Generation method and device of distribution network dispatching transfer mode operation order, and electronic equipment

By obtaining scheduling operation requirements information and equipment group information, and automatically generating scheduling and transfer operation tickets, the problem of low efficiency in generating operation tickets in the prior art is solved, and the safety and standardization of operations are improved.

CN119228311APending Publication Date: 2024-12-31GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411353665.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-31

AI Technical Summary

Technical Problem

In the prior art, the efficiency of generating operation tickets for distribution network scheduling and transfer mode is low, and the lack of automated generation methods leads to users who need to manually fill in operation tickets, which is cumbersome.

Method used

By obtaining the scheduling operation requirements information and the equipment group to be dispatched, determining the target scheduling equipment group and environment information, generating scheduling operation execution information, and then automatically generating scheduling mode operation tickets, and recording scheduling operation execution information.

Benefits of technology

It realizes automatic generation of scheduling transfer operation tickets, improves operation efficiency, and ensures the safe, standardized and efficient execution of scheduling operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119228311A_ABST
    Figure CN119228311A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a device for generating a distribution network dispatching transfer mode operation ticket, and electronic equipment. The method comprises the steps that scheduling operation demand information and a to-be-scheduled equipment group are acquired, and the to-be-scheduled equipment group at least comprises power supply equipment and initial power receiving equipment before the scheduling operation is executed; based on the scheduling operation demand information and the to-be-scheduled equipment group, a target scheduling equipment group is determined, and the target scheduling equipment group at least comprises power supply equipment and target power receiving equipment after the scheduling operation is executed; scheduling operation execution information is determined based on the to-be-scheduled equipment group, the target scheduling equipment group and environment information, the environment information is used for representing environment parameters of the position where the target scheduling equipment group is located, and the scheduling operation execution information is used for guiding operation and maintenance personnel to execute scheduling operation; and generating a scheduling-to-mode operation ticket based on the scheduling operation execution information. According to the invention, the technical problem of low efficiency of generating the scheduling-to-mode operation order in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of distribution network dispatching control, and in particular to a method, device and electronic equipment for generating a distribution network dispatching mode change operation ticket. Background Art

[0002] Before performing a dispatching operation, you need to prepare and fill out a detailed operation ticket, including operator information, operation time, operation content, safety measures and other information. That is, you need to fill out a distribution network dispatching mode change operation ticket to ensure that the operation process is safe and reliable, and record key information and results during the operation. The operation ticket can help operators standardize the operation process, reduce the possibility of operational errors and accidents, and ensure stable and safe operation of the power grid.

[0003] At present, the relevant technologies often require users to manually fill in and prepare distribution network dispatching mode change operation tickets. The process of users completing the dispatching mode change operation tickets is relatively cumbersome, and there is a lack of methods to automatically generate dispatching mode change operation tickets, resulting in low efficiency in generating dispatching mode change operation tickets in the relevant technologies.

[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0005] The embodiments of the present invention provide a method, device and electronic device for generating a distribution network dispatching mode change operation ticket, so as to at least solve the technical problem of low efficiency in generating a dispatching mode change operation ticket in the related art.

[0006] According to one aspect of an embodiment of the present invention, a method for generating a distribution network dispatching mode change operation ticket is provided, comprising: obtaining dispatching operation requirement information and a device group to be dispatched, wherein the dispatching operation requirement information is used to characterize the expected effect to be achieved by performing a dispatching operation on the device group to be dispatched, and the device group to be dispatched at least includes the power supply device and the initial power receiving device before the dispatching operation is performed; based on the dispatching operation requirement information and the device group to be dispatched, determining a target dispatching device group, wherein the target dispatching device group at least includes the power supply device and the target power receiving device after the dispatching operation is performed; based on the device group to be dispatched, the target dispatching device group and environmental information, determining dispatching operation execution information, wherein the environmental information is used to characterize the environmental parameters of the location of the target dispatching device group, and the dispatching operation execution information is used to guide operation and maintenance personnel to perform dispatching operations; based on the dispatching operation execution information, generating a dispatching mode change operation ticket, wherein the dispatching mode change operation ticket is used to record the dispatching operation execution information.

[0007] Optionally, based on the scheduling operation requirement information and the device group to be scheduled, the target scheduling device group is determined, including: based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled, determining the target powered device; based on the power supply device and the target powered device, determining the target scheduling device group.

[0008] Optionally, based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled, the target powered device is determined, including: obtaining the network topology of the distribution network where the power supply device is located; determining at least one candidate powered device based on the scheduling operation type, the power supply device and the network topology; and screening at least one candidate powered device based on the first hardware parameter information to determine the target powered device.

[0009] Optionally, the scheduling operation execution information includes scheduling operation execution steps, or scheduling operation alarm prompts; based on the device group to be scheduled, the target scheduling device group and the environmental information, the scheduling operation execution information is determined, including: based on the environmental information, simulating the process of converting the device group to be scheduled to the target scheduling device group to obtain a simulation result, wherein the simulation result is used to characterize whether the simulated device group to be scheduled can safely perform the scheduling operation; when the simulation result shows that the device group to be scheduled can safely perform the scheduling operation, generating scheduling operation execution steps based on the device group to be scheduled and the target scheduling device group; when the simulation result shows that the device group to be scheduled cannot safely perform the scheduling operation, generating a scheduling operation alarm prompt.

