Construction method of fabricated steel trestle combination system

Through modular design and intelligent monitoring technology, the problems of long construction cycle, difficult sealing status and noise pollution in traditional steel trests are solved, and an efficient and safe construction process is achieved, ensuring the durability of the structure and environmentally friendly construction are carried out. method.

CN119266105AInactive Publication Date: 2025-01-07JIANGSU RUOQI CONSTR IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411490026.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-24
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional steel trest construction methods have problems such as long construction cycle, difficult sealing status, serious noise pollution, inconsistent quality, and insufficient monitoring methods, which affect construction efficiency, safety and environment.

Method used

Modular design and intelligent monitoring technology are adopted to monitor sealing status in real time through standardized prefabricated parts and intelligent monitoring systems, and combine noise reduction systems and automated lifting devices to optimize construction process and quality control.

Benefits of technology

Improve construction efficiency and safety, reduce environmental impact, ensure the durability and reliability of the structure, reduce noise pollution, provide real-time data recording and management optimization, and reduce maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119266105A_ABST
    Figure CN119266105A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of civil engineering, in particular to a construction method of an assembly type steel trestle combination system, which adopts a prefabricated part design, so that each component of a steel trestle is produced in a factory in a standardized manner, the field processing requirement is reduced, and the construction period is shortened. According to the key technology, a pressure sensor and a data acquisition unit are installed in an inner cabin of a steel trestle plate to form an intelligent monitoring system, and real-time monitoring of the sealing state is achieved. The system can automatically trigger a sound-light alarm when the air pressure is abnormal, prompts constructors to check in time and ensures the sealing performance and safety of the structure, through the measures, the safety and efficiency of construction are improved, an effective quality control and data feedback mechanism is further provided, and the construction safety is improved. And an innovative solution is provided for infrastructure construction. The method is suitable for construction of steel trestles of various scales, has wide application prospects and market value, and can bring remarkable economic and social benefits to construction units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and in particular to a construction method of an assembled steel trestle combination system. Background Art

[0002] With the acceleration of urbanization, the demand for infrastructure construction is increasing, especially steel trestles, as important transportation facilities, which play an important role. However, the construction method of traditional steel trestles faces many challenges in the following aspects:

[0003] The construction of traditional steel trestles often relies on on-site processing, which requires a lot of welding, cutting and assembly, resulting in a long construction period, unstable construction period, and affecting the progress of the project. During the construction process, due to the lack of real-time monitoring means, the sealing state is difficult to guarantee. If the seal fails, it may cause structural deformation or damage, posing a safety hazard to construction personnel and subsequent use. The construction of steel trestles is usually accompanied by the generation of noise and waste. Traditional construction methods have failed to effectively control noise pollution, affecting the lives of surrounding residents and the ecological environment. Because traditional construction relies on manual operation, it is difficult to achieve precise control, resulting in uneven quality of each component, affecting the stability and durability of the overall structure. Traditional construction methods have limited monitoring methods for on-site conditions and lack effective data recording and feedback systems. It is impossible to obtain construction progress and quality in real time, which increases the complexity of management.

[0004] In view of the above problems, the present invention proposes a construction method for a prefabricated steel trestle combined system, which effectively improves construction efficiency and safety while reducing environmental impact by adopting standardized prefabricated parts and intelligent monitoring technology. This method provides a new solution for infrastructure construction, conforms to the development trend of modern construction, and has important theoretical and practical significance. Summary of the invention

[0005] The present invention relates to a construction method of an assembled steel trestle combined system, which mainly includes the following key technical solutions:

[0006] Modular Design:

[0007] The steel trestle deck and its related components adopt standardized and prefabricated design to reduce on-site processing time and improve installation efficiency.

[0008] Intelligent monitoring system:

[0009] Pressure sensors and data acquisition units are installed in the inner cabin of the steel trestle board, and real-time monitoring of the sealing status is achieved through the controller.

[0010] The system sets a normal air pressure range and triggers an audible and visual alarm when the air pressure is abnormal, reminding construction workers to conduct inspections in a timely manner.

