Full-automatic thermal burst experiment system and experiment method
By designing a fully automatic thermal burst experimental system, and using automated tracks and lifting mechanisms to achieve mineral drying, thermal bursting and screening, the safety hazards caused by the many manual operation steps in the existing technology are solved, and the experimental efficiency and safety are improved.
Patent Information
- Application Number
- CN202411293438.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-12-27
AI Technical Summary
There are many manual operation steps in existing thermal burst experiments, which can easily cause injuries to people, and high temperature and dust pose a threat to the experimenters during the experiment.
A fully automatic thermal burst experimental system was designed, including tracks, lifting mechanisms, ovens, muffle furnaces, loading trucks, screening machines, etc. The drying, thermal bursting and screening of minerals is achieved through automated tracks and lifting mechanisms. Reduce manual operation and use infrared detectors and hoisting guillotine for precise control to ensure safety.
The experiment is automated, the intermediate processes are reduced, the experimental efficiency and safety are improved, the exposure risk of experimenters is reduced, and the harm of high temperature and dust to the respiratory system is avoided.
Smart Images

Figure CN119198833A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of thermal burst experiments, and in particular to a full-automatic thermal burst experiment system and an experiment method. Background Art
[0002] Thermal explosion is an important metallurgical property of iron ore. It mainly occurs in natural iron ore. Ores with high thermal explosion index will lead to an increase in the amount of dust blown out during blast furnace smelting and deterioration of blast furnace operating indicators. The proportion of this kind of ore in the charge should be controlled, so it is very important in the smooth operation of the blast furnace. At present, the thermal explosion test is to weigh 5 portions of 500g of lump ore and place them in the experimental box, place the experimental box on the molybdenum plate, place the molybdenum plate at the end of the fork handle of the forklift, and use the forklift to send the molybdenum plate into the muffle furnace for the experiment. Close the muffle furnace door and wait for 30 minutes, then open the cabinet door, use a forklift to take out the molybdenum plate, let it stand and cool, and then screen it separately. This will lead to the following disadvantages: the temperature of the muffle furnace is high, and the experimenter is easily burned by high temperature when opening and closing the furnace door; the temperature of the experimental box and molybdenum plate that have just completed the experiment is extremely high, but the experimenter is close to the molybdenum plate when closing the cabinet door, and is more likely to be burned; finally, manual screening, the lump ore is extremely dusty after hot explosion, which is harmful to the respiratory system of the experimenter.
[0003] Therefore, a fully automatic thermal burst test system and test method are provided to solve the above problems. Summary of the invention
[0004] The technical problem to be solved by the present invention is that the existing thermal burst test has many manual operation steps, which is easy to cause injuries to personnel, so a fully automatic thermal burst test system and test method are provided, and the fully automatic thermal burst test system includes: A track, a first lifting mechanism, an oven, a second lifting mechanism, a muffle furnace, a loading trolley, a trolley placement platform, a third lifting mechanism and a fully automatic screening machine, wherein the muffle furnace and the oven are arranged in parallel in sequence, the track is arranged in front of the muffle furnace and the oven, one end of the track is obliquely erected on the fully automatic screening machine, a first lifting mechanism is arranged in front of the oven, and a second lifting mechanism is arranged in front of the muffle furnace; the first lifting mechanism is used to lift the loading trolley to the box opening of the oven, and the second lifting mechanism is used to lift the loading trolley to the muffle furnace intersection; the third lifting mechanism is fixedly installed at the track close to the fully automatic screening machine, and the third lifting mechanism is used to pour the material on the loading trolley into the fully automatic screening machine; The loading trolley is arranged on the trolley placing platform, the trolley placing platform is arranged on a track and moves along the track, a driving mechanism is arranged on the track, and the driving mechanism is used to drive the trolley placing platform; a furnace entry device is detachably installed on the loading trolley.
[0005] Further, the first lifting mechanism includes: a first ascending track, a first lifting platform, a first lifting rope, a first winch, a first lifting and hoisting guillotine, a first infrared detector and a first limiting mechanism. The lower end of the first ascending track is fixedly installed between the track and the oven, the upper end of the first ascending track is fixedly installed with the first lifting platform, the first winch is fixedly installed on the first lifting platform, the upper end of the first lifting rope is fixedly connected to the first winch, the lower end of the first lifting rope is fixedly connected to the first lifting and hoisting guillotine, and the first lifting and hoisting guillotine rises and falls along the first ascending track; the first infrared detector is fixedly installed on the track on one side of the first ascending track, and the first limiting mechanism is fixedly installed on the upper end of the track on the other side of the first ascending track.
