Construction and transportation method for ship sheet block
By arranging support structures at assembly and transportation sites and using fixed and movable piers instead of transport brackets, the problem of excessive bracket occupation during the construction of thin-plate sections of ships was solved, reducing equipment costs and improving transportation efficiency.
Patent Information
- Application Number
- CN202411637046.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-15
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2044-11-15
AI Technical Summary
In existing technologies, the method of off-site construction of ship thin plate sections requires the simultaneous construction of multiple sections, which necessitates the use of large-sized transport brackets for each section, thus increasing equipment investment costs.
Support structures are arranged at the assembly site and the transportation target site respectively. Fixed and movable supports are used instead of transportation brackets. Thin plate sections are fixed by welding process components. During transportation, the levelness of the support structure is adjusted and diagonal reinforcing ribs are added to ensure stability.
The number of transport trays used was reduced, equipment investment costs were lowered, the transport capacity of the transport trays was increased, tray occupation was avoided, and construction efficiency was improved.
Smart Images

Figure CN119262224A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shipbuilding, and in particular to a method for constructing and transporting thin-plate sections of ships. Background Art
[0002] Ship thin plate block technology refers to the manufacturing process of splicing multiple thin steel plates into a large integral structure section according to design requirements during ship construction. Thin plate block technology can improve ship construction efficiency, reduce costs, and improve hull performance.
[0003] For large ships (such as large cruise ships), the number of thin plate sections reaches dozens, and the integrity construction work involves a large amount of thin plate welding, leveling, outfitting, painting, insulation, interior decoration, etc., and the construction period reaches more than 70-90 days. Therefore, the ship thin plate sections require a larger assembly site and a huge amount of crane resources. Due to the limited assembly site in the dock area and the shortage of crane resources, a part of the thin plate sections are usually selected to be built off-site within the range of the gantry crane in the non-dock crane area, and then large-sized transport brackets are used with large-scale transportation equipment to transport the completed thin plate sections back to the dock crane area to ensure that the construction period of the thin plate sections matches the dock loading period, so as to achieve the thin plate section loading construction node.
[0004] However, the above-mentioned off-site construction method of thin plate segments requires the simultaneous construction of several thin plate segments, and each segment requires a large-sized transport bracket. This results in the need to invest in a large number of large-sized transport brackets during the construction of the thin plate segments, greatly increasing the equipment investment cost. Summary of the invention
[0005] The purpose of the present application is to provide a method for the construction and transportation of thin plate sections of ships, so as to solve the above-mentioned off-site construction method of thin plate sections existing in the prior art to a certain extent. Since several thin plate sections are constructed at the same time, and each section needs to occupy a large-sized transport bracket, this leads to the need to invest in a large number of large-sized transport brackets during the construction of the thin plate sections, which greatly increases the technical problem of equipment investment cost.
[0006] According to a first aspect of the present application, a method for constructing and transporting a ship thin plate section is provided, comprising:
[0007] Arranging a first supporting structure at an assembly site, and setting the first supporting structure at a position corresponding to a side longitudinal beam and a midship longitudinal beam of the ship thin plate section at the assembly site according to the drawing of the ship thin plate section, wherein the first supporting structure comprises a first fixed pier and a first movable pier, the assembly site comprises a first transport channel area, a portion of the first supporting structure arranged in the first transport channel area is the first movable pier, and a portion of the first supporting structure arranged outside the first transport channel area is the first fixed pier;
[0008] Assembling, after completing the assembly of the lowest deck segment of the ship thin plate segment, fixing the assembled lowest deck segment of the ship thin plate segment to the first supporting structure through welding process parts, and completing the assembly of the remaining part of the ship thin plate segment on the first supporting structure;
[0009] The transport equipment enters the site, removes the first movable pier, and allows the transport equipment to enter below the ship sheet metal section through the first transport channel area, fixes the ship sheet metal section to the transport equipment, and removes the connection between the ship sheet metal section and the first fixed pier;
[0010] Arrange a second supporting structure at the transport target site, set a second transport channel area at a corresponding position of the transport target site, the second supporting structure includes a second fixed pier and a second movable pier, and set a second fixed pier corresponding to the side longitudinal beam and the mid-ship longitudinal beam of the ship thin plate section in an area outside the second transport channel area of the transport target site;
[0011] Transport and fixation: transport the ship thin plate section to the transport target site by means of transport equipment, and place the ship thin plate section above the second support structure of the transport target site through the second transport channel area, and fix each longitudinal beam of the ship thin plate section to the corresponding second fixed pier respectively;
[0012] The transport equipment leaves the site, the connection between the ship thin plate section and the transport equipment is removed, the transport equipment is driven away from the transport target site, a second movable pier is set at a corresponding position in the second transport channel area, and each longitudinal beam connected to the ship thin plate section and located in the second transport channel area is fixedly connected to the corresponding second movable pier.
