Gas supply pipeline point location monitoring device and method thereof

By designing the locking installation components and monitoring systems of the gas supply pipeline point monitoring device, the monitoring problems at pipe connections of different sizes are solved, real-time data leakage feedback and automatic emergency treatment are realized, and the applicability and safety of the monitoring device are improved. .

CN119267808AInactive Publication Date: 2025-01-07THE NO 3 ENG LTD OF CHINA RAILWAY 22TH BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411423473.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2025-01-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing gas supply pipeline monitoring device cannot be used for pipe connections of different sizes, and the monitoring data is single, so the leakage speed information cannot be feedback in real time, and the automatic emergency processing function is lacking.

Method used

A gas supply pipe point monitoring device is designed, including locking installation components and monitoring system, using the resistance slide, transmission structure and monitoring module to monitor leakage in real time, and feedback data through the signal output device, with emergency blocking components to automatically handle leakage function.

Benefits of technology

It realizes stable installation and leakage monitoring at pipe connections of different sizes, feedback leakage information and speed data in real time, and automatically handles leakage situations, improving the scope of application and safety protection of the monitoring device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119267808A_ABST
    Figure CN119267808A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of air supply pipeline monitoring, in particular to an air supply pipeline point location monitoring device and a method thereof.The air supply pipeline point location monitoring device comprises a monitoring box, a feedback instrument box and a set of air supply pipe mounting sleeves, the set of air supply pipe mounting sleeves are symmetrically arranged on the two sides of the monitoring box, and two through windows are symmetrically arranged on the monitoring box; a top cover plate and a bottom cover plate are arranged in the two through windows respectively, the feedback instrument box is arranged on the top cover plate, an instrument panel is arranged on the feedback instrument box, a pointer is movably arranged on the instrument panel, and a plurality of alarm lamps are arranged on the monitoring box. The monitoring device further comprises locking installation assemblies and a monitoring system, each air supply pipe installation sleeve is provided with one locking installation assembly, and the monitoring system is arranged on the monitoring box. The whole device is high in automation degree, and the safety protection coefficient of the whole monitoring device to the pipeline is improved while the application range of the whole monitoring device is widened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gas supply pipeline monitoring, and more specifically, to a gas supply pipeline point monitoring device and method. Background Art

[0002] In order to meet the gas power requirements of commercial liquid medium-sized launch vehicles during component assembly, final assembly transfer and vertical testing, it is used to provide gas media of different types, pressures and flows. The gas power system of the final assembly and testing area is set up to specifically include a high-pressure air supply system, a high-pressure nitrogen supply system, a high-pressure helium supply system and a process equipment control system to meet the above technical requirements.

[0003] However, in order to ensure the integrity of the gas power system and the accuracy of the interface conditions, a monitoring device is usually installed at the connection of the above-mentioned high-pressure gas supply pipeline to perform real-time monitoring of the connection of the pipe. Once a leak occurs, a leak prompt will be issued in time. However, the existing monitoring device still has the following defects: Existing monitoring devices cannot be applied and installed at the joints of pipes of different sizes. Pipes of different thicknesses need to be equipped with different types of monitoring devices, which is very inconvenient. In addition, the monitoring data of existing monitoring devices is single, and the remote terminal can only obtain basic leakage information but not leakage speed information. In addition, existing monitoring devices do not have the function of automatically handling leakage in an emergency. Summary of the invention

[0004] The object of the present invention is to provide a gas supply pipeline point monitoring device to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions: A gas supply pipeline point monitoring device, comprising a monitoring box, a feedback instrument box and a group of gas supply pipe installation sleeves, wherein the group of gas supply pipe installation sleeves are symmetrically arranged on both sides of the monitoring box, the monitoring box is symmetrically provided with two through windows, the two through windows are respectively provided with a top cover plate and a bottom cover plate, the feedback instrument box is arranged on the top cover plate, the feedback instrument box is provided with an instrument panel, the instrument panel is movably provided with a pointer, the monitoring box is provided with a plurality of alarm lights, the monitoring device further comprises a locking installation component and a monitoring system, each of the gas supply pipe installation sleeves is provided with a locking installation component, the locking installation component is used to clamp and fix the gas supply pipe and perform sealing treatment between the gas supply pipe and the gas supply pipe installation sleeve, the monitoring system is arranged on the monitoring box, and is used to monitor the leakage status of the gas supply pipe connection and perform feedback treatment; The monitoring system includes a resistance slide, a back box, a signal output device, a transmission structure and a monitoring module. The resistance slide is movably arranged in the monitoring box and the two are elastically connected. The back box is arranged on the feedback instrument box. The signal output device is arranged on the back box. The transmission structure is arranged in the feedback instrument box and connects the resistance slide and the pointer. When the resistance slide moves along the monitoring box, the transmission structure is controlled to work to drive the pointer to rotate. The monitoring module is arranged in the back box and connected to the transmission structure. When the transmission structure works, the monitoring module is controlled to work and measure the leakage data at the connection of the air supply pipe and feedback. The signal output device and the monitoring module are electrically connected.