[0006] Furthermore, the second lifting mechanism includes: a second ascending track, a second lifting platform, a second lifting rope, a second winch, a second lifting guillotine, a second infrared detector and a second limiting mechanism, the lower end of the second lifting platform is fixedly installed between the track and the muffle furnace, the upper end of the second ascending track is fixedly installed with the second lifting platform, the second winch is fixedly installed on the second lifting platform, the upper end of the second lifting rope is fixedly connected to the second winch, the lower end of the second lifting rope is fixedly connected to the second lifting guillotine, the second lifting guillotine rises and falls along the second ascending track, the second infrared detector is fixedly installed on the track on one side of the second ascending track, and the second limiting mechanism is fixedly installed on the upper end of the track on the other side of the second ascending track.
[0007] Furthermore, the loading trolley includes: a loading body, loading wheels, a loading cross bar, a shear hanging ring and a trolley stop handle. The trolley stop handle is fixedly arranged on the upper surface of one end of the loading body, the shear hanging ring is laterally symmetrically arranged on the upper surface of the loading body, and a loading cross bar is arranged between the two shear hanging rings. The wheels of the loading trolley are square, and a track groove is opened at the lower end of the wheel. The loading trolley moves back and forth along the trolley placement platform toward the oven.
[0008] Furthermore, the lower end of the loading trolley placing platform cooperates with the track and moves along the track. The upper end of the loading trolley placing platform is fixedly provided with a wheel track, and the wheel track is arranged in the track groove. Fixed grooves are arranged on both sides of the wheel track, and also include a telescopic gas rod. The telescopic gas rod is fixedly installed on both sides of the wheel of the loading trolley, and the telescopic part of the telescopic gas rod passes through the wheel of the loading trolley and extends into the fixed groove.
[0009] Further, the furnace entry device comprises: a furnace entry base, a vertical plate is arranged at one end of the furnace entry base, a fixed furnace entry buckle is fixedly arranged on the surface of the vertical plate away from the furnace entry base, a movable furnace entry buckle is arranged above the fixed furnace entry buckle, the fixed furnace entry buckle and the movable furnace entry buckle are used to cooperate with each other to fix the furnace entry device on the load-carrying cross bar, a screw rod lifting mechanism is fixedly installed on the furnace entry base, a transverse movable base is arranged between the two screw rod lifting mechanisms, first linear bearings are fixedly arranged on both sides of the transverse movable base to cooperate with the screw rod lifting mechanism, and transverse screw rod movable mechanisms are symmetrically installed on the transverse movable base; The screw rod lifting mechanism includes a first stepper motor and a first screw rod, the stepper motor is fixedly mounted on the furnace entry base, the driving shaft of the stepper motor is vertically upward, the first screw rod is fixedly connected to the driving shaft of the stepper motor, and the first linear bearing is sleeved on the first screw rod; The transverse screw rod movable mechanism comprises a second stepping motor and a second screw rod, the second stepping motor is fixedly mounted on the transverse movable base, the driving shaft of the second stepping motor faces away from the vertical plate, and the second screw rod is fixedly connected to the driving shaft of the second stepping motor; It also includes a loading fork, which includes a fork body and a second linear bearing. Second linear bearings are respectively installed below the tail ends of two fork teeth of the fork body. The second linear bearings are sleeved on the second screw rod, and a locking mechanism is fixedly installed on the fork teeth.
[0010] Furthermore, the third lifting mechanism includes a third ascending track, a third lifting platform, a third lifting rope, a third winch, a third lifting and hoisting guillotine, a third infrared detector and a third limiting mechanism. The lower end of the third lifting platform is fixedly installed between the track and the muffle furnace, the upper end of the third ascending track is fixedly installed with the third lifting platform, the third winch is fixedly installed on the third lifting platform, the upper end of the third lifting rope is fixedly connected to the third winch, the lower end of the third lifting rope is fixedly connected to the third lifting guillotine, the third lifting guillotine rises and falls along the third ascending track, the third infrared detector is fixedly installed on the track on one side of the third ascending track, and the third limiting mechanism is fixedly installed on the upper end of the track on the other side of the third ascending track.
