Waste heat recovery control system and method based on central air conditioner

By introducing data acquisition and air supply adjustment modules into the central air conditioner, the preset air volume is dynamically adjusted, and the problem of inefficiency of central air conditioner in waste heat recovery control is solved, efficient and accurate waste heat recovery control is achieved, and energy utilization efficiency is improved. System stability.

CN119123608AActive Publication Date: 2024-12-13GUANGZHOU HENGHE ENERGY SAVING TECHNOLOGY CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411403747.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-13
Estimated Expiration
2044-10-09

AI Technical Summary

Technical Problem

When performing waste heat recovery control, central air conditioners cannot accurately control based on real-time operation, resulting in efficiency losses during heat transfer and energy conversion, and there are limitations on waste heat recovery efficiency.

Method used

By providing a waste heat recovery control system and method based on central air conditioner, including a data acquisition module, an initial calibration module for air supply and a feedback regulation module for air supply, the working status data of the central air conditioner and waste heat recovery control system are obtained, and the air supply volume is comprehensively analyzed to obtain the air supply volume Initial calibration indicators and adjustment parameters, dynamically adjust the preset air volume to achieve precise control.

Benefits of technology

It improves waste heat recovery efficiency, optimizes the operating performance of central air conditioners, promotes efficient use and conservation of energy, avoids the problems of waste heat recovery or insufficient recycling, and ensures the efficiency and stability of waste heat recovery process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119123608A_ABST
    Figure CN119123608A_ABST
Patent Text Reader

Abstract

The invention discloses a waste heat recovery control system and method based on a central air conditioner, and belongs to the technical field of energy-saving air conditioners. The system comprises a data acquisition module, an air supply quantity initial calibration module, an air supply quantity feedback adjustment module and a central air conditioner database, firstly, working state data of a central air conditioner and a waste heat recovery control system are acquired, working environment data of the central air conditioner are collected, and then the central air conditioner is calibrated according to the working state data and the working environment data of the central air conditioner. The method comprises the following steps: carrying out comprehensive analysis to obtain an initial calibration index of the air supply volume of the central air conditioner, processing according to the initial calibration index of the air supply volume of the central air conditioner to obtain a preset air volume of the waste heat recovery control system, and finally analyzing according to working state data of the waste heat recovery control system to obtain an air supply volume adjusting parameter of the waste heat recovery control system. And the preset air volume of the waste heat recovery control system is adjusted according to the air supply volume adjusting parameters of the waste heat recovery control system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy-saving air conditioners, and in particular to a waste heat recovery control system and method based on a central air conditioner. Background Art

[0002] With the rapid development of industrialization, energy consumption has increased dramatically, and the waste heat generated has also increased significantly. If this waste heat is directly discharged into the environment, it will not only cause energy waste, but also aggravate environmental pollution. In order to protect the environment, reduce greenhouse gas emissions, and improve energy utilization efficiency, waste heat recovery control technology came into being.

[0003] Existing waste heat recovery control systems mainly extract waste heat from the production process through various heat exchangers, heat transfer equipment, etc., and convert it into usable energy forms such as hot water, steam or electricity, thereby realizing energy reuse, reducing energy consumption costs, and achieving the goal of energy conservation and emission reduction.

[0004] For example, the invention patent announcement with announcement number: CN117906268B announces a waste heat recovery device for a HVAC, comprising: two water tanks and a support frame installed on the surface of the water tank and a recovery box installed on the surface of the support frame, so that the warm air after the waste heat recovery of the HVAC can be controlled, and the air volume of the warm air flowing into the water tank can be controlled, so that the air volume of the warm air can be released according to the water temperature inside the water tank, thereby avoiding the inability to regulate the temperature according to the water temperature inside the water tank, affecting the working efficiency after the waste heat is recovered, affecting the effect of its utilization, greatly improving the performance of the waste heat treatment device, greatly improving the scope of use of the waste heat after recovery, making the device as a whole controllable, expanding the practicability of the device, and being able to be controlled according to the ambient temperature state, and being able to display the control data for the convenience of users to observe.

[0005] For example, the waste heat recovery control system, method and central air conditioner of the central air conditioner announced in the invention patent with announcement number: CN115789927B include: a control unit, which controls the operation of the refrigeration system of the central air conditioner when the central air conditioner is started; an acquisition unit, which acquires the temperature of the liquid in the cooling tower and the temperature of the liquid in the hot water storage tank; the control unit also controls the opening and closing of the cooling tower fan according to the temperature of the liquid in the cooling tower; the control unit also controls the opening and closing of the membrane heat permeation component according to the temperature of the liquid in the hot water storage tank when the fan of the cooling tower is turned on, so that when the membrane heat permeation component is turned on, the membrane heat permeation component uses the steam generated by heating the liquid inside the hot water storage tank to drive the generator to generate electricity, thereby realizing the recovery of the exhaust waste heat of the cooling tower.

[0006] However, in the process of implementing the technical solution of the invention in the embodiments of the present application, the present application found that the above technology has at least the following technical problems: In the prior art, when performing waste heat recovery control, the central air conditioner is unable to accurately control the waste heat recovery system according to the real-time operating conditions, resulting in efficiency loss in the process of heat transfer and energy conversion, and the waste heat recovery efficiency of the central air conditioner is limited. Summary of the invention

[0007] The embodiments of the present application provide a waste heat recovery control system and method based on a central air conditioner, thereby solving the problem in the prior art that the central air conditioner is unable to accurately control the waste heat recovery system according to the real-time operating conditions during waste heat recovery control, resulting in efficiency loss in the heat transfer and energy conversion process and limited waste heat recovery efficiency of the central air conditioner, thereby achieving efficient and precise control of the waste heat recovery system.

[0008] The embodiment of the present application provides a waste heat recovery control system and method based on a central air-conditioning, comprising: a data acquisition module, an air supply volume initial calibration module, an air supply volume feedback adjustment module and a central air-conditioning database; wherein the data acquisition module is used to acquire the working status data of the central air-conditioning and the waste heat recovery control system, and collect the working environment data of the central air-conditioning; the air supply volume initial calibration module is used to comprehensively analyze the working status data and working environment data of the central air-conditioning to obtain the initial calibration index of the air supply volume of the central air-conditioning, and process the preset air volume of the waste heat recovery control system according to the initial calibration index of the air supply volume of the central air-conditioning; the air supply volume feedback adjustment module is used to analyze the working status data of the waste heat recovery control system to obtain the air supply volume adjustment parameters of the waste heat recovery control system, and adjust the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameters of the waste heat recovery control system.