[0006] A further technical solution of the present application is as follows: the transmission structure comprises a gear, a rack and a rotating shaft, the gear is movably arranged in the feedback instrument box via the rotating shaft, the rack is movably arranged in the monitoring box, the rack slides through the feedback instrument box with a margin, the rack and the gear are meshed, the pointer is coaxially connected to one end of the rotating shaft, and the other end of the rotating shaft is connected to the monitoring module.

[0007] A further technical solution of the present application is as follows: the monitoring module includes a monitoring panel, a plurality of conductive blocks, a rotating handle and a distribution block; the monitoring panel is arranged in a back box; a guide rail is formed on the monitoring panel; a plurality of conductive blocks are arranged on the inner wall of the guide rail; the rotating handle is movably arranged on the monitoring panel and connected to a rotating shaft through a transmission; a distribution block is movably arranged in the guide rail; the distribution block is arranged at one end of the rotating handle; and the conductive block is located on the moving path of the rotating handle.

[0008] A further technical solution of the present application: the monitoring system also includes an emergency barrier component, which is arranged on the bottom cover and located on the inner side of the monitoring box, and is used to perform emergency repair treatment on the connection of the air supply pipe. The monitoring module also includes a trigger unit, which is arranged on the turning handle. When the rotation speed of the turning handle reaches an expected value, the trigger unit is controlled to work, and the trigger unit triggers the emergency barrier component to work.

[0009] The present application has a further technical solution: the trigger unit includes a distribution sleeve, a resistance rod and a slide groove, the slide groove is formed on the turning handle, the distribution sleeve is movably arranged in the slide groove and elastically connected to the turning handle, the resistance rod is arranged on the turning handle, the distribution sleeve is movably sleeved on the outer wall of the resistance rod, and the distribution sleeve, the resistance rod and the emergency barrier assembly are electrically connected.

[0010] The present application has a further technical solution: the emergency barrier assembly includes a protective seat, a barrier airbag, a linear motor and an inflatable structure, the protective seats are in a group and are symmetrically and movably arranged on the bottom cover, the barrier airbags are arranged on opposite surfaces of the protective seats, the number of the linear motors is the same as the number of the protective seats and are symmetrically arranged on the bottom cover, the movable end of the linear motor is connected to the protective seat, the inflatable structure is arranged on a side of the bottom cover away from the protective seat, the inflatable structure is in communication with the barrier airbag and is electrically connected to the trigger unit.

[0011] The present application has a further technical solution: the inflation structure includes an inflation tube, a second piston rod and an electromagnetic block, the inflation tube is arranged on the bottom cover plate, the inflation tube is connected to the barrier airbag, the second piston rods are numbered in a group and are symmetrically and movably arranged in the inflation tube, the second piston rods in a group are electrically connected, and the second piston rods and the bottom cover plate are provided with electromagnetic blocks that repel each other when energized.

[0012] The present application has a further technical solution: the locking installation assembly includes an operating panel, a threaded rod, a sleeve, a ring, a positioning sleeve, a sealing airbag and a clamping structure, the sleeve is arranged on the monitoring box, the threaded rod is movably arranged in the sleeve and the two are threadedly matched, the operating panel is movably arranged on the monitoring box and is coaxially connected to the threaded rod, the ring is sleeved on the threaded rod, a positioning sleeve is slidably sleeved on the outer wall of each of the air supply pipe mounting sleeves and the two are elastically connected, the positioning sleeve is movably connected by a push arm and a ring, a sealing airbag is arranged on the inner wall of each of the air supply pipe mounting sleeves, the clamping structure is arranged on the air supply pipe mounting sleeve and is located on the inner side of the positioning sleeve, the clamping structure is used to clamp and fix the air supply pipe and inflate the sealing airbag when the clamping structure is working, and the positioning sleeve controls the operation of the clamping structure when it moves.