[0011] Furthermore, it also includes a material platform, a locking block is fixedly arranged at the bottom of the material platform, the locking block is provided with a locking hole in cooperation with the locking mechanism, the locking mechanism cooperates with the locking hole to fix the material platform on the loading fork, and a plurality of experimental boxes are fixedly arranged on the upper surface of the material platform, the experimental boxes are in the form of a rectangular parallelepiped, and a box cover is arranged at the upper end of the experimental box.
[0012] Furthermore, a 6.3 mm sieve, a 3.15 mm sieve and a 0.5 mm sieve are respectively provided in the fully automatic screening machine; an openable cabin door is correspondingly provided at each screen surface, and the openable cabin door includes a 6.3 mm sieve door, a 3.15 mm sieve door and a 0.5 mm sieve door, and a cleaning sieve door is also provided on the side wall of the fully automatic screening machine 7 below the 0.5 mm sieve door.
[0013] On the other hand, the present application also provides a fully automatic thermal burst test method, which is used in the fully automatic thermal burst test system as described above, and the fully automatic thermal burst test method comprises: Take out several portions of ore and put them into the experimental boxes respectively placed on the loading platforms, place the loading platforms on the loading forks, and the locking mechanism on the loading platforms locks the loading platforms and the loading forks; The telescopic gas rods on both sides of the loading trolley wheels fix the loading trolley on the trolley placement platform; the driving mechanism drives the track to drive the trolley placement platform to move toward the oven; When it moves to the first lifting mechanism, the driving mechanism stops, the first lifting guillotine of the first lifting mechanism descends through the first winch and the first lifting rope, the first lifting guillotine hooks the guillotine hanging ring on the loading trolley, the telescopic gas rods on both sides of the wheels of the loading trolley retract, the first lifting guillotine lifts the loading trolley upward, the first infrared detector on the first ascending track detects the height of the loading trolley, and when the lifting guillotine is lifted to the first limit mechanism, the loading trolley faces the furnace inlet of the oven; After the screw rod ascending mechanism and the transverse screw rod movable mechanism are fine-tuned, the loading platform is sent into the oven; After drying is completed, the screw rod ascending mechanism and the transverse screw rod movable mechanism take the loading platform out of the oven. After taking it out, the first lifting and hoisting guillotine of the first lifting mechanism descends through the first winch and the first hoisting rope, and the loading trolley returns to the trolley placement platform. At this time, the telescopic mechanism extends to fix the trolley on the wheel track; The driving mechanism drives the trolley placement platform forward to the front of the muffle furnace, the second lifting guillotine of the second lifting mechanism descends through the second winch and the second lifting rope, the second lifting guillotine hooks the guillotine hanging ring on the loading trolley, the telescopic gas rods on both sides of the wheels of the loading trolley retract, the second lifting guillotine lifts the loading trolley upward, the second infrared detector on the second ascending track detects the height of the loading trolley, and when the lifting guillotine is lifted to the second limit mechanism, the loading trolley is facing the inlet of the muffle furnace; After the screw rod ascending mechanism and the transverse screw rod movable mechanism are fine-tuned, the loading platform is sent into the muffle furnace for thermal bursting experiment; After the thermal burst test is completed, the screw rod lifting mechanism and the transverse screw rod movable mechanism take the loading platform out of the muffle furnace. After taking it out, the second lifting and hoisting guillotine of the second lifting mechanism is lowered through the second winch and the second hoisting rope, and the loading trolley returns to the trolley placement platform. At this time, the telescopic mechanism extends to fix the trolley on the wheel track; The loading trolley is stationary and cooled on the track. When the ore in the experimental box on the loading platform has finished cooling, the driving mechanism continues to drive and moves the trolley placement platform to just below the third lifting mechanism. The third lifting and hoisting guillotine of the third lifting mechanism descends through the third winch and the third hoisting rope. The third lifting and hoisting guillotine hooks the trolley handle on the loading trolley, and the telescopic gas rods on both sides of the wheels of the loading trolley retract. The third hoisting guillotine lifts the loading trolley upward and pours the ore in the experimental box that has undergone thermal explosion into the fully automatic screening device.
