Heat preservation and insulation green building and assembly method thereof
By adopting thermal insulation panels and latch fixing structures of assembled connecting frames in green buildings, combined with maintaining a fixed frame, the complex problems of traditional assembly methods are solved, and the assembly operation is simplified and the stability and firmness of the building structure is improved.
Patent Information
- Application Number
- CN202411483382.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2025-01-07
AI Technical Summary
Traditional green building assembly methods are not convenient for installation. When the installation steps are wrong, the fixtures need to be removed, resulting in damage to the building structure, and the dismantling process is complicated and difficult to correct.
The prefabricated building wall is composed of thermal insulation panels and assembly connecting frames. Fixed connections are achieved through structures such as latch, gear adjustment sleeve and sealing cover, simplifying assembly operations, and increasing structural strength and firmness by maintaining the shaped frame.
It achieves easier assembly operations, provides safety and stability, facilitates building assembly, while increasing the firmness of thermal insulation panels and the firmness of assembly connections.
Smart Images

Figure CN119266412A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field related to green buildings, and in particular to a thermal insulation green building and an assembly method thereof. Background Art
[0002] Green building refers to a building that maximizes resource conservation, protects the environment, reduces pollution, provides people with healthy, applicable and efficient use space, and coexists harmoniously with nature throughout its entire life cycle. The "green" in green building does not refer to three-dimensional greening or roof gardens in the general sense, but represents a concept or symbol that refers to a building that is harmless to the environment, can make full use of the natural resources of the environment, and is built without destroying the basic ecological balance of the environment. Therefore, it is also called ecological building or energy-saving and environmentally friendly building.
[0003] There are still certain deficiencies in the existing technology for the construction of green buildings. The traditional assembly method is not convenient for workers to install it. If an error occurs in the installation steps, the fixings need to be disassembled. During the disassembly process, the building structure will be damaged. The disassembly process is complicated and difficult to correct, which makes it inconvenient for assembly. Summary of the invention
[0004] The purpose of the present invention is to provide a thermal insulation green building and an assembly method thereof, so as to solve the problem that the traditional assembly method proposed in the above background technology is not convenient for workers to install it. If an error occurs in the installation steps, the fixing parts need to be disassembled. During the disassembly process, the building structure will be damaged. The disassembly process is complicated, difficult to correct, and inconvenient for assembly.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a thermal insulation green building includes an assembled building wall, wherein the assembled building wall is composed of a thermal insulation board and an assembly connection frame, the thermal insulation board is arranged inside a shaping frame, and the interior of the assembly connection frame is provided with a right half-end locking piece and a left half-end locking piece from top to bottom, a left side latch is provided on one side of the interior of the left half-end locking piece, and a right side latch is provided on the other side of the interior of the right half-end locking piece, a gear adjustment sleeve is provided inside the right half-end locking piece, notches are provided on both sides of the bottom end of the interior of the right half-end locking piece, and an adjustment handle is provided at one end below the right side latch and the left side latch, a sealing cover is provided at the front end of the assembly connection frame, and reinforcing fixing plates are provided at the front and rear end surfaces of the thermal insulation board.
[0006] In a further embodiment, one side of the thermal insulation board is fixedly connected to the shaping frame via a first combination mosaic groove and a first combination mosaic block, and the other side of the thermal insulation board is fixedly connected to the shaping frame via a second combination mosaic groove and a second combination mosaic block, the cross-sections of the first combination mosaic block and the second combination mosaic block are both set to a trapezoidal structure, and the first combination mosaic block and the second combination mosaic block are connected in an staggered structure.
[0007] In a further embodiment, both sides of the retaining and shaping frame are provided with sockets, and the sockets are communicated with the interiors of the first combined mosaic block and the second combined mosaic block.
[0008] In a further embodiment, one side of the shaping frame is fixedly connected to the thermal insulation board through a left-side latch, and the other side of the shaping frame is fixedly connected to the thermal insulation board through a right-side latch, and the left-side latch and the right-side latch are connected in an alternating structure.
[0009] In a further embodiment, rubber sealing rings are provided at the inner ends of the right side latch and the left side latch, and the adjustment handle is connected to the right side latch and the left side latch by welding, the adjustment handle is connected to the assembly connecting frame through a positioning bayonet and a positioning column, and the positioning bayonet and the positioning column are fixedly connected by a fixing bolt.
[0010] In a further embodiment, the installation directions of the right half-end locking piece and the left half-end locking piece are set to be opposite, and the right half-end locking piece and the left half-end locking piece are connected to the assembly connection frame by welding.