[0010] Optionally, based on the environmental information, the process of converting the device group to be scheduled to the target scheduling device group is simulated to obtain a simulation result, including: based on the second hardware parameter information and environmental information of the target scheduling device group, simulating the scheduling operation of the device group to be scheduled to obtain an initial simulation result; based on the initial simulation result and a preset safety scheduling rule set, determining the simulation result, wherein the preset safety scheduling rule set is used to represent a set of pre-set rules for the safe operation of the scheduling device.

[0011] Optionally, based on the device group to be scheduled and the target scheduling device group, a scheduling operation execution step is generated, including: based on the operating status parameters of the device group to be scheduled, a power-off operation execution step and a waiting time are generated, wherein the power-off operation execution step is used to guide the operation and maintenance personnel to disconnect the connection relationship between the power supply device and the initial power receiving device, and the waiting time is used to indicate the waiting time required after executing the power-off operation execution step; based on the second hardware parameter information of the target scheduling device group, and the topological connection relationship between the power supply device and the target power receiving device, a power-on operation execution step is generated, and the power-on operation execution step is used to guide the operation and maintenance personnel to establish a connection relationship between the power supply device and the target power receiving device; based on the power-off operation execution step, the waiting time and the power-on operation execution step, a scheduling operation execution step is generated.

[0012] According to another aspect of an embodiment of the present invention, there is also provided a device for generating a distribution network dispatching mode change operation ticket, comprising: an acquisition module, used to acquire dispatching operation requirement information and a device group to be dispatched, wherein the dispatching operation requirement information is used to characterize the expected effect to be achieved by performing a dispatching operation on the device group to be dispatched, and the device group to be dispatched at least includes the power supply device and the initial power receiving device before the dispatching operation is performed; a first determination module, used to determine the target dispatching device group based on the dispatching operation requirement information and the device group to be dispatched, wherein the target dispatching device group at least includes the power supply device and the target power receiving device after the dispatching operation is performed; a second determination module, used to determine the dispatching operation execution information based on the device group to be dispatched, the target dispatching device group and the environmental information, wherein the environmental information is used to characterize the environmental parameters of the location of the target dispatching device group, and the dispatching operation execution information is used to guide the operation and maintenance personnel to perform the dispatching operation; a generation module, used to generate a dispatching mode change operation ticket based on the dispatching operation execution information, wherein the dispatching mode change operation ticket is used to record the dispatching operation execution information.

[0013] According to another aspect of an embodiment of the present invention, there is further provided an electronic device, comprising: a memory storing an executable program; and a processor for running the program, wherein the method in each embodiment of the present invention is executed when the program is running.

[0014] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. The computer-readable storage medium includes a stored executable program, wherein when the executable program is running, the device where the computer-readable storage medium is located is controlled to execute the methods in various embodiments of the present invention.

[0015] According to another aspect of an embodiment of the present invention, a computer program product is provided, including a computer program. When the computer program is executed by a processor, the method in each embodiment of the present invention is implemented.

[0016] According to another aspect of an embodiment of the present invention, a computer program product is provided, including a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method in each embodiment of the present invention is implemented.

[0017] According to another aspect of the embodiments of the present invention, a computer program is further provided. When the computer program is executed by a processor, the methods in the embodiments of the present invention are implemented.

[0018] In an embodiment of the present invention, a method for generating a distribution network dispatching mode change operation ticket is provided, comprising: obtaining dispatching operation requirement information and a device group to be dispatched, wherein the dispatching operation requirement information is used to characterize the expected effect to be achieved by performing a dispatching operation on the device group to be dispatched, and the device group to be dispatched at least includes the power supply device and the initial power receiving device before the dispatching operation is performed; based on the dispatching operation requirement information and the device group to be dispatched, determining the target dispatching device group, wherein the target dispatching device group at least includes the power supply device and the target power receiving device after the dispatching operation is performed; based on the device group to be dispatched, the target dispatching device group and environmental information, determining the dispatching operation execution information, wherein the environmental information is used to characterize the environmental parameters of the location of the target dispatching device group, and the dispatching operation execution information is used to guide the operation and maintenance personnel to perform the dispatching operation; based on the dispatching operation execution information, generating a dispatching mode change operation ticket, wherein the dispatching mode change operation ticket is used to record the dispatching operation execution information. It is easy to notice that the present application determines the target scheduling equipment group based on the scheduling operation demand information and the equipment group to be scheduled, realizes the specific description and requirements of the expected effect to be achieved by the scheduling operation based on the equipment group to be scheduled, and the execution object of the scheduling operation, first automatically and accurately clarifies the target scheduling equipment group after the scheduling operation is executed; then, based on the equipment group to be scheduled, the target scheduling equipment group and the environmental information, determines whether the scheduling operation can be carried out safely and smoothly, and generates the scheduling operation execution information. In particular, the present application takes into account that the environmental information will affect whether the scheduling operation can be carried out safely and smoothly, and the operating status of the equipment, and proposes to determine whether the scheduling operation can be carried out safely and smoothly based on the environmental information, or the appropriate time and operation steps for executing the scheduling operation, so as to obtain the scheduling operation execution information; through the above steps, the automatic generation of the scheduling mode conversion operation ticket can be realized, which can help ensure the safe, standardized and efficient execution of the scheduling operation, thereby solving the technical problem of low efficiency in generating the scheduling mode conversion operation ticket in the related technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0020] Figure 1is a flow chart of a method for generating a distribution network dispatching mode change operation ticket according to an embodiment of the present invention;

[0021] Figure 2 It is a flow chart of an optional method for generating a distribution network dispatching mode transfer operation ticket according to an embodiment of the present invention;

[0022] Figure 3 It is a schematic diagram of a device for generating a distribution network dispatching mode change operation ticket according to an embodiment of the present invention. DETAILED DESCRIPTION

[0023] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0025] According to one aspect of an embodiment of the present invention, a method for generating a distribution network dispatching mode change operation ticket is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0026] Figure 1 is a flow chart of a method for generating a distribution network dispatching mode change operation ticket according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:

[0027] Step S102, obtaining scheduling operation requirement information and a group of devices to be scheduled.

