Power distribution terminal grid-connected automatic debugging method and device, storage medium and electronic equipment

By configuring the master site table template and acceptance scheme, the acceptance task of the power distribution terminal is completed automatically, which solves the problems of high human resource consumption and low accuracy in the existing technology, and realizes efficient and accurate power distribution terminal grid connection acceptance.

CN119291338APending Publication Date: 2025-01-10GUANGDONG POWER GRID CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411432762.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2025-01-10

AI Technical Summary

Technical Problem

In existing technologies, the commissioning process of distribution automation terminal equipment before grid connection consumes a lot of human resources, has low accuracy, and is not standardized, making it difficult to meet the needs of power grid operation and maintenance under a high degree of automation.

Method used

This paper provides a method for automatic grid connection commissioning of distribution automation terminals. By configuring the master site table template, determining the acceptance plan, creating the acceptance task, and generating the acceptance report, the automatic acceptance of distribution terminals is achieved.

Benefits of technology

It reduced the workload of the main station personnel, improved the efficiency and accuracy of grid connection acceptance of automated power distribution terminals, and met the requirements of safe and efficient operation and maintenance of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119291338A_ABST
    Figure CN119291338A_ABST
Patent Text Reader

Abstract

The invention provides a power distribution terminal grid-connected automatic debugging method and device, a storage medium and electronic equipment, and the method comprises the steps: configuring a point table template in a master station according to the operation information of a power distribution terminal, and determining an acceptance scheme of the power distribution terminal according to the point table template, the point table template being a virtual template capable of reflecting the real operation state of the power distribution terminal; importing an acceptance scheme of the power distribution terminal, and confirming and configuring the acceptance scheme; creating an acceptance task according to the acceptance scheme, wherein the acceptance task is a task for acceptance of power distribution data collected by the power distribution terminal; and performing acceptance on the power distribution terminal based on the acceptance task to obtain an acceptance result, and generating an acceptance report according to the acceptance result. According to the method, the workload of master station personnel can be reduced, and the automatic power distribution terminal grid-connected acceptance efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power system distribution network system, and specifically, to a distribution automation terminal grid-connected automatic debugging method, a distribution automation terminal grid-connected automatic debugging device, a computer-readable storage medium and an electronic device. Background Art

[0002] At present, distribution automation terminal equipment needs to be debugged by the master station and on-site personnel before it can be connected to the master station automation system. Joint debugging with the master station is based on manual operation, telephone communication, and bookkeeping to record the debugging results. On the one hand, the existing operation method based on telephone communication between the two parties has difficulties in coordinating the master station time, and the debugging process requires the other party to wait for a long time. On the other hand, the testing and recording are not rigorous, the debugging process is not standardized, and the addition records cannot be accurately and automatically recorded, which is prone to omissions and cannot be traced later. In addition, with the high-level development of distribution network automation, the debugging work is increasing, the burden on the master station personnel is heavy, and the centralized debugging acceptance is very likely to conflict with daily work. At the same time, the debugging manpower for multiple sites is also stretched. Therefore, in order to improve the quality, increase efficiency, and reduce the burden of distribution terminal grid connection acceptance work, it is urgent to develop a distribution automation terminal grid connection automatic debugging method and system. Summary of the invention

[0003] The main purpose of the present application is to provide a distribution automation terminal grid-connected automatic debugging method, a distribution automation terminal grid-connected automatic debugging device, a computer-readable storage medium and an electronic device, so as to at least solve the problem of large human resource consumption and low accuracy in the debugging process of distribution automation terminal equipment before grid-connected operation in the prior art.

[0004] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for automatic grid-connected debugging of a distribution automation terminal is provided, comprising: configuring a point table template in a master station according to the operating information of the distribution terminal, and determining an acceptance plan for the distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the actual operating status of the distribution terminal; importing the acceptance plan of the distribution terminal, and confirming the configuration of the acceptance plan; creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the distribution data collected by the distribution terminal; accepting the distribution terminal based on the acceptance task, obtaining an acceptance result, and generating an acceptance report according to the acceptance result.

[0005] Optionally, according to the operating information of the distribution terminal, the point table template in the master station is configured, including: obtaining the manufacturer information and model information of the distribution terminal; determining the terminal type and signal type of the distribution terminal according to the manufacturer information and model information of the distribution terminal, the terminal type being one of the following: DTU, FTU, TTU; determining the signal acceptance strategy according to the signal type of the distribution terminal; configuring the point table template in the master station according to the manufacturer information, model information, terminal type, signal type and signal acceptance strategy of the distribution terminal, and updating the historical template in the master station to the point table template.

[0006] Optionally, there are multiple distribution terminals, and the acceptance plan for the distribution terminal is determined according to the point table template, including: obtaining the IP information of the acceptance terminal, the acceptance terminal being one of the multiple distribution terminals; determining the acceptance point table template corresponding to the acceptance terminal in the master station according to the IP information of the acceptance terminal; importing the acceptance point table template, and determining the acceptance plan for the distribution terminal according to the terminal type, manufacturer information and model information of the acceptance terminal.