[0013] A further technical solution of the present application is as follows: the clamping structure includes a splint, a sliding tube, a first piston rod and a roller, the number of the splints is multiple and they are arranged on the inner side of the air supply pipe mounting sleeve, the number of the sliding tubes is the same as the number of the splints and they are arranged on the inner wall of the air supply pipe mounting sleeve, the sliding tube is provided with an exhaust hole, the exhaust hole is connected to the sealing airbag through a connecting tube, the first piston rod is movably arranged in the sliding tube and the two are elastically connected, the roller is movably arranged on one end of the first piston rod away from the sliding tube, a conical ramp is formed in the adjustment sleeve, and the conical ramp and the roller are slidably matched.

[0014] A method for monitoring gas supply pipeline points is applied to the monitoring device described in the above technical solution. The specific steps of the detection method are as follows: S100: Insert two air supply pipes into the air supply pipe installation sleeve, open the bottom cover plate, connect the two air supply pipes in the monitoring box, and control the locking installation assembly to clamp and fix the air supply pipes in the air supply pipe installation sleeve and seal the air supply pipes and the inner wall of the air supply pipe installation sleeve; S200: Using the monitoring system to monitor the leakage state of the gas supply pipe connection in real time, when the gas supply pipe connection has leakage, it can drive the resistance slide plate to move along the monitoring box, thereby controlling the transmission structure to work, and the transmission structure can drive the pointer to rotate in the instrument panel to monitor the leakage amount; S300: When the transmission structure is working, the monitoring module can be controlled to monitor the air leakage rate, and the alarm light can be controlled to turn on and illuminate, and the monitoring data can be fed back to the remote terminal of the monitoring personnel through the signal output device.

[0015] Compared with the prior art, the technical solution provided by the embodiment of the present invention has the following beneficial effects: The embodiment of the present invention provides a locking installation component and a monitoring system. The locking installation component can not only facilitate the installation of the entire device at the connection of air supply pipes of different sizes, but also can realize automatic sealing processing between the air supply pipe and the air supply pipe installation sleeve while stably clamping and fixing the air supply pipe. The leakage of the air supply pipe connection is monitored in real time through the monitoring system. When the air supply pipe leaks, the leakage information and leakage speed data can be fed back to the remote terminal of the remote monitoring personnel in the first time, so that the monitoring personnel can arrange the maintenance and protection work of the air supply pipe in the first time. At the same time, the emergency processing of the air supply pipe connection can be automatically realized when the leakage speed reaches the expected value. The whole device has a high degree of automation. While improving the scope of application of the whole monitoring device, it also improves the safety protection factor of the whole monitoring device for the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of a gas supply pipeline point monitoring device in an embodiment of the present invention; Figure 2 It is a structural schematic diagram of a locking installation component in a gas supply pipeline point monitoring device according to an embodiment of the present invention; Figure 3 It is a partial cross-sectional view of a locking installation assembly in a gas supply pipeline point monitoring device according to an embodiment of the present invention; Figure 4 It is a structural schematic diagram of a clamping structure in a gas supply pipeline point monitoring device according to an embodiment of the present invention; Figure 5 It is a structural schematic diagram of an emergency blocking component in a gas supply pipeline point monitoring device according to an embodiment of the present invention; Figure 6A half-section view of a monitoring box in a gas supply pipeline point monitoring device according to an embodiment of the present invention; Figure 7 It is a partial cross-sectional view of a feedback instrument box and a back box in a gas supply pipeline point monitoring device in an embodiment of the present invention; Figure 8 Schematic diagram of the structure of the monitoring module in the gas supply pipeline point monitoring device in the embodiment of the present invention.