[0013] Preferably, the ship thin plate section comprises multiple decks, the multiple decks are arranged at intervals along the ship height direction, and there is a portion without longitudinal beams between two adjacent decks at the side longitudinal beam position and the midship longitudinal beam position of the ship thin plate section;
[0014] The assembling step also includes installing a temporary reinforcement beam, and adding a temporary reinforcement beam to the portion where the longitudinal beam is not provided.
[0015] Preferably, the ship thin plate section has a ship width direction and a ship length direction, and the ship length direction is perpendicular to the ship width direction;
[0016] There are multiple midship longitudinal beams, and the multiple midship longitudinal beams are arranged at intervals along the ship length direction to form a midship longitudinal beam row, and the ship thin plate section includes an even number of midship longitudinal beam rows, and the even number of midship longitudinal beam rows are evenly divided into two groups of midship longitudinal beam groups, and the two groups of midship longitudinal beam groups are symmetrically arranged about the first center line of the ship thin plate section in the ship width direction;
[0017] Each of the midship longitudinal beams has a first supporting structure and a second supporting structure corresponding to it.
[0018] Preferably, there are a plurality of side longitudinal beams, and the plurality of side longitudinal beams are arranged at intervals along the ship length direction to form side longitudinal beam rows, and the ship thin plate section includes an even number of side longitudinal beam rows, and the even number of side longitudinal beam rows are evenly divided into two groups of side longitudinal beam groups, and the two groups of side longitudinal beam groups are arranged on both sides of the midship longitudinal beam in the ship width direction, and the two groups of side longitudinal beam groups are symmetrically arranged about the first center line of the ship thin plate section;
[0019] Wherein, each of the side longitudinal beams has a first supporting structure and a second supporting structure corresponding to it.
[0020] Preferably, in the ship length direction, each row of the midship longitudinal beams and each row of the side longitudinal beams are arranged one by one in alignment, so as to form a plurality of rows of longitudinal beams arranged at intervals along the ship length direction;
[0021] The first transport channel area and the second transport channel area both extend in the ship width direction.
[0022] Preferably, a plurality of rows of longitudinal beams are sequentially arranged in a direction from one end to the other end in the ship length direction, wherein the positions of the longitudinal beam rows with even numbers correspond to the first transport channel area and the second transport channel area.
[0023] Preferably, the step of arranging the first support structures at the assembly site further includes adjusting the levelness of the plurality of the first support structures;
[0024] The step of arranging the second supporting structure at the transport target site also includes adjusting the level of the plurality of second fixed piers.
[0025] Preferably, the step of bringing the transport equipment into the site further includes adding oblique reinforcing ribs, and connecting and fixing the transport equipment and the ship sheet metal section at both ends of the oblique reinforcing ribs respectively;
[0026] The center line of the ship thin plate section in the ship length direction is defined as the second center line, the first end of the oblique reinforcing rib is fixedly arranged at an end of the transport device away from the second center line, and the oblique reinforcing rib is inclined upward from the transport device and in a direction away from the second center line;
[0027] The second end of the oblique reinforcing rib is fixedly connected to the intersection of the transverse beam and the longitudinal beam of the ship thin plate overall section.
[0028] Preferably, the specification of the welding process parts is not less than No. 20 channel steel;
[0029] The welding length between the welding process part and the structure to which it is connected is greater than or equal to 200 mm.
[0030] Preferably, the transport equipment comprises at least two transport brackets, and the number of the first transport channel areas and the number of the second transport channel areas are both equal to the number of the transport brackets.