[0007] Optionally, importing the acceptance plan of the distribution terminal and confirming the configuration of the acceptance plan includes: obtaining a target file including the acceptance plan of the distribution terminal; importing the target file to automatically display the terminal name, IP address and acceptance signal of the distribution terminal; and determining the terminal name, IP address and acceptance signal of the distribution terminal to configure the acceptance plan.

[0008] Optionally, creating an acceptance task according to the acceptance plan includes: creating at least one of the acceptance tasks according to the acceptance plan, and when there are multiple acceptance tasks, each of the acceptance tasks is displayed in list order, and the acceptance task includes at least one of the following: point number, name of the acceptance project, type of acceptance project, acceptance result, real-time value of the master station, and acceptance information, wherein the point number is the mapping point of the telesignaling signal, telemetering signal, remote control signal and remote adjustment signal corresponding to the distribution terminal in the master station, the name of the acceptance project is the terminal telesignaling name, the type of the acceptance project is one of telesignaling, telemetering, remote control and remote adjustment of the automation terminal, the acceptance result includes the point number acceptance status of the distribution terminal, the point number acceptance status includes one of failure, success and no acceptance, the real-time value of the master station includes real-time data of telesignaling, telemetering, remote control and remote adjustment, and the acceptance information includes theoretical value and real-time value of the corresponding point of the distribution terminal.

[0009] Optionally, an acceptance report is generated based on the acceptance results, including: determining that the acceptance is completed when all acceptance items are accepted and the corresponding acceptance results are generated, and the acceptance items correspond one-to-one with the distribution terminals; generating the acceptance report based on the acceptance results of all the acceptance items, and displaying the generation progress of the acceptance report on the display device.

[0010] According to another aspect of the present application, there is provided a distribution automation terminal grid-connected automatic debugging device, comprising: a first determination unit, configured according to the operation information of the distribution terminal, a point table template in the master station, and determined the acceptance scheme of the distribution terminal according to the point table template, the point table template being a virtual template that can reflect the actual operation status of the distribution terminal; a second determination unit, imported the acceptance scheme of the distribution terminal, and confirmed the configuration of the acceptance scheme; a creation unit, created according to the acceptance scheme The acceptance task is a task for accepting the distribution data collected by the distribution terminal; a generation unit, accepted the distribution terminal based on the acceptance task, obtained an acceptance result, and generated an acceptance report according to the acceptance result.

[0011] According to another aspect of the present application, a computer-readable storage medium is provided, the computer-readable storage medium including a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the distribution automation terminal grid-connected automatic debugging methods.

[0012] According to another aspect of the present application, an electronic device is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing any one of the distribution automation terminal grid-connected automatic debugging methods.

[0013] Applying the technical solution of the present application, the above-mentioned distribution automation terminal grid-connected automatic debugging method first configures the point table template in the master station according to the operation information of the distribution terminal, and determines the acceptance plan of the distribution terminal according to the point table template. The point table template is a virtual template that can reflect the actual operation status of the distribution terminal; then imports the acceptance plan of the distribution terminal, and confirms the configuration acceptance plan; then creates an acceptance task according to the acceptance plan, and the acceptance task is a task for accepting the distribution data collected by the distribution terminal; finally, the distribution terminal is accepted based on the acceptance task, and the acceptance result is obtained, and an acceptance report is generated according to the acceptance result. This method can reduce the workload of the master station personnel and improve the efficiency of grid-connected acceptance of automated distribution terminals. This method provides a specific implementation process for grid-connected automatic debugging of distribution automation terminals, solves the problem of large human resource consumption and low accuracy in the debugging process before grid-connected operation of distribution automation terminal equipment in the prior art, realizes the remote automatic debugging of remote signaling, remote measurement, remote control and remote adjustment of distribution automation terminals, and improves the efficiency of grid-connected acceptance of automated distribution terminals, thereby meeting the requirements for the construction of a safe and efficient automated master station system operation and maintenance guarantee system under the spot environment promoted by the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0015] Figure 1 A hardware structure block diagram of a mobile terminal for executing a distribution automation terminal grid-connected automatic debugging method provided in an embodiment of the present application is shown;

[0016] Figure 2 A schematic diagram of a flow chart of a method for automatic grid-connected debugging of a distribution automation terminal provided according to an embodiment of the present application is shown;

[0017] Figure 3 A schematic diagram of a flow chart of a method and system for automatic debugging of a distribution automation terminal grid connection provided according to an embodiment of the present application is shown;

[0018] Figure 4 A structural block diagram of a distribution automation terminal grid-connected automatic debugging device provided according to an embodiment of the present application is shown;

[0019] The above drawings include the following reference numerals:

[0020] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION

[0021] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0024] As introduced in the background technology, in the prior art, on the one hand, the existing operation mode based on telephone communication between the two parties has the problem of difficulty in coordinating the time of the master station and the problem of long-term waiting of the other party when encountering problems in the debugging process; on the other hand, the testing and recording are not rigorous, the debugging process is not standardized, and the added records cannot be accurately and automatically recorded, which is prone to omissions and cannot be traced later. In addition, the debugging work is increasing, resulting in a heavy burden on the master station personnel, and centralized debugging and acceptance are very likely to conflict with daily work. In order to solve the problem of large human resource consumption and low accuracy in the debugging process before the distribution automation terminal equipment is connected to the grid in the prior art, the embodiments of the present application provide a distribution automation terminal grid-connected automatic debugging method, a distribution automation terminal grid-connected automatic debugging device, a computer-readable storage medium and an electronic device.

