Sludge foundation reinforcing device based on coastal building and reinforcing process thereof

By using a combination of reinforced column group, water-gathering device and isolation cloth on the silt foundation, the rapid water filtration and solidification are used to use vacuum and electroosmotic technology to solve the problem of long-term drying of the silt foundation affecting the construction progress, and rapid reinforcement and construction are achieved Security.

CN119121891APending Publication Date: 2024-12-13SHISHI XIEHE CONSTR ENG CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411377051.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-13

AI Technical Summary

Technical Problem

When the prior art deals with newly blown silt foundations with high moisture content and almost zero strength, it requires long-term natural drying, which affects the construction progress and extends the drying cycle on rainy days, making it difficult to ensure construction progress and safety.

Method used

The silt foundation reinforcement device based on coastal buildings, including reinforcement column groups, water collection devices and isolation cloths, is used to absorb moisture from the foundation and perform electrodiafiltration of water to achieve rapid curing of the silt foundation.

Benefits of technology

The silt foundation reinforcement cycle is shortened, and the reinforcement can be completed within one week, avoiding the problem of extending construction time due to rainy days, ensuring construction progress and safety, and is suitable for coastal construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119121891A_ABST
    Figure CN119121891A_ABST
Patent Text Reader

Abstract

The invention provides a silt foundation reinforcing device based on a coastal building and a reinforcing process of the silt foundation reinforcing device, and belongs to the technical field of silt foundation reinforcing devices.The silt foundation reinforcing device comprises a reinforcing device body, the reinforcing device body is composed of a reinforcing column set, a water collecting device and isolation cloth, and the reinforcing device body is composed of the reinforcing column set, the water collecting device and the isolation cloth. The reinforcing device has the functions of sucking vacuum and filtering water to preliminarily reinforce the sludge foundation, and also has the function of assisting in sucking vacuum through electroosmosis to finally reinforce the sludge foundation, and the reinforcing column group has the water filtering and gathering functions; the cooperation of the water gathering device and the isolation cloth can vacuumize a sealing cavity at the lower end of the reinforcing column set so as to extend to the sludge foundation on the periphery of the reinforcing column set to form vacuum suction force, so that water in the sludge foundation flows to the reinforcing column set to be filtered and gathered, and the water gathering device further has the electro-osmosis auxiliary vacuumizing function. And secondary deep water filtering reinforcement is achieved after the sludge foundation is preliminarily reinforced, the reinforcement period is shortened, and follow-up continuous construction of a building is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a silt foundation reinforcement device based on coastal buildings and a reinforcement process thereof, belonging to the technical field of silt foundation reinforcement devices. Background Art

[0002] The current processing flow for the newly filled silt foundation, which has a high water content and almost zero strength, is as follows: after the filling is completed, it is first dried for a period of time (usually more than one year) to allow the surface layer of the filled silt foundation to form a certain strength, and then thorns are laid to form a construction cushion layer. After people and machinery can enter the site, foundation treatment begins. However, this natural drying time is relatively long, which seriously affects the construction progress. In addition, during the long-term natural drying process, if there is heavy rainfall, the drying cycle needs to be extended. In view of the above shortcomings, the present invention proposes a silt foundation reinforcement device based on coastal buildings and a reinforcement process thereof. Summary of the invention

[0003] In view of the deficiencies in the prior art, the object of the present invention is to provide a silt foundation reinforcement device based on coastal buildings and a reinforcement process thereof to solve the existing problems.

[0004] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical solutions: a silt foundation reinforcement device based on coastal buildings, including a reinforcement device, the reinforcement device is composed of a reinforcement column group, a water collecting device and an isolation cloth, the vertical sealing sleeve of the water collecting device is arranged in the cavity of the reinforcement column group, and the other end of the water collecting device extends to the outside of the diagonal of the reinforcement column group, and the isolation cloth covers the top surface of the reinforced silt foundation where the reinforcement column group and the water collecting device are located for vacuum isolation; The reinforcement column group includes an insertion column, and a column head is arranged on the top surface of the insertion column, and a plurality of filter mesh members are arranged at the upper and lower ends of the four side surfaces of the insertion column; The water collecting device includes a sealing plate, and a vacuum pump, a water extraction pipe and an electroosmotic cathode tube are arranged on the sealing plate. A controller is arranged at the upper end of the inserted column cavity next to the top surface of the sealing plate. The lower ends of the vacuum pump, the water extraction pipe and the electroosmotic cathode tube extend to the lower end of the water collecting cavity of the inserted column, and the upper ends of the vacuum pump and the water extraction pipe extend to the column head cavity. Four electroosmotic anode rods are connected to the controller through electric wires, and the vacuum pump and the electroosmotic cathode tube are electrically connected to the controller.