[0009] Furthermore, based on the working status data and working environment data of the central air conditioner, a comprehensive analysis is performed to obtain an initial calibration index of the air supply volume of the central air conditioner, including: obtaining a working status evaluation value of the central air conditioner based on processing the working status data of the central air conditioner; obtaining a working environment evaluation value of the central air conditioner based on processing the working environment data of the central air conditioner; and obtaining an initial calibration index of the air supply volume based on a comprehensive analysis of the working status evaluation value of the central air conditioner and the working environment evaluation value of the central air conditioner.

[0010] Furthermore, the step of obtaining a working status evaluation value of the central air conditioner based on the working status data of the central air conditioner includes: deploying a number of monitoring time points, the working status data of the central air conditioner including the air conditioning load and condensing temperature at each monitoring time point; obtaining an air conditioning load reference value and a condensing temperature reference value from a central air conditioning database; and obtaining a working status evaluation value of the central air conditioner through comprehensive analysis.

[0011] Furthermore, the step of obtaining a working environment evaluation value of the central air conditioner based on the working environment data of the central air conditioner includes: the working environment data of the central air conditioner includes working environment temperature, working environment humidity and wind speed; obtaining a reference working environment temperature, reference working environment humidity and critical wind speed from a central air conditioner database; and obtaining a working environment evaluation value of the central air conditioner through comprehensive analysis.

[0012] Furthermore, based on the initial calibration index of the air supply volume of the central air conditioner, the step of processing to obtain the preset air volume of the waste heat recovery control system includes: matching the initial calibration index of the air supply volume of the central air conditioner with the preset air volume of the waste heat recovery control system corresponding to each initial calibration index interval of the air supply volume stored in the central air conditioner database to obtain the initial preset air volume of the waste heat recovery control system; and adjusting the preset air volume according to the initial preset air volume of the waste heat recovery control system.

[0013] Furthermore, according to the working status data of the waste heat recovery control system, the step of analyzing and obtaining the air supply volume adjustment parameters of the waste heat recovery control system includes: the working status data of the waste heat recovery control system includes the heat exchanger inlet temperature and the heat exchanger outlet temperature; obtaining the heat exchanger inlet temperature threshold, the heat exchanger outlet temperature threshold and the critical inlet and outlet temperature difference from the central air conditioning database; and comprehensively analyzing and obtaining the air supply volume adjustment parameters of the waste heat recovery control system.

[0014] Furthermore, the step of adjusting the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameter of the waste heat recovery control system includes: matching the air supply volume adjustment parameter of the waste heat recovery control system with the air supply volume adjustment values ​​corresponding to each air supply volume adjustment parameter interval stored in the central air conditioning database to obtain the air supply volume adjustment value of the waste heat recovery control system; adjusting the preset air volume according to the air supply volume adjustment value of the waste heat recovery control system.

[0015] Furthermore, the initial calibration index of the central air conditioner's air supply volume is calculated as follows: ; In the formula, represents the initial calibration index of the air supply volume of the central air conditioner, μ represents the weight factor of the initial calibration index of the air supply volume corresponding to the preset working state, λ represents the weight factor of the initial calibration index of the air supply volume corresponding to the preset working environment, Indicates the working status evaluation value of the central air conditioner. Indicates the working environment assessment value of the central air conditioner.

[0016] Furthermore, the specific calculation formula of the air supply volume adjustment parameter of the waste heat recovery control system is: ; In the formula Indicates the air supply volume adjustment parameter. Indicates the weight factor of the air supply volume adjustment parameter corresponding to the heat exchanger inlet temperature, Indicates the weight factor of the air supply volume adjustment parameter corresponding to the heat exchanger outlet temperature, Indicates the weight factor of the air supply volume adjustment parameter corresponding to the inlet and outlet temperature difference of the heat exchanger, represents the heat exchanger inlet temperature, Indicates the heat exchanger inlet temperature threshold, represents the heat exchanger outlet temperature, Indicates the heat exchanger outlet temperature threshold, Represents the critical inlet and outlet temperature difference.

[0017] Furthermore, a waste heat recovery control method based on a central air conditioner is characterized in that: the specific steps include: obtaining the working status data of the central air conditioner and the waste heat recovery control system, and collecting the working environment data of the central air conditioner; based on the working status data and the working environment data of the central air conditioner, comprehensively analyzing to obtain the initial calibration index of the air supply volume of the central air conditioner, and processing to obtain the preset air volume of the waste heat recovery control system based on the initial calibration index of the air supply volume of the central air conditioner; based on the working status data of the waste heat recovery control system, analyzing to obtain the air supply volume adjustment parameter of the waste heat recovery control system, and adjusting the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameter of the waste heat recovery control system.

[0018] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. The present invention provides a waste heat recovery control system and method based on a central air conditioner, obtains a preset air volume according to the working state and working environment of the central air conditioner, and then adjusts the preset air volume according to the working state of the waste heat recovery control system, thereby achieving precise adjustment of the preset air volume of the waste heat recovery control system, thereby improving the waste heat recovery efficiency.

[0019] 2. The present invention obtains accurate initial calibration indicators of air supply volume by comprehensively analyzing the working status data and working environment data of the central air conditioner, thereby processing a reasonable preset air volume of the waste heat recovery control system, thereby optimizing the operating performance of the central air conditioner while promoting efficient utilization and conservation of energy.

[0020] 3. The present invention dynamically adjusts the preset air volume according to the air supply adjustment parameter, so that the system can flexibly adjust the air volume according to the actual operating conditions, effectively avoiding the energy waste or insufficient recovery problems that may exist under the traditional fixed air volume setting, and ensuring the efficiency and stability of the waste heat recovery process. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic structural diagram of a waste heat recovery control system based on central air conditioning provided in an embodiment of the present application.

[0022] Figure 2 This is a diagram of changes in air supply volume adjustment parameters of a waste heat recovery control system based on a central air conditioner provided in an embodiment of the present application.

[0023] Figure 3 A flow chart of a waste heat recovery control method based on central air conditioning provided in an embodiment of the present application. DETAILED DESCRIPTION

[0024] The embodiments of the present application provide a waste heat recovery control system and method based on a central air conditioner, thereby solving the problem in the prior art that the central air conditioner is unable to accurately control the waste heat recovery system according to the real-time operating conditions when performing waste heat recovery control, resulting in efficiency loss in the heat transfer and energy conversion process, and the waste heat recovery efficiency of the central air conditioner is limited. By obtaining a preset air volume according to the working state and working environment of the central air conditioner, and then adjusting the preset air volume according to the working state of the waste heat recovery control system, efficient and precise control of the waste heat recovery system is achieved.