[0028] The scheduling operation requirement information is used to characterize the expected effect to be achieved by performing the scheduling operation on the equipment group to be scheduled. The equipment group to be scheduled includes at least the power supply equipment and the initial power receiving equipment before the scheduling operation is performed.

[0029] The above-mentioned distribution network dispatching transformation may refer to the transformation of the original distribution network dispatching mode into a new dispatching mode in the power system, which may include adjusting the operation and control strategy of the distribution network to improve the performance, efficiency and reliability of the system. The distribution network dispatching transformation may optimize the operation of the distribution network by introducing intelligent equipment and technologies, achieve precise control of power loads, improve power supply quality, reduce energy consumption and losses, and promote the access of renewable energy.

[0030] The above-mentioned dispatching operation requirement information may refer to the specific description and requirements of the expected effect to be achieved by performing dispatching operations on the dispatching equipment group. The dispatching operation requirement information may include, but is not limited to, the purpose and requirements of the dispatching operation, which may be the purpose and requirements of the dispatching operation, such as equipment maintenance, debugging, disassembly or replacement. For example, the dispatching operation requirement information for a substation may be: perform insulation performance testing on the transformer group of substation A. The dispatching operation requirement information can be determined according to actual needs and is not limited here.

[0031] The above-mentioned dispatching operation may refer to the operation and control of the dispatching equipment, which may include the operation of switchgear, circuit breakers, disconnectors, voltage transformers, current transformers and other equipment. The dispatching operation needs to be carried out in accordance with specific steps and procedures to ensure the safe and stable operation of the power grid.

[0032] The above-mentioned power supply equipment can form a power supply and power receiving relationship with the initial power receiving equipment. The power supply equipment and the power receiving equipment can be determined according to actual needs and are not limited here.

[0033] The above-mentioned group of equipment to be dispatched may refer to a group of equipment that needs to be dispatched, and may include a combination of power supply equipment and initial power receiving equipment that need to be operated before performing the dispatching operation. The group of equipment to be dispatched may include substations, transformers, circuit breakers, disconnectors, grounding switches, etc. The group of equipment to be dispatched can be determined according to actual needs and is not limited here.

[0034] In an optional embodiment, scheduling operation requirement information can be obtained, which may include the expected effect to be achieved by scheduling the equipment group to be scheduled, the time and location of the operation, the purpose and requirements of the operation, etc.; the equipment group to be scheduled includes at least the power supply equipment and the initial power receiving equipment before the scheduling operation is performed. By determining the equipment group to be scheduled, the execution object of the scheduling operation can be clarified, which facilitates the subsequent generation of a scheduling mode change operation ticket.

[0035] Step S104: determining a target scheduling device group based on the scheduling operation requirement information and the device group to be scheduled.

[0036] The target scheduling device group at least includes power supply equipment and target power receiving equipment after the scheduling operation is performed.

[0037] The above-mentioned target powered device may refer to a device that forms a power supply and power receiving relationship with the power supply device after the scheduling operation is executed. The scheduling operation in this application may refer to the situation where the power supply device remains unchanged and the powered device changes before and after the scheduling operation is executed.

[0038] In an optional embodiment, the target scheduling equipment group after executing the scheduling operation can be determined based on the scheduling operation requirement information of the scheduling operation and the equipment group to be scheduled. The target scheduling equipment group should at least include the power supply equipment and the target power receiving equipment after executing the scheduling operation. It can also include other equipment required for the power supply equipment and the target power receiving equipment to form a power supply and power receiving relationship. This is not limited here. The present application first determines the target power receiving equipment after executing the scheduling operation based on the scheduling operation requirement information and the equipment group to be scheduled. By accurately determining the target scheduling equipment group, the safety and reliability of the scheduling operation can be effectively guaranteed, and the normal operation of the power system can be ensured.

[0039] Step S106: determining scheduling operation execution information based on the device group to be scheduled, the target scheduling device group and the environment information.

[0040] Among them, the environmental information is used to characterize the environmental parameters of the location of the target scheduling equipment group, and the scheduling operation execution information is used to guide the operation and maintenance personnel to perform scheduling operations.

[0041] The above-mentioned environmental information may refer to environmental parameters that may affect the execution of scheduling operations, and may include but are not limited to weather information, temperature, humidity, wind speed, atmospheric pressure, surrounding environment, etc. at the location of the target scheduling equipment group, among which weather conditions such as rain, snow, typhoons, etc. may affect the execution of scheduling operations; ambient temperature may affect the scheduling operation process and the heat dissipation performance of the equipment; humidity may affect the insulation and conductivity of the equipment during the scheduling operation; wind speed may affect the heat dissipation of the equipment during the scheduling operation, or the stability of the equipment; whether the surrounding environment has vegetation, buildings, water sources, etc., the surrounding environment conditions may affect the heat dissipation, maintenance, etc. of the equipment. Environmental information can be determined according to actual needs and is not limited here.