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0026] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal for a method for automatic debugging of a distribution automation terminal connected to the grid according to an embodiment of the present invention. Figure 1As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0027] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the Z method in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0028] In this embodiment, a distribution automation terminal grid-connected automatic debugging method running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although the logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that here.

[0029] Figure 2 1 is a flow chart of a method for automatic debugging of a distribution automation terminal connected to the grid according to an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:

[0030] Step S201, configuring a point table template in the master station according to the operation information of the distribution terminal, and determining the acceptance plan of the distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the distribution terminal;

[0031] Specifically, by obtaining the operating information of the distribution terminal, reflecting the actual operating status of the terminal in the point table template, and formulating an acceptance plan, a comprehensive and accurate acceptance of the distribution terminal can be achieved, and a detailed acceptance report can be generated, which can clearly reflect whether the distribution terminal is qualified or whether there are any problems.

[0032] Among them, by importing the distribution terminal point table template in Excel format file, template configuration is realized, the template point table is imported or a new signal is added, the manufacturer and model are input, the terminal type is selected, the strategy configuration is realized for the accepted signal, and the acceptance plan is generated. That is, the acceptance plan generation model is adopted, the distribution terminal point table template in Excel format file, the new signal, manufacturer, model, and terminal type are input into the acceptance plan generation model, and the model outputs the acceptance plan for the signal.

[0033] Among them, the point table template can reflect the actual operating status of the distribution terminal, and determining the acceptance plan based on the above point table template can improve the accuracy and reliability of the acceptance.

[0034] According to the operation information of the above-mentioned power distribution terminal, the point table template in the master station is configured, including the following steps:

[0035] Step S301, obtaining the manufacturer information and model information of the above-mentioned power distribution terminal;

[0036] Step S302, determining the terminal type and signal type of the power distribution terminal according to the manufacturer information and model information of the power distribution terminal, the terminal type being one of the following: DTU, FTU, TTU;

[0037] Step S303, determining a signal acceptance strategy according to the signal type of the power distribution terminal;

[0038] Step S304, configuring the point table template in the master station according to the manufacturer information, model information, terminal type, signal type and signal acceptance strategy of the power distribution terminal, and updating the historical template in the master station to the point table template.

[0039] Specifically, comprehensive information about the distribution terminal is obtained, and its type, signal type and acceptance strategy are accurately determined, so as to configure the appropriate point table template and update the historical template in the master station, so as to achieve effective management and accurate acceptance of the distribution terminal.

[0040] Wherein, there are multiple distribution terminals, and the acceptance scheme of the distribution terminals is determined according to the point table template, including the following steps:

[0041] Step S401, obtaining IP information of an acceptance terminal, where the acceptance terminal is one of the plurality of power distribution terminals;

[0042] Step S402, determining the acceptance point table template corresponding to the acceptance terminal in the master station according to the IP information of the acceptance terminal;

[0043] Step S403, importing the above acceptance point table template, and determining the acceptance plan of the above distribution terminal according to the terminal type, manufacturer information and model information of the above acceptance terminal.

[0044] Specifically, obtaining the IP information and model information of the distribution terminal provides basic data for subsequent judgment and processing. Determining the terminal type and signal type based on the above information can more accurately determine the specific characteristics and functions of the distribution terminal. Determining the acceptance plan for the distribution terminal is an important part of ensuring the correct operation of the system.

[0045] Step S202, importing the above acceptance plan of the above power distribution terminal, and confirming the configuration of the above acceptance plan;

[0046] Among them, importing the above acceptance plan of the above distribution terminal and confirming the configuration of the above acceptance plan includes the following steps:

[0047] Step S501, obtaining a target file including the acceptance plan of the above-mentioned power distribution terminal;

[0048] Step S502, importing the target file, and automatically displaying the terminal name, IP address and acceptance signal of the power distribution terminal;

[0049] Step S503, determining the terminal name, IP address and acceptance signal of the power distribution terminal to determine the acceptance scheme.

[0050] Specifically, obtaining the target file of the acceptance plan including the above-mentioned distribution terminal provides an accurate information source for subsequent processes, automatically displays the terminal name, IP address and acceptance signal of the above-mentioned distribution terminal so that important data can be presented intuitively, provides convenience for subsequent processing, and finally determines the above-mentioned important information to ensure the accuracy and completeness of the acceptance plan configuration and achieve effective acceptance.