[0025] The technical solution in the embodiment of the present application is to solve the problem in the above-mentioned prior art that the central air conditioner cannot accurately control the waste heat recovery system according to the real-time operation situation when performing waste heat recovery control, resulting in efficiency loss in the heat transfer and energy conversion process, and the waste heat recovery efficiency of the central air conditioner is limited. The overall idea is as follows: By acquiring the working status data of the central air-conditioning and the waste heat recovery control system, and collecting the working environment data of the central air-conditioning; based on the working status data and working environment data of the central air-conditioning, a comprehensive analysis is performed to obtain the initial calibration index of the air supply volume of the central air-conditioning, and based on the initial calibration index of the air supply volume of the central air-conditioning, the preset air volume of the waste heat recovery control system is obtained through processing; based on the working status data of the waste heat recovery control system, the air supply volume adjustment parameters of the waste heat recovery control system are analyzed, and the preset air volume of the waste heat recovery control system is adjusted according to the air supply volume adjustment parameters of the waste heat recovery control system, thereby realizing precise adjustment of the preset air volume of the waste heat recovery control system.

[0026] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0027] like Figure 1As shown, it is a structural schematic diagram of a waste heat recovery control system based on a central air-conditioning provided in an embodiment of the present application. The waste heat recovery control system based on a central air-conditioning provided in an embodiment of the present application includes: a data acquisition module, an air supply volume initial calibration module, an air supply volume feedback adjustment module and a central air-conditioning database; wherein, the data acquisition module is used to acquire the working status data of the central air-conditioning and the waste heat recovery control system, and collect the working environment data of the central air-conditioning; the air supply volume initial calibration module is used to comprehensively analyze the working status data and working environment data of the central air-conditioning to obtain the initial calibration index of the air supply volume of the central air-conditioning, and process the preset air volume of the waste heat recovery control system according to the initial calibration index of the air supply volume of the central air-conditioning; the air supply volume feedback adjustment module is used to analyze the working status data of the waste heat recovery control system to obtain the air supply volume adjustment parameters of the waste heat recovery control system, and adjust the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameters of the waste heat recovery control system.

[0028] In this embodiment, the initial calibration index of the air supply volume of the central air conditioner is based on the accurate calculation of the current working environment and the operating status of the central air conditioner, aiming to ensure the comfort of the indoor environment and maximize the energy efficiency. The preset air volume is set for the waste heat recovery control system according to the initial calibration index of the air supply volume, ensuring that the waste heat recovery system can effectively recover and utilize the actual waste heat generated. During the operation of the waste heat recovery control system, its working status data is continuously monitored, and the air supply volume adjustment parameters are analyzed to reflect the actual needs of the system for air volume adjustment. Through precise data analysis and dynamic adjustment, the coordinated optimization of the central air conditioner and the waste heat recovery control system is achieved, the overall energy efficiency is improved, and it helps to reduce energy consumption and operating costs; real-time monitoring and dynamic adjustment ensure that the system can maintain a stable operating state under various working conditions, reducing the possibility of failure; the air supply volume calibration of the central air conditioner is based on the actual working environment data, which can more accurately meet the needs of the indoor environment and improve the comfort of users; the effective operation of the waste heat recovery control system maximizes the recovery and utilization of waste heat resources, reduces energy waste, and conforms to the concept of sustainable development.

[0029] In addition, the central air conditioning database is used to store relevant data of the waste heat recovery control system of the central air conditioning, including: air conditioning load reference value, condensing temperature reference value, reference working environment temperature, reference working environment humidity, allowable deviation working environment temperature, allowable deviation working environment humidity, critical wind speed, air supply volume adjustment value corresponding to each air supply volume adjustment parameter interval and preset air volume of the waste heat recovery control system corresponding to each air supply volume initial calibration index interval, etc. The central air conditioning database can be obtained by utilizing existing public databases or existing systems, such as advanced energy management systems (capable of integrating the waste heat recovery function of central air conditioning to achieve comprehensive monitoring and management of energy usage of the entire building or industrial facility), high-efficiency heat exchanger systems (the core component of the waste heat recovery system, which uses efficient heat exchange technology to transfer the waste heat generated by the central air conditioning during the cooling or heating process to the medium that needs to be heated) or an intelligent control system that monitors and controls the operation of the waste heat recovery system, or through the equipment measurement and control module to collect real-time status information and operation data of each device in the central air conditioning system.

[0030] Furthermore, based on the working status data and working environment data of the central air conditioner, a comprehensive analysis is performed to obtain an initial calibration index of the air supply volume of the central air conditioner, including: obtaining a working status evaluation value of the central air conditioner based on processing the working status data of the central air conditioner; obtaining a working environment evaluation value of the central air conditioner based on processing the working environment data of the central air conditioner; and obtaining an initial calibration index of the air supply volume based on a comprehensive analysis of the working status evaluation value of the central air conditioner and the working environment evaluation value of the central air conditioner.

[0031] In this embodiment, the working state data reflects the operating status inside the central air-conditioning system, and its data directly determines whether the system can operate efficiently and stably. The working environment data describes the external environmental conditions of the central air-conditioning system, and has an important impact on the air supply demand, cooling or heating effect, and energy consumption of the central air-conditioning. There is a close correlation between the working state data and the working environment data. The working state data needs to be adjusted according to the environmental data to ensure that the air-conditioning system can adapt to environmental changes and provide the required comfort. For example, in a high temperature and high humidity environment, the air speed and cooling capacity of the air conditioner may need to be increased to maintain a comfortable temperature and humidity level indoors, while in a low temperature and dry environment, the working mode and wind speed of the air conditioner may need to be adjusted to adapt to environmental changes. By comprehensively analyzing the working state data and the working environment data, the initial calibration index of the air supply volume of the central air conditioner can be accurately obtained. The index is calculated based on the current system operating state and external environmental conditions, and is intended to ensure that the central air-conditioning system can maintain the best energy efficiency ratio and stability while meeting the indoor environmental requirements.

[0032] Furthermore, the step of obtaining a working status evaluation value of the central air conditioner based on the working status data of the central air conditioner includes: deploying a number of monitoring time points, the working status data of the central air conditioner including the air conditioning load and condensing temperature at each monitoring time point; obtaining an air conditioning load reference value and a condensing temperature reference value from a central air conditioning database; and obtaining a working status evaluation value of the central air conditioner through comprehensive analysis.

