Comprehensive scheduling method and system for power supply network

By calculating the voltage offset coefficient and power loss coefficient, controlling the circuit breaker status, the colinear interconnection and unified scheduling of the subway and urban railway power supply systems is solved, and the power quality and heat loss problems caused by the scheduling independence of the power supply network are improved. Comprehensive and integrity reduce the fault response time and the probability of misoperation.

CN119093379APending Publication Date: 2024-12-06CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411176180.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the prior art, the independent dispatch of subway and urban railway power supply systems makes it difficult to ensure the quality of power and reduce heat loss when the power supply network changes drastically, and the probability of misoperation of dispatchers is high.

Method used

By calculating the voltage offset coefficient and power loss coefficient, determining the target interruption state matrix, controlling the interruption state of the circuit breaker in the power supply network, realizing the colinear interconnection and unified scheduling of the subway and urban railway power supply systems, and using a unique power scheduling algorithm to adapt Instantaneously variable load.

Benefits of technology

It improves the comprehensiveness and integrity of the power scheduling of the railway power supply network in the colinear interconnection scenario of urban railway sections, shortens the fault response time, reduces the probability of failure caused by personnel misoperation, ensures the quality of power and reduces heat loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093379A_ABST
    Figure CN119093379A_ABST
Patent Text Reader

Abstract

The invention discloses a comprehensive scheduling method and system for a power supply network, and the method comprises the steps: calculating a voltage deviation coefficient of each node in the power supply network and an electric energy loss coefficient of each branch in the power supply network according to an input power network initial parameter and a boundary constraint condition of the power supply network, the power network initial parameters comprise an on-off state matrix used for representing the on-off state of the circuit breaker; under the condition that the voltage deviation coefficient is smaller than a target voltage deviation coefficient and the electric energy loss coefficient is smaller than a target electric energy loss coefficient, the current on-off state matrix corresponding to the voltage deviation coefficient and the electric energy loss coefficient is determined as a target on-off state matrix, and the target on-off state matrix is used for representing the on-off state of each branch circuit breaker; and controlling the on-off state of each branch circuit breaker in the power supply network according to the target on-off state matrix.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power supply network scheduling, and more specifically, to a comprehensive scheduling and system for a power supply network. Background Art

[0002] The development of shared-line interconnection between intercity railways and subways has facilitated inter-city exchanges within urban agglomerations and metropolitan areas.

[0003] At present, some areas have realized the interconnection of the power supply systems of subways and urban railways, but the dispatching of these two power supply systems is separate. If one of the power supply systems has a problem and needs support from the other power supply system, the railway dispatchers need to operate two independent dispatching systems at the same time, which is not only very time-consuming, but also prone to errors. In addition, it is impossible to ensure the power quality of each node and reduce the heat loss of each branch when the power supply network undergoes drastic changes.

[0004] Therefore, it becomes an urgent problem to provide a comprehensive dispatching method and system for the power supply network suitable for the scenario of co-line interconnection of subway and urban railway sections. Summary of the invention

[0005] In response to at least one defect or improvement need in the prior art, the present invention provides a comprehensive dispatching method and system for a power supply network, which realizes the co-interconnection of power supply systems of two different railway systems, namely the subway and the urban railway. A set of comprehensive dispatching methods can be used to uniformly dispatch two different power systems belonging to the urban railway and the subway, respectively. This not only improves the comprehensiveness and integrity of power dispatching of the railway power supply network in the co-interconnection scenario of the urban railway section, but also reduces the probability of failure of the railway dispatching system due to human error.

[0006] To achieve the above-mentioned purpose, according to the first aspect of the present invention, a comprehensive scheduling method for a power supply network is provided, the method comprising: calculating the voltage offset coefficient on each node in the power supply network and the electric energy loss coefficient on each branch according to the input initial parameters of the power network and the boundary constraints of the power supply network, wherein the initial parameters of the power network include an opening state matrix for representing the opening state of the circuit breaker; when the voltage offset coefficient is less than the target voltage offset coefficient and the electric energy loss coefficient is less than the target electric energy loss coefficient, determining the opening state matrix corresponding to the current voltage offset coefficient and the electric energy loss coefficient as the target opening state matrix, wherein the target opening state matrix is ​​used to represent the opening state of each branch circuit breaker; and controlling the opening state of each branch circuit breaker in the power supply network according to the target opening state matrix.

[0007] In an exemplary embodiment, calculating the voltage offset coefficient at each node in the power supply network and the power loss coefficient on each branch includes: obtaining the actual voltage and the rated voltage corresponding to each node in the power network; determining the difference between the actual voltage and the rated voltage to obtain the voltage offset value; and determining the square of the ratio between the voltage offset value and the rated voltage as the voltage offset coefficient.

[0008] In an exemplary embodiment, calculating the voltage offset coefficient at each node in the power supply network and the power loss coefficient on each branch includes: determining the terminal voltage of each branch in the power network, the active power flow power and the reactive power flow power flowing through each branch by the Newton-Raphson method; taking the sum of the square of the active power flow power and the square of the reactive power flow power as the first ratio; taking the square of the terminal voltage of each branch as the second ratio; determining the ratio between the first ratio and the second ratio as the target ratio; and determining the product of the target ratio and the resistance of each branch as the power loss coefficient.