[0042] In an optional embodiment, it is possible to determine whether the scheduling operation can be carried out safely and smoothly based on the device group to be scheduled, the target scheduling device group and the environmental information, generate scheduling operation execution information, and guide the operation and maintenance personnel to perform the scheduling operation. Here, guiding the operation and maintenance personnel to perform the scheduling operation may include but is not limited to prompting the operation and maintenance personnel whether the scheduling operation can be carried out safely and smoothly, guiding the operation and maintenance personnel on how to perform the scheduling operation, the operation matters that need to be paid attention to in the key steps of the scheduling operation, or reminding the operation and maintenance personnel that the scheduling operation cannot be performed due to high security risks, etc. When determining the scheduling operation execution information, the relationship between the device group to be scheduled and the target scheduling device group may be considered, such as the connection mode and operation sequence between the devices. Considering that the environmental information will affect whether the scheduling operation can be safely performed and the operating status of the device, it is possible to determine whether the scheduling operation can be carried out safely and smoothly based on the environmental information, or the appropriate time and operation steps for performing the scheduling operation, etc., to ensure the smooth progress of the scheduling operation. The scheduling operation execution information may include specific operation steps and precautions, and can guide the operation and maintenance personnel to perform the scheduling operation. It can be comprehensively determined based on the device group to be scheduled, the target scheduling device group and the environmental information to ensure the safety and efficiency of the scheduling operation.

[0043] Step S108, generating a scheduling mode conversion operation ticket based on the scheduling operation execution information.

[0044] Among them, the dispatch mode change operation ticket is used to record the dispatch operation execution information.

[0045] The above-mentioned dispatch mode conversion operation ticket can record the dispatch operation execution information, and can also record the operation and maintenance personnel who perform the dispatch operation, the start time and end time of the dispatch operation, the generation time of the dispatch mode conversion operation ticket and other information. It can be determined according to actual needs and is not limited here.

[0046] In an optional embodiment, generating a dispatching mode conversion operation ticket based on the dispatching operation execution information may involve organizing the dispatching operation execution information and converting it into a standardized operation ticket format for recording and managing the execution process of the dispatching operation. Specifically, the dispatching operation execution information may be organized, which may include the specific operation content, operator, operation time, operation steps, equipment status and other related information of the substation; the collected operation execution information may be organized into a standardized operation ticket format, which may include the operator's name, operation time, operation location, operation content, operation steps, safety precautions, operation records and other contents. The process of organizing the operation information needs to ensure the accuracy, completeness and standardization of the operation ticket so that subsequent operators can clearly understand the operation process and execution requirements; finally, a complete dispatching mode conversion operation ticket may be generated and reviewed and approved. After the operation ticket is generated, the operation ticket may be reviewed by a professional to ensure that the operation content and steps meet the specification requirements and be approved. After the operation ticket is reviewed and approved, it can be used to record and manage the execution process of the dispatching operation. Through the above steps, the automatic generation of the dispatching mode conversion operation ticket can help ensure the safe, standardized and efficient execution of the dispatching operation, and also help to record and track key information in the operation process, providing a basis for subsequent operations and management.

[0047] In an embodiment of the present invention, a method for generating a distribution network dispatching mode change operation ticket is provided, comprising: obtaining dispatching operation requirement information and a device group to be dispatched, wherein the dispatching operation requirement information is used to characterize the expected effect to be achieved by performing a dispatching operation on the device group to be dispatched, and the device group to be dispatched at least includes the power supply device and the initial power receiving device before the dispatching operation is performed; based on the dispatching operation requirement information and the device group to be dispatched, determining the target dispatching device group, wherein the target dispatching device group at least includes the power supply device and the target power receiving device after the dispatching operation is performed; based on the device group to be dispatched, the target dispatching device group and environmental information, determining the dispatching operation execution information, wherein the environmental information is used to characterize the environmental parameters of the location of the target dispatching device group, and the dispatching operation execution information is used to guide the operation and maintenance personnel to perform the dispatching operation; based on the dispatching operation execution information, generating a dispatching mode change operation ticket, wherein the dispatching mode change operation ticket is used to record the dispatching operation execution information. It is easy to notice that the present application determines the target scheduling equipment group based on the scheduling operation demand information and the equipment group to be scheduled, realizes the specific description and requirements of the expected effect to be achieved by the scheduling operation based on the equipment group to be scheduled, and the execution object of the scheduling operation, first automatically and accurately clarifies the target scheduling equipment group after the scheduling operation is executed; then, based on the equipment group to be scheduled, the target scheduling equipment group and the environmental information, determines whether the scheduling operation can be carried out safely and smoothly, and generates the scheduling operation execution information. In particular, the present application takes into account that the environmental information will affect whether the scheduling operation can be carried out safely and smoothly, and the operating status of the equipment, and proposes to determine whether the scheduling operation can be carried out safely and smoothly based on the environmental information, or the appropriate time and operation steps for executing the scheduling operation, so as to obtain the scheduling operation execution information; through the above steps, the automatic generation of the scheduling mode conversion operation ticket can be realized, which can help ensure the safe, standardized and efficient execution of the scheduling operation, thereby solving the technical problem of low efficiency in generating the scheduling mode conversion operation ticket in the related technology.

[0048] Optionally, based on the scheduling operation requirement information and the device group to be scheduled, the target scheduling device group is determined, including: based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled, determining the target powered device; based on the power supply device and the target powered device, determining the target scheduling device group.

