Semi-physical simulation operation training system for diesel power station
Through the semi-physical simulation operation training system of the diesel engine and power station, PLC control equipment and three-dimensional simulation modeling software are used to simulate power station control and fault treatment, which solves the problem of the operators of the diesel engine and power station lacking emergency operation experience, and improves the effectiveness of training and operation proficiency of the training Spend.
Patent Information
- Application Number
- CN202411514215.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2024-12-27
AI Technical Summary
The operators of diesel engine and power stations lack operation experience during emergency operation, resulting in insufficient power supply reliability training and unable to effectively respond to interruptions in mains power supply.
A semi-physical simulation operation training system for diesel engine and power stations was designed, including a fault setting unit, a virtual setting unit for power supply and a virtual display unit for power supply. The PLC control equipment and three-dimensional simulation modeling software are used to simulate the operation and fault handling process of the power station control system. , provides interactive virtual large screen and control screen training.
This system enables newly-employed operators to safely and intuitively understand and master the component distribution, system principles and operating steps of diesel engine and power stations, quickly improve troubleshooting capabilities, and enhance the operating proficiency of emergency power supplies.
Smart Images

Figure CN119207199A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of diesel engine power station simulation training, in particular to a semi-physical simulation operation training system for a diesel engine power station. Background Art
[0002] The State Grid stipulates that the power supply reliability rate in general urban areas must be greater than 99.9%, and the power supply reliability rate in large urban centers must be greater than 99.99%. In some important livelihood facilities such as communications, hospitals, transportation, energy, and important national defense projects, the power supply reliability rate is required to reach more than 99.999%. Therefore, the above-mentioned locations will be equipped with diesel engines as power generation equipment to maintain the power supply reliability of important facilities;
[0003] Since diesel power stations are crucial to maintaining the high reliability of the power supply network, once the city power supply is interrupted, the diesel power station as an emergency power source needs to be started immediately to complete power generation, closing and switching. However, the system has fewer opportunities to handle this (because the State Grid generally requires the reliability rate of the power supply system to be above 99.99%), so trainees generally lack operating experience in emergency operation of diesel power stations, and there is room for improvement. Summary of the invention
[0004] The purpose of the present invention is to provide a semi-physical simulation operation training system for a diesel power station, which intuitively and vividly displays the system structure, working principle and operation process of the diesel power station control panel, lays a foundation for new diesel engine operators to engage in power supply guarantee, and solves the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a semi-physical simulation operation training system for a diesel power station, comprising a training system as a whole, which is used for testing and configuring the diesel engine in an emergency state; a hardware device, which is configured in the training system as a whole and simulated in the simulation operation; and a training algorithm, which is installed in the hardware device and is used for electrical control of the hardware device.
[0006] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the training system generally includes a fault setting unit, a power generation and supply virtual setting unit and a power generation and supply virtual display unit, and the fault setting unit is provided with a screen device used by the power generation and supply virtual setting unit and the power generation and supply virtual display unit.
[0007] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, wherein the hardware device simulates the operation of the power station control system, and the hardware device includes electrical components required to realize the simulated power station operation, PLC control equipment used to control the electrical components, and display equipment.
[0008] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the training algorithm includes a topological structure unit and a data control unit, the topological structure unit puts each unit into a display device for display through a PLC control device, and the data control unit is used for data processing when the system is running.
[0009] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the power generation and supply virtual display unit includes a virtual large screen, the screen device includes a unit control screen, a parallel screen and a switching screen, and the power generation and supply virtual display unit and the screen device can be used interactively.
[0010] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the topological structure unit realizes its topological function through the interactive use of a screen device, a power generation and supply virtual display unit and a PLC control device.
[0011] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the data control unit includes a virtual simulation module, a simulation training and guidance module and a data processing module, and the virtual simulation module, the simulation training and guidance module and the data processing module are respectively provided with sub-module units for their display use.
[0012] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power plant, the sub-module unit of the virtual simulation module includes a three-dimensional simulation modeling software, and the three-dimensional simulation modeling software is used for displaying the scene layout of a real diesel power plant operation room.