[0009] In an exemplary embodiment, after calculating the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch, the method also includes: when the voltage offset coefficient is not less than the target voltage offset coefficient or the power loss coefficient is not less than the target power loss coefficient, multiplying the disconnection state matrix by the random state update matrix to obtain an updated disconnection state matrix; calculating the updated voltage offset coefficient of each branch and the updated power loss coefficient on each branch based on the updated disconnection state matrix; when the updated voltage offset coefficient is less than the target voltage offset coefficient and the updated power loss coefficient is less than the target power loss coefficient, determining the updated disconnection state matrix corresponding to the current updated voltage offset coefficient and the updated power loss coefficient as the target disconnection state matrix.

[0010] In an exemplary embodiment, multiplying the disconnection state matrix by the random state update matrix to obtain an updated disconnection state matrix includes: determining the random state update matrix based on a preset imitation coefficient and a preset stubborn coefficient, wherein the elements in the random state update matrix are composed of 0 and 1, and the elements correspond to the disconnection state of each branch circuit breaker, and the preset imitation coefficient and the preset stubborn coefficient are used to determine the degree of change of the random state update matrix.

[0011] In an exemplary embodiment, controlling the disconnection state of each branch circuit breaker in the power supply network according to the target disconnection state matrix includes: determining the target circuit breakers in each branch circuit breaker whose disconnection state is inconsistent with the disconnection state of each branch circuit breaker indicated by the target disconnection state matrix; sending a control signal to the target circuit breaker, wherein the control signal is used to change the disconnection state of the target circuit breaker; and controlling the disconnection state of the target circuit breaker in each branch circuit breaker according to the control signal.

[0012] According to the second aspect of the present invention, there is also provided a comprehensive dispatching system for a power supply network, which applies the comprehensive dispatching method for a power supply network as described above, and includes: a central management computer, communication cables, switches and circuit breakers; wherein the central management computer and the circuit breaker are interconnected via the communication cables and switches.

[0013] According to the third aspect of the present invention, there is also provided a comprehensive dispatching device for a power supply network, comprising: a first calculation unit, for calculating the voltage offset coefficient on each node in the power supply network and the electric energy loss coefficient on each branch according to the input initial parameters of the power network and the boundary constraints of the power supply network, wherein the initial parameters of the power network include an opening state matrix for representing the opening state of the circuit breaker; a determination unit, for determining the opening state matrix corresponding to the current voltage offset coefficient and the electric energy loss coefficient as the target opening state matrix when the voltage offset coefficient is less than the target voltage offset coefficient and the electric energy loss coefficient is less than the target electric energy loss coefficient, wherein the target opening state matrix is ​​used to represent the opening state of each branch circuit breakers; a control unit, for controlling the opening state of each branch circuit breakers in the power supply network according to the target opening state matrix.

[0014] According to a fourth aspect of the present invention, there is also provided a computer-readable storage medium, in which a computer program is stored, wherein the computer program is configured to execute the above-mentioned comprehensive scheduling method of the power supply network when running.

[0015] According to a fifth aspect of the present invention, there is also provided an electronic device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor executes the comprehensive scheduling method of the power supply network through the computer program.

[0016] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0017] (1) The present invention provides a comprehensive dispatching method for a power supply network, which is suitable for the comprehensive dispatching of a railway power supply network in a scenario where subways and urban railway sections are interconnected on the same line. The method combines the two original different power dispatching systems of the urban railway and the subway into one, thereby improving the comprehensiveness and integrity of the power dispatching of the railway power supply network in the scenario where the urban railway sections are interconnected on the same line. It not only shortens the response time of the urban railway and subway power supply systems to sudden failures in this state, but also reduces the probability of failure of the railway dispatching system due to human error.

[0018] (2) The present invention provides a comprehensive dispatching method for a power supply network, which adopts a unique power dispatching algorithm and can adapt to loads with large instantaneous changes such as subway drive motors and urban rail kinetic energy recovery and compensation devices. It can ensure the power quality of each node when the load in the network changes drastically, while reducing the heat loss of each branch. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 A schematic flow chart of an optional comprehensive scheduling method for a power supply network provided in an embodiment of the present application;

[0021] Figure 2 A schematic diagram of an optional integrated dispatching system for a power supply network provided in an embodiment of the present application;

[0022] Figure 3 A schematic flow chart of another optional comprehensive scheduling method for a power supply network provided in an embodiment of the present application;

[0023] Figure 4 A schematic diagram of the structure of an optional integrated dispatching device for a power supply network provided in an embodiment of the present application;

[0024] Figure 5 A schematic diagram of the structure of an optional electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0026] The terms "first", "second", "third", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.

[0027] According to one aspect of the embodiments of the present application, a comprehensive scheduling method for a power supply network is provided. Figure 1 The present invention describes a comprehensive scheduling method for a power supply network provided in an embodiment of the present application.