[0005] A further improvement is that the insertion column includes an insertion column body, and a plug is sleeved on the lower end of the insertion column body, and a column edge is arranged around the top surface of the insertion column body, and a water collecting chamber is opened on the top surface of the insertion column body, and a water collecting chamber sealing edge is arranged at the upper end of the water collecting chamber for installing and sealing a sealing plate, and a plurality of water collecting openings for fixing the filter mesh are arranged on the four walls of the water collecting chamber, and a lower opening is opened through the lower end of the water collecting chamber for the lower end of the electroosmosis cathode tube to abut against the top surface of the plug.

[0006] A further improvement is that the electro-osmosis cathode tube is composed of an iron rod wrapped with a conductive wire, each of the electro-osmosis anode plugs is composed of a steel bar wrapped with a conductive wire, and the plug is made of iron.

[0007] A further improvement is that the water collecting opening comprises an inner concave sleeve groove, and a through opening is opened through the middle of the inner concave sleeve groove, and the inner concave sleeve groove is used for embedding the filter mesh.

[0008] A further improvement is that the stigma includes a stigma body, and a drainage cavity is opened on the top surface of the stigma body, a plurality of first pipe openings are opened on the bottom surface of the drainage cavity, a plurality of second pipe openings are opened on the left side wall of the drainage cavity, a plurality of lifting openings are opened on the front and rear sides of the stigma body, and a drainage hole is obliquely opened on the lower end of the right side wall of the drainage cavity.

[0009] A further improvement is that each of the filter screen elements is composed of a filter screen body and a sealing pressure frame.

[0010] As a further improvement, the isolation cloth comprises an isolation cloth body, a first opening adapted to the column head is provided in the middle of the isolation cloth body, and a plurality of second openings adapted to the electroosmosis anode rods are provided on four sides of the isolation cloth body.

[0011] A further improvement is that the isolation fabric is formed by laminating a non-woven geotextile and a sealing film.

[0012] A further improvement is that the diagonal spacing between the midpoint and four electro-osmosis anode rods of the reinforcement column group reinforced on the silt foundation is 1-1.2m, while the diagonal spacing adopted in the present invention is 1m.

[0013] A further improvement is that the insertion column and the column head are both made of high-hardness plastic material.

[0014] In addition, the present invention also provides a reinforcement process for the above-mentioned silt foundation reinforcement device based on coastal buildings, and the reinforcement process is as follows: S1: First, the external column insertion machine inserts the reinforcement column group vertically into the mud foundation through the upper lifting port, and the reinforcement column group is arranged horizontally and vertically with one column inserted every 2m for distribution; S2: Four electroosmotic anode plugs are manually and vertically inserted at a diagonal extension of 1m of each reinforcement column group, and the four electroosmotic anode plugs are electrically connected to the controller, and the pumping pipes between each reinforcement column group are connected in series through a hose, and a water pump is installed at the tail end to pump water, and each reinforcement column group is connected in series through an electric wire, and an operating electric box is installed at the tail end of the wire; S3: Cover the top surface of the mud foundation between each reinforcement column group and the water collecting device with isolation cloth, and manually press the four edges of the isolation cloth into the mud to fix the cloth body, completing the overall distribution installation of the reinforcement device on the mud foundation; S4: During reinforcement, the vacuum pump on each reinforcement column group is started by powering on, so that the vacuum pump can generate negative pressure suction on the water collection chamber, and form vacuum suction on the mud foundation within 1m around the midpoint of the inserted column through the water collection port and the filter mesh. Because the isolation cloth isolates the air on the top surface of the mud, vacuum suction is formed to filter the water in the mud foundation into the water collection chamber, and the filtered water in the water collection chamber is pumped out by an external water pump. This process takes 3-5 days; S5: Electroosmosis assisted vacuum suction filtration. After the initial completion of the vacuum filtration of the silt foundation, the silt foundation is solidified, but there is still some free water and weakly bound water in the silt foundation. At this time, the electroosmosis cathode tube and plug form an electroosmosis cathode, and four electroosmosis anode plugs form an electroosmosis anode. Electroosmosis is performed to make free water and weakly bound water flow from each anode to the cathode, and under the vacuum suction coordination of the vacuum pump, the final filtration and solidification of the silt foundation is carried out; this process takes 1-2 days; S6: After completing the silt foundation reinforcement, dismantle each reinforcement device.