[0011] In a further embodiment, the sealing cover and the assembly connection frame are connected by being engaged with each other through a fixing clamp head and a fixing clamp groove, and the thickness of the assembly connection frame is the same as the thickness of the shaping frame.
[0012] A method for assembling a thermal insulation green building, using the thermal insulation green building, comprises the following steps: S1. Apply glue on the edge of the thermal insulation board; S2, inlaying and installing the thermal insulation board inside the holding frame, so that the first combination inlaying groove is inlaid with the first combination inlaying block, and the second combination inlaying groove is inlaid with the second combination inlaying block; S3. Install the assembly connection frame between two adjacent thermal insulation boards, hold the adjustment handle, extend the right pin to one end, adjust the adjustment handle to one end of the gear adjustment sleeve, and fix it in the slot, so that the positioning bayonet is connected with the positioning clamp column, and fix it with the fixing bolt; S4. Connect and fix one side of the assembly connection frame to the thermal insulation board, extend the left latch to one end, connect and fix the other side of the assembly connection frame to the thermal insulation board, cover the sealing cover by connecting the fixing clamp head to the fixing clamp slot, and the assembly is completed.
[0013] Compared with the prior art, the present invention has the following beneficial effects: The thermal insulation board in the invention is fixedly connected to the assembly connection frame by means of a latch, and this fixing method is easier to assemble and operate, is simple to use, does not require special tools, provides safety and stability when connecting objects, and is convenient for building assembly.
[0014] The thermal insulation board is arranged inside the shaping frame. The shaping frame can increase the strength around the thermal insulation board and the firmness of the thermal insulation board. At the same time, the firmness of the thermal insulation board and the assembly connection frame can be increased, and the connection can be tighter. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of a thermal insulation green building of the present invention; Figure 2 It is a detailed structural diagram of part A of the present invention; Figure 3 It is a schematic cross-sectional structure diagram of the assembly connection frame of the present invention; Figure 4 It is a structural schematic diagram of the left latch and the right latch of the present invention; Figure 5 It is a structural schematic diagram of the right side latch of the present invention; Figure 6 A front view of a retaining shaping frame of the present invention; Figure 7 A side view of a retaining and shaping frame of the present invention; Figure 8 It is a front view of the thermal insulation board of the present invention.
[0016] In the figure: 1. Prefabricated building wall; 2. Thermal insulation board; 3. Maintaining shaping frame; 4. Strengthening fixing plate; 5. Assembling connecting frame; 6. Left half locking piece; 7. Right half locking piece; 8. Fixing slot; 9. Notch; 10. Gear adjustment sleeve; 11. Positioning column; 12. Fixing bolt; 13. Adjusting handle; 14. Right side latch; 15. Sealing cover; 16. Fixing clamp; 17. Left side latch; 18. Rubber sealing ring; 19. Positioning slot; 20. First combination mosaic block; 21. Socket; 22. Second combination mosaic block; 23. Second combination mosaic groove; 24. First combination mosaic groove. DETAILED DESCRIPTION
[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0018] See also Figure 1-8 , an embodiment of the present invention: a thermal insulation green building, comprising an assembled building wall 1, the assembled building wall 1 is composed of a thermal insulation board 2 and an assembly connection frame 5, the thermal insulation board 2 is arranged inside the holding frame 3, the assembly connection frame 5 is provided with a right half-end locking piece 7 and a left half-end locking piece 6 from top to bottom, one side of the left half-end locking piece 6 is provided with a left latch 17, the other side of the right half-end locking piece 7 is provided with a right latch 14, the right half-end locking piece 7 is provided with a gear adjustment sleeve 10, the right half-end locking piece 7 is provided with notches 9 on both sides of the bottom end, the right half-end locking piece 7 is provided with an adjustment handle 13 at one end below the right latch 14 and the left latch 17, the front end of the assembly connection frame 5 is provided with a sealing cover 15, the front and rear end surfaces of the thermal insulation board 2 are provided with a reinforcing fixing sheet 4; through the thermal insulation board 2 It is used to provide thermal insulation for the building, and is used to connect and assemble multiple thermal insulation panels 2 into one through the assembly connecting frame 5, and is used to increase the firmness of the thermal insulation panel 2 through the maintaining shaping frame 3, and is used to install the left side latch 17 through the right half end locking piece 7, and is used to fix the connecting surface of the maintaining shaping frame 3 and the left side of the thermal insulation panel 2 through the left side latch 17, and is used to install the right side latch 14 through the right half end locking piece 7, and is used to fix the connecting surface of the maintaining shaping frame 3 and the right side of the thermal insulation panel 2 through the right side latch 14, and is used to adjust the right side latch 14 or the left side latch 17 through the gear adjustment sleeve 10, and is used to locate the position of the adjustment handle 13 through the slot 9, and is used to seal the assembly connecting frame 5 through the sealing cover 15, and is used to increase the firmness of the thermal insulation panel 2 through the strengthening fixing plate 4.