[0028] Figure 1 is a flow chart of an optional comprehensive scheduling method for a power supply network provided in an embodiment of the present application, such as Figure 1 As shown, the process of the method may include the following steps:

[0029] S102, calculating the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch according to the input power network initial parameters and the boundary constraints of the power supply network, wherein the power network initial parameters include an opening state matrix for representing the opening state of the circuit breaker.

[0030] S104, when the voltage offset coefficient is less than the target voltage offset coefficient and the power loss coefficient is less than the target power loss coefficient, the breaking state matrix corresponding to the current voltage offset coefficient and the power loss coefficient is determined as the target breaking state matrix, wherein the target breaking state matrix is ​​used to represent the breaking state of each branch circuit breaker.

[0031] S106, controlling the breaking state of each branch circuit breaker in the power supply network according to the target breaking state matrix.

[0032] An optional comprehensive scheduling method for a power supply network provided in an embodiment of the present application is applicable to scenarios where subway and urban rail sections are interconnected on the same line. It can ensure the power quality of each node and reduce the heat loss of each branch when the load of the power supply network changes drastically when the above two different power scheduling systems are uniformly scheduled.

[0033] Figure 2 A schematic diagram of an optional integrated dispatching system for a power supply network provided in an embodiment of the present application, such as Figure 2 As shown, the dispatching system may include a central management computer, switches and circuit breakers to achieve control over each transmission branch.

[0034] Combination Figure 1 and Figure 2 When the power supply network is comprehensively dispatched, the initial parameters of the power network can be input into the central management computer. It should be noted that the initial parameters of the power network can include the node branch association matrix M representing the topological structure of the power supply network, the branch matrix y representing the admittance of each branch of the power supply network, and the circuit breaker disconnection state matrix B representing the disconnection state of each branch circuit breaker. The boundary constraints of the railway power supply network are input into the central management computer, including the maximum voltage and current that each branch element can withstand, the maximum load that each terminal node may be connected to, and the maximum capacity that each power supply node can provide. Optionally, based on the input initial parameters of the power network and the boundary constraints of the power supply network, the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch can be calculated by the breathing calculation method.

[0035] After determining the voltage offset coefficients at each node in the current power supply network and the electric energy loss coefficients at each branch, the preset voltage offset coefficient (target voltage offset coefficient) and the electric energy loss coefficient (target electric energy loss coefficient) can be compared with the current values ​​calculated by the two, respectively. Optionally, the target voltage offset coefficient and the target electric energy loss coefficient can be target parameters input into the central management computer for the railway power supply network, which can be an ideal voltage offset coefficient and an ideal electric energy loss coefficient.

[0036] When the voltage offset coefficient is less than the target voltage offset coefficient and the power loss coefficient is less than the target power loss coefficient, the breaking state matrix corresponding to the current voltage offset coefficient and the power loss coefficient can be determined as the target breaking state matrix, and the breaking state of each branch circuit breaker in the power supply network can be controlled according to the target breaking state matrix to achieve an ideal scheduling effect.

[0037] Through the above steps S102 to S106, the voltage offset coefficient on each node in the power supply network and the electric energy loss coefficient on each branch are calculated according to the input power network initial parameters and the boundary constraints of the power supply network, wherein the power network initial parameters include an opening state matrix for representing the opening state of the circuit breaker; when the voltage offset coefficient is less than the target voltage offset coefficient and the electric energy loss coefficient is less than the target electric energy loss coefficient, the opening state matrix corresponding to the current voltage offset coefficient and the electric energy loss coefficient is determined as the target opening state matrix, wherein the target opening state matrix is ​​used to represent the opening state of each branch circuit breaker; according to the target opening state matrix, the power supply network is controlled. The on and off states of the circuit breakers in each branch of the railway realize the interconnection of the power supply systems of the two different railway systems, the subway and the urban railway. A set of comprehensive dispatching methods can be used to uniformly dispatch the two different power systems belonging to the urban railway and the subway. Each node voltage and each branch in the power network of the urban railway and the subway can be comprehensively considered, and the power supply networks of the intercity railway and the subway are integrated together at the power dispatching level. This not only improves the comprehensiveness and integrity of the power dispatching of the railway power supply network in the scenario of urban railway section co-line interconnection, but also shortens the response time of the urban railway and subway power supply systems in the state of section co-line interconnection to sudden faults, and reduces the probability of failure of the railway dispatching system due to human error.

[0038] In an exemplary embodiment, calculating the voltage deviation coefficient at each node in the power supply network and the power loss coefficient at each branch includes:

[0039] S11, obtaining the actual voltage and rated voltage corresponding to each node in the power network;

[0040] S12, determining the difference between the actual voltage and the rated voltage to obtain a voltage offset value;

[0041] S13, determining the square of the ratio of the voltage offset value to the rated voltage as the voltage offset coefficient.

[0042] In this embodiment, the voltage offset coefficient can be calculated based on the breathing calculation method. Optionally, the voltage offset coefficient α can be determined by the following formula:

[0043]

[0044] Among them, U i is the actual voltage of the ith node in the railway power network, U ie is the rated voltage of the ith node in the railway power network.