[0015] The beneficial effects of the present invention are: The present invention provides a silt foundation reinforcement device based on coastal buildings and a reinforcement process thereof. The reinforcement device is composed of a reinforcement column group, a water collecting device and an isolation cloth. The reinforcement device has the function of vacuum suction and water filtration to initially reinforce the silt foundation, and also has the function of electroosmosis-assisted vacuum suction to finally reinforce the silt foundation. The reinforcement column group has the function of filtering and collecting water, and the water collecting device and the isolation cloth cooperate to vacuum the sealed chamber at the lower end of the reinforcement column group, thereby extending to the silt foundation around the reinforcement column group to form a vacuum suction force, so that the water in the silt foundation flows to the reinforcement column group to be filtered and collected, and the water collecting device also has the function of electroosmosis-assisted vacuum suction, so as to achieve the purpose of reinforcing the silt foundation. After the initial reinforcement, deep filtration and reinforcement are carried out to enhance the solidification degree of the silt foundation. The water collecting device can realize unified pumping and drainage of the water collecting cavity on each reinforcement column group through a simple hose and an external water pump in series. In addition, through the design of the reinforcement device, each reinforcement device can handle and reinforce about four square meters of silt foundation, and the horizontal and vertical arrangement and installation process of multiple reinforcement devices is adopted, so that the overall area of ​​the silt foundation can be controlled, and the silt foundation can be filtered and solidified at one time, so that the reinforcement construction period of the silt foundation can be completed within one week, which can effectively avoid rainy days, shorten the reinforcement period, and facilitate the subsequent construction of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1This is a schematic structural diagram of a silt foundation reinforcement device based on coastal buildings according to the present invention; Figure 2 This is a schematic diagram of the structure of the reinforcement column group of the present invention; Figure 3 This is a schematic diagram of the insertion column structure of the present invention; Figure 4 It is a schematic diagram of the column head structure of the present invention; Figure 5 It is a schematic diagram of the structure of the filter element of the present invention; Figure 6 This is a schematic diagram of the structure of the water collecting device of the present invention; Figure 7 This is a schematic diagram of the structure of the isolation cloth body of the present invention; Figure 8 This is a cross-sectional effect diagram of the reinforcement device of the present invention; Fig. 9 This is a diagram showing the distribution and installation effect of the reinforcement device of the present invention. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0018] See also Figure 1-Figure 9 The present invention provides a silt foundation reinforcement device based on coastal buildings and a reinforcement process thereof: comprising a reinforcement device, the reinforcement device is composed of a reinforcement column group 1, a water collecting device 2 and an isolation cloth 3, the water collecting device 2 is vertically sealed and sleeved in the cavity of the reinforcement column group 1, and the other end of the water collecting device 2 extends to the outside of the diagonal of the reinforcement column group 1, the isolation cloth 3 covers the top surface of the reinforced silt foundation where the reinforcement column group 1 and the water collecting device 2 are located for vacuum isolation, the reinforcement column group 1 comprises an insertion column 11, and a column head 12 is arranged on the top surface of the insertion column 11, and a plurality of filter screens are arranged at the upper and lower ends of the four sides of the insertion column 11 Part 13, the water collecting device 2 includes a sealing plate 21, and the sealing plate 21 is provided with a vacuum pump 22, a water extraction pipe 23 and an electroosmotic cathode tube 25, and a controller 24 is provided at the upper end of the cavity of the inserted column 11 beside the top surface of the sealing plate 21, and the lower ends of the vacuum pump 22, the water extraction pipe 23 and the electroosmotic cathode tube 25 are extended to the lower end of the water collecting cavity of the inserted column 11, and the upper ends of the vacuum pump 22 and the water extraction pipe 23 are extended to the cavity of the column head 12, and four electroosmotic anode rods 26 are connected to the controller 24 through electric wires, and the vacuum pump 22 and the electroosmotic cathode tube 25 are electrically connected to the controller 24.