[0033] In this embodiment, the air conditioning load refers to the heat that the air conditioning system needs to remove or add in order to maintain indoor set temperature, humidity, air quality and other parameters. The air conditioning load can be obtained using professional load calculation software, or it can be calculated based on the indoor and outdoor ambient temperature difference by multiplying the area of ​​the wall or window and the heat transfer coefficient, where the heat transfer coefficient can be directly obtained from the central air conditioning database. The air conditioning load reflects the size of the environmental heat load that the air conditioning system needs to handle; the condensing temperature refers to the temperature when the refrigerant changes from gas to liquid in the condenser, and its value is usually directly measured by the temperature sensor installed on the condenser. The condensing temperature directly affects the refrigeration efficiency and energy consumption of the refrigeration system. When the average air conditioning load of the central air conditioner is greater than or equal to the air conditioning load reference value, the system may be in a high-load operation state; when the average condensing temperature of the central air conditioner is greater than or equal to the condensing temperature reference value, the system may face heat dissipation problems, and the working state evaluation value of the central air conditioner will increase accordingly, affecting the initial index of the air supply volume, thereby changing the air supply volume. There is a close correlation between the air conditioning load and the condensing temperature. When the air conditioning load increases, it means that the system needs to remove more heat, which usually leads to an increase in the refrigerant flow in the condenser, which may increase the condensing temperature. Conversely, when the air conditioning load decreases, the condensing temperature may also decrease accordingly. By comprehensively analyzing the air conditioning load and condensing temperature data at each monitoring time point, the working status of the central air conditioning system can be accurately evaluated, which can help operation and maintenance personnel understand the actual operating efficiency, energy consumption and potential problems of the system. At the same time, it can accurately evaluate the operating status and efficiency of the system, providing strong support for the optimized operation of the system.

[0034] Furthermore, the step of obtaining a working environment evaluation value of the central air conditioner based on the working environment data of the central air conditioner includes: the working environment data of the central air conditioner includes working environment temperature, working environment humidity and wind speed; obtaining a reference working environment temperature, reference working environment humidity and critical wind speed from a central air conditioner database; and obtaining a working environment evaluation value of the central air conditioner through comprehensive analysis.

[0035] In this embodiment, the working environment temperature is usually measured and obtained in real time by temperature sensors installed in the working environment. These sensors can be analog or digital, and can accurately convert the temperature into an electrical signal and transmit it to the control system or monitoring equipment; the working environment humidity can be measured by a humidity sensor, which can sense the water vapor content in the air and convert it into a measurable electrical signal and transmit it to the control system or monitoring equipment; the wind speed can be measured using an anemometer or a wind speed sensor, which can sense the speed of air flow and convert it into a corresponding electrical signal or digital signal. By reading these signals, the current wind speed value can be obtained. There is a certain mutual influence and correlation between the working environment temperature, humidity and wind speed. For example, a high temperature and high humidity environment may increase the load of the air conditioning system because the system needs to remove more heat and moisture. At the same time, changes in wind speed will also affect the heat exchange efficiency of the air, thereby affecting the performance of the air conditioning system. By using the working environment temperature, humidity and wind speed to jointly determine the operating environment of the air conditioning system, it has an important impact on the cooling and heating efficiency, energy consumption and indoor comfort of the system. By comprehensively analyzing the working environment temperature, humidity and wind speed values, the working environment conditions of the central air-conditioning system can be accurately evaluated. This analysis helps operation and maintenance personnel understand the external challenges currently facing the system, such as increased load caused by high temperature and humidity, and decreased heat exchange efficiency caused by insufficient wind speed. Based on the working environment assessment values ​​of the central air-conditioning, operation and maintenance personnel can formulate corresponding optimization measures, such as adjusting system setting parameters, adding auxiliary heat dissipation equipment, optimizing air flow paths, etc., to improve the system's operating efficiency and energy-saving effects. It also provides an important basis for the system's preventive maintenance and troubleshooting.

[0036] Furthermore, based on the initial calibration index of the air supply volume of the central air conditioner, the step of processing to obtain the preset air volume of the waste heat recovery control system includes: matching the initial calibration index of the air supply volume of the central air conditioner with the preset air volume of the waste heat recovery control system corresponding to each initial calibration index interval of the air supply volume stored in the central air conditioner database to obtain the initial preset air volume of the waste heat recovery control system; and adjusting the preset air volume according to the initial preset air volume of the waste heat recovery control system.

[0037] In this embodiment, when matching the initial calibration index of the air supply volume of the central air conditioner with the preset air volume of the waste heat recovery control system corresponding to each initial calibration index interval of the air supply volume stored in the central air conditioner database, all relevant initial calibration index intervals of the air supply volume and their corresponding preset air volume values ​​of the waste heat recovery control system can be first extracted from the central air conditioner database, including the initial calibration index interval range of the air supply volume and the preset air volume value corresponding to each interval, and the collected data is sorted according to the size of the air supply volume, and it is ensured that each interval range does not overlap, so as to facilitate subsequent graphical representation. In order to intuitively show the relationship between the initial calibration index of the air supply volume of the central air conditioner and the preset air volume of the waste heat recovery control system, a curve diagram of the relationship between the initial calibration index of the air supply volume of the central air conditioner and the preset air volume of the waste heat recovery control system is drawn, with the horizontal axis representing the air supply volume of the central air conditioner and the vertical axis representing the preset air volume of the waste heat recovery control system. When matching, the initial calibration index value of the air supply volume of the current central air conditioner is clarified, the initial calibration index value of the air supply volume is positioned on the curve chart, and the closest interval range or data point is found. According to the positioning result, the preset air volume value of the waste heat recovery control system corresponding to the interval range or data point is read as the initial preset air volume.

[0038] Furthermore, according to the working status data of the waste heat recovery control system, the step of analyzing and obtaining the air supply volume adjustment parameters of the waste heat recovery control system includes: the working status data of the waste heat recovery control system includes the heat exchanger inlet temperature and the heat exchanger outlet temperature; obtaining the heat exchanger inlet temperature threshold, the heat exchanger outlet temperature threshold and the critical inlet and outlet temperature difference from the central air conditioning database; and comprehensively analyzing and obtaining the air supply volume adjustment parameters of the waste heat recovery control system.