[0051] Step S203, creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal;

[0052] Specifically, corresponding acceptance tasks are created for the power distribution data collected by the power distribution terminal to provide clear task guidance and operation plans for subsequent actual acceptance work.

[0053] Among them, by selecting the corresponding distribution terminal collection point in the acceptance plan, it supports selecting multiple point numbers and creating an acceptance task with one click. Specifically, the acceptance task creation model is adopted, and multiple point numbers are input into the acceptance task creation model, and the output is the acceptance task corresponding to each distribution terminal collection point.

[0054] Among them, creating an acceptance task according to the above acceptance plan includes: creating at least one of the above acceptance tasks according to the above acceptance plan, and in the case that there are multiple acceptance tasks, each of the above acceptance tasks is displayed in the order of the list, and the above acceptance task includes at least one of the following: point number, name of acceptance project, type of acceptance project, acceptance result, real-time value of the master station, and acceptance information, wherein the above point number is the mapping point of the telesignaling signal, telemetering signal, remote control signal and remote adjustment signal corresponding to the above distribution terminal in the above master station, the name of the above acceptance project is the terminal telesignaling name, the type of the above acceptance project is one of the telesignaling, telemetering, remote control and remote adjustment of the automation terminal, the above acceptance result includes the point number acceptance status of the above distribution terminal, the above point number acceptance status includes one of failure, success and no acceptance, the real-time value of the above master station includes real-time data of telesignaling, telemetering, remote control and remote adjustment, and the above acceptance information includes theoretical value and real-time value of the corresponding point of the above distribution terminal.

[0055] Specifically, create at least one specific acceptance task, which may include point number, acceptance item name, type, acceptance result, master station real-time value, acceptance information, etc. A clear task direction can ensure data quality, standardize the acceptance process, thereby improving work efficiency and reducing the workload of master station personnel.

[0056] Step S204: Accept the power distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report based on the acceptance result.

[0057] Specifically, the joint commissioning acceptance provides single-point and automatic acceptance functions. For single-point acceptance, after selecting a single acceptance item to be accepted, click single-point acceptance to accept the selected signal; for automatic acceptance, select multiple or all signals to be accepted, click automatic acceptance, and accept multiple acceptance signals with one click. After accepting all acceptance items, the on-site commissioning personnel click the acceptance end button to display the progress of generating the acceptance report and generate the acceptance report, providing a basis for the master station side and realizing the automatic commissioning of the distribution automation terminal connected to the grid.

[0058] Among them, the above-mentioned distribution terminal is accepted based on the above-mentioned acceptance task to obtain the acceptance result, including: based on the above-mentioned acceptance task, the above-mentioned distribution terminal is jointly debugged and accepted to obtain the above-mentioned acceptance result, the above-mentioned joint debugging and acceptance includes single-point acceptance and automatic acceptance, the above-mentioned single-point acceptance is to accept a single acceptance item that needs to be accepted, and the above-mentioned automatic acceptance is to accept multiple or all of the above-mentioned acceptance items at the same time.

[0059] Specifically, two acceptance methods, single-point acceptance and automatic acceptance, are provided to meet the needs of different scenarios. For individual acceptance items that require special attention, single-point acceptance can accurately locate the problem, and automatic acceptance can quickly process multiple acceptance items in batches to improve acceptance efficiency.

[0060] Among them, generating an acceptance report according to the above acceptance results includes the following steps:

[0061] Step S601, after all acceptance items have been accepted and the corresponding acceptance results have been generated, it is determined that the acceptance is completed, and the acceptance items correspond to the distribution terminals one by one;

[0062] Step S602: Generate the acceptance report according to the acceptance results of all the acceptance items, and display the generation progress of the acceptance report on a display device.

[0063] Specifically, after the joint commissioning and acceptance is completed, an acceptance report is generated with one click and the electronic version of the acceptance report is pushed to the main station for inspection by the main station personnel. This ensures the comprehensiveness and completeness of the acceptance, while ensuring that the staff can keep abreast of the progress of the work content.

[0064] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the distribution automation terminal grid-connected automatic debugging method of the present application will be described in detail below in combination with specific embodiments.

[0065] This embodiment relates to a specific distribution automation terminal grid-connected automatic debugging method, such as Figure 3 As shown, the following steps are included:

[0066] Step S1: terminal point table policy template configuration, generating acceptance plan;

[0067] Step S2: Import the solution and confirm the configuration;

[0068] Step S3: task creation;

[0069] Step S4: Joint commissioning and acceptance;

[0070] Step S5: Generate an acceptance report.

[0071] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0072] The embodiment of the present application also provides a distribution automation terminal grid-connected automatic debugging device. It should be noted that the distribution automation terminal grid-connected automatic debugging device of the embodiment of the present application can be used to execute the distribution automation terminal grid-connected automatic debugging method provided by the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been described will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0073] The following is an introduction to the distribution automation terminal grid-connected automatic debugging device provided in the embodiment of the present application.