[0045] Through this embodiment, the voltage offset coefficient is calculated by the breathing calculation method, and each node voltage and each branch in the power network are comprehensively considered, thereby improving the comprehensiveness and integrity of power dispatching of the power supply network.

[0046] In an exemplary embodiment, calculating the voltage deviation coefficient at each node in the power supply network and the power loss coefficient at each branch includes:

[0047] S21, determining the terminal voltage of each branch in the power network, the active power flow and the reactive power flow through each branch by Newton-Raphson method;

[0048] S22, taking the sum of the square of the active power flow and the square of the reactive power flow as the first ratio;

[0049] S23, taking the square of the terminal voltage of each branch as the second ratio;

[0050] S24, determining a ratio between the first ratio and the second ratio as a target ratio;

[0051] S25, determining the product of the target ratio and the resistance of each branch as the power loss coefficient.

[0052] In this embodiment, the terminal voltage U of each branch in the power network can be determined by the Newton-Raphson method. i , the active power flow P flowing through each branch i and reactive power Q i , and then determine the power loss coefficient through the breathing calculation method.

[0053] Alternatively, the power loss factor may be determined by the following formula:

[0054]

[0055] In the formula, r i is the resistance of the i-th branch in the railway power network, P i is the active power flow through the i-th branch in the railway power network, Q i is the reactive power flow through the ith branch in the railway power network, U i is the terminal voltage of the i-th branch in the railway power network.

[0056] Through this embodiment, the power loss coefficient is calculated by the breathing calculation method, and each node voltage and each branch in the power network are comprehensively considered, thereby improving the comprehensiveness and integrity of power dispatching of the power supply network.

[0057] In an exemplary embodiment, after calculating the voltage deviation coefficient at each node in the power supply network and the power loss coefficient at each branch, the method further includes:

[0058] S31, when the voltage offset coefficient is not less than the target voltage offset coefficient or the power loss coefficient is not less than the target power loss coefficient, multiply the disconnection state matrix by the random state update matrix to obtain an updated disconnection state matrix;

[0059] S32, calculating an updated voltage offset coefficient of each branch and an updated electric energy loss coefficient on each branch based on the updated disconnection state matrix;

[0060] S33, when the updated voltage offset coefficient is smaller than the target voltage offset coefficient and the updated power loss coefficient is smaller than the target power loss coefficient, the updated disconnection state matrix corresponding to the current updated voltage offset coefficient and the updated power loss coefficient is determined as the target disconnection state matrix.

[0061] In this embodiment, the voltage offset coefficient is compared with the target voltage offset coefficient, and the power loss coefficient is compared with the target power loss coefficient. When the voltage offset coefficient is not less than the target voltage offset coefficient or the power loss coefficient is not less than the target power loss coefficient, it is necessary to control the on and off of the circuit breakers on some branches in the power supply network to achieve comprehensive scheduling of the power supply network.

[0062] Optionally, the disconnection state matrix can be updated using a random state update matrix to obtain an updated disconnection state matrix. The updated voltage offset coefficient of each branch and the updated electric energy loss coefficient on each branch are recalculated based on the updated disconnection state matrix. The voltage offset coefficient is compared with the target voltage offset coefficient, and the electric energy loss coefficient is compared with the target electric energy loss coefficient again, until the updated voltage offset coefficient is less than the target voltage offset coefficient, and the updated electric energy loss coefficient is less than the target electric energy loss coefficient. The updated disconnection state matrix corresponding to the current updated voltage offset coefficient and the updated electric energy loss coefficient can be determined as the target disconnection state matrix, and the on and off of each branch circuit breaker in the power supply network can be controlled according to the updated updated disconnection state matrix (target disconnection state matrix) after the update.

[0063] In an exemplary embodiment, multiplying the disconnection state matrix by the random state update matrix to obtain an updated disconnection state matrix includes:

[0064] S41, determine the random state update matrix based on the preset imitation coefficient and the preset stubborn coefficient, wherein the elements in the random state update matrix are composed of 0 and 1, and the elements correspond to the breaking state of each branch circuit breaker. The preset imitation coefficient and the preset stubborn coefficient are used to determine the degree of change of the random state update matrix.

[0065] In this embodiment, the random state update matrix can be determined based on the preset imitation coefficient and the preset stubborn coefficient, and the preset imitation coefficient and the preset stubborn coefficient are used to determine the degree of change of the random state update matrix. The elements in the random state update matrix can be composed of 0 and 1, and the elements correspond to the on-off state of each branch circuit breaker. For example, 0 indicates that the corresponding circuit breaker on the branch is open, and 1 indicates that the corresponding circuit breaker on the branch is closed; it can also be 0 to indicate that the corresponding circuit breaker on the branch is closed, and 1 to indicate that the corresponding circuit breaker on the branch is open.

[0066] For example, the random state update matrix X has the element x in the i-th row and j-th column. ij Satisfies the following formula:

[0067]

[0068] Where c1 is the imitation coefficient and c2 is the stubborn coefficient. Both c1 and c2 can be set by yourself to determine the degree of change of the random state update matrix X.