[0017] Explanation of the symbols in the schematic diagram: 1-monitoring box, 2-operating panel, 3-positioning sleeve, 4-air supply pipe installation sleeve, 5-feedback instrument box, 6-back box, 7-screw sleeve, 8-threaded rod, 9-ring, 10-push arm, 11-sliding pipe, 12-sealed airbag, 13-conical ramp, 15-first piston rod, 16-roller, 17-connecting pipe, 18-clamp, 19-exhaust hole, 20-warning light, 21-bottom cover, 22-inflatable pipe, 23-second active Plug rod, 24-electromagnetic block, 25-linear motor, 26-protective seat, 27-barrier airbag, 28-through window, 29-signal output device, 30-top cover, 31-contact slide plate, 32-rack, 33-pointer, 34-instrument panel, 35-gear, 36-transmission, 37-monitoring panel, 38-conductive block, 39-guide rail, 40-handle, 41-slideway, 42-distribution block, 43-distribution sleeve, 44-resistance rod. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. The present invention is further described below in combination with the embodiments.

[0019] See also Figure 1-Figure 8In one embodiment of the present application, a gas supply pipeline point monitoring device includes a monitoring box 1, a feedback instrument box 5 and a group of gas supply pipe installation sleeves 4, a group of the gas supply pipe installation sleeves 4 are symmetrically arranged on both sides of the monitoring box 1, the monitoring box 1 is symmetrically provided with two through windows 28, the two through windows 28 are respectively provided with a top cover plate 30 and a bottom cover plate 21, the feedback instrument box 5 is arranged on the top cover plate 30, the feedback instrument box 5 is provided with an instrument panel 34, the instrument panel 34 is movably provided with a pointer 33, the monitoring box 1 is provided with a plurality of alarm lights 20, the monitoring device also includes a locking installation component and a monitoring system, each of the gas supply pipe installation sleeves 4 is provided with a locking installation component, the locking installation component is used to clamp and fix the gas supply pipe and perform sealing treatment between the gas supply pipe and the gas supply pipe installation sleeve 4, the monitoring system is arranged on the monitoring box 1, and is used to monitor the leakage state of the gas supply pipe connection and perform feedback processing; The monitoring system includes a resistance slide 31, a back box 6, a signal output device 29, a transmission structure and a monitoring module. The resistance slide 31 is movably arranged in the monitoring box 1 and the two are elastically connected. The back box 6 is arranged on the feedback instrument box 5. The signal output device 29 is arranged on the back box 6. The transmission structure is arranged in the feedback instrument box 5 and connects the resistance slide 31 and the pointer 33. When the resistance slide 31 moves along the monitoring box 1, it controls the transmission structure to drive the pointer 33 to rotate. The monitoring module is arranged in the back box 6 and connected to the transmission structure. When the transmission structure works, it controls the monitoring module to work and measure the leakage data at the connection of the gas supply pipe and feedback. The signal output device 29 is electrically connected to the monitoring module.

[0020] In this exemplary embodiment, the transmission structure includes a gear 35, a rack 32 and a rotating shaft. The gear 35 is movably set in the feedback instrument box 5 through the rotating shaft, and the rack 32 is movably set in the monitoring box 1. The rack 32 slides through the feedback instrument box 5 with a margin, and the rack 32 and the gear 35 are meshed. The pointer 33 is coaxially connected to one end of the rotating shaft, and the other end of the rotating shaft is connected to the monitoring module.

[0021] It should be noted that the monitoring module includes a monitoring disk 37, a plurality of conductive blocks 38, a rotating handle 40 and a distribution block 42. The monitoring disk 37 is arranged in the back box 6. A guide rail 39 is formed on the monitoring disk 37. A plurality of conductive blocks 38 are arranged on the inner wall of the guide rail 39. The rotating handle 40 is movably arranged on the monitoring disk 37 and is connected to the rotating shaft through the transmission 36. A distribution block 42 is movably arranged in the guide rail 39. The distribution block 42 is arranged at one end of the rotating handle 40. The conductive block 38 is located on the moving path of the rotating handle 40.