[0074] Figure 4 Schematic diagram of a distribution automation terminal grid-connected automatic debugging device according to an embodiment of the present application. Figure 4 As shown, the device includes: a first determining unit 10, a second determining unit 20, a creating unit 30 and a generating unit 40, the first determining unit 10 is used to configure the point table template in the master station according to the operation information of the above-mentioned distribution terminal, and determine the acceptance plan of the above-mentioned distribution terminal according to the above-mentioned point table template, and the above-mentioned point table template is a virtual template that can reflect the actual operation status of the above-mentioned distribution terminal; the second determining unit 20 is used to import the above-mentioned acceptance plan of the above-mentioned distribution terminal, and confirm the configuration of the above-mentioned acceptance plan; the creating unit 30 is used to create an acceptance task according to the above-mentioned acceptance plan, and the above-mentioned acceptance task is a task for accepting the distribution data collected by the above-mentioned distribution terminal; the generating unit 40 is used to accept the above-mentioned distribution terminal based on the above-mentioned acceptance task, obtain the acceptance result, and generate an acceptance report according to the above-mentioned acceptance result.

[0075] The above-mentioned distribution automation terminal grid-connected automatic debugging device of the present application includes: a first determination unit, a second determination unit, a creation unit and a generation unit. The first determination unit is used to configure the point table template in the master station according to the operation information of the distribution terminal, and determine the acceptance plan of the distribution terminal according to the point table template. The point table template is a virtual template that can reflect the real operation status of the distribution terminal; the second determination unit is used to import the acceptance plan of the distribution terminal and confirm the configuration acceptance plan; the creation unit is used to create an acceptance task according to the acceptance plan. The acceptance task is a task for accepting the distribution data collected by the distribution terminal; the generation unit is used to accept the distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report according to the acceptance result. The device configures the point table template and determines the acceptance plan according to the operation information of the distribution terminal and imports it, and then creates the acceptance task according to the above plan and generates the acceptance report. Through the above process, the acceptance quality and efficiency of the grid-connected automated distribution terminal are improved, the workload of the master station personnel is reduced, and the requirements for the construction of a safe and efficient automated master station system operation and maintenance guarantee system under the spot environment promoted by the power grid are met.

[0076] In some instances, the first determination unit includes a first acquisition module, a first determination module, a second determination module and a first processing module, wherein the first acquisition module is used to acquire the manufacturer information and model information of the above-mentioned distribution terminal; the first determination module is used to determine the terminal type and signal type of the above-mentioned distribution terminal according to the manufacturer information and model information of the above-mentioned distribution terminal, and the above-mentioned terminal type is one of the following: DTU, FTU, TTU; the second determination module is used to determine the signal acceptance strategy according to the signal type of the above-mentioned distribution terminal; the first processing module is used to configure the above-mentioned point table template in the above-mentioned master station according to the manufacturer information, model information, terminal type, signal type and signal acceptance strategy of the above-mentioned distribution terminal, and update the historical template in the above-mentioned master station to the above-mentioned point table template. In this way, the manufacturer information, model information, terminal type, signal type and signal acceptance strategy can be efficiently acquired, and effective management and accurate acceptance of the distribution terminal can be achieved.

[0077] In some examples, the first determination unit further includes a second acquisition module, a third determination module and a fourth determination module, wherein the second acquisition module is used to acquire the IP information of the acceptance terminal, and the acceptance terminal is one of the plurality of distribution terminals; the third determination module is used to determine the acceptance point table template corresponding to the acceptance terminal in the master station according to the IP information of the acceptance terminal; the fourth determination module is used to import the acceptance point table template and determine the acceptance scheme of the distribution terminal according to the terminal type, manufacturer information and model information of the acceptance terminal. In this way, the specific features and functions of the distribution terminal can be determined more accurately, which is an important link to ensure the correct operation of the system.

[0078] In some examples, the second determination unit includes a third acquisition module, a fourth acquisition module and a fifth determination module. The third acquisition module is used to acquire a target file including the acceptance scheme of the above-mentioned power distribution terminal; the fourth acquisition module is used to import the above-mentioned target file and automatically display the terminal name, IP address and acceptance signal of the above-mentioned power distribution terminal; the fifth determination module is used to determine the terminal name, IP address and acceptance signal of the above-mentioned power distribution terminal to determine the configuration of the above-mentioned acceptance scheme. In this way, important data can be presented intuitively, which facilitates subsequent processing, while ensuring the accuracy and completeness of the acceptance scheme configuration and achieving effective acceptance.