[0014] The implementation of the present invention has the following beneficial effects: 1. The present invention designs the oven and the muffle furnace on the same experimental line, and can directly carry out the muffle furnace experiment after the drying is completed, reducing the intermediate process. The furnace entry device has a simple structure, and the furnace entry device and the trolley are detachable. The loading platform can be directly placed on the loading trolley, reducing manual operation and improving the accuracy of the experiment. The full-automatic system includes automatic screening, and the experimenter does not need to screen manually. On the one hand, it improves the efficiency of the experiment, and on the other hand, it reduces the trauma of the dust of the lump ore after the thermal explosion to the respiratory system of the experimenter. The whole process is time-saving, labor-saving and safe. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural diagram of the present invention; Figure 2 It is a structural diagram of the cargo-carrying trolley of the present invention; Figure 3 is a structural diagram of the first lifting mechanism of the present invention; Figure 4 is a side view of the furnace feeding device of the present invention; Figure 5 is a top view of the furnace feeding device of the present invention; Figure 6 It is a structural schematic diagram of the muffle furnace of the present invention. Example
[0016] Please refer to the instruction manual Figure 1-2 In this embodiment, a fully automatic thermal burst test system is provided, and the fully automatic thermal burst test system comprises: Track 3, first lifting mechanism 4, oven 1, second lifting mechanism 5, muffle furnace 2, loading trolley 9, trolley placement platform, third lifting mechanism 6 and full-automatic screening machine 7, muffle furnace 2 and oven 1 are arranged in parallel in sequence, the track is arranged in front of the muffle furnace 2 and oven 1, one end of the track is obliquely erected on the full-automatic screening machine 7, the first lifting mechanism 4 is arranged in front of the oven 1, and the second lifting mechanism 5 is arranged in front of the muffle furnace 2; the first lifting mechanism 4 is used to lift the loading trolley 9 to the box opening of the oven 1, and the second lifting mechanism 5 is used to lift the loading trolley 9 to the intersection of the muffle furnace 2; the third lifting mechanism 6 is fixedly installed on the track close to the full-automatic screening machine 7, and the third lifting mechanism 6 is used to pour the material on the loading trolley 9 into the full-automatic screening machine 7; The loading trolley 9 is arranged on the trolley placing platform, and the trolley placing platform is arranged on the track 3 and moves along the track 3. A driving mechanism 8 is arranged on the track, and the driving mechanism 8 is used to drive the trolley placing platform; the loading trolley 9 is detachably provided with a furnace entry device.
[0017] The first lifting mechanism 4 includes: a first ascending track 404, a first lifting platform 402, a first lifting rope 403, a first winch 401, a first lifting and hoisting guillotine 407, a first infrared detector 405 and a first limiting mechanism 406. The lower end of the first ascending track 404 is fixedly installed between the track 3 and the oven 1, the upper end of the first ascending track 404 is fixedly installed with the first lifting platform 402, the first winch 401 is fixedly installed on the first lifting platform 402, the upper end of the first lifting rope 403 is fixedly connected to the first winch 401, the lower end of the first lifting rope 403 is fixedly connected to the first lifting and hoisting guillotine 407, and the first lifting and hoisting guillotine 407 rises and falls along the first ascending track 404; the first infrared detector 405 is fixedly installed on the track on one side of the first ascending track 404, and the first limiting mechanism 406 is fixedly installed on the upper end of the track on the other side of the first ascending track 404.
[0018] The second lifting mechanism 5 includes: a second ascending track, a second lifting platform, a second lifting rope, a second winch, a second lifting guillotine, a second infrared detector and a second limiting mechanism. The lower end of the second lifting platform is fixedly installed between the track and the muffle furnace 2, the second lifting platform is fixedly installed on the upper end of the second ascending track, the second winch is fixedly installed on the second lifting platform, the upper end of the second lifting rope is fixedly connected to the second winch, the lower end of the second lifting rope is fixedly connected to the second lifting guillotine, the second lifting guillotine rises and falls along the second ascending track, the second infrared detector is fixedly installed on the track on one side of the second ascending track, and the second limiting mechanism is fixedly installed on the upper end of the track on the other side of the second ascending track.
[0019] The loading trolley 9 includes: a loading body 901, loading wheels 905, a loading cross bar 908, a shear hanging ring 907 and a trolley stop handle 902. The trolley stop handle 902 is fixedly arranged on the upper surface of one end of the loading body 901, the shear hanging ring 907 is laterally symmetrically arranged on the upper surface of the loading body 901, and a loading cross bar 908 is arranged between the two shear hanging rings 907. The wheels of the loading trolley 9 are square, and a track groove is opened at the lower end of the wheel 905. The loading trolley 9 moves back and forth along the trolley placement platform toward the oven 1.
