Form input method for constructional engineering, electronic equipment and storage medium
By building a table engineering database and automatically loading the corresponding table specifications, the problems of convenience and efficiency of engineering data management in construction are solved, and automated data entry and verification are realized, the risk of information omissions and errors is reduced, and the risk of information omissions and errors is improved. Data management efficiency and accuracy.
Patent Information
- Application Number
- CN202411430520.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-01-10
AI Technical Summary
During the construction process, the existing spreadsheet management system cannot effectively improve the convenience and efficiency of engineering data management, resulting in data officers being prone to information omissions and incorrect filling in information when managing a large number of forms with different specifications.
Build a table engineering database, including multiple process information and table specifications. Each process information corresponds to one or more table specifications. Automatically load the corresponding table specifications according to the process to be entered, create a table instance and enter and save project data, including table templates, Data inspection rules and acceptance requirements realize automated data entry and verification.
It reduces the time for data clerks to find and select forms when entering project data, reduces the probability of information omissions and errors filling in, improves the convenience and efficiency of project data management, and ensures data accuracy and efficient management.
Smart Images

Figure CN119294372A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information processing, and in particular to a form entry method for construction engineering. Background Art
[0002] A lot of engineering data will be generated during the construction process. Construction data management is one of the core links of construction. Data clerks need to select and fill out forms of different specifications according to different acceptance standards and application scenarios. This requires high experience of data clerks, and data clerks are prone to missing information and filling out incorrect information in the process of managing a large number of forms of different specifications. In some construction projects, electronic spreadsheet management systems are used to electronically manage engineering data and forms, but existing electronic spreadsheet management systems can only provide basic engineering data processing functions, and they still need to rely on the experience of data clerks to select forms of corresponding specifications, resulting in low convenience and low efficiency in engineering data management. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a form entry method for construction projects to solve the problems of low convenience and low efficiency in existing construction project data management.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a form entry method for construction engineering, which comprises the following steps:
[0005] S1: constructing a table engineering database, wherein the table engineering database includes a plurality of process information and a plurality of table specifications; wherein each process information corresponds to at least one table specification;
[0006] S2: selecting a process to be entered from the plurality of process information, and acquiring the table specification corresponding to the process to be entered according to the process to be entered;
[0007] S3: Creating a table instance according to the table specification, and inputting and saving engineering data in the table instance.
[0008] Furthermore, the table engineering database is a structure tree engineering database, the process information is a node of the structure tree engineering database, and each node of the structure tree engineering database includes at least one of the table specifications.
[0009] Furthermore, the table specification includes a table template; in the step S3, creating a table instance according to the table specification includes: copying a copy instance file according to the table template, and using the copy instance file as the table instance.
[0010] Furthermore, in the step S3, the engineering data is input and saved in the table instance, including: inputting the capacity of the inspection batch, calculating the minimum sampling quantity according to the table specification, and filling the table instance according to the minimum sampling quantity.
[0011] Furthermore, the table specification includes data verification rules; in the step S3, the engineering data is input and saved in the table instance, including: verifying the engineering data according to the data verification rules, marking unqualified engineering data, and calculating the pass rate, and the pass rate is filled into the table instance.
[0012] Furthermore, the form specification includes acceptance requirements. In the step S3, the engineering data is input and saved in the form instance, including: obtaining an acceptance conclusion based on the acceptance requirements and the engineering data, and filling the acceptance conclusion into the form instance.
[0013] Furthermore, in the step S2, the multiple table specifications corresponding to the input process are obtained, including: selecting a table specification to be input from the multiple table specifications;
[0014] In the step S3, creating a table instance according to the table specification includes: creating a table instance according to the table specification to be entered.
[0015] Furthermore, the table engineering database is stored in a cloud platform.
[0016] Another object of the present invention is to provide an electronic device, comprising a memory and a processor coupled to each other, wherein the memory stores program data, and the processor calls the program data to execute the above-mentioned form entry method.
[0017] Another object of the present invention is to provide a computer-readable storage medium having program data stored thereon, wherein the program data implements the above-mentioned form entry method when executed by a processor.