[0019] The insertion column 11 includes an insertion column body 111, and a plug 112 is sleeved on the lower end of the insertion column body 111, and a column edge 113 is arranged around the top surface of the insertion column body 111, and a water collecting chamber 114 is opened on the top surface of the insertion column body 111, and a water collecting chamber sealing edge 115 for sealing the sealing plate 21 is arranged at the upper end of the water collecting chamber 114, and a plurality of water collecting openings 116 for fixing the filter mesh 13 are opened on the four walls of the water collecting chamber 114, and a lower through-hole 117 is opened at the lower end of the water collecting chamber 114 for the lower end of the electroosmosis cathode tube 25 to abut against the top surface of the plug 112.

[0020] The electroosmosis cathode tube 25 is composed of an iron rod wound with a conductive wire, each of the electroosmosis anode plug rods 26 is composed of a steel bar wound with a conductive wire, and the plug 112 is made of iron.

[0021] The water collecting opening 116 comprises an inner concave sleeve groove 1161 , and a through opening 1162 is formed in the middle of the inner concave sleeve groove 1161 . The inner concave sleeve groove 1161 is used for embedding the filter mesh 13 .

[0022] The column head 12 includes a column head body 121, and a drainage cavity 122 is opened on the top surface of the column head body 121, a plurality of first pipe openings 123 are opened on the bottom surface of the drainage cavity 122, a plurality of second pipe openings 124 are opened on the left side wall of the drainage cavity 122, a plurality of lifting openings 125 are opened on the front and rear sides of the column head body 121, and a drainage hole 126 is obliquely opened at the lower end of the right side wall of the drainage cavity 122.

[0023] Each of the filter elements 13 is composed of a filter body 131 and a sealing frame 132 .

[0024] The isolation cloth 3 comprises an isolation cloth body 31 , and a first opening 32 adapted to the column head 12 is opened in the middle of the isolation cloth body 31 , and a plurality of second openings 33 adapted to the electroosmosis positive-stage plug rods 26 are opened on four sides of the isolation cloth body 31 .

[0025] The isolation fabric 3 is formed by laminating a non-woven geotextile 311 and a sealing film 312 .

[0026] The diagonal spacing between the midpoint of the reinforcement column group 1 and the four electroosmosis anode rods 26 reinforced on the silt foundation is 1-1.2m, while the diagonal spacing adopted in the present invention is 1m.

[0027] Working principle: The reinforcement process is as follows: S1: First, the external column inserting machine moves the reinforcement column group 1 through the upper lifting port 125 and vertically inserts it into the silt foundation, and the reinforcement column group 1 is distributed in the transverse and longitudinal arrangement with one column inserted every 2m.

[0028] S2: Four electroosmotic anode rods 26 are manually and vertically inserted at a diagonal extension of 1m of each reinforcement column group 1, and the four electroosmotic anode rods 26 are electrically connected to the controller 24, and the pumping pipes 23 between each reinforcement column group 1 are connected in series through a hose, and a water pump is installed at the tail end to pump water, and each reinforcement column group 1 is electrically connected in series through electric wires, and an operating electrical box is installed at the tail end of the electric wires.

[0029] S3: The top surface of the mud foundation between each reinforcement column group 1 and the water collecting device 2 is covered with an isolation cloth 3, and the four edges of the isolation cloth 3 are manually pressed into the mud to fix the cloth body, thereby completing the overall distributed installation of the reinforcement device on the mud foundation.

[0030] The above steps S1, S2 and S3 are the distributed installation process of the reinforcement device on the silt foundation.

[0031] S4: During reinforcement, the vacuum pump 22 on each reinforcement column group 1 is started by powering on, so that the vacuum pump 22 can suck the water collecting chamber 114 to generate negative pressure suction, and form vacuum suction on the mud foundation within 1m around the midpoint of the inserted column 11 through the water collecting port 116 and the filter mesh 13. Since the isolation cloth 3 isolates the air from the top surface of the mud, vacuum suction is formed to filter the moisture in the mud foundation into the water collecting chamber 114, and the filtered water in the water collecting chamber 114 is pumped out by an external water pump. This process takes 3-5 days.