[0011] Integrated Noise Reduction System:

[0012] The inner compartment of the steel trestle deck is filled with polyurethane foam or mineral wool to reduce resonance and noise.

[0013] Noise reduction plates are welded and rubber pads are installed at the four corners of the bottom plate to further reduce the impact of noise on the surrounding environment.

[0014] Construction process optimization:

[0015] The use of prefabricated parts simplifies the installation process of the steel trestle and ensures that the components can be connected quickly and efficiently.

[0016] Introduce automated lifting devices to improve the safety and efficiency of lifting and installation.

[0017] Quality Control and Data Feedback:

[0018] During the construction process, real-time monitoring data records will provide a basis for subsequent analysis, help identify potential problems, and optimize construction management.

[0019] The system will record the detected abnormal conditions in the database for subsequent quality tracking and improvement.

[0020] The beneficial effects of the present invention are as follows: the application of prefabricated parts simplifies the on-site assembly process, reduces construction time and labor costs, and improves construction efficiency. The real-time monitoring system can quickly determine the sealing status and issue an alarm in time to effectively avoid safety hazards caused by sealing failure. Standardized materials and components are used to ensure the quality consistency of each part and improve the durability and reliability of the overall structure. Environmentally friendly materials (such as polyurethane foam or mineral wool) are used as noise reduction fillings to reduce the environmental impact during construction and meet the requirements of sustainable development. The monitoring data recorded by the system provides a basis for subsequent analysis, helps to identify potential problems, optimize construction plans, and improve the overall management level. The intelligent monitoring system can be remotely monitored, reducing dependence on on-site manpower and improving management efficiency. The system can dynamically adjust monitoring parameters and optimize according to the actual situation of the construction site, thereby improving adaptability. By improving construction efficiency and safety, possible accidents and failures are reduced, thereby reducing long-term maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 This is a schematic diagram of the overall structure of the steel trestle of the present invention;

[0023] Figure 2 This is a schematic diagram of the internal noise reduction system of the steel trestle of the present invention;

[0024] Figure 3 It is a schematic diagram of the external noise reduction system of the steel trestle of the present invention. DETAILED DESCRIPTION

[0025] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternatives to implement some known technologies; and the accompanying drawings are only for more specific description of the embodiments, and are not intended to specifically limit the present invention.

[0026] It should be noted that the references to "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).

[0027] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.

[0028] Example 1

[0029] like Figures 1 to 3 Shown

[0030] Materials and equipment preparation

[0031] Prepare steel trestle plates, lifting ring modules, noise reduction materials, sealing materials, pressure sensors, data acquisition units, controllers and alarm systems.

[0032] Ensure that all materials meet design standards and equipment undergoes quality inspection.

[0033] Steel trestle deck drainage system installation

[0034] A water hole is provided on the contact surface between the bottom plate and the inner rib plate.

[0035] like Figure 1 As shown, an M8 drain hole is opened at the lower end of the short side outer sealing plate, and a drainage operation process is set.

[0036] Steel trestle deck inner compartment seal detection

[0037] Open an air hole and install an M8 pressure hole at the bottom of the outer sealing plate.

[0038] Install the pressure sensor at the bottom of the short side outer sealing plate to ensure it is well sealed.

[0039] Connect sensors to data acquisition units to ensure real-time data transmission.

[0040] Intelligent monitoring system configuration

[0041] Write a control program to set the normal air pressure range and define the alarm thresholds.

[0042] Connect the alarm system to the controller and set up audible and visual alarm conditions.

[0043] Steel trestle board lifting system application

[0044] like Figure 1 As shown, each trestle board is equipped with 4 lifting ring modules and a crane is used for lifting operations.

[0045] like Figure 1 As shown, after laying is completed, the lifting ring is rotated 90 degrees and placed in the shell.

[0046] Construction of noise reduction system for steel trestle deck

[0047] like Figure 2 As shown, the inner cabin is filled with polyurethane foam or mineral wool to reduce resonance and noise.