[0079] In some examples, the creation unit is used to create at least one of the above-mentioned acceptance tasks according to the above-mentioned acceptance scheme. In the case that there are multiple acceptance tasks, each of the above-mentioned acceptance tasks is displayed in the order of the list. The above-mentioned acceptance tasks include at least one of the following: point number, name of the acceptance project, type of the acceptance project, acceptance result, real-time value of the master station, and acceptance information. The above-mentioned point number is the mapping point of the telesignaling signal, telemetering signal, remote control signal, and remote adjustment signal corresponding to the above-mentioned distribution terminal in the above-mentioned master station. The name of the above-mentioned acceptance project is the terminal telesignaling name. The type of the above-mentioned acceptance project is one of the telesignaling, telemetering, remote control, and remote adjustment of the automation terminal. The above-mentioned acceptance result includes the acceptance of the point number of the above-mentioned distribution terminal. The acceptance of the point number includes one of failure, success, and non-acceptance. The real-time value of the above-mentioned master station includes the real-time data of telesignaling, telemetering, remote control, and remote adjustment. The above-mentioned acceptance information includes the theoretical value and real-time value of the corresponding point of the above-mentioned distribution terminal. In this way, the clear task direction can ensure data quality, standardize the acceptance process, thereby improving work efficiency and reducing the workload of the master station personnel.

[0080] In some examples, the generation unit includes a first generation module, which performs joint commissioning and acceptance on the above-mentioned distribution terminal based on the above-mentioned acceptance task to obtain the above-mentioned acceptance result, and the above-mentioned joint commissioning and acceptance includes single-point acceptance and automatic acceptance. The above-mentioned single-point acceptance is to accept a single acceptance item that needs to be accepted, and the above-mentioned automatic acceptance is to accept multiple or all of the above-mentioned acceptance items at the same time. Single-point acceptance can accurately locate problems, while automatic acceptance can quickly process multiple acceptance items in batches, improve acceptance efficiency, and meet the needs of different scenarios.

[0081] In some examples, the generation unit further includes a second generation module and a third generation module. The second generation module is used to determine the end of the acceptance after all the acceptance items are accepted and the corresponding acceptance results are generated. The acceptance items correspond to the distribution terminals one by one. The third generation module generates the acceptance report according to the acceptance results of all the acceptance items and displays the generation progress of the acceptance report on the display device. In this way, the automatic grid-connected debugging of the distribution automation terminal can be effectively realized, while ensuring that the staff can grasp the progress of the work content in a timely manner and reduce the workload.

[0082] The above-mentioned distribution automation terminal grid-connected automatic debugging device includes a processor and a memory, and the above-mentioned first determination unit and the like are stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions. The above-mentioned modules are all located in the same processor; or, the above-mentioned modules are located in different processors in any combination.

[0083] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the kernel parameters can be adjusted to solve the problem that the debugging process of distribution automation terminal equipment before grid connection operation in the prior art consumes a lot of human resources and has low accuracy.

[0084] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0085] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the distribution automation terminal grid-connected automatic debugging method.

[0086] Specifically, the distribution automation terminal grid-connected automatic debugging method includes:

[0087] Step S201, configuring a point table template in the master station according to the operation information of the power distribution terminal, and determining the acceptance plan of the power distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the power distribution terminal;

[0088] Step S202, importing the above acceptance plan of the above power distribution terminal, and confirming the configuration of the above acceptance plan;

[0089] Step S203, creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal;

[0090] Step S204: Accept the power distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report based on the acceptance result.

[0091] Optionally, according to the operation information of the above-mentioned distribution terminal, the point table template in the master station is configured, including: obtaining the manufacturer information and model information of the above-mentioned distribution terminal; determining the terminal type and signal type of the above-mentioned distribution terminal according to the manufacturer information and model information of the above-mentioned distribution terminal, the above-mentioned terminal type is one of the following: DTU, FTU, TTU; determining the signal acceptance strategy according to the signal type of the above-mentioned distribution terminal; configuring the above-mentioned point table template in the above-mentioned master station according to the manufacturer information, model information, terminal type, signal type and signal acceptance strategy of the above-mentioned distribution terminal, and updating the historical template in the above-mentioned master station to the above-mentioned point table template.

[0092] Optionally, there are multiple distribution terminals, and the acceptance plan for the distribution terminals is determined according to the point table template, including: obtaining the IP information of the acceptance terminal, the acceptance terminal being one of the multiple distribution terminals; determining the acceptance point table template corresponding to the acceptance terminal in the master station according to the IP information of the acceptance terminal; importing the acceptance point table template, and determining the acceptance plan for the distribution terminal according to the terminal type, manufacturer information and model information of the acceptance terminal.

[0093] Optionally, the above-mentioned acceptance plan of the above-mentioned distribution terminal is imported, and the configuration of the above-mentioned acceptance plan is confirmed, including: obtaining a target file including the acceptance plan of the above-mentioned distribution terminal; importing the above-mentioned target file, automatically displaying the terminal name, IP address and acceptance signal of the above-mentioned distribution terminal; determining the terminal name, IP address and acceptance signal of the above-mentioned distribution terminal to configure the above-mentioned acceptance plan.