[0013] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the sub-module unit of the simulation training guidance module includes a simulation training subject management sub-module, a simulation training real-time guidance sub-module and a simulation training record management sub-module, and the simulation training subject management sub-module cooperates with the simulation training real-time guidance sub-module and the simulation training record management sub-module for centralized management and control of the simulation training guidance module.
[0014] As a further solution of the present invention: a semi-physical simulation operation training system for a diesel power station, the sub-module unit of the data processing module includes a data embedding sub-module, a data retention sub-module and a data push sub-module, the data embedding sub-module is used for data reading and writing, the data retention sub-module is used for data maintenance, and the data push sub-module is used for data sending and receiving.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] The purpose of the present invention is to provide a safe, intuitive, economical, and time- and space-independent semi-physical simulation teaching and training system for newly employed diesel power station operators, so that they can quickly understand and master the component distribution, system principles, and operating procedures of the diesel power station, and accelerate the generation of their troubleshooting capabilities. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of a training system in a semi-physical simulation operation training system for a diesel power station of the present invention;
[0018] Figure 2 A diesel power generation circuit diagram of the prior art in a semi-physical simulation operation training system for a diesel power station of the present invention;
[0019] Figure 3 A diagram of a diesel power generation device in the prior art in a semi-physical simulation operation training system for a diesel power station of the present invention;
[0020] Figure 4 It is a structural schematic diagram of a semi-physical operation training system of a diesel power station in the semi-physical simulation operation training system of the present invention;
[0021] Figure 5 A schematic diagram of the topological structure and data flow in a semi-physical simulation operation training system for a diesel power station according to the present invention;
[0022] Figure 6 It is a flow chart of a semi-physical simulation training software for a diesel generator set in a semi-physical simulation operation training system for a diesel power station of the present invention;
[0023] Figure 7 A virtual scene diagram of a diesel power station in a semi-physical simulation operation training system of a diesel power station according to the present invention;
[0024] Figure 8 The present invention discloses a software diagram of a diesel engine power station semi-physical simulation operation training system in the diesel engine power station semi-physical simulation operation training system. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The following is an explanation of an embodiment of the present invention based on the overall structure of the present invention.
[0027] In the embodiment of the present invention, a semi-physical simulation operation training system for a diesel power station is provided. Figure 2 and Figure 3, since diesel power stations in the prior art usually consist of three parts: diesel engines, generators, and unit control cabinets, the "two in use and one in standby" mode is usually adopted, that is, two diesel engines run in parallel and one is on standby. The main operations of the power station are divided into two categories: machine-side operation and control cabinet operation. The automated diesel units are mainly in two modes: cabinet manual and cabinet automatic. Power supply process: In the cabinet manual mode, the operator first completes the start-up of two single units in the cabinet and switches from idling to full speed. Observe the indicator instrument, and close the circuit breaker after the unit is powered stably to complete the power supply of the single unit. At this time, the GPC (unit paralleling device) or manual synchronization table can be used to complete the paralleling of the second unit with the first unit. After the paralleling is completed, the second unit automatically closes and enters synchronization, and supplies power to the load at the same time. Operate the GPC control panel of the two units to transfer loads and distribute power. In the cabinet automatic mode: the operator first pre-selects the lead sequence. After the unit is started, the control program automatically closes and supplies power according to the pre-selected sequence. When the program detects that the load is too large and meets the conditions for parallel operation, the second unit automatically completes the parallel power supply, load transfer and power distribution under the control of two GPCs. When the city power is restored, the unit exits the power supply. The same exit power supply mode is also divided into two types: cabinet manual and cabinet automatic. Its action steps are opposite to the power supply closing sequence. Therefore, the diesel power station as an emergency power supply plays a vital role in maintaining the high reliability of the power system. In order to solve the adverse effects on the pre-job training of diesel power station operators such as the large number of components on the control panel of the diesel power station, the complex system principles, the many operating steps, and the great safety hazards of the unit caused by misoperation.
