Mechanical suspension arm device for railway dredging vehicle and railway dredging vehicle
By designing a mechanical boom device for railway silt trucks, combining mechanized dredging and sewage recycling technology, the problems of low efficiency of manual silt and inability to clean up concealed pipes are solved, and efficient silt cleaning operations in railway tunnel drainage ditches are achieved .
Patent Information
- Application Number
- CN202411741878.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-01-14
AI Technical Summary
In the prior art, the dredging operation of railway tunnel drainage ditches relies on manual completion, and there are problems such as high labor intensity, low efficiency, and the inability to clean up some silt in the concealed pipes, resulting in a long dredging time and affecting driving safety.
A mechanical boom device for railway dredging vehicles was designed, including a rotatable mechanical boom frame, a telescopic suction pipe, a guide mechanism and a high-pressure water pipe. Combined with vacuum suction, high-pressure dredging and sewage recycling technology, it realizes mechanization. Drainage and silt cleaning.
It greatly reduces the labor intensity of dredging operations, improves dredging efficiency, can meet the operating needs of different angles and depths, realizes mechanized dredging and effective silt cleaning, and shortens dredging time.
Smart Images

Figure CN119308408A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of railway maintenance machinery, and in particular to a mechanical boom device for a railway silt removal vehicle. Background Art
[0002] Affected by seasonal changes, karst water, groundwater, rainwater, etc., tunnels are equipped with drainage ditches and drainage wells to prevent water damage. However, due to the dissolution (calcification) produced by wall leakage, coal powder falling, and powder produced by vibration and friction of the roadbed, the drainage ditch is silted and drainage is not smooth. Taking the Shuohuang Line as an example, the line has a long span, tall mountains, large water storage capacity, and long drainage ditches. It has the typical characteristics of a long tunnel of a heavy-duty railway in a mountainous area, which has always been the focus, difficulty, and weakness of the Shuohuang Line. In recent years, the density of 20,000-ton heavy-duty trains has continued to increase. Affected by factors such as the scattering of coal ash dust, grouting for comprehensive tunnel renovation, and friction and vibration of the roadbed, the silt deposition in the tunnel drainage ditch has increased year by year, resulting in poor drainage of the tunnel, which in turn causes mud and water to flood the roadbed, causing roadbed slurry and mud to occur, affecting driving safety.
[0003] At present, the dredging work of the Baoshen Railway is mainly done manually, but there are the following problems with manual cleaning and maintenance: (1) The manual cleaning work is very intensive; (2) The silt in the underground pipes of the drainage ditch cannot be cleaned; (3) The total number of kilometers to be cleaned is long, the manual cleaning efficiency is low, and the operation cycle is long.
[0004] Therefore, in order to solve the problems of high labor intensity, poor working environment, low working efficiency, inability to clean the silt in the underground pipe of the drainage ditch, and long silt removal time during the dredging of railway tunnel drainage ditches, key technologies for mechanized dredging of tunnel drainage ditches are studied, including vacuum suction, high-pressure dredging and cleaning, sewage recycling, automatic unloading, etc. Therefore, a railway tunnel drainage ditch dredging vehicle with independent intellectual property rights is developed, which integrates flushing, dredging, sewage suction, sewage separation and recycling treatment, immediate reuse, loading and unloading, etc., to meet the needs of mechanized dredging, silt cleaning, collection and off-site unloading of drainage ditches, dense wells, precipitation wells and other railway tunnel drainage facilities. Summary of the invention
[0005] In order to solve one of the above-mentioned technical defects, a mechanical boom device for a railway dredging vehicle and a railway dredging vehicle are provided in an embodiment of the present application.
[0006] According to a first aspect of an embodiment of the present application, a mechanical boom device for a railway silt removal vehicle is provided, comprising:
[0007] A mechanical arm frame is rotatably arranged on the railway silt removal vehicle;
[0008] The sewage suction pipe reel is rotatably arranged on the mechanical arm frame;
[0009] The sewage suction pipe is slidably arranged on the arm of the mechanical arm frame, and the sewage discharge end of the sewage suction pipe is connected to the sewage suction pipe reel, and the sewage suction pipe reel can coil and retract the sewage suction pipe by self-rotation;
[0010] The telescopic mechanism is slidably connected to the arm of the mechanical arm frame, and can extend or shorten the path of the sewage suction pipe on the arm;
[0011] The guide mechanism is connected to the free end of the telescopic mechanism and can guide the sewage suction pipe downward into the working point.
[0012] Preferably, the guiding mechanism comprises:
[0013] The auxiliary roller and the retractable driving wheel are respectively connected to the free end of the telescopic mechanism through a roller guide frame. The auxiliary roller is located above the retractable driving wheel. A downward inclined passage is formed between the auxiliary roller and the retractable driving wheel. The sewage suction pipe extends along the downward inclined passage into the working point.