[0069] In an exemplary embodiment, controlling the disconnection state of each branch circuit breaker in the power supply network according to the target disconnection state matrix includes:

[0070] S51, determining a target circuit breaker among each branch circuit breaker whose breaking state is inconsistent with the breaking state of each branch circuit breaker indicated by the target breaking state matrix;

[0071] S52, sending a control signal to the target circuit breaker, wherein the control signal is used to change the opening state of the target circuit breaker;

[0072] S53, controlling the opening and closing state of the target circuit breaker in each branch circuit breaker according to the control signal.

[0073] like Figure 2 As shown, according to another aspect of an embodiment of the present application, a comprehensive dispatching system that applies the comprehensive dispatching method of the power supply network as described above is also provided, which can be applicable to the comprehensive dispatching of railway power supply networks in scenarios where subway and urban rail sections are interconnected on the same line.

[0074] Exemplarily, the integrated dispatching system of the power supply network may include a central management computer, a communication cable, a switch and a circuit breaker. Here, the central management computer may be installed in a control room, the circuit breaker may be installed on each branch of the railway power supply network, and the central management computer and the circuit breaker may be interconnected through a communication cable and a switch. The central management computer may control the circuit breaker opening and closing state by sending a control signal to the circuit breaker, and the control signal may be transmitted through the communication cable and the switch.

[0075] Furthermore, the central management computer can realize the comprehensive dispatch of the entire subway-urban railway power supply network, the circuit breaker is responsible for the opening and closing of the power grid branch where it is located, and the communication cable is responsible for transmitting the control signal issued by the central management computer and the feedback signal issued by the circuit breaker. The switch is responsible for amplifying and forwarding the electrical signal transmitted in the communication cable, so that the electrical signal can be transmitted farther through the communication cable. It should be noted that the transmission of the control / feedback electrical signal is carried out according to the CSMA / CD (Carrier Sense Multiple Access, Carrier Sense Multiple Access / Collision Detection) protocol.

[0076] Optionally, after determining the target disconnection state matrix, the target circuit breakers among the branch circuit breakers whose disconnection states are inconsistent with the disconnection states of the branch circuit breakers indicated by the target disconnection state matrix can be determined, that is, the circuit breakers whose on / off states need to be changed. After determining the target circuit breakers, the central management computer can send a control signal to the target circuit breaker, and the control signal can be transmitted through the communication cable and the switch. After the circuit breaker receives the control signal sent by the central management computer, it can change its disconnection state according to the control signal.

[0077] Through this embodiment, the power supply network is dispatched and controlled as a whole, which can adapt to loads with large instantaneous changes such as subway drive motors and urban rail kinetic energy recovery and compensation devices. It can ensure the power quality of each node when the load in the network changes drastically, while reducing the heat loss of each branch.

[0078] The following is an explanation of the comprehensive dispatching method of the power supply network in the embodiment of the present application in conjunction with an optional example. The comprehensive dispatching method of the power supply network in this optional example can be applied to the comprehensive dispatching scenario of subway and railway power supply networks, such as Figure 3 As shown, the process of the comprehensive scheduling method of the power supply network in this optional example may include the following steps:

[0079] S302, start.

[0080] S304, input initial parameters, boundary constraints and target parameters.

[0081] Input the initial parameters of the power network into the central management computer, including the node-branch association matrix M representing the topological structure of the railway power supply network, the branch matrix y representing the admittance of each branch of the power supply network, and the circuit breaker disconnection state matrix B representing the disconnection state of each branch circuit breaker. Input the boundary constraints of the railway power supply network into the central management computer, including the maximum voltage and current that each branch element can withstand, the maximum load that each terminal node may be connected to, and the maximum capacity that each power supply node can provide. Input the target parameters of the railway power supply network into the central management computer, including the ideal voltage deviation coefficient and the ideal power loss coefficient.

[0082] S306, using the breathing calculation method to calculate the voltage offset coefficient and the power loss coefficient.

[0083] The breathing calculation method is used to calculate the voltage deviation coefficient α on each node in the railway power supply network and the power loss coefficient β on each branch, and these two coefficients are compared with the set ideal coefficients.

[0084] S308, determine whether the calculated value is less than the reference value, if so, execute step S316; if not, execute step S310.

[0085] It is determined whether the calculated values ​​of the voltage offset coefficient and the electric energy loss coefficient calculated by the breathing calculation method are less than the reference values.

[0086] S310, multiplying the circuit breaker disconnection state matrix by a random state update matrix.

[0087] The circuit breaker opening state matrix B is multiplied by a random state update matrix X to obtain a new circuit breaker opening state matrix B'.

[0088] S312, recalculating the voltage offset coefficient and the power loss coefficient.

[0089] The new circuit breaker disconnection state matrix B' is used to recalculate the voltage deviation coefficient α at each node in the railway power supply network and the power loss coefficient on each branch.

[0090] S314, determine whether the recalculated value is less than the reference value, if so, execute step S316; if not, execute step S310.

[0091] S316, changing the disconnection state of each circuit breaker according to the current circuit breaker disconnection state matrix.