[0018] The beneficial effect of the present invention is that the form entry method provided by the present invention can automatically load all corresponding form specifications according to the process to be entered, so that the document clerk can enter the engineering data according to the form specifications, which reduces the time for the document clerk to find and select forms when entering engineering data, reduces the probability of missing engineering data information and incorrect filling, and improves the convenience and efficiency of engineering data management. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A flowchart of the steps of the form entry method of the present invention;
[0020] Figure 2 for Figure 1 The step flow chart of step S3 in FIG.
[0021] Figure 3 The present invention provides a schematic structural diagram of an electronic device. DETAILED DESCRIPTION
[0022] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.
[0023] Please refer to Figure 1 as well as Figure 2 , a form entry method for a construction project, comprising the following steps:
[0024] S1: constructing a table engineering database, wherein the table engineering database includes a plurality of process information and a plurality of table specifications; wherein each process information corresponds to at least one table specification;
[0025] S2: selecting a process to be entered from the plurality of process information, and acquiring the table specification corresponding to the process to be entered according to the process to be entered;
[0026] S3: Creating a table instance according to the table specification, and inputting and saving engineering data in the table instance.
[0027] From the above description, it can be seen that the beneficial effect of the present invention is that the form entry method provided by the present invention can automatically load all corresponding form specifications according to the process to be entered, so that the document clerk can enter the engineering data according to the form specifications, which reduces the time for the document clerk to find and select forms when entering engineering data, reduces the probability of missing engineering data information and incorrect filling, and improves the convenience and efficiency of engineering data management.
[0028] Furthermore, the table engineering database is a structure tree engineering database, the process information is a node of the structure tree engineering database, and each node of the structure tree engineering database includes at least one of the table specifications.
[0029] From the above description, it can be seen that the acceptance procedure for construction projects includes acceptance in sequence according to the records of projects, divisions, sub-divisions, and sub-items. Therefore, the present application establishes a structure tree database according to the above procedure; specifically, the structure tree engineering database includes project nodes, division nodes, sub-division nodes, and sub-item nodes; wherein the division node is a child node of the project node, the sub-division node is a child node of the division node, and the sub-item node is a child node of the sub-division node; each node of the structure tree database corresponds to the storage of multiple table specifications, which can reduce the difficulty of updating and maintaining the table database, and facilitate the data clerk to select the table correctly and in a standardized manner.
[0030] Furthermore, the table specification includes a table template; in the step S3, creating a table instance according to the table specification includes: copying a copy instance file according to the table template, and using the copy instance file as the table instance.
[0031] From the above description, it can be seen that by copying the copy instance file in the table specification, an empty table instance set up according to the preset specification requirements is obtained, and the data clerk can easily enter the corresponding engineering data in the table instance.
[0032] Furthermore, in the step S3, the engineering data is input and saved in the table instance, including: inputting the capacity of the inspection batch, calculating the minimum sampling quantity according to the table specification, and filling the table instance according to the minimum sampling quantity.
[0033] It can be seen from the above description that in the form entry method provided by the present invention, the back-end form specification can integrate and calculate the engineering data entered into the front-end form instance, and automatically calculate and fill the form instance based on the entered engineering data.
[0034] Furthermore, the table specification includes data verification rules; in the step S3, the engineering data is input and saved in the table instance, including: verifying the engineering data according to the data verification rules, marking unqualified engineering data, and calculating the pass rate, and the pass rate is filled into the table instance.
[0035] From the above description, it can be seen that in the form entry method provided by the present invention, the back-end form specification can calculate and verify the engineering data entered by the front-end form instance, and visually mark unqualified engineering data to improve the accuracy of the engineering data.
[0036] Furthermore, the form specification includes acceptance requirements. In the step S3, the engineering data is input and saved in the form instance, including: obtaining an acceptance conclusion based on the acceptance requirements and the engineering data, and filling the acceptance conclusion into the form instance.