[0031] Compared with the prior art, the beneficial effects of this application are:
[0032] The construction and transportation method of ship thin plate sections provided in the present application arranges a first supporting structure at an assembly site and a second supporting structure at a transportation target site, respectively, effectively replacing the existing method of using a transport bracket to support the ship thin plate sections during the construction of the ship thin plate sections, so that during the construction of the ship thin plate sections, the transport bracket can be removed from the ship thin plate section and other ship thin plate sections or other devices can be transported, thereby avoiding the occupation of the transport bracket during the construction of the ship thin plate sections, improving the transportation capacity of the transport bracket, greatly reducing the number of transport brackets used during the ship construction process, and reducing the equipment investment cost.
[0033] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the specific implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0035] Figure 1 A front view structural schematic diagram of a method for constructing and transporting a ship thin plate section provided in an embodiment of the present application;
[0036] Figure 2 Another front view structural schematic diagram of the method for constructing and transporting a ship thin plate section provided in an embodiment of the present application;
[0037] Figure 3 A schematic diagram of the front view structure of the method for constructing and transporting a ship thin plate section provided in an embodiment of the present application in a transport state;
[0038] Figure 4 A schematic diagram of the top view of the structure of the method for constructing and transporting a ship thin plate section provided in an embodiment of the present application;
[0039] Figure 5 A side structural schematic diagram of a method for constructing and transporting a ship thin plate section provided in an embodiment of the present application;
[0040] Figure 6 This is a schematic diagram of the assembly structure of the welding process parts provided in an embodiment of the present application.
[0041] Reference numerals:
[0042] 1- ship thin plate section; 11- mid-ship longitudinal beam; 12- side longitudinal beam; 13- outer plate; 14- cross beam; 15- temporary reinforcement beam; 16- deck; 17- end longitudinal beam; 21- first supporting structure; 211- first fixed pier; 212- first movable pier; 22- second supporting structure; 221- second fixed pier; 222- second movable pier; 3- transport bracket; 41- first transport channel area; 42- second transport channel area; 5- oblique reinforcement rib; 61- first center line; 62- second center line; 7- welding process parts.
[0043] W-ship width direction; L-ship length direction; H-ship height direction. DETAILED DESCRIPTION
[0044] The technical solution of the present application will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.
[0045] The components of the embodiments of the present application generally described and shown in the drawings herein may be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed, but merely represents the selected embodiments of the present application.
[0046] Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making any creative work shall fall within the scope of protection of this application.
[0047] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0048] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0049] Refer to the following Figures 1 to 6 The following describes a method for constructing and transporting a ship thin plate section 1 according to some embodiments of the present application.
[0050] See also Figures 1 to 6 As shown, the embodiment of the first aspect of the present application provides a method for constructing and transporting a ship thin plate section 1, the steps of which include:
[0051] S1 arranges the first supporting structure 21 at the assembly site. According to the drawing of the ship thin plate section 1, the first supporting structure 21 is set at the position of the assembly site corresponding to the side longitudinal beam 12 and the midship longitudinal beam 11 of the ship thin plate section 1, wherein the first supporting structure 21 includes a first fixed pier 211 and a first movable pier 212. The assembly site includes a first transport channel area 41. The part of the first supporting structure 21 arranged in the first transport channel area 41 is the first movable pier 212, and the part of the first supporting structure 21 arranged outside the first transport channel area 41 is the first fixed pier 211.
[0052] Specifically, Figure 1 , Figure 2 and Figure 4 As shown, the ship thin plate section 1 may have a ship width direction W and a ship length direction L, wherein the ship length direction L is perpendicular to the ship width direction W.
[0053] Preferably, if Figure 1 , Figure 2 and Figure 4 As shown, the number of midship longitudinal beams 11 can be multiple, and multiple midship longitudinal beams 11 are arranged at intervals along the ship length direction L to form a midship longitudinal beam row. The ship thin plate section 1 includes an even number of midship longitudinal beam rows, and the even number of midship longitudinal beam rows are evenly divided into two groups of midship longitudinal beam groups, and the two groups of midship longitudinal beam groups are symmetrically arranged about the first center line 61 of the ship thin plate section 1 in the ship width direction W to ensure that the force of the hull in the ship width direction W is uniform. Among them, each midship longitudinal beam 11 has a first supporting structure 21 and a second supporting structure 22 corresponding to it. As shown in FIG. Figure 1 , Figure 2 and Figure 4 As shown, the figure shows an example in which the ship thin plate section 1 has two rows of mid-ship longitudinal beams, but it is not limited to this, and the number of mid-ship longitudinal beams can also be 4 rows, 8 rows, etc.