[0092] The central management computer records the circuit breaker disconnection state matrix at this time, and changes the disconnection state of each circuit breaker in the railway power supply network according to the circuit breaker disconnection state data recorded in the matrix at this time.

[0093] S318, stop.

[0094] Through this embodiment, the two original different power dispatching systems for urban rail and subway are combined into one, which improves the comprehensiveness and integrity of the power dispatching of the railway power supply network in the scenario of urban rail section co-line interconnection. It not only shortens the response time of the urban rail and subway power supply systems to sudden failures in this state, but also reduces the probability of failure of the railway dispatching system due to human misoperation. It adopts a unique power dispatching algorithm that can adapt to loads with large instantaneous changes such as subway drive motors and urban rail kinetic energy recovery and compensation devices, and can ensure the power quality of each node when the load in the network changes drastically, while reducing the heat loss of each branch.

[0095] According to another aspect of an embodiment of the present application, there is also provided a comprehensive scheduling device for implementing the above-mentioned comprehensive scheduling method for the power supply network. Figure 4 is a schematic diagram of the structure of an optional integrated dispatching device for a power supply network according to an embodiment of the present application, such as Figure 4 As shown, the device may include:

[0096] A first calculation unit 402 is used to calculate the voltage offset coefficient of each node in the power supply network and the power loss coefficient of each branch according to the input power network initial parameters and the boundary constraints of the power supply network, wherein the power network initial parameters include an opening state matrix for indicating the opening state of the circuit breaker;

[0097] A determining unit 404 is used to determine the breaking state matrix corresponding to the current voltage offset coefficient and the electric energy loss coefficient as a target breaking state matrix when the voltage offset coefficient is less than a target voltage offset coefficient and the electric energy loss coefficient is less than a target electric energy loss coefficient, wherein the target breaking state matrix is ​​used to represent the breaking state of each branch circuit breaker;

[0098] The control unit 406 is used to control the disconnection state of each branch circuit breaker in the power supply network according to the target disconnection state matrix.

[0099] It should be noted that the first calculation unit 402 in this embodiment can be used to execute the above step S102, the determination unit 404 in this embodiment can be used to execute the above step S104, and the control unit 406 in this embodiment can be used to execute the above step S106.

[0100] Through the above module, the voltage offset coefficient on each node in the power supply network and the electric energy loss coefficient on each branch are calculated according to the input initial parameters of the power network and the boundary constraints of the power supply network, wherein the initial parameters of the power network include an opening state matrix used to represent the opening state of the circuit breaker; when the voltage offset coefficient is less than the target voltage offset coefficient and the electric energy loss coefficient is less than the target electric energy loss coefficient, the opening state matrix corresponding to the current voltage offset coefficient and the electric energy loss coefficient is determined as the target opening state matrix, wherein the target opening state matrix is ​​used to represent the opening state of each branch circuit breaker; according to the target opening state matrix, the circuit breakers of each branch in the power supply network are controlled. The on / off state of the circuit breaker realizes the interconnection of the power supply systems of the two different railway systems, the subway and the urban railway. A set of comprehensive dispatching methods can be used to uniformly dispatch the two different power systems belonging to the urban railway and the subway. Each node voltage and each branch in the power network of the urban railway and the subway can be comprehensively considered, and the power supply networks of the intercity railway and the subway are integrated together at the power dispatching level. It not only improves the comprehensiveness and integrity of the power dispatching of the railway power supply network in the scenario of urban railway section co-line interconnection, but also shortens the response time of the urban railway and subway power supply systems in the state of section co-line interconnection to sudden faults, and reduces the probability of failure of the railway dispatching system due to personnel misoperation.

[0101] In an exemplary embodiment, the first computing unit includes:

[0102] An acquisition module is used to obtain the actual voltage and rated voltage corresponding to each node in the power network;

[0103] A first determination module is used to determine the difference between the actual voltage and the rated voltage to obtain a voltage offset value;

[0104] The second determining module is used to determine the square of the ratio between the voltage offset value and the rated voltage as the voltage offset coefficient.

[0105] In an exemplary embodiment, the first computing unit includes:

[0106] The third determination module is used to determine the terminal voltage of each branch in the power network, the active power flow and the reactive power flow through each branch by Newton-Raphson method;

[0107] A first ratio module, configured to take the sum of the square of the active power flow and the square of the reactive power flow as a first ratio;

[0108] A second ratio module, used for taking the square of the terminal voltage of each branch as a second ratio;

[0109] a fourth determination module, configured to determine a ratio between the first ratio and the second ratio as a target ratio;

[0110] The fifth determination module is used to determine the product of the target ratio and the resistance of each branch as the power loss coefficient.

[0111] In an exemplary embodiment, the above device further comprises:

[0112] A first updating unit is used to multiply the disconnection state matrix by the random state update matrix to obtain an updated disconnection state matrix when the voltage offset coefficient is not less than the target voltage offset coefficient or the power loss coefficient is not less than the target power loss coefficient;

[0113] A second calculation unit is used to calculate an updated voltage offset coefficient of each branch and an updated electric energy loss coefficient on each branch based on the updated disconnection state matrix;

[0114] The second updating unit is used to determine the updated disconnecting state matrix corresponding to the current updated voltage offset coefficient and the updated power loss coefficient as the target disconnecting state matrix when the updated voltage offset coefficient is less than the target voltage offset coefficient and the updated power loss coefficient is less than the target power loss coefficient.