[0022] In actual application, two air supply pipes are inserted into the air supply pipe installation sleeve 4, and the two air supply pipes are connected in the monitoring box 1 by opening the bottom cover plate 21. By controlling the locking installation component to work, the air supply pipe can be clamped and fixed in the air supply pipe installation sleeve 4, and the air supply pipe and the inner wall of the air supply pipe installation sleeve 4 are sealed. The monitoring system is used to monitor the leakage state of the air supply pipe connection in real time. When the air supply pipe connection leaks, the resistance slide plate 31 can be driven to move along the monitoring box 1, and the rack 32 can be driven to move. Under the meshing action between the rack 32 and the gear 35, the gear 35 and the rotating shaft are driven to rotate, thereby driving the pointer 3 3 rotates, the cooperation between the pointer 33 and the instrument panel 34 can facilitate the detection of the gas leakage in the monitoring box 1; during the rotation of the shaft, the handle 40 can be driven to rotate synchronously, and the rotation of the handle 40 can drive the distribution block 42 to rotate along the guide rail 39, and the distribution block 42 successively contacts with the conductive blocks 38 at different positions, and each time the distribution block 42 and the conductive block 38 contact, the alarm light 20 can be controlled to emit light, and the signal output device 29 can be controlled to continuously send leakage information to the remote terminal of the monitoring personnel to prompt the monitoring personnel, so that the monitoring personnel can arrange maintenance personnel to repair the pipeline at the leakage position in time.

[0023] See also Figure 1 , Figure 2 , Figure 5 , Figure 6 , Figure 7 as well as Figure 8 As another preferred embodiment of the present application, the monitoring system also includes an emergency blocking component, which is arranged on the bottom cover 21 and located on the inner side of the monitoring box 1, and is used to perform emergency repair treatment on the connection of the air supply pipe. The monitoring module also includes a trigger unit, which is arranged on the turning handle 40. When the rotation speed of the turning handle 40 reaches an expected value, the trigger unit is controlled to work, and the trigger unit triggers the emergency blocking component to work.

[0024] In a specific case of this embodiment, the trigger unit includes a distribution sleeve 43, a resistance rod 44 and a slide groove 41, the slide groove 41 is formed on the rotating handle 40, the distribution sleeve 43 is movably arranged in the slide groove 41 and is elastically connected to the rotating handle 40, the resistance rod 44 is arranged on the rotating handle 40, the distribution sleeve 43 is movably sleeved on the outer wall of the resistance rod 44, and the distribution sleeve 43, the resistance rod 44 and the emergency barrier assembly are electrically connected.

[0025] In another specific case in the present embodiment, the emergency blocking assembly includes a protective seat 26, a blocking airbag 27, a linear motor 25 and an inflatable structure. The protective seats 26 are grouped together and are symmetrically and movably arranged on the bottom cover 21. The blocking airbags 27 are arranged on the opposite surfaces of the protective seats 26. The number of the linear motors 25 is the same as the number of the protective seats 26 and they are symmetrically arranged on the bottom cover 21. The movable end of the linear motor 25 is connected to the protective seat 26. The inflatable structure is arranged on a side of the bottom cover 21 away from the protective seat 26. The inflatable structure is connected to the blocking airbag 27 and is electrically connected to the trigger unit.

[0026] It should be noted that the inflation structure includes an inflation tube 22, a second piston rod 23 and an electromagnetic block 24. The inflation tube 22 is arranged on the bottom cover plate 21, and the inflation tube 22 is connected to the barrier airbag 27. The second piston rods 23 are in a group and are symmetrically and movably arranged in the inflation tube 22. A group of second piston rods 23 are electrically connected, and electromagnetic blocks 24 that repel each other when powered are arranged on opposite surfaces of the second piston rod 23 and the bottom cover plate 21.

[0027] Of course, this embodiment is not limited to the above-mentioned electromagnetic block 24 to adjust the position of the second piston rod 23. Electric cylinders, air cylinders or hydraulic cylinders can also be used instead, as long as the position of the second piston rod 23 can be adjusted. They are not listed here one by one.

[0028] After completing the connection work of the air supply pipe, by installing the bottom cover plate 21 in the through window 28, by controlling the linear motor 25 to be energized, the protective seat 26 is driven to move along the bottom cover plate 21 and be located on both sides of the connection of the air supply pipe. In the process of the shaft driving the handle 40 to rotate, the distribution sleeve 43 is acted upon by centrifugal force, and the distribution sleeve 43 moves toward the outside of the handle 40 along the slide groove 41 and the resistance rod 44, so that the distribution sleeve 43 and the resistance rod 44 are in contact at different positions. When the leakage speed of the air supply pipe causes the movement speed of the sliding plate 31 and the rotation speed of the handle 40 to reach the expected value, the resistance value of the access circuit reaches the expected value at this time and the electromagnetic block 24 is energized to repel each other, thereby driving the second piston rod 23 to move along the inflation pipe 22, thereby inputting the air in the inflation pipe 22 into the barrier airbag 27, and the barrier airbag 27 expands, thereby wrapping and sealing the connection of the air supply pipe, thereby urgently dealing with the leakage of the air supply pipe and waiting for maintenance personnel to disassemble and repair it.