[0054] Similarly, if Figure 1 , Figure 2 and Figure 4 As shown, the number of the side longitudinal beams 12 can also be multiple, and multiple side longitudinal beams 12 are arranged at intervals along the ship length direction L to form side longitudinal beam rows. The ship thin plate section 1 includes an even number of side longitudinal beam rows, and the even number of side longitudinal beam rows are evenly divided into two groups of side longitudinal beam groups, and the two groups of side longitudinal beam groups are arranged on both sides of the midship longitudinal beam 11 in the ship width direction W, and the two groups of side longitudinal beam groups are symmetrically arranged about the first center line 61 of the ship thin plate section 1 to ensure that the force of the hull in the ship width direction W is uniform. Among them, each side longitudinal beam 12 has a first supporting structure 21 and a second supporting structure 22 corresponding to it.
[0055] like Figure 1 As shown, the ship thin plate section 1 may further include an outer plate 13, and the outer plate 13 may be arranged at both ends of the ship thin plate section 1 in the ship width direction W. Optionally, as Figure 1 As shown, the outer plate 13 may also be provided with the first supporting structure 21 and the second supporting structure 22 for supporting the outer plate 13 , so as to improve the supporting stability of the first supporting structure 21 and the second supporting structure 22 on the ship thin plate section 1 .
[0056] In an embodiment, Figure 4 and Figure 5 As shown, in the ship length direction L, each row of midship longitudinal beams 11 and each row of side longitudinal beams are arranged one by one to form a plurality of rows of longitudinal beams arranged at intervals along the ship length direction L. In other words, Figure 4 and Figure 5 As shown, the number of midship longitudinal beams 11 included in each row of midship longitudinal beams 11 and the number of side longitudinal beams 12 included in each row of side longitudinal beams are equal and are arranged in alignment one by one.
[0057] Preferably, if Figure 4 As shown, the first transport channel area 41 and the second transport channel area 42 both extend along the ship width direction W. In this way, it is convenient for the transport equipment to transport the ship thin plate section 1 along the ship width direction W.
[0058] However, it is not limited thereto, and the extension directions of the first transport channel area 41 and the second transport channel area 42 may be adaptively adjusted according to the transport direction of the ship thin plate section 1 .
[0059] Preferably, if Figure 4 As shown, multiple rows of longitudinal beams are sequentially arranged in a direction from one end to the other end in the ship length direction L, wherein the longitudinal beam rows with even numbers are located at positions corresponding to the first transportation channel area 41 and the second transportation channel area 42. That is, when the ship sheet section 1 is at the assembly site, the longitudinal beam rows with even numbers are located at positions corresponding to the first transportation channel area 41; when the ship sheet section 1 is at the transportation target site, the longitudinal beam rows with even numbers are located at positions corresponding to the second transportation channel area 42.
[0060] In other words, the arrangement of the first support structure 21 in the assembly site is the same as the arrangement of the second support structure 22 in the transport destination site.
[0061] Preferably, if Figure 4 and Figure 5 As shown, the transport equipment may include at least two transport brackets 3, and the number of the first transport channel areas 41 and the number of the second transport channel areas 42 are both equal to the number of the transport brackets 3, so as to improve the transport stability of the ship thin plate section 1.
[0062] like Figure 4 and Figure 5 As shown in the figure, the number of the longitudinal beam rows is five. In other words, the number of the midship longitudinal beams 11 included in each row of midship longitudinal beams 11 and the number of the side longitudinal beams 12 included in each row of side longitudinal beams are both five. Figure 5 In the direction from the right end to the left end shown in the figure, when the ship thin plate section 1 is at the assembly site, the positions of the second row of longitudinal beams and the fourth row of longitudinal beams correspond to the first transport channel area 41; when the ship thin plate section 1 is at the transport target site, the positions of the second row of longitudinal beams and the fourth row of longitudinal beams correspond to the first transport channel area 41.
[0063] Alternatively, if Figure 4 and Figure 5As shown, a row of end longitudinal beams 17 may also be provided at one end of the above-mentioned ship thin plate section 1 in the ship width direction W to prevent the end of the ship thin plate section 1 in the ship width direction W from drooping or tilting, so as to improve the supporting stability of the ship thin plate section 1.