[0115] In an exemplary embodiment, the first updating unit includes:

[0116] The sixth determination module is used to determine the random state update matrix based on the preset imitation coefficient and the preset stubborn coefficient, wherein the elements in the random state update matrix are composed of 0 and 1, and the elements correspond to the opening and closing states of each branch circuit breaker. The preset imitation coefficient and the preset stubborn coefficient are used to determine the degree of change of the random state update matrix.

[0117] In an exemplary embodiment, the control unit comprises:

[0118] A seventh determination module is used to determine a target circuit breaker among the branch circuit breakers whose breaking states are inconsistent with the breaking states of the branch circuit breakers indicated by the target breaking state matrix;

[0119] A sending module, used for sending a control signal to a target circuit breaker, wherein the control signal is used for changing the opening and closing state of the target circuit breaker;

[0120] The control module is used to control the opening and closing state of the target circuit breaker in each branch circuit breaker according to the control signal.

[0121] It should be noted here that the examples and scenarios implemented by the above-mentioned modules and corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned embodiments. It should be noted that the above-mentioned modules as part of the device can run in a hardware environment and can be implemented by software or hardware, wherein the hardware environment includes a network environment.

[0122] According to another aspect of the embodiments of the present application, a storage medium is further provided. Optionally, in this embodiment, the storage medium can be used to execute the program code of any of the above-mentioned comprehensive scheduling methods for power supply networks in the embodiments of the present application.

[0123] Optionally, in this embodiment, the storage medium is configured to store program codes for executing the following steps:

[0124] S1, according to the input power network initial parameters and the boundary constraints of the power supply network, calculate the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch, wherein the power network initial parameters include an opening state matrix for representing the opening state of the circuit breaker.

[0125] S2, when the voltage offset coefficient is less than the target voltage offset coefficient and the power loss coefficient is less than the target power loss coefficient, the breaking state matrix corresponding to the current voltage offset coefficient and the power loss coefficient is determined as the target breaking state matrix, wherein the target breaking state matrix is ​​used to represent the breaking state of each branch circuit breaker.

[0126] S3, controlling the breaking state of each branch circuit breaker in the power supply network according to the target breaking state matrix.

[0127] Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments, which will not be described in detail in this embodiment.

[0128] Among them, computer-readable storage media may include, but are not limited to, any type of disk, including floppy disks, optical disks, DVDs, CD-ROMs, microdrives and magneto-optical disks, ROMs, RAMs, EPROMs, EEPROMs, DRAMs, VRAMs, flash memory devices, magnetic or optical cards, nanosystems (including molecular memory ICs), or any type of medium or device suitable for storing instructions and / or data.

[0129] According to another aspect of an embodiment of the present application, an electronic device for implementing the above-mentioned comprehensive scheduling method of the power supply network is also provided. The electronic device may be a server, a terminal, or a combination thereof.

[0130] Figure 5 is a schematic diagram of the structure of an optional electronic device according to an embodiment of the present application, such as Figure 5 As shown, it includes a processor 502, a communication interface 504, a memory 506 and a communication bus 508, wherein the processor 502, the communication interface 504, and the memory 506 communicate with each other through the communication bus 508, wherein:

[0131] Memory 506, used for storing computer programs;

[0132] The processor 502 is used to execute the computer program stored in the memory 506 to implement the following steps:

[0133] S1, according to the input power network initial parameters and the boundary constraints of the power supply network, calculate the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch, wherein the power network initial parameters include an opening state matrix for representing the opening state of the circuit breaker.

[0134] S2, when the voltage offset coefficient is less than the target voltage offset coefficient and the power loss coefficient is less than the target power loss coefficient, the breaking state matrix corresponding to the current voltage offset coefficient and the power loss coefficient is determined as the target breaking state matrix, wherein the target breaking state matrix is ​​used to represent the breaking state of each branch circuit breaker.

[0135] S3, controlling the breaking state of each branch circuit breaker in the power supply network according to the target breaking state matrix.

[0136] Optionally, the communication bus may be a PCI (Peripheral Component Interconnect) bus, or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 5 The communication interface is used for communication between the electronic device and other devices.

[0137] The memory may include RAM, or may include non-volatile memory, such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0138] As an example, the memory 506 may include, but is not limited to, the first calculation unit 402, the determination unit 404, and the control unit 406 in the integrated dispatching device of the power supply network. In addition, it may also include, but is not limited to, other module units in the integrated dispatching device of the power supply network, which will not be repeated in this example.

[0139] The above-mentioned processor can be a general-purpose processor, which can include but not be limited to: CPU (Central Processing Unit), NP (Network Processor), etc.; it can also be DSP (Digital Signal Processing), ASIC (Application Specific Integrated Circuit), FPGA (Field-Programmable Gate Array) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0140] Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments, and this embodiment will not be described in detail here.