[0032] S5: Electroosmosis assisted vacuum suction filtration. After the preliminary completion of the vacuum filtration of the silt foundation, the silt foundation is now solidified, but there is still some free water and weakly bound water in the silt foundation. At this time, an electroosmosis cathode is formed by the electroosmosis cathode tube 25 and the plug 112, and the four electroosmosis anode plugs 26 form an electroosmosis anode. Electroosmosis is performed to make the free water and weakly bound water flow from each anode to the cathode, and under the vacuum suction coordination of the vacuum pump 22, the final filtration and solidification of the silt foundation is carried out; this process takes 1-2 days.

[0033] The above steps S4 and S5 are a reinforcement process in which the reinforcement device performs vacuum suction and electroosmosis to coordinate water filtration and drainage on the entire silt foundation.

[0034] S6: After completing the silt foundation reinforcement, dismantle each reinforcement device.

[0035] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0036] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A silt foundation reinforcement device based on coastal buildings, the structure of which includes a reinforcement device, characterized in that: The reinforcement device is composed of a reinforcement column group (1), a water collecting device (2) and an isolation cloth (3); the water collecting device (2) is vertically sealed and sleeved in the cavity of the reinforcement column group (1), and the other end of the water collecting device (2) extends to the outside of the opposite corner of the reinforcement column group (1); the isolation cloth (3) covers the top surface of the reinforced silt foundation where the reinforcement column group (1) and the water collecting device (2) are located to perform vacuum isolation; The reinforcement column group (1) comprises an insertion column (11), a column head (12) is provided on the top surface of the insertion column (11), and a plurality of filter mesh elements (13) are provided at upper and lower ends of four side surfaces of the insertion column (11); The water collecting device (2) comprises a sealing plate (21), and a vacuum pump (22), a water extraction pipe (23) and an electroosmotic cathode tube (25) are arranged on the sealing plate (21). A controller (24) is arranged at the upper end of the cavity of the insertion column (11) on the side of the top surface of the sealing plate (21). The lower ends of the vacuum pump (22), the water extraction pipe (23) and the electroosmotic cathode tube (25) extend to the lower end of the water collecting cavity of the insertion column (11), and the upper ends of the vacuum pump (22) and the water extraction pipe (23) extend to the cavity of the column head (12). Four electroosmotic anode plug rods (26) are connected to the controller (24) via electric wires. The vacuum pump (22) and the electroosmotic cathode tube (25) are electrically connected to the controller (24).

2. A silt foundation reinforcement device based on coastal buildings according to claim 1, characterized in that: The insert column (11) comprises an insert column body (111), wherein a plug (112) is sleeved on the lower end of the insert column body (111), a column edge (113) is arranged around the top surface of the insert column body (111), and a water collecting chamber (114) is provided on the top surface of the insert column body (111), wherein a water collecting chamber sealing edge (115) for sealing the sealing plate (21) is arranged at the upper end of the water collecting chamber (114), wherein a plurality of water collecting openings (116) for fixing the filter mesh (13) are arranged on four walls of the water collecting chamber (114), and a lower through-hole (117) is provided at the lower end of the water collecting chamber (114) for the lower end of the electroosmotic cathode tube (25) to abut against the top surface of the plug (112).

3. The silt foundation reinforcement device for coastal buildings according to claim 2 is characterized in that: The electroosmotic cathode tube (25) is formed by an iron rod wound around a conductive wire, each of the electroosmotic anode plug rods (26) is formed by a steel bar wound around a conductive wire, and the plug (112) is made of iron.

4. The silt foundation reinforcement device for coastal buildings according to claim 3 is characterized in that: The water collecting opening (116) comprises an inner concave sleeve groove (1161), and a through opening (1162) is provided in the middle of the inner concave sleeve groove (1161). The inner concave sleeve groove (1161) is used for embedding the filter mesh element (13).