[0019] Furthermore, one side of the thermal insulation board 2 is fixedly connected to the first combination mosaic block 20 and the retaining frame 3 through the first combination mosaic groove 24, and the other side of the thermal insulation board 2 is fixedly connected to the second combination mosaic block 22 and the retaining frame 3 through the second combination mosaic groove 23. The cross-sections of the first combination mosaic block 20 and the second combination mosaic block 22 are both set to a trapezoidal structure, and the first combination mosaic block 20 and the second combination mosaic block 22 are connected in an interlaced structure. The first combination mosaic groove 24 is connected to the first combination mosaic block 20 to fix the installation position of one side of the thermal insulation board 2, and the second combination mosaic groove 23 is connected to the second combination mosaic block 22 to fix the installation position of the other side of the thermal insulation board 2.
[0020] Sockets 21 are provided on both sides of the holding and shaping frame 3, and the sockets 21 are communicated with the interior of the first and second combined mosaic blocks 20, 22, and are used to locate the fixed positions of the right latch 14 and the left latch 17.
[0021] One side of the shaping frame 3 is fixedly connected to the thermal insulation board 2 by the left side latch 17, and the other side of the shaping frame 3 is fixedly connected to the thermal insulation board 2 by the right side latch 14, and the left side latch 17 and the right side latch 14 are connected in a staggered structure, and the staggered structure can make the fixed positions of the left side latch 17 and the right side latch 14 more coordinated; the inner end positions of the right side latch 14 and the left side latch 17 are provided with rubber sealing rings 18, and the adjusting handle 13 is connected to the right side latch 14 and the left side latch 17 by welding, the adjusting handle 13 is connected to the assembly connecting frame 5 through the positioning bayonet 19 and the positioning column 11, and the positioning bayonet 19 and the positioning column 11 are fixedly connected by the fixing bolts 12, and the rubber sealing ring 18 is used to seal and position the positions where the right side latch 14 and the left side latch 17 are fixed.
[0022] The installation directions of the right half-end locking piece 7 and the left half-end locking piece 6 are set to be opposite, and the right half-end locking piece 7 and the left half-end locking piece 6 are connected to the assembly connecting frame 5 by welding, and the welding connection is used to increase the firmness of the installation of the right half-end locking piece 7 and the left half-end locking piece 6.
[0023] The sealing cover 15 and the assembly connecting frame 5 are connected by the fixing clamp 16 and the fixing slot 8, and the thickness of the assembly connecting frame 5 is the same as the thickness of the shaping frame 3. The sealing cover 15 can be easily installed or removed by connecting the fixing clamp 16 and the fixing slot 8.
[0024] A method for assembling a thermal insulation green building, using the thermal insulation green building, comprises the following steps: S1, applying glue on the edge of the thermal insulation board 2; S2, the thermal insulation board 2 is mounted inside the holding frame 3, so that the first combination mounting groove 24 is mounted with the first combination mounting block 20, and the second combination mounting groove 23 is mounted with the second combination mounting block 22; S3, install the assembly connection frame 5 between two adjacent thermal insulation boards 2, hold the adjustment handle 13, extend the right latch 14 to one end, adjust the adjustment handle 13 to one end of the gear adjustment sleeve 10, and fix it in the slot 9, so that the positioning bayonet 19 is connected with the positioning clamping column 11, and fixed by the fixing bolt 12; S4. Connect and fix one side of the assembly connection frame 5 to the thermal insulation board 2, then extend the left side latch 17 to one end, connect and fix the other side of the assembly connection frame 5 to the thermal insulation board 2, and cover the sealing cover 15 by connecting the fixing clamp head 16 to the fixing clamp slot 8, and the assembly is completed.
[0025] Working principle: When in use, apply glue on the edge of the thermal insulation board 2, inlay the thermal insulation board 2 into the inside of the retaining frame 3, inlay the first combination inlay groove 24 with the first combination inlay block 20, inlay the second combination inlay groove 23 with the second combination inlay block 22, install the assembly connecting frame 5 between two adjacent thermal insulation boards 2, hold the adjustment handle 13, extend the right side latch 14 to one end, adjust the adjustment handle 13 to one end of the gear adjustment sleeve 10, and clamp it in the slot 9, so that the positioning bayonet 19 is clamped and connected with the positioning clamp column 11, and fixed by the fixing bolt 12, connect and fix one side of the assembly connecting frame 5 to the thermal insulation board 2, the method is the same as above, and then extend the left side latch 17 to one end, connect and fix the other side of the assembly connecting frame 5 to the thermal insulation board 2, cover the sealing cover 15 by connecting the fixing clamp head 16 to the fixing slot 8, and the assembly is completed.