[0028] Other embodiments of the present invention: please refer to Figure 1 Therefore, this application specifically proposes a semi-physical simulation operation training system for a diesel power station. The training system is used for testing and configuring diesel engines in emergency situations. The training system includes a fault setting unit, a virtual power supply setting unit, and a virtual power supply display unit. The virtual power supply display unit includes a virtual large screen. The screen device includes a unit control screen, a parallel screen, and a switching screen. The virtual power supply display unit and the screen device can be used interactively. The fault setting unit is provided with a screen device for the virtual power supply setting unit and the virtual power supply display unit. The specific training system is composed of three parts: a diesel power station control system (including a fault setting unit), a virtual power supply device and scene, and a virtual power supply display large screen. The diesel power station control system (including a fault setting unit) is composed of two unit control screens, one parallel screen, and one switching screen.
[0029] Other embodiments of the present invention: please refer to Figure 4The hardware device is configured in the overall training system and simulated in the simulation operation. The hardware device simulates the operation of the power station control system. The hardware device includes the electrical components required to realize the simulated power station operation, the PLC control device used to control the electrical components, and the display device. The specific hardware part of the training system is consistent with the real power station control system. It includes 2 unit control screens, 1 paralleling screen, and 1 switching screen. The main electrical components include indicator lights, switch buttons, unit controllers, analog instruments, PLC controllers, etc.;
[0030] Other embodiments of the present invention: please refer to Figure 5 The training algorithm is installed in the hardware device and used for electrical control of the hardware device. The training algorithm includes a topological structure unit and a data control unit. The topological structure unit puts each unit into the display device for display through the PLC control device. The data control unit is used for data processing when the system is running. The topological structure unit realizes its topological function through the interactive use between the screen device, the power generation and supply virtual display unit and the PLC control device. The data control unit includes a virtual simulation module, a simulation training and adjustment module and a data processing module. The virtual simulation module, the simulation training and adjustment module and the data processing module are respectively provided with sub-module units for their display use. Specifically, the PLC control device is used as Figure 5 The nodes of the middle topology network are electrically connected to the No. 1 virtual instrument touch screen and the No. 2 virtual instrument touch screen with the virtual large screen, the parallel screen and the touch screen, so that the virtual large screen, the parallel screen and the touch screen can operate the No. 1 virtual instrument touch screen and the No. 2 virtual instrument touch screen, and then indirectly display or control the No. 1 unit controller and the No. 2 unit controller through the No. 1 virtual instrument touch screen and the No. 2 virtual instrument touch screen.
[0031] Other embodiments of the present invention: please refer to Figure 6 The submodule units of the simulation training and guidance module include a simulation training subject management submodule, a simulation training real-time guidance submodule and a simulation training record management submodule. The simulation training subject management submodule cooperates with the simulation training real-time guidance submodule and the simulation training record management submodule for centralized management and control of the simulation training and guidance module. The simulation training subject management in the module guidance module is the control center of the software, which realizes the centralized management function of various training subjects of the diesel power station and can support system administrators to expand subjects according to training needs. The data access unit in the data processing module receives the real-time monitoring data of the virtual diesel power station and the simulation training and guidance component equipment through the dedicated interface of the equipment access gateway, including the equipment operation status data such as the diesel power station operation status and the circuit breaker operation status and the real-time data of the equipment operation parameters such as current, voltage and speed.
[0032] Other embodiments of the present invention: please refer to Figure 8The submodule units of the data processing module include a data embedding submodule, a data holding submodule and a data pushing submodule. The data embedding submodule is used for data reading and writing, the data holding submodule is used for data maintenance, and the data pushing submodule is used for data sending and receiving. The data holding unit is used to maintain the virtual simulation data required for equipment monitoring, simulation, guidance and other functions. The data source includes the real-time monitoring data of the control panel accessed through the equipment access gateway and the monitoring point data of the virtual equipment simulated and generated by this module. The data pushing unit pushes the real-time monitoring data collected by the equipment to the power generation and supply professional virtual simulation components and simulation training and guidance components through the dedicated interface of the equipment access gateway.