[0049] The above-mentioned dispatching operation type may refer to a specific dispatching operation behavior or dispatching operation method performed on the power grid equipment. The dispatching operation type may include but is not limited to tripping operation, merging operation, switching operation and voltage regulation operation, among which, tripping operation may refer to opening the circuit breaker in the circuit to cut off the current transmission; merging operation may refer to closing the circuit breakers in two circuits to merge the circuits; switching operation may refer to replacing the position of one circuit breaker with another circuit breaker; voltage regulation operation may refer to adjusting the voltage so that the voltage in the power grid remains within a normal range. The dispatching operation type can be determined according to actual needs and is not limited here.

[0050] The above-mentioned first hardware parameter information may refer to the basic hardware parameters of the power supply equipment, which may include but is not limited to the model, rated voltage, rated current, connection method, protection parameters and other information of the power supply equipment, which can help determine the characteristics and capabilities of the power supply equipment, thereby providing basic data for subsequent operations. The first hardware parameter information can be determined according to actual needs and is not limited here.

[0051] In an optional embodiment, the target powered device can be determined according to the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled. The first hardware parameter information of the power supply device may include the model, capacity, rated voltage and other information of the device. The powered device that can be powered by the power supply device can be determined through the first hardware parameter information. The target powered device can be determined based on the scheduling operation type and the first hardware parameter information of the power supply device in the device group to be scheduled, that is, the specific device that needs to be operated can be determined. Then, based on the power supply device and the target powered device, the target scheduling device group can be determined, and the devices and device combinations that need to be operated are accurately determined. The matching and adaptability between the target powered device and the power supply device are fully considered, so as to generate a corresponding scheduling mode conversion operation ticket, which can effectively reduce the operation risk and improve the scheduling operation efficiency. The target scheduling device group can be determined according to the information of the power supply device and the target powered device. The target scheduling device group can be determined according to other devices required for the power supply device and the target powered device to perform power supply and power receiving connection, so as to facilitate the subsequent generation of the scheduling mode conversion operation ticket.

[0052] Optionally, based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled, the target powered device is determined, including: obtaining the network topology of the distribution network where the power supply device is located; determining at least one candidate powered device based on the scheduling operation type, the power supply device and the network topology; and screening at least one candidate powered device based on the first hardware parameter information to determine the target powered device.

[0053] The above-mentioned network topology structure may refer to the connection relationship and power transmission path of the distribution network where the power supply equipment is located, and may include information such as the cable and wire connection method between the power supply equipment and each powered equipment. The network topology structure can be determined according to actual needs and is not limited here.

[0054] In an optional embodiment, the network topology of the distribution network where the power supply device is located is obtained. The layout and connection relationship of the distribution network where the current power supply device is located can be obtained through the power grid monitoring system or other related systems. The structure of the entire distribution network and the connection method between each device can be understood to help determine the target powered device; then, the candidate powered device that may need to be operated can be determined according to the specific scheduling operation type, the location of the power supply device, and the topology of the distribution network. The impact range of the operation type on the power grid, as well as the location and connection relationship of the powered device can be considered to determine at least one candidate powered device. By analyzing the topology of the distribution network, the connection relationship between the power supply device and each powered device can be more accurately determined, thereby more effectively selecting the candidate powered device; finally, after determining the candidate powered device, the candidate powered device can be screened according to the specific hardware parameter information of the power supply device, and finally the target powered device that needs to be operated is determined, which can ensure the accuracy and effectiveness of the operation, while also taking into account the performance and safety factors of the device. In the above steps, at least one candidate powered device is determined by obtaining the topology of the distribution network, and then the target powered device is screened and determined according to the hardware parameter information, thereby providing accurate basic information and reference basis for subsequent operation ticket generation and distribution network scheduling operations.

[0055] Optionally, the scheduling operation execution information includes scheduling operation execution steps, or scheduling operation alarm prompts; based on the device group to be scheduled, the target scheduling device group and the environmental information, the scheduling operation execution information is determined, including: based on the environmental information, simulating the process of converting the device group to be scheduled to the target scheduling device group to obtain a simulation result, wherein the simulation result is used to characterize whether the simulated device group to be scheduled can safely perform the scheduling operation; when the simulation result shows that the device group to be scheduled can safely perform the scheduling operation, generating scheduling operation execution steps based on the device group to be scheduled and the target scheduling device group; when the simulation result shows that the device group to be scheduled cannot safely perform the scheduling operation, generating a scheduling operation alarm prompt.

[0056] In an optional embodiment, the process of converting the device group to be scheduled to the target scheduling device group can be simulated based on environmental information. Specifically, the process of performing scheduling operations in the current environment can be simulated. The simulation here can be performed using a simulation device in the system, or computer simulation software, to simulate the operation of converting the device group to be scheduled to the target scheduling device group. During the simulation, possible situations and state changes in the current environment can be considered. For example, scheduling operations can be performed under the current weather, temperature and humidity, and finally a simulation result can be obtained.