[0039] In this embodiment, the heat exchanger inlet temperature refers to the temperature of the fluid (usually a heat source such as exhaust gas or hot water) before entering the heat exchanger. It reflects the initial thermal energy state of the heat source and is the starting point of the heat exchange process. The heat exchanger outlet temperature refers to the temperature of the fluid (which has become a cooling medium or a heat source that has released part of its thermal energy) when it leaves the heat exchanger after passing through the heat exchanger. It reflects the thermal energy state of the fluid after the heat exchange process. The heat exchanger inlet temperature and the heat exchanger outlet temperature are usually measured by temperature sensors installed at the inlet and outlet positions of the heat exchanger. The temperature sensor can sense the temperature of the fluid in real time and convert it into an electrical signal or a digital signal for the control system to read and process. The difference between the heat exchanger inlet temperature and the outlet temperature (i.e., the temperature difference) is an indicator for evaluating the degree of heat transfer during the heat exchange process. A larger temperature difference usually means that more heat is transferred during the heat exchange process; conversely, a smaller temperature difference usually means that less heat is transferred during the heat exchange process. By monitoring these two temperatures, the performance of the waste heat recovery system can be evaluated and it can be determined whether it is necessary to adjust parameters such as the air supply volume to optimize the heat exchange effect. For example, if the outlet temperature is too high, it may mean that the air supply is insufficient, resulting in insufficient heat exchange; if the inlet temperature is too low, it may mean that the heat source is insufficient or there are other problems in the system. Comprehensive analysis of the heat exchanger inlet and outlet temperatures can accurately obtain the air supply adjustment parameters of the waste heat recovery control system, achieve precise adjustment of the air supply, and thus optimize the overall performance and energy recovery rate of the system.

[0040] Furthermore, the step of adjusting the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameter of the waste heat recovery control system includes: matching the air supply volume adjustment parameter of the waste heat recovery control system with the air supply volume adjustment values ​​corresponding to each air supply volume adjustment parameter interval stored in the central air conditioning database to obtain the air supply volume adjustment value of the waste heat recovery control system; adjusting the preset air volume according to the air supply volume adjustment value of the waste heat recovery control system.

[0041] In this embodiment, when matching the air supply volume adjustment parameter of the waste heat recovery control system with the air supply volume adjustment value corresponding to each air supply volume adjustment parameter interval stored in the central air conditioning database, all relevant air supply volume adjustment parameter intervals and their corresponding air supply volume adjustment values ​​can be first extracted from the central air conditioning database, including multiple air supply volume adjustment parameter interval ranges and the air supply volume adjustment value corresponding to each interval, and the collected data is sorted according to the size of the air supply volume adjustment parameter, and it is ensured that each interval range does not overlap, so as to facilitate subsequent graphical representation. In order to intuitively show the relationship between the air supply volume adjustment parameter of the waste heat recovery control system and the air supply volume adjustment value of the waste heat recovery control system, a relationship curve diagram of the air supply volume adjustment parameter of the waste heat recovery control system and the air supply volume adjustment value of the waste heat recovery control system is drawn, the horizontal axis represents the air supply volume adjustment parameter of the waste heat recovery control system, and the vertical axis represents the corresponding air supply volume adjustment value. During matching, the air supply volume adjustment parameter value is positioned on the curve graph to find the closest interval range or data point. Based on the positioning result, the air supply volume adjustment value corresponding to the interval range or data point is read. Based on the obtained air supply volume adjustment value, the preset air volume of the waste heat recovery control system is increased or decreased accordingly to optimize the heat exchange efficiency and energy recovery rate of the system.

[0042] Furthermore, the initial calibration index of the central air conditioner's air supply volume is calculated as follows: ; In the formula, represents the initial calibration index of the air supply volume of the central air conditioner, μ represents the weight factor of the initial calibration index of the air supply volume corresponding to the preset working state, λ represents the weight factor of the initial calibration index of the air supply volume corresponding to the preset working environment, Indicates the working status evaluation value of the central air conditioner. Indicates the working environment assessment value of the central air conditioner.

[0043] In this embodiment, the working state of the central air conditioner directly affects its air volume demand, and the working environment determines that the air conditioner needs to adjust the air volume to adapt to external conditions. By comprehensively considering the working state and working environment of the central air conditioner, the initial air supply volume calibration value of the central air conditioner can be accurately calculated to ensure that the system can maintain efficient operation under different working conditions. Accurate initial air supply volume adjustment is performed according to different working states and environmental conditions, so that the air conditioner can achieve optimal performance and comfort in actual operation. The weight factor of the initial calibration index of the air volume supply volume corresponding to the working state represents the numerical value of the degree of influence of the working state of the central air conditioner on the initial calibration index of the air volume supply volume of the central air conditioner. When used, the weight factor of the initial calibration index of the air volume supply volume corresponding to the working state can be directly obtained from the central air conditioner database. The corresponding relationship can be a preset mapping relationship. For example, the working state evaluation value of the central air conditioner and the weight factor of the initial calibration index of the air volume supply volume corresponding to the working state preset in the central air conditioner database form a mapping set. The working state evaluation value of the central air conditioner is input into the mapping set to obtain the weight factor of the initial calibration index of the air volume supply volume corresponding to the working state. The mapping relationship can be one-to-one or many-to-one. In this example, the value range is [0,1]. The larger the working state evaluation value of the central air conditioner is, the larger the initial calibration index of the air volume supply volume of the central air conditioner is. The weight factor of the initial calibration index of the air volume supply volume corresponding to the working environment represents the numerical value of the influence of the working environment of the central air conditioner on the initial calibration index of the air volume supply volume of the central air conditioner. When used, the weight factor of the initial calibration index of the air volume supply volume corresponding to the working environment can be directly obtained from the central air conditioner database. The corresponding relationship can be a preset mapping relationship. For example, the working environment evaluation value of the central air conditioner and the weight factor of the initial calibration index of the air volume supply volume corresponding to the working environment preset in the central air conditioner database form a mapping set. The real-time working environment evaluation value of the central air conditioner is input into the mapping set to obtain the weight factor of the initial calibration index of the air volume supply volume corresponding to the working environment. The mapping relationship can be one-to-one or many-to-one. In this example, the value range is [0,1]. The larger the working environment evaluation value of the central air conditioner is, the larger the initial calibration index of the air volume supply volume of the central air conditioner is.

[0044] Among them, the working status evaluation value of the central air conditioner is calculated as follows: ; ; ; In the formula, Indicates the working status evaluation value of the central air conditioner. represents the weight factor of the working status evaluation value corresponding to the air conditioning load, represents the weight factor of the working status evaluation value corresponding to the condensing temperature, Indicates the average air conditioning load of the central air conditioner. Indicates the reference value of air conditioning load. Indicates the average condensing temperature of the central air conditioner. represents the reference value of condensing temperature, i represents the number of each monitoring time point, i=1,2,3,...,n, n represents the total number of monitoring time points, represents the air conditioning load at the i-th detection time point, represents the condensation temperature at the i-th detection time point.