[0064] Correspondingly, a fixed pier can be set at the corresponding position of the end longitudinal beam 17 (that is, when the ship thin plate section 1 is at the assembly site, the end longitudinal beam 17 is supported by the first fixed pier 211; when the ship thin plate section 1 is at the transportation target site, the end longitudinal beam 17 is supported by the second fixed pier 221).
[0065] Preferably, the method further includes adjusting the horizontality of the plurality of first supporting structures 21 to improve the installation reference for the ship sheet metal section 1 .
[0066] S2 assembly, after completing the assembly of the lowest deck 16 segments of the ship thin plate section 1, the assembled lowest deck 16 segments of the ship thin plate section 1 are fixed to the first supporting structure 21 via the welding process parts 7, and the remaining parts of the ship thin plate section 1 are assembled on the first supporting structure 21.
[0067] Optionally, the ship thin plate section 1 can be welded to the first supporting structure 21 via a welding process part 7 , and the specification of the welding process part 7 is not less than No. 20 channel steel to ensure the supporting strength of the ship thin plate section 1 .
[0068] Preferably, the welding length between the welding process part 7 and the ship plate section 1 (eg Figure 6 The L value shown) is greater than or equal to 200 mm to ensure the connection strength between the welding process part 7 and the ship thin plate section 1.
[0069] Optionally, the welding process part 7 may be a channel steel, an angle steel, etc. The specification of the welding process part 7 is not less than No. 20 channel steel. It can be understood that the supporting strength and size specification of the welding process part 7 are not less than No. 20 channel steel.
[0070] like Figure 2 As shown, the ship thin plate section 1 may include multiple decks 16, which are arranged at intervals along the ship height direction H. At the position of the side longitudinal beam 12 and the position of the midship longitudinal beam 11 of the ship thin plate section 1, there is a portion without longitudinal beams between two adjacent decks 16. The portion without longitudinal beams here can be understood as a non-load-bearing portion where no longitudinal beams are provided in the design drawings of the ship thin plate section 1.
[0071] Optionally, each of the above-mentioned decks 16 is provided with a crossbeam 14 for supporting the deck 16 , and the crossbeam 14 connects the longitudinal beams in the same row of longitudinal beams to improve the supporting stability of the deck 16 .
[0072] Preferably, the assembly step may also include S21 installing a temporary reinforcement beam 15, adding a temporary reinforcement beam 15 to the portion where the longitudinal beam is not provided, so as to improve the supporting strength of the ship thin plate section 1 and prevent the ship thin plate section 1 from collapsing, deforming, breaking, etc. during the transportation and assembly process.
[0073] Optionally, the temporary reinforcement beam 15 can also be welded to the ship thin plate section 1 via a welding process part 7 , and the specification of the welding process part 7 is not less than No. 20 channel steel to ensure the supporting strength of the temporary reinforcement beam 15 .
[0074] Preferably, the welding length between the welding process part 7 and the ship plate section 1 (eg Figure 6 The L value shown) is greater than or equal to 200 mm to ensure the connection strength between the welding process part 7 and the ship thin plate section 1.
[0075] S3 The transport equipment enters the site, removes the first movable pier 212, and allows the transport equipment to pass through the first transport channel area 41 and enter under the ship thin plate section 1, fix the ship thin plate section 1 to the transport equipment, and remove the connection between the ship thin plate section 1 and the first fixed pier 211.
[0076] Preferably, it also includes adding oblique reinforcing ribs 5, the two ends of which are respectively connected and fixed to the transportation equipment and the ship thin plate section 1 to improve the stability of the ship thin plate section 1 during transportation, prevent the ship thin plate section 1 from moving or the two ends of the ship thin plate section 1 in the length direction from drooping.
[0077] Specifically, the center line of the ship sheet section 1 in the ship length direction L is defined as the second center line 62. The first end of the oblique reinforcing rib 5 can be fixedly arranged at one end of the transport equipment away from the second center line 62, and the oblique reinforcing rib 5 is inclined upward from the transport equipment and away from the second center line 62.
[0078] Preferably, the second end of the oblique stiffener 5 is fixedly connected to the intersection of the transverse beam 14 and the longitudinal beam of the ship thin plate section 1 to ensure the supporting stability of the oblique stiffener 5.
[0079] Optionally, the oblique reinforcing ribs 5 are welded to both the ship sheet section 1 and the transport equipment via the welding process parts 7 to ensure that the assembly and disassembly of the oblique reinforcing ribs 5 do not damage the ship sheet section 1 and the transport equipment. Preferably, the welding process parts 7 can be selected from a structure with a specification size not less than 25 channel steel to ensure the supporting strength of the oblique reinforcing ribs 5.