[0057] The present application can generate specific dispatching operation execution steps after confirming that the equipment group to be dispatched can safely perform the dispatching operation based on the simulation results. The dispatching operation execution steps may include equipment operation sequence, parameter settings, safety measures, etc., to ensure the smooth execution of the dispatching operation; if the simulation results show that the equipment group to be dispatched cannot safely perform the dispatching operation, the system can generate corresponding dispatching operation alarm prompts. The dispatching operation alarm prompts may include specific safety risks, possible causes of failures, recommended countermeasures, etc., to help operators avoid potential safety problems. For example, when the current weather environment at the location where the dispatching equipment is located is moderate rain, a dispatching operation alarm prompt can be output to prompt the operation and maintenance personnel that the dispatching operation cannot be performed; for another example, when the humidity at the location where the dispatching equipment is located is high, a prompt can be output to prompt the operation and maintenance personnel that insulation protection is required in a certain step of the dispatching operation; through simulation analysis based on environmental information, the system can provide effective operational support and safety guarantees for the dispatching operation generation field, to ensure the safe operation of power grid equipment and the smooth execution of dispatching operations.

[0058] Optionally, based on the environmental information, the process of converting the device group to be scheduled to the target scheduling device group is simulated to obtain a simulation result, including: based on the second hardware parameter information and environmental information of the target scheduling device group, simulating the scheduling operation of the device group to be scheduled to obtain an initial simulation result; based on the initial simulation result and a preset safety scheduling rule set, determining the simulation result, wherein the preset safety scheduling rule set is used to represent a set of pre-set rules for the safe operation of the scheduling device.

[0059] The above-mentioned preset safety scheduling rule set can be a pre-set rule for the safe operation of the scheduling equipment, which may include various safety requirements such as current, voltage, temperature, equipment spacing, etc. If the simulation results meet the preset safety scheduling rule set, the operation can be considered safe; if it does not meet the preset safety scheduling rule set, adjustment or modification of the operation is required.

[0060] In an optional embodiment, based on the second hardware parameter information of the target dispatching device group, the information such as the model and capacity of each device can be included, and environmental information such as temperature, humidity, pressure, etc. can be obtained at the same time; the distribution network dispatching operation simulation software can be used to simulate the process of executing the dispatching operation on the device group to be dispatched according to the second hardware parameter information and environmental information, which can include switching, adjusting, connecting and other operations to obtain the initial simulation results; and then further analyze and evaluate the simulation results according to the initial simulation results and the preset safety dispatching rule set. The preset safety dispatching rule set can be a set of safety operation rules formulated by experts according to the characteristics of the equipment and actual operation experience, which can include equipment operation sequence, current and voltage limits, equipment status monitoring and other rules. By comparing the initial simulation results with these rules, the final simulation results can be determined to ensure that the dispatching operation complies with safety specifications, the equipment operates normally, and will not affect the power grid. Through the above-mentioned simulation operations, safety rule comparisons and result determinations, and through scientific analysis and evaluation, a distribution network dispatching mode conversion operation ticket that complies with safety specifications can be effectively generated.

[0061] Optionally, based on the device group to be scheduled and the target scheduling device group, a scheduling operation execution step is generated, including: based on the operating status parameters of the device group to be scheduled, a power-off operation execution step and a waiting time are generated, wherein the power-off operation execution step is used to guide the operation and maintenance personnel to disconnect the connection relationship between the power supply device and the initial power receiving device, and the waiting time is used to indicate the waiting time required after executing the power-off operation execution step; based on the second hardware parameter information of the target scheduling device group, and the topological connection relationship between the power supply device and the target power receiving device, a power-on operation execution step is generated, and the power-on operation execution step is used to guide the operation and maintenance personnel to establish a connection relationship between the power supply device and the target power receiving device; based on the power-off operation execution step, the waiting time and the power-on operation execution step, a scheduling operation execution step is generated.

[0062] The above-mentioned operating status parameters may refer to parameters used to describe the operating status of the device group to be scheduled before executing the scheduling operation, and may include but are not limited to parameters such as temperature and voltage of the power supply equipment and the initial power receiving equipment in the device group to be scheduled. The operating status parameters can be determined according to actual needs and are not limited here.

[0063] In an optional embodiment, the power-off operation execution steps can be generated according to the operating status parameters of the device group to be scheduled, and the operation and maintenance personnel can be guided to disconnect the connection between the power supply device and the initial powered device. The waiting time after the power-off operation is performed can be determined according to the actual situation to ensure the safe power-off of the device. For example, the waiting time can be generated according to the temperature of the power supply device in the device group to be scheduled. The temperature of the power supply device may affect the subsequent connection operation with the target power supply device. When the temperature of the power supply device is high, a longer waiting time can be set, and when the temperature of the power supply device is low, a shorter waiting time can be set. When the temperature of the power supply device returns to the normal temperature range, the connection operation with the target powered device can be performed to ensure the safety and smooth progress of the scheduling operation; then , according to the second hardware parameter information of the target scheduling equipment group and the topological connection relationship between the power supply equipment and the target powered equipment, the power-on operation execution steps can be generated to guide the operation and maintenance personnel to establish the connection relationship between the power supply equipment and the target powered equipment; finally, according to the generated power-off operation execution steps, waiting time and power-on operation execution steps, the final scheduling operation execution steps can be integrated and generated, which may include the specific steps of the power-off operation and the power-on operation, as well as the time sequence and requirements for executing these steps, to provide detailed operation guidance for the operation and maintenance personnel to ensure the smooth progress of the scheduling operation and the safe operation of the equipment. Through the above steps, the efficiency and accuracy of the distribution network scheduling mode change operation ticket generation can be effectively improved to ensure the safety, reliability and operation stability of the scheduling operation.