[0014] Preferably, the sewage suction end of the sewage suction pipe is connected to a sewage suction pipe port assembly, and the sewage suction pipe port assembly includes:
[0015] Connect the hard pipe seat and sleeve it inside the sewage suction pipe;
[0016] The connection fixing card is sleeved on the outside of the sewage suction pipe. After the connection fixing card is tightened and locked, the sleeved connection hard pipe seat and the sewage suction pipe can be fastened;
[0017] The connecting hard pipe is connected to the connecting hard pipe seat through a flange;
[0018] The first dirt suction filter is detachably arranged at the end of the connecting hard pipe.
[0019] Preferably, a flushing water pipe reel is provided on the other arm of the robotic arm frame, and the flushing water pipe reel can coil and retract the water pipe, and the input end of the water pipe of the pipeline support is connected to a high-pressure water pump.
[0020] Preferably, the mechanical boom device for the railway silt clearing vehicle further comprises a pipeline bracket, which is arranged on the mechanical arm frame and can be used to arrange control harnesses and pipelines.
[0021] According to a second aspect of an embodiment of the present application, a railway silt removal vehicle is provided, comprising:
[0022] Any of the above mechanical boom devices for railway silt removal vehicles;
[0023] Install the frame;
[0024] The sewage storage tank is mounted on the mounting frame;
[0025] Two side brackets are respectively installed on the mounting frame and located on both sides of the sewage storage tank;
[0026] A support bracket is arranged above the sewage storage tank, and the support bracket is connected to the tops of the two side brackets;
[0027] The boom connection assembly, the mechanical arm frame is rotatably connected to the support bracket through the boom connection assembly.
[0028] Preferably, the boom connection assembly comprises:
[0029] The boom base flange, a frame pre-installed flange is arranged on the support bracket, and the boom base flange is connected to the frame pre-installed flange through the boom base connecting bolts;
[0030] A hollow pipe is arranged in the middle of the sewage suction pipe base, the boom base flange and the frame pre-installed flange, the hollow pipe is connected to the sewage storage tank, the sewage suction pipe base is connected to the top of the hollow pipe by a rotary seal, and the sewage suction pipe base is fixedly connected to the support bracket;
[0031] A sewage suction pipe joint is installed in the middle of the sewage suction pipe reel, one end of which is connected to the sewage discharge end of the sewage suction pipe, and the other end of which is downwardly connected to the top rotary seal of the sewage suction pipe base.
[0032] Preferably, a locking device is installed on the support bracket, and the locking device comprises:
[0033] The lock fixing seat is arranged on the supporting bracket, and the lock tongue of the lock fixing seat is arranged upward;
[0034] A controller capable of controlling the extension or retraction of the lock tongue;
[0035] Position sensor, capable of monitoring the position information of the lock tongue.
[0036] Preferably, a sewage suction pipe protection frame assembly is installed on the mounting frame, and the sewage suction pipe protection frame assembly includes:
[0037] A protective support is vertically mounted on the mounting frame;
[0038] The fixed lock comprises a lock body and a lock buckle, wherein the lock body is arranged on the protective support, the lock body is inwardly concave with a semicircular arc groove, the lock buckle is a semicircular ring, and one end of the lock buckle is hinged to the lock body;
[0039] The rotating cover plate is arranged on the lock body, and the locking is completed by rotating the cover plate after the lock buckle and the lock body are closed.
[0040] Preferably, the support bracket is installed with a limit assembly, and the limit assembly includes:
[0041] The limit mounting seat is arranged on the support bracket, the limit mounting seat is provided with a plug hole in the vertical direction, and the limit mounting seat is screwed with a plurality of connecting bolts perpendicular to the plug hole;
[0042] The limit mounting pin is inserted into the insertion hole and the limit mounting pin is limited by tightening the connecting bolt.
[0043] The mechanical arm device for railway silt removal vehicle provided in the embodiment of the present application is adopted, the overall angle is adjusted by rotating the mechanical arm frame, the path of the sewage suction pipe on the arm is changed by adjusting the telescopic mechanism, the sewage suction pipe is guided by the guide mechanism, the sewage suction pipe is retracted and released by cooperating with the sewage suction pipe coil, and the water pipe is retracted and released by setting a high-pressure water pipe coil. Through the smooth cooperation of various mechanical components, the sewage suction and high-pressure flushing operations can be met within a certain range, and the recovery is convenient after the operation is completed, which greatly reduces the labor intensity of the drainage ditch silt removal operation, can meet the operation requirements of different angles and depths, realizes mechanized dredging, sludge cleaning, and collection work, and greatly improves the silt removal work efficiency.