[0094] Optionally, creating an acceptance task according to the above-mentioned acceptance plan includes: creating at least one of the above-mentioned acceptance tasks according to the above-mentioned acceptance plan, and in the case that there are multiple acceptance tasks, each of the above-mentioned acceptance tasks is displayed in the order of the list, and the above-mentioned acceptance task includes at least one of the following: point number, name of the acceptance project, type of acceptance project, acceptance result, real-time value of the master station, and acceptance information, wherein the above-mentioned point number is the mapping point of the telesignaling signal, telemetering signal, remote control signal and remote adjustment signal corresponding to the above-mentioned distribution terminal in the above-mentioned master station, the name of the above-mentioned acceptance project is the terminal telesignaling name, and the type of the above-mentioned acceptance project is one of the telesignaling, telemetering, remote control and remote adjustment of the automation terminal, the above-mentioned acceptance result includes the point number acceptance status of the above-mentioned distribution terminal, and the above-mentioned point number acceptance status includes one of failure, success and no acceptance, the above-mentioned master station real-time value includes real-time data of telesignaling, telemetering, remote control and remote adjustment, and the above-mentioned acceptance information includes theoretical value and real-time value of the corresponding point of the above-mentioned distribution terminal.

[0095] Optionally, an acceptance report is generated based on the above acceptance results, including: after all acceptance items are accepted and the corresponding acceptance results are generated, determining that the acceptance is completed, the above acceptance items correspond one-to-one with the above distribution terminals; based on the above acceptance results of all the above acceptance items, generating the above acceptance report, and displaying the generation progress of the above acceptance report on the display device.

[0096] An embodiment of the present invention provides a processor, which is used to run a program, wherein the program executes a distribution automation terminal grid-connected automatic debugging method when running.

[0097] Step S201, configuring a point table template in the master station according to the operation information of the power distribution terminal, and determining the acceptance plan of the power distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the power distribution terminal;

[0098] Step S202, importing the above acceptance plan of the above power distribution terminal, and confirming the configuration of the above acceptance plan;

[0099] Step S203, creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal;

[0100] Step S204: Accept the power distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report based on the acceptance result.

[0101] An embodiment of the present invention provides a device, the device including a processor, a memory, and a program stored in the memory and executable on the processor, and when the processor executes the program, at least the following steps are implemented:

[0102] Step S201, configuring a point table template in the master station according to the operation information of the power distribution terminal, and determining the acceptance plan of the power distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the power distribution terminal;

[0103] Step S202, importing the above acceptance plan of the above power distribution terminal, and confirming the configuration of the above acceptance plan;

[0104] Step S203, creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal;

[0105] Step S204: Accept the power distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report based on the acceptance result.

[0106] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0107] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:

[0108] Step S201, configuring a point table template in the master station according to the operation information of the power distribution terminal, and determining the acceptance plan of the power distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the power distribution terminal;

[0109] Step S202, importing the above acceptance plan of the above power distribution terminal, and confirming the configuration of the above acceptance plan;

[0110] Step S203, creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal;

[0111] Step S204: Accept the power distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report based on the acceptance result.

[0112] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.

[0113] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0114] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0115] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0116] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0117] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0118] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0119] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0120] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0121] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0122] 1) The automatic debugging method for grid-connected distribution automation terminal of the present application first configures the point table template in the master station according to the operation information of the distribution terminal, and determines the acceptance plan of the distribution terminal according to the point table template. The point table template is a virtual template that can reflect the real operation status of the distribution terminal; then the acceptance plan of the distribution terminal is imported, and the configuration acceptance plan is confirmed; then the acceptance task is created according to the acceptance plan, and the acceptance task is the task of accepting the distribution data collected by the distribution terminal; finally, the distribution terminal is accepted based on the acceptance task, the acceptance result is obtained, and the acceptance report is generated according to the acceptance result. This method can reduce the workload of the master station personnel and improve the efficiency of grid-connected acceptance of automated distribution terminals. This method provides a specific implementation process for automatic grid-connected debugging of distribution automation terminals, solves the problem of large human resource consumption and low accuracy in the debugging process before grid-connected operation of distribution automation terminal equipment in the prior art, realizes the remote automatic debugging of remote signaling, remote measurement, remote control and remote adjustment of distribution automation terminals, and improves the efficiency of grid-connected acceptance of automated distribution terminals, thereby meeting the requirements for the construction of a safe and efficient automated master station system operation and maintenance guarantee system under the spot environment promoted by the power grid.

[0123] 2) The distribution automation terminal grid-connected automatic debugging device of the present application includes: a first determination unit, a second determination unit, a creation unit and a generation unit. The first determination unit is used to configure the point table template in the master station according to the operation information of the distribution terminal, and determine the acceptance plan of the distribution terminal according to the point table template. The point table template is a virtual template that can reflect the actual operation status of the distribution terminal; the second determination unit is used to import the acceptance plan of the distribution terminal and confirm the configuration acceptance plan; the creation unit is used to create an acceptance task according to the acceptance plan. The acceptance task is a task for accepting the distribution data collected by the distribution terminal; the generation unit is used to accept the distribution terminal based on the acceptance task, obtain the acceptance result, and generate an acceptance report according to the acceptance result. The device configures the point table template and determines the acceptance plan according to the operation information of the distribution terminal and imports it, and then creates the acceptance task according to the above plan and generates the acceptance report. Through the above process, the acceptance quality and efficiency of the grid-connected automated distribution terminal are improved, the workload of the master station personnel is reduced, and the requirements for the construction of a safe and efficient automated master station system operation and maintenance guarantee system under the spot environment promoted by the power grid are met.