[0064] Figure 2 is a flow chart of an optional method for generating a distribution network dispatching mode transfer operation ticket according to an embodiment of the present invention, such as Figure 2 As shown, including:

[0065] Step S202, obtaining scheduling operation requirement information and a group of devices to be scheduled.

[0066] Step S204, determining a target powered device based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled; and determining a target scheduling device group based on the power supply device and the target powered device.

[0067] Step S206, the scheduling operation execution information includes the scheduling operation execution steps, or the scheduling operation alarm prompt; based on the environmental information, the process of converting the to-be-scheduled device group to the target scheduling device group is simulated to obtain a simulation result.

[0068] Step S208, when the simulation result shows that the device group to be scheduled can safely perform the scheduling operation, the scheduling operation execution steps are generated based on the device group to be scheduled and the target scheduling device group; when the simulation result shows that the device group to be scheduled cannot safely perform the scheduling operation, a scheduling operation alarm prompt is generated.

[0069] Step S210, generating a scheduling mode conversion operation ticket based on the scheduling operation execution information.

[0070] According to another aspect of an embodiment of the present invention, a device for generating a distribution network dispatching mode change operation ticket is also provided. The system can execute the method for generating a distribution network dispatching mode change operation ticket of the above embodiment. The specific implementation method and preferred application scenario are the same as those of the above embodiment and will not be repeated here.

[0071] Figure 3 is a schematic diagram of a device for generating a distribution network dispatching mode switching operation ticket according to an embodiment of the present application, such as Figure 3 As shown, the device includes the following: an acquisition module 302 , a first determination module 304 , a second determination module 306 and a generation module 308 .

[0072] Among them, the acquisition module 302 is used to obtain the scheduling operation requirement information and the equipment group to be scheduled, wherein the scheduling operation requirement information is used to characterize the expected effect to be achieved by performing the scheduling operation on the equipment group to be scheduled, and the equipment group to be scheduled at least includes the power supply equipment and the initial power receiving equipment before the scheduling operation is performed; the first determination module 304 is used to determine the target scheduling equipment group based on the scheduling operation requirement information and the equipment group to be scheduled, wherein the target scheduling equipment group at least includes the power supply equipment and the target power receiving equipment after the scheduling operation is performed; the second determination module 306 is used to determine the scheduling operation execution information based on the equipment group to be scheduled, the target scheduling equipment group and the environmental information, wherein the environmental information is used to characterize the environmental parameters of the location of the target scheduling equipment group, and the scheduling operation execution information is used to guide the operation and maintenance personnel to perform the scheduling operation; the generation module 308 is used to generate a scheduling mode conversion operation ticket based on the scheduling operation execution information, wherein the scheduling mode conversion operation ticket is used to record the scheduling operation execution information.

[0073] Optionally, based on the scheduling operation requirement information and the device group to be scheduled, the target scheduling device group is determined, including: based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled, determining the target powered device; based on the power supply device and the target powered device, determining the target scheduling device group.

[0074] Optionally, based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the device group to be scheduled, the target powered device is determined, including: obtaining the network topology of the distribution network where the power supply device is located; determining at least one candidate powered device based on the scheduling operation type, the power supply device and the network topology; and screening at least one candidate powered device based on the first hardware parameter information to determine the target powered device.

[0075] Optionally, the scheduling operation execution information includes scheduling operation execution steps, or scheduling operation alarm prompts; based on the device group to be scheduled, the target scheduling device group and the environmental information, the scheduling operation execution information is determined, including: based on the environmental information, simulating the process of converting the device group to be scheduled to the target scheduling device group to obtain a simulation result, wherein the simulation result is used to characterize whether the simulated device group to be scheduled can safely perform the scheduling operation; when the simulation result shows that the device group to be scheduled can safely perform the scheduling operation, generating scheduling operation execution steps based on the device group to be scheduled and the target scheduling device group; when the simulation result shows that the device group to be scheduled cannot safely perform the scheduling operation, generating a scheduling operation alarm prompt.

[0076] Optionally, based on the environmental information, the process of converting the device group to be scheduled to the target scheduling device group is simulated to obtain a simulation result, including: based on the second hardware parameter information and environmental information of the target scheduling device group, simulating the scheduling operation of the device group to be scheduled to obtain an initial simulation result; based on the initial simulation result and a preset safety scheduling rule set, determining the simulation result, wherein the preset safety scheduling rule set is used to represent a set of pre-set rules for the safe operation of the scheduling device.

[0077] Optionally, based on the device group to be scheduled and the target scheduling device group, a scheduling operation execution step is generated, including: based on the operating status parameters of the device group to be scheduled, a power-off operation execution step and a waiting time are generated, wherein the power-off operation execution step is used to guide the operation and maintenance personnel to disconnect the connection relationship between the power supply device and the initial power receiving device, and the waiting time is used to indicate the waiting time required after executing the power-off operation execution step; based on the second hardware parameter information of the target scheduling device group, and the topological connection relationship between the power supply device and the target power receiving device, a power-on operation execution step is generated, and the power-on operation execution step is used to guide the operation and maintenance personnel to establish a connection relationship between the power supply device and the target power receiving device; based on the power-off operation execution step, the waiting time and the power-on operation execution step, a scheduling operation execution step is generated.