[0037] From the above description, it can be seen that in the form entry method provided by the present invention, the back-end form specifications can automatically obtain the acceptance conclusion according to the acceptance requirements, without the need for the document clerk to calculate and verify the engineering data. This form entry method can improve the efficiency of form entry.
[0038] Furthermore, in the step S2, the multiple table specifications corresponding to the input process are obtained, including: selecting a table specification to be input from the multiple table specifications;
[0039] In the step S3, creating a table instance according to the table specification includes: creating a table instance according to the table specification to be entered.
[0040] From the above description, it can be seen that the data clerk can select the corresponding form specifications according to the requirements of the acceptance project, without having to enter the engineering data for all the form specifications.
[0041] Furthermore, the table engineering database is stored in a cloud platform.
[0042] It can be seen from the above description that the form entry method provided by the present invention supports remote access, sharing, and backup of engineering data to ensure the integrity and availability of engineering data.
[0043] An electronic device comprises a memory and a processor coupled to each other, wherein the memory stores program data, and the processor calls the program data to execute the above-mentioned form entry method.
[0044] It can be seen from the above description that the electronic device provided by the present invention at least has all the beneficial effects of the above form entry method.
[0045] A computer-readable storage medium stores program data, which implements the above-mentioned form entry method when executed by a processor.
[0046] It can be seen from the above description that the computer-readable storage medium provided by the present invention has at least all the beneficial effects of the above form entry method.
[0047] Embodiment 1
[0048] Please refer to Figure 1 to Figure 2 , Embodiment 1 of the present invention is: to provide a form entry method for a construction project to improve the convenience and efficiency of engineering data of the construction project.
[0049] Construction data management is a key link in construction projects. Currently, there are a large number of different forms according to different acceptance requirements and acceptance procedures. These forms cover detailed records of all aspects from land construction to building construction, and different acceptance parties publish different form specifications, and different acceptance parties have different acceptance requirements. Data clerks usually need to select the required forms from a large number of forms based on experience and acceptance requirements, and fill in the forms to record engineering data. This requires high experience from data clerks, and is prone to information omissions and incorrect filling. In addition, engineering data management is inconvenient and inefficient.
[0050] In order to solve the above problem, the form entry method provided in this embodiment includes the following steps:
[0051] It includes the following steps:
[0052] S1: constructing a table engineering database, wherein the table engineering database includes a plurality of process information and a plurality of table specifications; wherein each process information corresponds to at least one table specification;
[0053] S2: selecting a process to be entered from the plurality of process information, and acquiring the table specification corresponding to the process to be entered according to the process to be entered;
[0054] S3: Creating a table instance according to the table specification, and inputting and saving engineering data in the table instance.
[0055] The above-mentioned table engineering database is a structure tree engineering database, the process information is a node of the structure tree engineering database, and each node of the structure tree engineering database includes at least one table specification.
[0056] During the acceptance process, the acceptance procedure is accepted according to the records of the project, division, sub-division, and sub-item. Therefore, the table entry method provided in this embodiment is based on the business experience summary and sets up a structure tree database according to the process structure. The structure of the structure tree database is constructed according to the hierarchical order of the project, division, sub-division, and sub-item procedures. The structure tree database includes project nodes, division nodes, sub-division nodes, and sub-item nodes; wherein the division node is a sub-node of the project node, the sub-division node is a sub-node of the division node, and the sub-item node is a sub-node of the sub-division node.
[0057] A node of the structure tree database corresponds to a process information and is divided according to the level of the process. At least one table specification corresponding to each node is set.
[0058] When the document clerk enters the engineering data of a certain process, the table entry method provided in this embodiment can automatically load multiple table specifications in the node corresponding to the process. Some table specifications may not need to be entered according to the actual acceptance requirements. Therefore, in step S2, multiple table specifications corresponding to the entry process are obtained according to the entry process, including: the document clerk selects the table specification to be entered from the multiple table specifications according to the requirements; in step S3, a table instance is created according to the table specification, including: creating a table instance according to the table specification to be entered.