[0026] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A thermally insulated green building, including a prefabricated building wall (1), characterized in that The prefabricated building wall (1) is composed of a thermal insulation board (2) and an assembly connection frame (5), wherein the thermal insulation board (2) is arranged inside a shaping frame (3), and the assembly connection frame (5) is provided with a right half-end locking piece (7) and a left half-end locking piece (6) in sequence from top to bottom inside the assembly connection frame (5), a left side latch (17) is provided on one side inside the left half-end locking piece (6), and a right side latch (14) is provided on the other side inside the right half-end locking piece (7), and a gear adjustment sleeve (10) is provided inside the right half-end locking piece (7), and notches (9) are provided on both sides of the bottom end inside the right half-end locking piece (7), and adjustment handles (13) are provided at one end below the right side latch (14) and the left side latch (17), and a sealing cover (15) is provided at the front end of the assembly connection frame (5), and reinforcing fixing plates (4) are provided at the front and rear end surfaces of the thermal insulation board (2).
2. A thermally insulated green building according to claim 1, characterized in that One side of the thermal insulation board (2) and the retaining and shaping frame (3) are fixedly connected to a first combined mosaic block (20) via a first combined mosaic groove (24), and the other side of the thermal insulation board (2) and the retaining and shaping frame (3) are fixedly connected to a second combined mosaic block (22) via a second combined mosaic groove (23), the cross-sections of the first combined mosaic block (20) and the second combined mosaic block (22) are both arranged in a trapezoidal structure, and the first combined mosaic block (20) and the second combined mosaic block (22) are connected in a staggered structure.
3. A thermally insulated green building according to claim 1, characterized in that The retaining frame (3) is provided with sockets (21) on both sides, and the sockets (21) are in communication with the interiors of the first combined inlay block (20) and the second combined inlay block (22).
4. A thermally insulated green building according to claim 1, characterized in that One side of the shaping frame (3) is fixedly connected to the thermal insulation board (2) via a left latch (17), and the other side of the shaping frame (3) is fixedly connected to the thermal insulation board (2) via a right latch (14), and the left latch (17) and the right latch (14) are connected in a staggered structure.
5. A thermally insulated green building according to claim 1, characterized in that The inner ends of the right latch pin (14) and the left latch pin (17) are both provided with rubber sealing rings (18), and the adjusting handle (13) is connected to the right latch pin (14) and the left latch pin (17) by welding. The adjusting handle (13) is connected to the assembly connection frame (5) via a positioning bayonet (19) and a positioning column (11), and the positioning bayonet (19) and the positioning column (11) are fixedly connected via a fixing bolt (12).
6. A thermally insulated green building according to claim 1, characterized in that The installation directions of the right half-end locking piece (7) and the left half-end locking piece (6) are arranged to be opposite, and the right half-end locking piece (7) and the left half-end locking piece (6) are connected to the assembly connection frame (5) by welding.
7. A thermally insulated green building according to claim 1, characterized in that The sealing cover (15) and the assembly connecting frame (5) are jammed and connected to the fixed card slot (8) through a fixing card head (16), and the thickness of the assembly connecting frame (5) is the same as the thickness of the retaining frame (3).
8. An assembly method for thermal insulation green building, characterized in that A thermally insulated green building according to any one of claims 1-7 is used; including the following steps: S1, applying glue to the edge of the thermal insulation board (2); S2, mounting the thermal insulation board (2) inside the retaining frame (3), so that the first combination mounting groove (24) is mounted with the first combination mounting block (20), and the second combination mounting groove (23) is mounted with the second combination mounting block (22); S3, install the assembly connection frame (5) between two adjacent thermal insulation boards (2), hold the adjustment handle (13), extend the right side latch (14) to one end, adjust the adjustment handle (13) to one end of the gear adjustment sleeve (10), and fix it in the groove (9), so that the positioning bayonet (19) is connected with the positioning bayonet column (11) by snapping, and fix it by the fixing bolt (12); S4. Connect and fix one side of the assembly connection frame (5) to the thermal insulation board (2), then extend the left latch (17) to one end, connect and fix the other side of the assembly connection frame (5) to the thermal insulation board (2), and cover the sealing cover (15) by connecting the fixing clamp (16) to the fixing clamp slot (8), and the assembly is completed.