[0078] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0079] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0080] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0081] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0082] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0083] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for generating a distribution network dispatching mode change operation ticket, characterized in that: include: Obtaining scheduling operation requirement information and a device group to be scheduled, wherein the scheduling operation requirement information is used to characterize the expected effect to be achieved by performing a scheduling operation on the device group to be scheduled, and the device group to be scheduled at least includes a power supply device and an initial power receiving device before performing the scheduling operation; Based on the scheduling operation requirement information and the device group to be scheduled, determining a target scheduling device group, wherein the target scheduling device group includes at least the power supply device and the target powered device after the scheduling operation is performed; Determine scheduling operation execution information based on the device group to be scheduled, the target scheduling device group and environmental information, wherein the environmental information is used to characterize environmental parameters of the location of the target scheduling device group, and the scheduling operation execution information is used to guide the operation and maintenance personnel to perform the scheduling operation; Based on the scheduling operation execution information, a scheduling mode change operation ticket is generated, wherein the scheduling mode change operation ticket is used to record the scheduling operation execution information.

2. The method for generating a distribution network dispatching mode change operation ticket according to claim 1, characterized in that: Determining a target scheduling device group based on the scheduling operation requirement information and the device group to be scheduled includes: Determining the target powered device based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the to-be-scheduled device group; The target scheduling device group is determined based on the power supply device and the target powered device.

3. The method for generating a distribution network dispatching mode change operation ticket according to claim 2, characterized in that: Determining the target powered device based on the scheduling operation type in the scheduling operation requirement information and the first hardware parameter information of the power supply device in the to-be-scheduled device group includes: Obtaining the network topology of the power distribution network where the power supply equipment is located; Determine at least one candidate powered device based on the scheduling operation type, the power supply device, and the network topology; The at least one candidate powered device is screened based on the first hardware parameter information to determine the target powered device.

4. The method for generating a distribution network dispatching mode change operation ticket according to claim 1, characterized in that: The scheduling operation execution information includes scheduling operation execution steps, or scheduling operation warning prompts; Determining scheduling operation execution information based on the to-be-scheduled device group, the target scheduling device group and the environment information, including: Based on the environmental information, a process of converting the to-be-scheduled device group to the target scheduling device group is simulated to obtain a simulation result, wherein the simulation result is used to indicate whether the to-be-scheduled device group obtained by simulation can safely perform the scheduling operation; When the simulation result shows that the device group to be scheduled can safely perform the scheduling operation, generating the scheduling operation execution steps based on the device group to be scheduled and the target scheduling device group; When the simulation result shows that the device group to be scheduled cannot safely perform the scheduling operation, an alarm prompt for the scheduling operation is generated.

5. The method for generating a distribution network dispatching mode change operation ticket according to claim 4, characterized in that: Based on the environmental information, a process of converting the to-be-scheduled device group to the target scheduled device group is simulated to obtain a simulation result, including: Based on the second hardware parameter information of the target scheduling device group and the environment information, simulating execution of the scheduling operation on the device group to be scheduled to obtain an initial simulation result; The simulation result is determined based on the initial simulation result and a preset safety dispatch rule set, wherein the preset safety dispatch rule set is used to represent a set of preset rules for the safe operation of the dispatching equipment.

6. The method for generating a distribution network dispatching mode change operation ticket according to claim 4, characterized in that: Based on the to-be-scheduled device group and the target scheduled device group, the scheduling operation execution steps are generated, including: Based on the operation status parameters of the device group to be scheduled, a power-off operation execution step and a waiting time are generated, wherein the power-off operation execution step is used to guide the operation and maintenance personnel to disconnect the connection relationship between the power supply device and the initial power receiving device, and the waiting time is used to indicate the waiting time required after executing the power-off operation execution step; Based on the second hardware parameter information of the target scheduling device group and the topological connection relationship between the power supply device and the target powered device, generating a power-on operation execution step, wherein the power-on operation execution step is used to guide the operation and maintenance personnel to establish a connection relationship between the power supply device and the target powered device; The scheduling operation execution step is generated based on the power-off operation execution step, the waiting time and the power-on operation execution step.

7. A device for generating a distribution network dispatching mode change operation ticket, characterized in that: include: An acquisition module, used to acquire scheduling operation requirement information and a device group to be scheduled, wherein the scheduling operation requirement information is used to characterize the expected effect to be achieved by performing a scheduling operation on the device group to be scheduled, and the device group to be scheduled at least includes a power supply device and an initial power receiving device before performing the scheduling operation; A first determination module is used to determine a target scheduling device group based on the scheduling operation requirement information and the device group to be scheduled, wherein the target scheduling device group at least includes the power supply device and the target powered device after the scheduling operation is performed; A second determination module is used to determine scheduling operation execution information based on the device group to be scheduled, the target scheduling device group and environmental information, wherein the environmental information is used to characterize the environmental parameters of the location of the target scheduling device group, and the scheduling operation execution information is used to guide the operation and maintenance personnel to perform the scheduling operation; A generation module is used to generate a scheduling mode change operation ticket based on the scheduling operation execution information, wherein the scheduling mode change operation ticket is used to record the scheduling operation execution information.

8. An electronic device, characterized in that: include: A memory storing an executable program; A processor is used to run the program, wherein when the program is running, the method for generating a distribution network dispatching mode change operation ticket as described in any one of claims 1 to 6 is executed.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored executable program, wherein when the executable program is running, the device where the storage medium is located is controlled to execute the method for generating a distribution network dispatching mode change operation ticket as described in any one of claims 1 to 6.

10. A computer program product, characterized in that It includes a computer program, which, when executed by a processor, implements the method for generating a distribution network dispatching mode change operation ticket according to any one of claims 1 to 6.