[0020] The lower end of the loading trolley 9 placement platform cooperates with the track 3 and moves along the track 3. The upper end of the loading trolley 9 placement platform is fixedly provided with a wheel track 904, and the wheel track 904 is set in the track groove. Fixed grooves are set on both sides of the wheel track 6, and also include telescopic gas rods 906. Telescopic gas rods 906 are fixedly installed on both sides of the wheels of the loading trolley 9, and the telescopic part of the telescopic gas rod 906 passes through the wheels of the loading trolley 9 and extends into the fixed groove.
[0021] The furnace entry device comprises: a furnace entry base 912, a vertical plate 911 is provided at one end of the furnace entry base 912, a fixed furnace entry buckle 910 is fixedly provided on the surface of the vertical plate 911 away from the furnace entry base 912, a movable furnace entry buckle 909 is provided above the fixed furnace entry buckle 910, the fixed furnace entry buckle 910 and the movable furnace entry buckle 909 are used to cooperate with each other to fix the furnace entry device on the load-carrying cross bar 908, a screw rod lifting mechanism is fixedly installed on the furnace entry base 912, a transverse movable base is provided between the two screw rod lifting mechanisms, first linear bearings 914 are fixedly provided on both sides of the transverse movable base in cooperation with the screw rod lifting mechanism, and transverse screw rod movable mechanisms are symmetrically installed on the transverse movable base; The screw rod lifting mechanism includes a first stepper motor 913 and a first screw rod 919. The stepper motor is fixedly mounted on the furnace entry base. The driving shaft of the first stepper motor 913 is vertically upward. The first screw rod 919 is fixedly connected to the driving shaft of the first stepper motor 913. The first linear bearing sleeve 914 is arranged on the first screw rod 919. The transverse screw rod movable mechanism includes a second stepper motor 916 and a second screw rod 917. The second stepper motor 917 is fixedly mounted on the transverse movable base 915. The driving shaft of the second stepper motor 916 faces away from the vertical plate. The second screw rod 917 and the driving shaft of the second stepper motor 916 are fixedly connected. It also includes a loading fork 918, which includes a fork body and a second linear bearing. Second linear bearings are respectively installed below the tail ends of the two fork teeth of the fork body. The second linear bearings are sleeved on the second screw rod 917, and a locking mechanism is fixedly installed on the fork teeth.
[0022] The third lifting mechanism 6 includes a third ascending track, a third lifting platform, a third lifting rope, a third winch, a third lifting guillotine, a third infrared detector and a third limiting mechanism. The lower end of the third lifting platform is fixedly installed between the track and the muffle furnace 2, the third lifting platform is fixedly installed on the upper end of the third ascending track, the third winch is fixedly installed on the third lifting platform, the upper end of the third lifting rope is fixedly connected to the third winch, the lower end of the third lifting rope is fixedly connected to the third lifting guillotine, the third lifting guillotine rises and falls along the third ascending track, the third infrared detector is fixedly installed on the track on one side of the third ascending track, and the third limiting mechanism is fixedly installed on the upper end of the track on the other side of the third ascending track.
[0023] It also includes a material platform, a locking block is fixedly arranged at the bottom of the material platform, the locking block cooperates with the locking mechanism to open a locking hole, the locking mechanism cooperates with the locking hole to fix the material platform on the loading fork, and a plurality of experimental boxes are fixedly arranged on the upper surface of the material platform. The experimental boxes are in the form of a rectangular parallelepiped, and a box cover is arranged at the upper end of the experimental box.
[0024] The fully automatic screening machine 7 is respectively provided with a 6.3 mm sieve, a 3.15 mm sieve and a 0.5 mm sieve; an openable cabin door is correspondingly arranged at each sieve surface, and the openable cabin door includes a 6.3 mm sieve door 701, a 3.15 mm sieve door 702 and a 0.5 mm sieve door 703. A cleaning sieve door 704 is also arranged on the side wall of the fully automatic screening machine 7 below the 0.5 mm sieve door.