[0080] S4 arranges a second supporting structure 22 at the transport target site, and sets a second transport channel area 42 at a corresponding position of the transport target site. The second supporting structure 22 includes a second fixed pier 221 and a second movable pier 222. A second fixed pier 221 corresponding to the side longitudinal beam 12 and the mid-ship longitudinal beam 11 of the ship thin plate section 1 is set in an area outside the second transport channel area 42 of the transport target site.
[0081] Correspondingly, the levelness of the plurality of second fixed piers 221 may also be adjusted to provide a reference for the ship sheet metal section 1 at the target transportation site.
[0082] Similarly, the arrangement of the second support structure 22 at the above-mentioned transport target site is similar to the arrangement of the first support structure 21 at the above-mentioned assembly site, and will not be repeated here.
[0083] S5 transport and fixation, transport the ship thin plate section 1 to the transport target site through the transport equipment, and set the ship thin plate section 1 above the second supporting structure 22 of the transport target site through the second transport channel area 42, and fix each longitudinal beam of the ship thin plate section 1 to the corresponding second fixed pier 221 respectively.
[0084] S6 The transport equipment leaves the site, the connection between the ship thin plate section 1 and the transport equipment is removed, the transport equipment is driven away from the transport target site, a second movable pier 222 is set at the corresponding position in the second transport channel area 42, and each longitudinal beam connected to the ship thin plate section 1 and located in the second transport channel area 42 is fixedly connected to the corresponding second movable pier 222.
[0085] According to the construction and transportation method of the ship thin plate section 1 provided by the above-mentioned technical features, a first supporting structure 21 is arranged at the assembly site and a second supporting structure 22 is arranged at the transportation target site, respectively, which effectively replaces the existing method of using a transport bracket 3 to support the ship thin plate section 1 during the construction of the ship thin plate section 1, so that during the construction of the ship thin plate section 1, the transport bracket 3 can be removed from the ship thin plate section 1 and other ship thin plate sections 1 or other devices can be transported, thereby avoiding the occupation of the transport bracket 3 during the construction of the ship thin plate section 1, improving the transportation capacity of the transport bracket 3, greatly reducing the number of transport brackets 3 used during ship construction, and reducing equipment investment costs.
[0086] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for constructing and transporting ship thin plate sections, characterized in that: include: Arranging a first supporting structure at an assembly site, and setting the first supporting structure at a position corresponding to a side longitudinal beam and a midship longitudinal beam of the ship thin plate section at the assembly site according to the drawing of the ship thin plate section, wherein the first supporting structure comprises a first fixed pier and a first movable pier, the assembly site comprises a first transport channel area, a portion of the first supporting structure arranged in the first transport channel area is the first movable pier, and a portion of the first supporting structure arranged outside the first transport channel area is the first fixed pier; Assembling, after completing the assembly of the lowest deck segment of the ship thin plate segment, fixing the assembled lowest deck segment of the ship thin plate segment to the first supporting structure through welding process parts, and completing the assembly of the remaining part of the ship thin plate segment on the first supporting structure; The transport equipment enters the site, removes the first movable pier, and allows the transport equipment to enter below the ship sheet metal section through the first transport channel area, fixes the ship sheet metal section to the transport equipment, and removes the connection between the ship sheet metal section and the first fixed pier; Arrange a second supporting structure at the transport target site, set a second transport channel area at a corresponding position of the transport target site, the second supporting structure includes a second fixed pier and a second movable pier, and set a second fixed pier corresponding to the side longitudinal beam and the mid-ship longitudinal beam of the ship thin plate section in an area outside the second transport channel area of the transport target site; Transport and fixation: transport the ship thin plate section to the transport target site by means of transport equipment, and place the ship thin plate section above the second support structure of the transport target site through the second transport channel area, and fix each longitudinal beam of the ship thin plate section to the corresponding second fixed pier respectively; The transport equipment leaves the site, the connection between the ship thin plate section and the transport equipment is removed, the transport equipment is driven away from the transport target site, a second movable pier is set at a corresponding position in the second transport channel area, and each longitudinal beam connected to the ship thin plate section and located in the second transport channel area is fixedly connected to the corresponding second movable pier.