5. The silt foundation reinforcement device for coastal buildings according to claim 4 is characterized in that: The column head (12) comprises a column head body (121), wherein the top surface of the column head body (121) is provided with a drainage cavity (122), the bottom surface of the drainage cavity (122) is provided with a plurality of first pipeline openings (123), the left cavity wall of the drainage cavity (122) is provided with a plurality of second pipeline openings (124), the front and rear side surfaces of the column head body (121) are provided with a plurality of lifting openings (125), and the lower end of the right cavity wall of the drainage cavity (122) is provided with a drainage hole (126) obliquely.

6. The device for reinforcing silt foundation for coastal buildings according to claim 5 is characterized in that: Each of the filter screen elements (13) is composed of a filter screen body (131) and a sealing pressure frame (132).

7. The device for reinforcing silt foundation for coastal buildings according to claim 6 is characterized in that: The isolation cloth (3) comprises an isolation cloth body (31), wherein a first through hole (32) adapted to fit the column head (12) is provided in the middle of the isolation cloth body (31), and a plurality of second through holes (33) adapted to fit the electroosmosis positive-stage plug rods (26) are provided on four sides of the isolation cloth body (31).

8. The device for reinforcing silt foundation for coastal buildings according to claim 7 is characterized in that: The isolation fabric (3) is formed by laminating a non-woven geotextile (311) and a sealing film (312).

9. The device for reinforcing silt foundation for coastal buildings according to claim 8, characterized in that: The reinforcement column group (1) is a midpoint and four electroosmosis anode plugs (26) are reinforced on the silt foundation with a diagonal spacing of 1-1.2 m.

10. A reinforcement process for a silt foundation reinforcement device for coastal buildings, comprising the reinforcement device according to any one of claims 1 to 9, characterized in that: The reinforcement process is as follows: S1: First, an external column inserting machine moves the reinforcement column group (1) through the upper lifting port (125) and vertically inserts the reinforcement column group (1) into the silt foundation, and the reinforcement column group (1) is arranged horizontally and vertically with one column inserted every 2m for distribution; S2: Four electroosmotic anode plugs (26) are manually and vertically inserted at a position of 1 m diagonally extending from each reinforcement column group (1), and the four electroosmotic anode plugs (26) are electrically connected to the controller (24), and the pumping pipes (23) between each reinforcement column group (1) are connected in series through a hose, and a water pump is installed at the tail end for pumping water, and each reinforcement column group (1) is electrically connected in series through an electric wire, and an operating electric box is installed at the tail end of the electric wire; S3: Covering the top surface of the mud foundation between each reinforcement column group (1) and the water collecting device (2) with an isolation cloth (3), and manually pressing the four edges of the isolation cloth (3) into the mud to fix the cloth body, thereby completing the overall distributed installation of the reinforcement device on the mud foundation; S4: During reinforcement, the vacuum pump (22) on each reinforcement column group (1) is started by powering on, so that the vacuum pump (22) can generate negative pressure suction force by vacuuming the water collecting chamber (114), and form vacuum suction force on the mud foundation within 1m around the midpoint of the inserted column (11) through the water collecting port (116) and the filter mesh (13). Since the isolation cloth (3) isolates the air from the top surface of the mud, vacuum suction force is formed to filter the water in the mud foundation into the water collecting chamber (114), and the filtered water in the water collecting chamber (114) is pumped out by an external water pump. This process takes 3-5 days. S5: Electroosmosis assisted vacuum suction filtration. After the initial completion of vacuum filtration of the silt foundation, the silt foundation is now solidified, but there is still some free water and weakly bound water in the silt foundation. At this time, an electroosmosis cathode is formed through the electroosmosis cathode tube (25) and the plug (112), and the four electroosmosis anode plug rods (26) form an electroosmosis anode. Electroosmosis is performed to make the free water and weakly bound water flow from each anode to the cathode, and under the vacuum suction coordination of the vacuum pump (22), the final filtration and solidification of the silt foundation is performed; This process takes 1-2 days; S6: After completing the silt foundation reinforcement, dismantle each reinforcement device.

Citation Information

Patent Citations

  • Electric osmosis and cathode vacuumizing combined soft soil reinforcement device and method

    CN104831704A

  • Vacuum electroosmosis combined type foundation pit dewatering and drainage system and using method thereof

    CN115045312A

  • Vacuum electroosmosis drainage device for reinforcing soft soil foundation and construction method of vacuum electroosmosis drainage device