped structures cooperate with the four fifth connecting parts to form the first printing layer, and the arc lines of the four fifth arc-shaped structures are all recessed into the sealing structure; Step A also includes: 4) Repeat step 3) until a first printing layer is formed; 5) forming a semicircular sixth arc structure on the periphery of the first printed layer, and then forming a sixth connecting portion at the end of the sixth arc structure; Wherein, a sixth arc-shaped structure cooperates with two adjacent fifth arc-shaped structures to form a cylinder.
10. The method for manufacturing a firework base based on 3D printing according to claim 1, characterized in that: Before step A, also include: A plurality of supporting members are formed, each supporting member is used to support a cylinder, and channels are formed between the plurality of supporting members.