[0029] See also Figure 1-Figure 4As another preferred embodiment of the present application, the locking installation assembly includes an operating disk 2, a threaded rod 8, a screw sleeve 7, a collar 9, an adjustment sleeve 3, a sealing airbag 12 and a clamping structure, the screw sleeve 7 is arranged on the monitoring box 1, the threaded rod 8 is movably arranged in the screw sleeve 7 and the two are threadedly matched, the operating disk 2 is movably arranged on the monitoring box 1 and is coaxially connected with the threaded rod 8, the collar 9 is sleeved on the threaded rod 8, the outer wall of each of the air supply pipe mounting sleeves 4 is slidably sleeved with an adjustment sleeve 3 and the two are elastically connected, the adjustment sleeve 3 is movably connected through a push arm 10 and the collar 9, the inner wall of each of the air supply pipe mounting sleeves 4 is provided with a sealing airbag 12, the clamping structure is arranged on the air supply pipe mounting sleeve 4 and is located on the inner side of the adjustment sleeve 3, the clamping structure is used to clamp and fix the air supply pipe and inflate the sealing airbag 12 when the clamping structure is working, and the adjustment sleeve 3 controls the clamping structure to work when it moves.

[0030] In the exemplary embodiment, the clamping structure includes a splint 18, a sliding tube 11, a first piston rod 15 and a roller 16. The number of the splints 18 is several and they are arranged on the inner side of the air supply pipe mounting sleeve 4. The number of the sliding tubes 11 is the same as the number of the splints 18 and they are arranged on the inner wall of the air supply pipe mounting sleeve 4. The sliding tube 11 is provided with an exhaust hole 19, and the exhaust hole 19 is connected to the sealing airbag 12 through a connecting tube 17. The first piston rod 15 is movably arranged in the sliding tube 11 and the two are elastically connected. The roller 16 is movably arranged on the end of the first piston rod 15 away from the sliding tube 11. A conical ramp 13 is formed in the adjusting sleeve 3, and the conical ramp 13 and the roller 16 are slidably matched.

[0031] It should be noted that the present embodiment is not limited to the above-mentioned cooperation mode of the first piston rod 15 and the sliding tube 11 to realize the inflation work in the sealing airbag 12, and a fan or an air pump can also be used directly instead, which are not listed here one by one.

[0032] In actual application, the air supply pipe is inserted into the air supply pipe installation sleeve 4 and extended into the monitoring box 1 for installation. By manually rotating the operating disk 2, the threaded rod 8 can be driven to rotate. Under the action of the threaded cooperation between the threaded rod 8 and the screw sleeve 7, the threaded rod 8 can be driven to move relative to the screw sleeve 7, thereby driving the collar 9 to move. Under the action of the push arm 10, the adjustment sleeve 3 can be driven to move away from each other. Under the action of the friction between the roller 16 and the conical ramp 13, the first piston rod 15, the slide pipe 11 and the clamping plate 18 can be driven toward the air supply pipe. The air supply pipe moves in the direction of the air pipe until the clamp 18 fits tightly against the outer wall of the air supply pipe to achieve the clamping work of the air supply pipe. When the adjusting sleeve 3 continues to move, the first piston rod 15 can move relative to the sliding tube 11, so that the air in the sliding tube 11 is discharged into the sealing airbag 12 along the exhaust hole 19 and the connecting pipe 17, thereby controlling the expansion of the sealing airbag 12, achieving the sealing processing work between the air supply pipe and the air supply pipe installation sleeve 4, improving the monitoring accuracy of the whole device, achieving pipes of different diameters and improving the sealing of the whole device.