[0025] On the other hand, the present application also provides a fully automatic thermal burst test method, which is used in the above fully automatic thermal burst test system. The fully automatic thermal burst test method includes: Take out several portions of ore and put them into the experimental boxes respectively placed on the loading platforms, place the loading platforms on the loading forks, and the locking mechanism on the loading platforms locks the loading platforms and the loading forks; The telescopic gas rods on both sides of the loading trolley wheels fix the loading trolley on the trolley placement platform; the driving mechanism drives the track to drive the trolley placement platform to move toward the oven; When it moves to the first lifting mechanism, the driving mechanism stops, the first lifting guillotine of the first lifting mechanism descends through the first winch and the first lifting rope, the first lifting guillotine hooks the guillotine hanging ring on the loading trolley, the telescopic gas rods on both sides of the wheels of the loading trolley retract, the first lifting guillotine lifts the loading trolley upward, the first infrared detector on the first ascending track detects the height of the loading trolley, and when the lifting guillotine is lifted to the first limit mechanism, the loading trolley faces the furnace inlet of the oven; After the screw rod ascending mechanism and the transverse screw rod movable mechanism are fine-tuned, the loading platform is sent into the oven; After drying is completed, the screw rod ascending mechanism and the transverse screw rod movable mechanism take the loading platform out of the oven. After taking it out, the first lifting and hoisting guillotine of the first lifting mechanism descends through the first winch and the first hoisting rope, and the loading trolley returns to the trolley placement platform. At this time, the telescopic mechanism extends to fix the trolley on the wheel track; The driving mechanism drives the trolley placement platform forward to the front of the muffle furnace, the second lifting guillotine of the second lifting mechanism descends through the second winch and the second lifting rope, the second lifting guillotine hooks the guillotine hanging ring on the loading trolley, the telescopic gas rods on both sides of the wheels of the loading trolley retract, the second lifting guillotine lifts the loading trolley upward, the second infrared detector on the second ascending track detects the height of the loading trolley, and when the lifting guillotine is lifted to the second limit mechanism, the loading trolley is facing the inlet of the muffle furnace; After the screw rod ascending mechanism and the transverse screw rod movable mechanism are fine-tuned, the loading platform is sent into the muffle furnace for thermal bursting experiment; After the thermal burst test is completed, the screw rod lifting mechanism and the transverse screw rod movable mechanism take the loading platform out of the muffle furnace. After taking it out, the second lifting and hoisting guillotine of the second lifting mechanism is lowered through the second winch and the second hoisting rope, and the loading trolley returns to the trolley placement platform. At this time, the telescopic mechanism extends to fix the trolley on the wheel track; The loading trolley is stationary and cooled on the track. When the ore in the experimental box on the loading platform has finished cooling, the driving mechanism continues to drive and moves the trolley placement platform to just below the third lifting mechanism. The third lifting and hoisting guillotine of the third lifting mechanism descends through the third winch and the third hoisting rope. The third lifting and hoisting guillotine hooks the trolley handle on the loading trolley, and the telescopic gas rods on both sides of the wheels of the loading trolley retract. The third hoisting guillotine lifts the loading trolley upward and pours the ore in the experimental box that has undergone thermal explosion into the fully automatic screening device.
[0026] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A fully automatic thermal burst test system, characterized in that: The fully automatic thermal burst test system comprises: a track, a first lifting mechanism, an oven, a second lifting mechanism, a muffle furnace, a loading trolley, a trolley placement platform, a third lifting mechanism and a fully automatic screening machine, wherein the muffle furnace and the oven are arranged in parallel in sequence, the track is arranged in front of the muffle furnace and the oven, one end of the track is obliquely mounted on the fully automatic screening machine, a first lifting mechanism is arranged in front of the oven, and a second lifting mechanism is arranged in front of the muffle furnace; the first lifting mechanism is used to lift the loading trolley to the box opening of the oven, and the second lifting mechanism is used to lift the loading trolley to the intersection of the muffle furnace; the third lifting mechanism is fixedly installed at the track close to the fully automatic screening machine, and the third lifting mechanism is used to pour the material on the loading trolley into the fully automatic screening machine; The loading trolley is arranged on the trolley placing platform, the trolley placing platform is arranged on a track and moves along the track, a driving mechanism is arranged on the track, and the driving mechanism is used to drive the trolley placing platform; a furnace entry device is detachably installed on the loading trolley.
2. The fully automatic thermal burst test system according to claim 1, characterized in that: The first lifting mechanism includes: a first ascending track, a first lifting platform, a first hoisting rope, a first winch, a first lifting and hoisting guillotine, a first infrared detector and a first limiting mechanism. The lower end of the first ascending track is fixedly installed between the track and the oven, the upper end of the first ascending track is fixedly installed with the first lifting platform, the first winch is fixedly installed on the first lifting platform, the upper end of the first hoisting rope is fixedly connected to the first winch, the lower end of the first hoisting rope is fixedly connected to the first lifting and hoisting guillotine, and the first lifting and hoisting guillotine rises and falls along the first ascending track; the first infrared detector is fixedly installed on the track on one side of the first ascending track, and the first limiting mechanism is fixedly installed on the upper end of the track on the other side of the first ascending track.