[0124] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for automatic debugging of distribution automation terminal grid connection, characterized in that: include: According to the operation information of the power distribution terminal, a point table template in the master station is configured, and the acceptance scheme of the power distribution terminal is determined according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the power distribution terminal; Importing the acceptance plan of the power distribution terminal and confirming the configuration of the acceptance plan; Creating an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal; The power distribution terminal is accepted based on the acceptance task to obtain an acceptance result, and an acceptance report is generated according to the acceptance result.

2. The method according to claim 1, characterized in that According to the operation information of the power distribution terminal, the point table template in the master station is configured, including: Obtaining manufacturer information and model information of the power distribution terminal; Determine the terminal type and signal type of the power distribution terminal according to the manufacturer information and model information of the power distribution terminal, wherein the terminal type is one of the following: DTU, FTU, TTU; Determining a signal acceptance strategy according to the signal type of the power distribution terminal; The point table template in the master station is configured according to the manufacturer information, model information, terminal type, signal type and signal acceptance strategy of the power distribution terminal, and the historical template in the master station is updated to the point table template.

3. The method according to claim 1, characterized in that There are multiple distribution terminals, and the acceptance scheme of the distribution terminals is determined according to the point table template, including: Acquire IP information of an acceptance terminal, where the acceptance terminal is one of the plurality of power distribution terminals; Determine, according to the IP information of the acceptance terminal, the acceptance point table template corresponding to the acceptance terminal in the master station; The acceptance point table template is imported, and the acceptance plan of the power distribution terminal is determined according to the terminal type, manufacturer information and model information of the acceptance terminal.

4. The method according to claim 1, characterized in that Importing the acceptance plan of the power distribution terminal and confirming the configuration of the acceptance plan includes: Acquire a target file including an acceptance plan for the power distribution terminal; Import the target file and automatically display the terminal name, IP address and acceptance signal of the power distribution terminal; Determine the terminal name, IP address and acceptance signal of the power distribution terminal to determine the acceptance plan for configuration.

5. The method according to claim 1, characterized in that Create acceptance tasks according to the acceptance plan, including: At least one acceptance task is created according to the acceptance plan. When there are multiple acceptance tasks, each acceptance task is displayed in the order of the list. The acceptance task includes at least one of the following: point number, name of acceptance item, type of acceptance item, acceptance result, real-time value of the master station, and acceptance information. The point number is the mapping point of the telesignaling signal, telemetering signal, remote control signal and remote adjustment signal corresponding to the distribution terminal in the master station. The name of the acceptance item is the terminal telesignaling name. The type of the acceptance item is one of the telesignaling, telemetering, remote control and remote adjustment of the automation terminal. The acceptance result includes the point number acceptance status of the distribution terminal. The point number acceptance status includes one of failure, success and no acceptance. The real-time value of the master station includes real-time data of telesignaling, telemetering, remote control and remote adjustment. The acceptance information includes theoretical value and real-time value of the corresponding point of the distribution terminal.

6. The method according to claim 1, characterized in that The power distribution terminal is accepted based on the acceptance task to obtain an acceptance result, including: Based on the acceptance task, the distribution terminal is jointly debugged and accepted to obtain the acceptance result. The joint debugging and acceptance includes single-point acceptance and automatic acceptance. The single-point acceptance is to accept a single acceptance item that needs to be accepted, and the automatic acceptance is to accept multiple or all of the acceptance items at the same time.

7. The method according to claim 1, characterized in that Generate an acceptance report based on the acceptance results, including: After all the acceptance items have been accepted and the corresponding acceptance results have been generated, the acceptance is determined to be complete, and the acceptance items correspond to the power distribution terminals one by one; The acceptance report is generated according to the acceptance results of all the acceptance items, and the generation progress of the acceptance report is displayed on a display device.

8. A distribution automation terminal grid-connected automatic debugging device, characterized in that: include: A first determining unit is used to configure a point table template in the master station according to the operation information of the distribution terminal, and determine the acceptance scheme of the distribution terminal according to the point table template, wherein the point table template is a virtual template that can reflect the real operation status of the distribution terminal; A second determining unit, configured to import the acceptance plan of the power distribution terminal and confirm the configuration of the acceptance plan; A creating unit, configured to create an acceptance task according to the acceptance plan, wherein the acceptance task is a task for accepting the power distribution data collected by the power distribution terminal; A generating unit is used to accept the power distribution terminal based on the acceptance task, obtain an acceptance result, and generate an acceptance report according to the acceptance result.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the distribution automation terminal grid-connected automatic debugging method according to any one of claims 1 to 7.

10. An electronic device, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing the distribution automation terminal grid-connected automatic debugging method described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Intelligent acceptance device-based power distribution master station and automatic joint debugging acceptance method of terminal

    CN109873497A

  • Power distribution automation terminal intelligent acceptance device, method and system

    CN116886562A