[0033] See also Figure 1-Figure 8 In one embodiment of the present application, a method for monitoring the position of a gas supply pipeline is applied to the monitoring device described in the above embodiment. The specific steps of the detection method are as follows: S100: insert two gas supply pipes into the gas supply pipe installation sleeve 4, open the bottom cover plate 21, connect the two gas supply pipes in the monitoring box 1, and control the locking installation assembly to clamp and fix the gas supply pipes in the gas supply pipe installation sleeve 4 and seal the gas supply pipes and the inner wall of the gas supply pipe installation sleeve 4; S200: Using the monitoring system to monitor the leakage state of the gas supply pipe connection in real time, when the gas supply pipe connection has leakage, it can drive the abutment slide plate 31 to move along the monitoring box 1, thereby controlling the transmission structure to work, and the transmission structure can drive the pointer 33 to rotate in the instrument panel 34 to monitor the leakage amount; S300: When the transmission structure is working, the monitoring module can be controlled to work, so as to monitor the air leakage speed. At the same time, the alarm light 20 can be controlled to be powered on and illuminated, and the monitoring data can be fed back to the remote terminal of the monitoring personnel through the signal output device 29.

[0034] The present invention and its embodiments are described schematically above, and the description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. Therefore, if a person skilled in the art is inspired by it and designs a structural method and an embodiment similar to the technical solution without creativity without departing from the purpose of the invention, they shall all fall within the protection scope of the present invention. In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A gas supply pipeline point monitoring device, comprising a monitoring box, a feedback instrument box and a group of gas supply pipe installation sleeves, wherein the group of gas supply pipe installation sleeves are symmetrically arranged on both sides of the monitoring box, the monitoring box is symmetrically provided with two through windows, the two through windows are respectively provided with a top cover plate and a bottom cover plate, the feedback instrument box is arranged on the top cover plate, the feedback instrument box is provided with an instrument panel, the instrument panel is movably provided with a pointer, and the monitoring box is provided with a plurality of alarm lights, characterized in that: The monitoring device also includes a locking installation component and a monitoring system. Each of the air supply pipe installation sleeves is provided with a locking installation component, and the locking installation component is used to clamp and fix the air supply pipe and perform sealing treatment between the air supply pipe and the air supply pipe installation sleeve. The monitoring system is arranged on the monitoring box and is used to monitor the leakage status of the air supply pipe connection and perform feedback processing; The monitoring system includes a resistance slide, a back box, a signal output device, a transmission structure and a monitoring module. The resistance slide is movably arranged in the monitoring box and the two are elastically connected. The back box is arranged on the feedback instrument box. The signal output device is arranged on the back box. The transmission structure is arranged in the feedback instrument box and connects the resistance slide and the pointer. When the resistance slide moves along the monitoring box, the transmission structure is controlled to work to drive the pointer to rotate. The monitoring module is arranged in the back box and connected to the transmission structure. When the transmission structure works, the monitoring module is controlled to work and measure the leakage data at the connection of the air supply pipe and feedback. The signal output device and the monitoring module are electrically connected.

2. The gas supply pipeline point monitoring device according to claim 1 is characterized in that: The transmission structure includes a gear, a rack and a rotating shaft. The gear is movably arranged in the feedback instrument box through the rotating shaft. The rack is movably arranged in the monitoring box. The rack slides through the feedback instrument box with a margin. The rack and the gear are meshed. The pointer is coaxially connected to one end of the rotating shaft, and the other end of the rotating shaft is connected to the monitoring module.

3. The gas supply pipeline point monitoring device according to claim 2 is characterized in that: The monitoring module includes a monitoring disk, a plurality of conductive blocks, a rotating handle and a distribution block. The monitoring disk is arranged in a back box. A guide rail is formed on the monitoring disk. A plurality of conductive blocks are arranged on the inner wall of the guide rail. The rotating handle is movably arranged on the monitoring disk and is connected to a rotating shaft through a transmission. A distribution block is movably arranged in the guide rail. The distribution block is arranged at one end of the rotating handle. The conductive block is located on the moving path of the rotating handle.

4. The gas supply pipeline point monitoring device according to claim 3 is characterized in that: The monitoring system also includes an emergency barrier component, which is arranged on the bottom cover and located on the inner side of the monitoring box, and is used to perform emergency repair treatment on the connection of the air supply pipe. The monitoring module also includes a trigger unit, which is arranged on the turning handle. When the rotation speed of the turning handle reaches an expected value, the trigger unit is controlled to work, and the trigger unit triggers the emergency barrier component to work.