[0045] The working state evaluation value weight factor corresponding to the air conditioning load represents the numerical value of the influence degree of the air conditioning load of the central air conditioner on the working state evaluation value of the central air conditioner. When used, the working state evaluation value weight factor corresponding to the air conditioning load can be directly obtained from the central air conditioning database. The corresponding relationship can be a preset mapping relationship. For example, the average air conditioning load of the central air conditioner and the working state evaluation value weight factor corresponding to the air conditioning load preset in the central air conditioning database form a mapping set. The average air conditioning load of the central air conditioner is input into the mapping set to obtain the working state evaluation value weight factor corresponding to the air conditioning load. The mapping relationship can be one-to-one or many-to-one. In this example, the value range is [0,1]. The ratio of the average air conditioning load of the central air conditioner to the air conditioning load reference value can evaluate the working state of the central air conditioner from the perspective of the air conditioning load. The larger the average air conditioning load of the central air conditioner, the larger the working state evaluation value of the central air conditioner. The working state evaluation value weight factor corresponding to the condensing temperature represents the numerical value of the influence of the condensing temperature of the central air conditioner on the working state evaluation value of the central air conditioner. When used, the working state evaluation value weight factor corresponding to the condensing temperature can be directly obtained from the central air conditioner database. The corresponding relationship can be a preset mapping relationship. For example, the average condensing temperature of the central air conditioner and the working state evaluation value weight factor corresponding to the condensing temperature preset in the central air conditioner database form a mapping set. The average condensing temperature of the central air conditioner is input into the mapping set to obtain the working state evaluation value weight factor corresponding to the condensing temperature. The mapping relationship can be one-to-one or many-to-one. In this example, its value range is [0,1]. The ratio of the average condensing temperature of the central air conditioner to the condensing temperature reference value can evaluate the working state of the central air conditioner from the perspective of the condensing temperature. The larger the average condensing temperature of the central air conditioner, the larger the working state evaluation value of the central air conditioner.

[0046] Among them, the working environment assessment value of the central air conditioner is calculated as follows: ; In the formula, Indicates the working environment evaluation value of the central air conditioner. Indicates the weight factor of the working environment assessment value corresponding to the working environment temperature, Indicates the weight factor of the working environment assessment value corresponding to the working environment humidity, Represents the weight factor of the working environment assessment value corresponding to the wind speed, Indicates the working environment temperature of the central air conditioner. Indicates the reference working environment temperature value, Indicates the working environment humidity value of the central air conditioner. Indicates the reference working environment humidity value. Indicates the wind speed of the central air conditioner. Indicates the critical wind speed.

[0047] The working environment evaluation value weight factor corresponding to the working environment temperature represents the numerical value of the influence of the working environment temperature of the central air conditioner on the working environment evaluation value of the central air conditioner. When used, the working environment evaluation value weight factor corresponding to the working environment temperature of the central air conditioner can be directly obtained from the central air conditioner database. The corresponding relationship can be a preset mapping relationship. For example, the working environment temperature value of the central air conditioner and the working environment evaluation value weight factor corresponding to the working environment temperature preset in the central air conditioner database form a mapping set. The working environment temperature value of the central air conditioner is input into the mapping set to obtain the working environment evaluation value weight factor corresponding to the working environment temperature. The mapping relationship can be one-to-one or many-to-one. In the example, its value range is [0,1]. The ratio of the working environment temperature value of the central air conditioner to the reference working environment temperature value can evaluate the working environment of the central air conditioner from the perspective of the working environment temperature. The larger the working environment temperature value of the central air conditioner, the larger the working environment evaluation value of the central air conditioner; the working environment evaluation value weight factor corresponding to the working environment humidity represents the numerical value of the influence of the working environment humidity of the central air conditioner on the working environment evaluation value of the central air conditioner. When used, the working environment evaluation value weight factor corresponding to the working environment humidity of the central air conditioner can be directly obtained from the central air conditioner database. The corresponding relationship can be a pre-set mapping relationship. For example, the working environment humidity value of the central air conditioner and the central air conditioner data The working environment assessment value weight factors corresponding to the working environment humidity preset in the library form a mapping set. The working environment humidity value of the central air conditioner is input into the mapping set to obtain the working environment assessment value weight factor corresponding to the working environment humidity. The mapping relationship can be one-to-one or many-to-one. In this example, its value range is [0,1]. The ratio of the working environment humidity value of the central air conditioner to the reference working environment humidity value can evaluate the working environment of the central air conditioner from the perspective of working environment humidity. The larger the working environment humidity value of the central air conditioner, the larger the working environment assessment value of the central air conditioner; the working environment assessment value weight factor corresponding to the wind speed indicates the degree of influence of the wind speed of the central air conditioner on the working environment assessment value of the central air conditioner. When used, the working environment assessment value weight factor corresponding to the wind speed of the central air conditioner can be directly obtained from the central air conditioning database, and the corresponding relationship can be a preset mapping relationship. For example, the wind speed of the central air conditioner and the working environment assessment value weight factor corresponding to the wind speed preset in the central air conditioning database form a mapping set, and the wind speed of the central air conditioner is input into the mapping set to obtain the working environment assessment value weight factor corresponding to the wind speed. The mapping relationship can be one-to-one or many-to-one. In this example, its value range is [0,1]. The ratio of the critical wind speed to the wind speed of the central air conditioner can evaluate the working environment of the central air conditioner from the perspective of wind speed. The smaller the wind speed of the central air conditioner, the greater the working environment assessment value of the central air conditioner.

[0048] Furthermore, the specific calculation formula of the air supply volume adjustment parameter of the waste heat recovery control system is: ; In the formula Indicates the air supply volume adjustment parameter. Indicates the weight factor of the air supply volume adjustment parameter corresponding to the heat exchanger inlet temperature, Indicates the weight factor of the air supply volume adjustment parameter corresponding to the heat exchanger outlet temperature, Indicates the weight factor of the air supply volume adjustment parameter corresponding to the inlet and outlet temperature difference of the heat exchanger, represents the heat exchanger inlet temperature, Indicates the heat exchanger inlet temperature threshold, represents the heat exchanger outlet temperature, Indicates the heat exchanger outlet temperature threshold, Represents the critical inlet and outlet temperature difference.