3. The fully automatic thermal burst test system according to claim 2, characterized in that: The second lifting mechanism includes: a second ascending track, a second lifting platform, a second lifting rope, a second winch, a second lifting guillotine, a second infrared detector and a second limiting mechanism. The lower end of the second lifting platform is fixedly installed between the track and the muffle furnace, the upper end of the second ascending track is fixedly installed with the second lifting platform, the second winch is fixedly installed on the second lifting platform, the upper end of the second lifting rope is fixedly connected to the second winch, the lower end of the second lifting rope is fixedly connected to the second lifting guillotine, the second lifting guillotine rises and falls along the second ascending track, the second infrared detector is fixedly installed on the track on one side of the second ascending track, and the second limiting mechanism is fixedly installed on the upper end of the track on the other side of the second ascending track.
4. The fully automatic thermal burst test system according to claim 3, characterized in that: The loading trolley includes: a loading body, loading wheels, a loading cross bar, a shear hanging ring and a trolley stop handle. The trolley stop handle is fixedly arranged on the upper surface of one end of the loading body. The shear hanging ring is laterally symmetrically arranged on the upper surface of the loading body. A loading cross bar is arranged between the two shear hanging rings. The wheels of the loading trolley are square, and a track groove is opened at the lower end of the wheel. The loading trolley moves back and forth along the trolley placement platform toward the oven.
5. The fully automatic thermal burst test system according to claim 4, characterized in that: The lower end of the loading trolley placing platform cooperates with the track and moves along the track. The upper end of the loading trolley placing platform is fixedly provided with a wheel track, and the wheel track is arranged in the track groove. Fixed grooves are arranged on both sides of the wheel track, and also include a telescopic gas rod. The telescopic gas rod is fixedly installed on both sides of the wheel of the loading trolley, and the telescopic part of the telescopic gas rod passes through the wheel of the loading trolley and extends into the fixed groove.
6. The fully automatic thermal burst test system according to claim 5, characterized in that: The furnace entry device comprises: a furnace entry base, a vertical plate is arranged at one end of the furnace entry base, a fixed furnace entry buckle is fixedly arranged on the surface of the vertical plate away from the furnace entry base, a movable furnace entry buckle is arranged above the fixed furnace entry buckle, the fixed furnace entry buckle and the movable furnace entry buckle are used to cooperate to fix the furnace entry device on the load-carrying cross bar, a screw rod rising mechanism is fixedly installed on the furnace entry base, a horizontal movable base is arranged between the two screw rod rising mechanisms, first linear bearings are fixedly arranged on both sides of the horizontal movable base to cooperate with the screw rod rising mechanism, and horizontal screw rod movable mechanisms are symmetrically installed on the horizontal movable base; The screw rod lifting mechanism includes a first stepper motor and a first screw rod, the stepper motor is fixedly mounted on the furnace entry base, the driving shaft of the stepper motor is vertically upward, the first screw rod is fixedly connected to the driving shaft of the stepper motor, and the first linear bearing is sleeved on the first screw rod; The transverse screw rod movable mechanism comprises a second stepping motor and a second screw rod, the second stepping motor is fixedly mounted on the transverse movable base, the driving shaft of the second stepping motor faces away from the vertical plate, and the second screw rod is fixedly connected to the driving shaft of the second stepping motor; It also includes a loading fork, which includes a fork body and a second linear bearing. Second linear bearings are respectively installed below the tail ends of two fork teeth of the fork body. The second linear bearings are sleeved on the second screw rod, and a locking mechanism is fixedly installed on the fork teeth.
7. The fully automatic thermal burst test system according to claim 6, characterized in that: The third lifting mechanism includes a third ascending track, a third lifting platform, a third lifting rope, a third winch, a third lifting and hoisting guillotine, a third infrared detector and a third limiting mechanism. The lower end of the third lifting platform is fixedly installed between the track and the muffle furnace, the upper end of the third ascending track is fixedly installed with the third lifting platform, the third winch is fixedly installed on the third lifting platform, the upper end of the third lifting rope is fixedly connected to the third winch, the lower end of the third lifting rope is fixedly connected to the third lifting guillotine, the third lifting guillotine rises and falls along the third ascending track, the third infrared detector is fixedly installed on the track on one side of the third ascending track, and the third limiting mechanism is fixedly installed on the upper end of the track on the other side of the third ascending track.