2. The method for constructing and transporting ship thin plate segments according to claim 1, characterized in that: The ship thin plate section comprises multiple decks, which are arranged at intervals along the ship height direction, and there is a portion without longitudinal beams between two adjacent decks at the side longitudinal beam position and the midship longitudinal beam position of the ship thin plate section; The assembling step also includes installing a temporary reinforcement beam, and adding a temporary reinforcement beam to the portion where the longitudinal beam is not provided.
3. The method for constructing and transporting ship thin plate sections according to claim 1, characterized in that: The ship thin plate section has a ship width direction and a ship length direction, and the ship length direction is perpendicular to the ship width direction; There are multiple midship longitudinal beams, and the multiple midship longitudinal beams are arranged at intervals along the ship length direction to form a midship longitudinal beam row, and the ship thin plate section includes an even number of midship longitudinal beam rows, and the even number of midship longitudinal beam rows are evenly divided into two groups of midship longitudinal beam groups, and the two groups of midship longitudinal beam groups are symmetrically arranged about the first center line of the ship thin plate section in the ship width direction; Each of the midship longitudinal beams has a first supporting structure and a second supporting structure corresponding to it.
4. The method for constructing and transporting ship thin plate segments according to claim 3, characterized in that: The number of the side longitudinal beams is multiple, and the multiple side longitudinal beams are arranged at intervals along the ship length direction to form side longitudinal beam rows, the ship thin plate section includes an even number of side longitudinal beam rows, and the even number of side longitudinal beam rows are evenly divided into two groups of side longitudinal beam groups, and the two groups of side longitudinal beam groups are arranged on both sides of the midship longitudinal beam in the ship width direction, and the two groups of side longitudinal beam groups are symmetrically arranged about the first center line of the ship thin plate section; Wherein, each of the side longitudinal beams has a first supporting structure and a second supporting structure corresponding to it.
5. The method for constructing and transporting ship thin plate segments according to claim 4, characterized in that: In the ship length direction, each row of the midship longitudinal beams and each row of the side longitudinal beams are arranged one by one in alignment, so as to form a plurality of rows of longitudinal beams arranged at intervals along the ship length direction; The first transport channel area and the second transport channel area both extend in the ship width direction.
6. The method for constructing and transporting ship thin plate segments according to claim 5, characterized in that: The plurality of rows of longitudinal beams are sequentially arranged in a direction from one end to the other end in the ship length direction, wherein the longitudinal beam rows with even numbers are located at positions corresponding to the first transport channel area and the second transport channel area.
7. The method for constructing and transporting ship thin plate segments according to claim 1, characterized in that: The step of arranging the first support structures at the assembly site further includes adjusting the level of the plurality of the first support structures; The step of arranging the second supporting structure at the transport target site also includes adjusting the level of the plurality of second fixed piers.
8. The method for constructing and transporting ship thin plate segments according to claim 3, characterized in that: The step of bringing the transport equipment into the site also includes adding oblique reinforcing ribs, and connecting and fixing the transport equipment and the ship sheet metal section at two ends of the oblique reinforcing ribs respectively; The center line of the ship thin plate section in the ship length direction is defined as the second center line, the first end of the oblique reinforcing rib is fixedly arranged at an end of the transport device away from the second center line, and the oblique reinforcing rib is inclined upward from the transport device and in a direction away from the second center line; The second end of the oblique reinforcing rib is fixedly connected to the intersection of the transverse beam and the longitudinal beam of the ship thin plate overall section.
9. The method for constructing and transporting ship thin plate segments according to claim 1, characterized in that: The specification of the welding process parts shall not be less than No. 20 channel steel; The welding length between the welding process part and the structure to which it is connected is greater than or equal to 200 mm.
10. The method for constructing and transporting ship thin plate segments according to claim 1, characterized in that: The transport equipment includes at least two transport brackets, and the number of the first transport channel areas and the number of the second transport channel areas are both equal to the number of the transport brackets.
Citation Information
Patent Citations
Gliding method of tandem shipbuilding process block
CN101723058A
Integral transporter of vessel superstructure
CN107416130A
Ship thin plate block construction method
CN115107952A
Container ship transverse bulkhead assembly system and method
CN115285311A
Assembling method and supporting tool for ship block folding
CN118514833A
Cited By
Hull precision strengthening method
CN120793080A