[0048] like Figure 3 As shown, noise reduction plates are welded at the four corners of the bottom plate, multiple round holes are opened on the plate, and rubber pads are placed under the noise reduction plates.

[0049] Quality inspection and acceptance

[0050] After completing the installation of each system, a comprehensive inspection is carried out, including the drainage system, sealing detection, lifting system and noise reduction system.

[0051] Ensure that all systems are functioning properly and record monitoring data for subsequent analysis.

[0052] Monitoring and feedback

[0053] Monitor the data of the pressure sensor in real time to determine the sealing status.

[0054] When seal failure is confirmed, the alarm system will be triggered, sounding an audible and visual alarm.

[0055] All abnormal situations are recorded in the database for subsequent analysis and improvement.

[0056] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, but those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.

[0057] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A construction method for an assembled steel trestle system, characterized in that it comprises the following steps: 1.1 Material preparation, ensuring that steel trestle plates, lifting ring modules, noise reduction materials, sealing materials and tools and equipment are complete; 1.2 The installation steps of the steel trestle deck drainage system include: A water hole is provided on the contact surface between the bottom plate and the bottom plate under the inner rib plate of the steel trestle plate; Open an M8 drain hole at the bottom of the outer sealing plate on the short side, and drain water by raising one end and tightening the M8 bolt next to the drain hole; 1.3 The steps for testing the sealing of the inner compartment of the steel trestle board include: A vent hole is provided on the contact surface between the bottom plate and the inner rib plate; Open an M8 pressure hole at the bottom of the short side outer sealing plate, apply air pressure and observe the bubbles in the soapy water to judge the sealing effect; Introduce intelligent sensors to monitor the sealing status in real time, use pressure sensors to monitor internal air pressure changes, automatically judge the sealing, and issue an alarm when an abnormality is detected 1.4 The application steps of the steel trestle board lifting system include: Each trestle board is equipped with 4 lifting ring modules, and the lifting rings are pulled out for operation during lifting; After laying, rotate the lifting ring 90 degrees and place it in the shell; 1.5 The construction steps of the steel trestle board noise reduction system include: Fill the inner cabin at the short side of the end of the steel trestle board with polyurethane foam or mineral wool to reduce resonance and noise; Noise reduction plates are welded at the four corners of the bottom plate, with multiple round holes opened on the plate, and rubber pads are placed under the noise reduction plates to further reduce noise; 1.6 Quality inspection and acceptance steps, including comprehensive inspection of drainage system, sealing detection, lifting system and noise reduction system to ensure the normal operation of all systems.

2. The construction method of a prefabricated steel trestle assembly system according to claim 1, characterized in that: The noise reduction material is polyurethane foam or mineral wool.

3. The construction method of a prefabricated steel trestle assembly system according to claim 1, characterized in that: The drainage system is optimized through the principles of gravity and water flow, reducing manual operations.

4. The construction method of a prefabricated steel trestle assembly system according to claim 1, characterized in that: The sealing detection is achieved through real-time monitoring by intelligent sensors, which automatically judge the sealing and issue an alarm. The monitoring method is to install a pressure sensor at the lower end of the outer sealing plate on the short side of the steel trestle board to ensure that it can accurately measure the internal air pressure, ensure that the sensor is well sealed with the inner cabin, and prevent external air interference. The sensor is connected to the data acquisition unit, and an appropriate communication interface is configured to transmit data, write a control program, and set the normal air pressure range and threshold. When the air pressure is detected to be lower than the preset value, it is judged as a seal failure. The alarm system is connected to the controller, and the corresponding alarm triggering conditions are set. The system continuously collects data from the pressure sensor and records the real-time air pressure change. The controller analyzes the collected data according to the set normal air pressure range. If the air pressure is abnormal, it is judged as a seal failure. When the seal failure is confirmed, the controller immediately triggers the alarm system, issues an audible and visual alarm, and reminds the construction personnel to check.

5. The construction method of a prefabricated steel trestle assembly system according to claim 1, characterized in that: The noise reduction system combines multiple layers of materials to enhance the overall noise reduction effect.