8. The fully automatic thermal burst test system according to claim 7, characterized in that: It also includes a material platform, a locking block is fixedly arranged at the bottom of the material platform, the locking block is provided with a locking hole in cooperation with the locking mechanism, the locking mechanism cooperates with the locking hole to fix the material platform on the loading fork, and a plurality of experimental boxes are fixedly arranged on the upper surface of the material platform, the experimental boxes are in the form of a rectangular parallelepiped, and a box cover is arranged at the upper end of the experimental box.
9. The fully automatic thermal burst test system according to claim 8, characterized in that: The fully automatic screening machine is equipped with a 6.3mm sieve, a 3.15mm sieve and a 0.5mm sieve; an openable cabin door is correspondingly arranged at each sieve surface, and the openable cabin doors include a 6.3mm sieve door, a 3.15mm sieve door and a 0.5mm sieve door. A cleaning sieve door is also arranged on the side wall of the fully automatic screening machine below the 0.5mm sieve door.
10. A fully automatic thermal burst test method, used in the fully automatic thermal burst test system as claimed in claims 1 to 9, characterized in that: The fully automatic thermal burst test method comprises: Take out several portions of ore and put them into the experimental boxes respectively placed on the loading platforms, place the loading platforms on the loading forks, and the locking mechanism on the loading platforms locks the loading platforms and the loading forks; The telescopic gas rods on both sides of the loading trolley wheels fix the loading trolley on the trolley placement platform; the driving mechanism drives the track to drive the trolley placement platform to move toward the oven; When it moves to the first lifting mechanism, the driving mechanism stops, the first lifting guillotine of the first lifting mechanism descends through the first winch and the first lifting rope, the first lifting guillotine hooks the guillotine hanging ring on the loading trolley, the telescopic gas rods on both sides of the wheels of the loading trolley retract, the first lifting guillotine lifts the loading trolley upward, the first infrared detector on the first ascending track detects the height of the loading trolley, and when the lifting guillotine is lifted to the first limit mechanism, the loading trolley faces the furnace inlet of the oven; After the screw rod ascending mechanism and the transverse screw rod movable mechanism are fine-tuned, the loading platform is sent into the oven; After drying is completed, the screw rod ascending mechanism and the transverse screw rod movable mechanism take the loading platform out of the oven. After taking it out, the first lifting and hoisting guillotine of the first lifting mechanism descends through the first winch and the first hoisting rope, and the loading trolley returns to the trolley placement platform. At this time, the telescopic mechanism extends to fix the trolley on the wheel track; The driving mechanism drives the trolley placement platform forward to the front of the muffle furnace, the second lifting guillotine of the second lifting mechanism descends through the second winch and the second lifting rope, the second lifting guillotine hooks the guillotine hanging ring on the loading trolley, the telescopic gas rods on both sides of the wheels of the loading trolley retract, the second lifting guillotine lifts the loading trolley upward, the second infrared detector on the second ascending track detects the height of the loading trolley, and when the lifting guillotine is lifted to the second limit mechanism, the loading trolley is facing the inlet of the muffle furnace; After the screw rod ascending mechanism and the transverse screw rod movable mechanism are fine-tuned, the loading platform is sent into the muffle furnace for thermal bursting experiment; After the thermal burst test is completed, the screw rod lifting mechanism and the transverse screw rod movable mechanism take the loading platform out of the muffle furnace. After taking it out, the second lifting and hoisting guillotine of the second lifting mechanism is lowered through the second winch and the second hoisting rope, and the loading trolley returns to the trolley placement platform. At this time, the telescopic mechanism extends to fix the trolley on the wheel track; The loading trolley is stationary and cooled on the track. When the ore in the experimental box on the loading platform has finished cooling, the driving mechanism continues to drive and moves the trolley placement platform to just below the third lifting mechanism. The third lifting and hoisting guillotine of the third lifting mechanism descends through the third winch and the third hoisting rope. The third lifting and hoisting guillotine hooks the trolley handle on the loading trolley, and the telescopic gas rods on both sides of the wheels of the loading trolley retract. The third hoisting guillotine lifts the loading trolley upward and pours the ore in the experimental box that has undergone thermal explosion into the fully automatic screening device.