[0059] The form entry method provided in this embodiment can greatly reduce the time taken by document clerks to search for and rotate forms, thereby improving work efficiency.
[0060] In this embodiment, the form specification includes a form template, data verification rules, and acceptance requirements. In this form entry method, the form specification at the back end can integrate and verify the engineering data entered into the front-end form instance, without the need for the document clerk to verify and calculate the engineering data.
[0061] Please refer to Figure 2 In step S3 of this embodiment, creating a table instance according to the table specification includes:
[0062] S301: copying a copy instance file according to the table template, and using the copy instance file as the table instance;
[0063] S302: input the capacity of the inspection lot, calculate the minimum sampling quantity according to the table specification, and fill the table instance according to the minimum sampling quantity;
[0064] S303: Inspect the engineering data according to the data inspection rule, mark unqualified engineering data, and calculate the pass rate, and fill the pass rate into the table instance;
[0065] S304: Obtaining an acceptance conclusion according to the acceptance requirements and the engineering data, and filling the acceptance conclusion into the table instance.
[0066] In this embodiment, when entering engineering data, it is possible to determine whether the engineering data is qualified according to the acceptance requirements, and provide timely feedback to the document clerk.
[0067] In this embodiment, the table engineering database is stored in a cloud platform, which can make data storage safer and access more convenient, support remote access and team collaboration, and improve work efficiency and data utilization.
[0068] To sum up, the form entry method provided by the present invention can automatically load all corresponding form specifications according to the process to be entered, so that the document clerk can enter the engineering data according to the form specifications. It reduces the time for the document clerk to find and select forms when entering engineering data, reduces the probability of missing engineering data information and incorrect filling, and improves the convenience and efficiency of engineering data management.
[0069] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for entering form information for a construction project, characterized in that: The following steps are involved: S1: constructing a table engineering database, wherein the table engineering database includes a plurality of process information and a plurality of table specifications; wherein each process information corresponds to at least one table specification; S2: selecting a process to be entered from the plurality of process information, and acquiring the table specification corresponding to the process to be entered according to the process to be entered; S3: Creating a table instance according to the table specification, and inputting and saving engineering data in the table instance.
2. The form entry method according to claim 1, characterized in that: The table engineering database is a structure tree engineering database, the process information is a node of the structure tree engineering database, and each node of the structure tree engineering database includes at least one of the table specifications.
3. The form entry method according to claim 1, characterized in that: The form specification includes a form template; In the step S3, creating a table instance according to the table specification includes: copying a copy instance file according to the table template, and using the copy instance file as the table instance.
4. The form entry method according to claim 1, characterized in that: In the step S3, the engineering data is input and saved in the table instance, including: inputting the capacity of the inspection batch, calculating the minimum sampling quantity according to the table specification, and filling the table instance according to the minimum sampling quantity.
5. The form entry method according to claim 1, characterized in that: The table specification includes data verification rules; in the step S3, the engineering data is input and saved in the table instance, including: verifying the engineering data according to the data verification rules, marking unqualified engineering data, and calculating the pass rate, and the pass rate is filled into the table instance.
6. The form entry method according to claim 1, characterized in that: The form specification includes acceptance requirements. In the step S3, the engineering data is input and saved in the form instance, including: obtaining an acceptance conclusion based on the acceptance requirements and the engineering data, and filling the acceptance conclusion into the form instance.
7. The form entry method according to claim 1, characterized in that: In the step S2, a plurality of the table specifications corresponding to the input process are obtained according to the input process, including: selecting a table specification to be input from the plurality of table specifications; In the step S3, creating a table instance according to the table specification includes: creating a table instance according to the table specification to be entered.
8. The form entry method according to claim 1, characterized in that: The table engineering database is stored in the cloud platform.
9. An electronic device, characterized in that: include: A memory and a processor coupled to each other, wherein the memory stores program data, and the processor calls the program data to execute the form entry method according to any one of claims 1 to 8.
10. A computer-readable storage medium having program data stored thereon, characterized in that: When the program data is executed by a processor, the form entry method according to any one of claims 1 to 8 is implemented.