[0033] Other embodiments of the present invention: please refer to Figure 7 The submodule unit of the virtual simulation module includes a three-dimensional simulation modeling software, which is used for displaying the scene layout of the real diesel power station operation room. The virtual simulation module relies on the three-dimensional simulation modeling software to restore the scene layout of the real diesel power station operation room in proportion, including the diesel power station, auxiliary equipment of the unit, and the installation connection relationship between systems. Based on the functions of scene roaming, system equipment principle cognition, data monitoring, etc., it helps users to quickly master the system layout, working principle and operation steps of the diesel power station. Therefore, users can realize the basic knowledge of the diesel power station structure through panoramic roaming through the virtual simulation scene, set virtual faults to learn and train the fault analysis and processing of the diesel power station, and the main elements include virtual model elements including diesel engine room, oil tank room, cooling water pool, smoke exhaust room, virtual diesel power station and ancillary facilities, virtual loads, etc.
[0034] The working principle of the present invention is: The purpose of the present invention is to provide a semi-physical simulation teaching and training system that is safe, intuitive, economical, and not limited by time and space for newly employed diesel power station operators, so that they can quickly understand and master the component distribution, system principles and operating steps of the diesel power station, and accelerate the generation of their troubleshooting capabilities.
[0035] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A semi-physical simulation operation training system for a diesel power station, characterized in that: It includes a training system as a whole, and the training system as a whole is used for testing and configuring the diesel engine in an emergency state; Hardware devices configured in the training system assembly and used in simulation during the simulation operation; and A training algorithm is mounted in a hardware device and is used for electrical control of the hardware device.
2. A diesel power station semi-physical simulation operation training system according to claim 1, characterized in that: The training system generally comprises a fault setting unit, a power generation and supply virtual setting unit and a power generation and supply virtual display unit, wherein the fault setting unit is provided with a screen device used by the power generation and supply virtual setting unit and the power generation and supply virtual display unit.
3. A diesel power station semi-physical simulation operation training system according to claim 2, characterized in that: The hardware device simulates the operation of a power station control system, and includes electrical components required to realize the simulated power station operation, a PLC control device used to control the electrical components, and a display device.
4. A diesel power station semi-physical simulation operation training system according to claim 3, characterized in that: The training algorithm includes a topological structure unit and a data control unit. The topological structure unit puts each unit into a display device for display through a PLC control device, and the data control unit is used for data processing when the system is running.
5. A diesel power station semi-physical simulation operation training system according to claim 4, characterized in that: The power generation and supply virtual display unit includes a virtual large screen, and the screen device includes a unit control screen, a paralleling screen and a switching screen. The power generation and supply virtual display unit and the screen device can be used interactively.
6. A diesel power station semi-physical simulation operation training system according to claim 5, characterized in that: The topological structure unit realizes its topological function through the interactive use between the screen device, the power generation and supply virtual display unit and the PLC control device.
7. A diesel power station semi-physical simulation operation training system according to claim 6, characterized in that: The data control unit includes a virtual simulation module, a simulation training and guidance module and a data processing module. The virtual simulation module, the simulation training and guidance module and the data processing module are respectively provided with sub-module units for their display use.
8. A diesel power station semi-physical simulation operation training system according to claim 7, characterized in that: The submodule unit of the virtual simulation module includes three-dimensional simulation modeling software, and the three-dimensional simulation modeling software is used for displaying the scene layout of the operating room of a real diesel power station.
9. A diesel power station semi-physical simulation operation training system according to claim 8, characterized in that: The submodule units of the simulation training guidance module include a simulation training subject management submodule, a simulation training real-time guidance submodule and a simulation training record management submodule. The simulation training subject management submodule cooperates with the simulation training real-time guidance submodule and the simulation training record management submodule to provide centralized management and control for the simulation training guidance module.
10. A diesel power station semi-physical simulation operation training system according to claim 9, characterized in that: The submodule unit of the data processing module includes a data embedding submodule, a data holding submodule and a data pushing submodule. The data embedding submodule is used for data reading and writing, the data holding submodule is used for data maintenance, and the data pushing submodule is used for data sending and receiving.