[0049] In this embodiment, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet temperature represents the numerical value of the influence degree of the heat exchanger inlet temperature on the air supply volume adjustment parameter of the waste heat recovery control system. When used, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet temperature can be directly obtained from the central air conditioning database, and the corresponding relationship can be a preset mapping relationship. For example, the heat exchanger inlet temperature and the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet temperature preset in the central air conditioning database form a mapping set, and the heat exchanger inlet temperature is input into the mapping set to obtain the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet temperature. The mapping relationship can be one-to-one or many-to-one. In this example, its value range is [0,1]. The ratio of the heat exchanger inlet temperature to the heat exchanger inlet temperature threshold can evaluate the air supply volume adjustment parameter of the waste heat recovery control system from the perspective of the heat exchanger inlet temperature. The larger the heat exchanger inlet temperature, the lower the air supply volume adjustment parameter of the waste heat recovery control system. The larger the amount; the air supply volume adjustment parameter weight factor corresponding to the heat exchanger outlet temperature, which represents the numerical value of the influence degree of the heat exchanger outlet temperature on the air supply volume adjustment parameter of the waste heat recovery control system. When used, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger outlet temperature can be directly obtained from the central air conditioning database, and the corresponding relationship can be a preset mapping relationship. For example, the heat exchanger outlet temperature and the air supply volume adjustment parameter weight factor corresponding to the heat exchanger outlet temperature preset in the central air conditioning database form a mapping set, and the heat exchanger outlet temperature is input into the mapping set to obtain the air supply volume adjustment parameter weight factor corresponding to the heat exchanger outlet temperature. The mapping relationship can be one-to-one or many-to-one. In this example, its value range is [0,1]. The ratio of the heat exchanger outlet temperature to the heat exchanger outlet temperature threshold can evaluate the air supply volume adjustment parameter of the waste heat recovery control system from the perspective of the heat exchanger outlet temperature. The larger the heat exchanger outlet temperature, the larger the air supply volume adjustment parameter of the waste heat recovery control system.The air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet and outlet temperature difference is a numerical value indicating the degree of influence of the heat exchanger inlet and outlet temperature difference on the air supply volume adjustment parameter of the waste heat recovery control system. When used, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet and outlet temperature difference can be directly obtained from the central air conditioning database. The corresponding relationship can be a pre-set mapping relationship. For example, the heat exchanger inlet and outlet temperature difference and the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet and outlet temperature difference preset in the central air conditioning database form a mapping set, and the current heat exchanger inlet and outlet temperature difference is input into the mapping set. The air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet and outlet temperature difference is obtained. The mapping relationship can be one-to-one or many-to-one. In this example, the value range is [0,1]. The difference between the absolute value of the heat exchanger inlet temperature and the heat exchanger outlet temperature represents the current heat exchanger inlet and outlet temperature difference. The ratio of the current heat exchanger inlet and outlet temperature difference to the critical inlet and outlet temperature difference can be used to evaluate the air supply volume adjustment parameter of the waste heat recovery control system from the perspective of the heat exchanger inlet and outlet temperature difference. The larger the current heat exchanger inlet and outlet temperature difference, the smaller the air supply volume adjustment parameter of the waste heat recovery control system. ;

[0050] Furthermore, a waste heat recovery control method based on a central air conditioner comprises the following specific steps: obtaining working status data of the central air conditioner and the waste heat recovery control system, and collecting working environment data of the central air conditioner; comprehensively analyzing the working status data and working environment data of the central air conditioner to obtain an initial calibration index of the air supply volume of the central air conditioner, and processing to obtain a preset air volume of the waste heat recovery control system based on the initial calibration index of the air supply volume of the central air conditioner; analyzing to obtain an air supply volume adjustment parameter of the waste heat recovery control system based on the working status data of the waste heat recovery control system, and adjusting the preset air volume of the waste heat recovery control system based on the air supply volume adjustment parameter of the waste heat recovery control system.

[0051] The air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet temperature is set to 0.3, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger outlet temperature is set to 0.3, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet and outlet temperature difference is set to 0.4, the heat exchanger inlet temperature threshold is set to 35°C, the heat exchanger outlet temperature threshold is set to 30°C, and the critical inlet and outlet temperature difference is set to 5°C. When the heat exchanger inlet temperature and the heat exchanger outlet temperature are different, the air supply volume adjustment parameter of the waste heat recovery control system is calculated. As shown in Table 1, the air supply volume adjustment parameter data table of the waste heat recovery control system based on central air conditioning.

[0052] Table 1 Air supply volume adjustment parameter data table based on waste heat recovery control system of central air conditioning Serial number (℃) (℃) 1 34 29 0.754 2 35 30 0.762 3 36 31 0.769 4 37 32 0.777 5 38 33 0.784 like Figure 2As shown in FIG. 1 , it is a diagram of the change of the air supply volume adjustment parameter of the waste heat recovery control system based on the central air conditioner provided in the embodiment of the present application, which is composed of Figure 2 It can be seen from Table 1 that when the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet temperature, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger outlet temperature, the air supply volume adjustment parameter weight factor corresponding to the heat exchanger inlet and outlet temperature difference, the heat exchanger inlet temperature threshold, the heat exchanger outlet temperature threshold, and the critical inlet and outlet temperature difference are the same, and the heat exchanger inlet temperature and the heat exchanger outlet temperature are different, the changes in the air supply volume adjustment parameters of the waste heat recovery control system.

[0053] like Figure 3 As shown, it is a flow chart of a waste heat recovery control method based on a central air-conditioning provided in an embodiment of the present application. The specific steps of the waste heat recovery control method based on a central air-conditioning provided in an embodiment of the present application include: acquiring the working status data of the central air-conditioning and the waste heat recovery control system, and collecting the working environment data of the central air-conditioning; based on the working status data and the working environment data of the central air-conditioning, comprehensively analyzing to obtain the initial calibration index of the air supply volume of the central air-conditioning, and based on the initial calibration index of the air supply volume of the central air-conditioning, processing to obtain the preset air volume of the waste heat recovery control system; based on the working status data of the waste heat recovery control system, analyzing to obtain the air supply volume adjustment parameters of the waste heat recovery control system, and adjusting the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameters of the waste heat recovery control system.

[0054] To sum up, this embodiment collects the working environment data of the central air conditioner and the central air conditioner, and comprehensively analyzes to obtain the initial calibration index of the air supply volume of the central air conditioner, thereby obtaining the preset air volume of the waste heat recovery control system, and then analyzes the air supply volume adjustment parameters according to the working status data of the waste heat recovery control system. This effectively solves the problem in the prior art that the central air conditioner cannot accurately control the waste heat recovery system according to the real-time operating conditions when performing waste heat recovery control, resulting in efficiency loss in the process of heat transfer and energy conversion, and the waste heat recovery efficiency of the central air conditioner is limited.