[0141] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0142] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0143] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0144] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0145] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0146] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: U disk, read-only memory (ROM), random access memory (RAM), mobile hard disk, disk or optical disk and other media that can store program code.

[0147] A person of ordinary skill in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable memory, which can include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0148] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of the implementation scheme of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are regarded as exemplary only, and the scope and spirit of the present disclosure are defined by the claims.

[0149] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0150] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A comprehensive dispatching method for a power supply network, characterized in that: include: Calculating the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch according to the input power network initial parameters and the boundary constraints of the power supply network, wherein the power network initial parameters include an opening state matrix for representing the opening state of the circuit breaker; When the voltage offset coefficient is less than the target voltage offset coefficient and the power loss coefficient is less than the target power loss coefficient, the breaking state matrix corresponding to the current voltage offset coefficient and the power loss coefficient is determined as the target breaking state matrix, wherein the target breaking state matrix is ​​used to represent the breaking state of each branch circuit breaker; According to the target disconnection state matrix, the disconnection state of each branch circuit breaker in the power supply network is controlled.

2. The comprehensive dispatching method for power supply network according to claim 1, characterized in that: The calculating of the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch includes: Obtaining the actual voltage and the rated voltage corresponding to each node in the power network; Determine the difference between the actual voltage and the rated voltage to obtain a voltage offset value; The square of the ratio of the voltage offset value to the rated voltage is determined as the voltage offset coefficient.

3. The comprehensive dispatching method for power supply network according to claim 1, characterized in that: The calculating of the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch includes: Determine the terminal voltage of each branch in the power network, the active power flow and the reactive power flow through each branch by Newton-Raphson method; Taking the sum of the square of the active power flow and the square of the reactive power flow as a first ratio; Taking the square of the terminal voltage of each branch as the second ratio; determining a ratio between the first ratio and the second ratio as a target ratio; The product of the target ratio and the resistance of each branch is determined as the power loss coefficient.

4. The comprehensive dispatching method for power supply network according to claim 1, characterized in that: After calculating the voltage offset coefficient on each node in the power supply network and the power loss coefficient on each branch, the method further includes: When the voltage offset coefficient is not less than the target voltage offset coefficient or the power loss coefficient is not less than the target power loss coefficient, multiplying the disconnection state matrix by a random state update matrix to obtain an updated disconnection state matrix; Calculating an updated voltage offset coefficient of each branch and an updated electric energy loss coefficient on each branch based on the updated disconnection state matrix; When the updated voltage offset coefficient is smaller than the target voltage offset coefficient and the updated power loss coefficient is smaller than the target power loss coefficient, the updated disconnection state matrix corresponding to the current updated voltage offset coefficient and the updated power loss coefficient is determined as the target disconnection state matrix.

5. The comprehensive dispatching method for power supply network according to claim 4, characterized in that: The step of multiplying the disconnection state matrix by the random state update matrix to obtain an updated disconnection state matrix comprises: The random state update matrix is ​​determined based on a preset imitation coefficient and a preset stubborn coefficient, wherein the elements in the random state update matrix are composed of 0 and 1, and the elements correspond to the opening and closing states of the branch circuit breakers. The preset imitation coefficient and the preset stubborn coefficient are used to determine the degree of change of the random state update matrix.

6. The comprehensive dispatching method for power supply network according to claim 1, characterized in that: The controlling the disconnection state of each branch circuit breaker in the power supply network according to the target disconnection state matrix comprises: Determine a target circuit breaker among the branch circuit breakers whose breaking state is inconsistent with the breaking state of the branch circuit breakers indicated by the target breaking state matrix; Sending a control signal to the target circuit breaker, wherein the control signal is used to change the opening state of the target circuit breaker; The opening and closing states of the target circuit breakers in each branch circuit breaker are controlled according to the control signal.

7. A comprehensive dispatching system for a power supply network, applying the comprehensive dispatching method for a power supply network as claimed in any one of claims 1 to 6, characterized in that: include: central management computers, communications cables, switches, and circuit breakers; Wherein, the central management computer and the circuit breaker are connected to each other through the communication cable and the switch.

8. A comprehensive dispatching device for a power supply network, characterized in that: include: A first calculation unit is used to calculate the voltage offset coefficient of each node in the power supply network and the power loss coefficient of each branch according to the input power network initial parameters and the boundary constraints of the power supply network, wherein the power network initial parameters include an opening state matrix for indicating the opening state of the circuit breaker; a determining unit, configured to determine the breaking state matrix corresponding to the current voltage offset coefficient and the electric energy loss coefficient as a target breaking state matrix when the voltage offset coefficient is less than a target voltage offset coefficient and the electric energy loss coefficient is less than a target electric energy loss coefficient, wherein the target breaking state matrix is ​​used to represent the breaking state of each branch circuit breaker; A control unit is used to control the breaking state of each branch circuit breaker in the power supply network according to the target breaking state matrix.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the method according to any one of claims 1 to 6 when executed.

10. An electronic device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to execute the method according to any one of claims 1 to 6 through the computer program.