5. The gas supply pipeline point monitoring device according to claim 4 is characterized in that: The trigger unit includes a distribution sleeve, a resistance rod and a slide groove, the slide groove is formed on the rotating handle, the distribution sleeve is movably arranged in the slide groove and elastically connected to the rotating handle, the resistance rod is arranged on the rotating handle, the distribution sleeve is movably sleeved on the outer wall of the resistance rod, and the distribution sleeve, the resistance rod and the emergency blocking assembly are electrically connected.

6. The gas supply pipeline point monitoring device according to claim 4 is characterized in that: The emergency blocking assembly includes a protective seat, a blocking airbag, a linear motor and an inflatable structure. The protective seats are in a group and are symmetrically and movably arranged on the bottom cover. The blocking airbags are arranged on opposite surfaces of the protective seats. The number of linear motors is the same as the number of protective seats and they are symmetrically arranged on the bottom cover. The movable end of the linear motor is connected to the protective seat. The inflatable structure is arranged on a side of the bottom cover away from the protective seat. The inflatable structure is connected to the blocking airbag and is electrically connected to the trigger unit.

7. The gas supply pipeline point monitoring device according to claim 6 is characterized in that: The inflation structure includes an inflation tube, a second piston rod and an electromagnetic block. The inflation tube is arranged on the bottom cover plate, and the inflation tube is connected to the barrier airbag. The second piston rods are in a group and are symmetrically and movably arranged in the inflation tube. The second piston rods in a group are electrically connected, and the second piston rods and the opposite surfaces of the bottom cover plate are provided with electromagnetic blocks that repel each other when energized.

8. The gas supply pipeline point monitoring device according to claim 1 is characterized in that: The locking installation assembly includes an operating disk, a threaded rod, a screw sleeve, a ring, a positioning sleeve, a sealing airbag and a clamping structure. The screw sleeve is arranged on the monitoring box, the threaded rod is movably arranged in the screw sleeve and the two are threadedly matched, the operating disk is movably arranged on the monitoring box and is coaxially connected with the threaded rod, the ring is sleeved on the threaded rod, a positioning sleeve is slidably sleeved on the outer wall of each air supply pipe mounting sleeve and the two are elastically connected, the positioning sleeve is movably connected by a push arm and a ring, a sealing airbag is arranged on the inner wall of each air supply pipe mounting sleeve, the clamping structure is arranged on the air supply pipe mounting sleeve and is located on the inner side of the positioning sleeve, the clamping structure is used to clamp and fix the air supply pipe and inflate the sealing airbag when the clamping structure is working, and the clamping structure is controlled to work when the positioning sleeve moves.

9. The gas supply pipeline point monitoring device according to claim 8, characterized in that: The clamping structure includes a splint, a sliding tube, a first piston rod and a roller. The number of the splints is several and they are arranged on the inner side of the air supply pipe mounting sleeve. The number of the sliding tubes is the same as the number of the splints and they are arranged on the inner wall of the air supply pipe mounting sleeve. The sliding tube is provided with an exhaust hole, and the exhaust hole is connected to the sealing airbag through a connecting tube. The first piston rod is movably arranged in the sliding tube and the two are elastically connected. The roller is movably arranged on one end of the first piston rod away from the sliding tube. A conical ramp is formed in the adjusting sleeve, and the conical ramp and the roller are slidably matched.

10. A method for monitoring gas supply pipeline points, applied to the monitoring device described in claim 1, characterized in that: The specific steps of the detection method are as follows: S100: Insert two air supply pipes into the air supply pipe installation sleeve, open the bottom cover plate, connect the two air supply pipes in the monitoring box, and control the locking installation assembly to clamp and fix the air supply pipes in the air supply pipe installation sleeve and seal the air supply pipes and the inner wall of the air supply pipe installation sleeve; S200: Using the monitoring system to monitor the leakage state of the gas supply pipe connection in real time, when the gas supply pipe connection has leakage, it can drive the resistance slide plate to move along the monitoring box, thereby controlling the transmission structure to work, and the transmission structure can drive the pointer to rotate in the instrument panel to monitor the leakage amount; S300: When the transmission structure is working, the monitoring module can be controlled to monitor the air leakage rate, and the alarm light can be controlled to turn on and illuminate, and the monitoring data can be fed back to the remote terminal of the monitoring personnel through the signal output device.