[0055] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0056] The present invention is described with reference to flowcharts and / or block diagrams of systems, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0057] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0058] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0059] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0060] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A waste heat recovery control system based on central air conditioning, characterized in that: include: Data acquisition module, air supply volume initial calibration module, air supply volume feedback adjustment module and central air conditioning database; The data acquisition module is used to acquire the working status data of the central air conditioner and the waste heat recovery control system, and collect the working environment data of the central air conditioner; The air supply volume initial calibration module is used to obtain the initial calibration index of the air supply volume of the central air conditioner through comprehensive analysis based on the working status data and working environment data of the central air conditioner, and to obtain the preset air volume of the waste heat recovery control system based on the initial calibration index of the air supply volume of the central air conditioner; The air supply volume feedback adjustment module is used to analyze and obtain the air supply volume adjustment parameters of the waste heat recovery control system according to the working status data of the waste heat recovery control system, and adjust the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameters of the waste heat recovery control system.

2. The waste heat recovery control system based on central air conditioning as claimed in claim 1, characterized in that: The step of comprehensively analyzing the working state data and working environment data of the central air conditioner to obtain the initial calibration index of the air supply volume of the central air conditioner comprises: Obtaining a working status evaluation value of the central air conditioner according to working status data of the central air conditioner; According to the working environment data of the central air conditioner, the working environment evaluation value of the central air conditioner is obtained; The initial calibration index of the air supply volume is obtained by comprehensive analysis based on the working status evaluation value of the central air conditioner and the working environment evaluation value of the central air conditioner.

3. The waste heat recovery control system based on central air conditioning as claimed in claim 2, characterized in that: The step of obtaining the working state evaluation value of the central air conditioner according to the working state data of the central air conditioner comprises: Deploy several monitoring time points, the working status data of the central air conditioner includes the air conditioning load and condensing temperature at each monitoring time point; Obtain air conditioning load reference value and condensing temperature reference value from the central air conditioning database; Comprehensive analysis is performed to obtain the working status evaluation value of the central air conditioner.

4. The waste heat recovery control system based on central air conditioning as claimed in claim 2, characterized in that: The step of obtaining the working environment evaluation value of the central air conditioner according to the working environment data of the central air conditioner comprises: The working environment data of the central air conditioner includes working environment temperature, working environment humidity and wind speed; Obtain reference working environment temperature, reference working environment humidity and critical wind speed from the central air conditioning database; Comprehensive analysis is performed to obtain the working environment assessment value of the central air conditioner.

5. The waste heat recovery control system based on central air conditioning as claimed in claim 1, characterized in that: The step of obtaining the preset air volume of the waste heat recovery control system according to the initial calibration index of the air supply volume of the central air conditioner comprises: Matching the initial calibration index of the air supply volume of the central air conditioner with the preset air volume of the waste heat recovery control system corresponding to each initial calibration index interval of the air supply volume stored in the central air conditioner database to obtain the initial preset air volume of the waste heat recovery control system; The preset air volume is adjusted according to the initial preset air volume of the waste heat recovery control system.

6. The waste heat recovery control system based on central air conditioning as claimed in claim 1, characterized in that: The step of analyzing and obtaining the air supply volume adjustment parameter of the waste heat recovery control system according to the working state data of the waste heat recovery control system comprises: The working state data of the waste heat recovery control system includes the heat exchanger inlet temperature and the heat exchanger outlet temperature; Obtain a heat exchanger inlet temperature threshold, a heat exchanger outlet temperature threshold, and a critical inlet and outlet temperature difference from a central air conditioning database; The air supply volume adjustment parameters of the waste heat recovery control system are obtained through comprehensive analysis.

7. The waste heat recovery control system based on central air conditioning as claimed in claim 1, characterized in that: The step of adjusting the preset air volume of the waste heat recovery control system according to the air supply volume adjustment parameter of the waste heat recovery control system comprises: Matching the air supply volume adjustment parameter of the waste heat recovery control system with the air supply volume adjustment value corresponding to each air supply volume adjustment parameter interval stored in the central air conditioning database to obtain the air supply volume adjustment value of the waste heat recovery control system; The preset air volume is adjusted according to the air supply volume adjustment value of the waste heat recovery control system.

8. The waste heat recovery control system based on central air conditioning as claimed in claim 5, characterized in that: The specific calculation formula of the initial calibration index of the air supply volume of the central air conditioner is: ; In the formula, represents the initial calibration index of the air supply volume of the central air conditioner, μ represents the weight factor of the initial calibration index of the air supply volume corresponding to the preset working state, λ represents the weight factor of the initial calibration index of the air supply volume corresponding to the preset working environment, Indicates the working status evaluation value of the central air conditioner. Indicates the working environment assessment value of the central air conditioner.

9. The waste heat recovery control system based on central air conditioning as claimed in claim 6, characterized in that: The specific calculation formula of the air supply volume adjustment parameter of the waste heat recovery control system is: ; In the formula Indicates the air supply volume adjustment parameter. Indicates the weight factor of the air supply volume adjustment parameter corresponding to the heat exchanger inlet temperature, Indicates the weight factor of the air supply volume adjustment parameter corresponding to the heat exchanger outlet temperature, Indicates the weight factor of the air supply volume adjustment parameter corresponding to the inlet and outlet temperature difference of the heat exchanger, represents the heat exchanger inlet temperature, Indicates the heat exchanger inlet temperature threshold, represents the heat exchanger outlet temperature, Indicates the heat exchanger outlet temperature threshold, Represents the critical inlet and outlet temperature difference.

10. A waste heat recovery control method based on a central air conditioner, applied to a waste heat recovery control system based on a central air conditioner as claimed in any one of claims 1 to 9, characterized in that : The specific steps include: Obtain the working status data of the central air conditioner and waste heat recovery control system, and collect the working environment data of the central air conditioner; According to the working status data and working environment data of the central air conditioner, the initial calibration index of the air supply volume of the central air conditioner is obtained by comprehensive analysis, and the preset air volume of the waste heat recovery control system is obtained according to the initial calibration index of the air supply volume of the central air conditioner; According to the working status data of the waste heat recovery control system, the air supply volume adjustment parameter of the waste heat recovery control system is analyzed and obtained, and the preset air volume of the waste heat recovery control system is adjusted according to the air supply volume adjustment parameter of the waste heat recovery control system.

Citation Information

Patent Citations

  • Waste heat recovery control system and method for central air conditioner and central air conditioner

    CN115789927B

  • Waste heat recovery device for heating, ventilation and air conditioning

    CN117906268B

  • Heat energy dispatching control system and control method

    CN117053436A

  • Condensation heat recovery device for central air conditioner

    CN1844776A

  • Device for increasing the heating and cooling capacity of a heat pump in heat recovery systems in ventilation units

    DE112008003700A5