[0044] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the contents pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0046] Figure 1 A schematic diagram of the structure of a mechanical boom device for a railway silt removal vehicle provided in an embodiment of the present application;
[0047] Figure 2 A schematic diagram of the structure of the sewage suction pipe port assembly provided in an embodiment of the present application;
[0048] Figure 3 A schematic diagram of the structure of a boom connection assembly provided in an embodiment of the present application;
[0049] Figure 4 A schematic diagram of the structure of a locking device provided in an embodiment of the present application;
[0050] Figure 5 A schematic diagram of the structure of the sewage suction pipe protection frame assembly provided in an embodiment of the present application;
[0051] Figure 6 A schematic diagram of the structure of the limit assembly provided in the embodiment of the present application;
[0052] Figure 7 A schematic diagram of the operation of the mechanical boom device for a railway silt removal vehicle provided in an embodiment of the present application.
[0053] 101 is a mechanical arm frame, 102 is a sewage suction pipe reel, 103 is a sewage suction pipe, 104 is a pipeline bracket, 105 is a telescopic mechanism, 106 is an auxiliary roller, 107 is a retractable driving wheel, 108 is a flushing water pipe reel, 109 is a blocking block, 200 is a sewage suction pipe outlet assembly, 201 is a connecting hard pipe seat, 202 is a connecting fixing card, 203 is a connecting hard pipe, 204 is a sewage suction filter net 1, 205 is a sewage suction filter net 2, 206 is a sewage suction filter 3, 300 is a sewage suction pipe protection frame assembly, 301 is a protection support, 302 is a rotating cover plate, 303 is a fixed lock, 400 is a locking device, 401 is a controller, 402 is a lock fixing seat, 403 is a lock tongue, 404 is a sewage suction filter net 1, 205 is a sewage suction filter net 2, 206 is a sewage suction filter net ...4 is a locking device, 404 is a locking device, 404 is a locking device, 404 is a locking device, 404 is a locking device, 404 is a locking device, 404 is a locking device, 04 is a position sensor, 500 is a boom connection assembly, 501 is a boom base flange, 502 is a sewage suction pipe base, 503 is a boom base connecting bolt, 600 is a limit assembly, 601 is a limit mounting pin, 602 is a limit mounting seat, 603 is a connecting bolt, 701 is a mounting frame, 702 is a support bracket, 703 is a sewage storage tank, 704 is a frame pre-set flange, 705 is a side bracket, 801 is a retracted position, 802 is a rotation position one, 803 is a rotation position two, L1 is a boom retracted position, L2 is an extended position, θ1 is a boom rotation angle one, θ2 is a boom rotation angle two, θ3 is a flushing water pipe reel rotation angle, θ4 is a sewage suction pipe reel rotation angle. DETAILED DESCRIPTION
[0054] In order to make the technical solutions and advantages of the embodiments of the present application more clear, the following Figure 1-7 The exemplary embodiments of the present application are further described in detail. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0055] In the process of realizing the present application, the inventor found that due to the influence of seasonal changes, karst water, groundwater, rainwater, etc., the tunnel is equipped with drainage ditches and drainage wells to prevent water damage. However, due to the influence of the dissolution (calcification) produced by the wall leakage, the falling of coal powder and the powder produced by the vibration and friction of the roadbed, the drainage ditch is silted and the drainage is not smooth. Taking the Shuohuang Line as an example, the line has a long span, tall mountains, large water storage capacity, and long drainage ditches. It has the typical characteristics of a long tunnel of a heavy-duty railway in a mountainous area, which has always been the maintenance focus, difficulty and weakness of the Shuohuang Line. In recent years, the running density of 20,000-ton heavy-duty trains has continued to increase. Affected by factors such as the scattering of coal ash dust, grouting for comprehensive tunnel renovation, and friction and vibration of the roadbed, the silt deposition in the tunnel drainage ditch has increased year by year, resulting in poor drainage of the tunnel, which in turn causes the muddy water to flood the roadbed, causing the roadbed to turn over and mud, and other diseases, affecting driving safety.
[0056] At present, the dredging work of the Baoshen Railway is mainly done manually, but there are the following problems with manual cleaning and maintenance: (1) The manual cleaning work is very intensive; (2) The silt in the underground pipes of the drainage ditch cannot be cleaned; (3) The total number of kilometers to be cleaned is long, the manual cleaning efficiency is low, and the operation cycle is long.
[0057] Therefore, in order to solve the problems of high labor intensity, poor working environment, low working efficiency, inability to clean the silt in the underground pipe of the drainage ditch, and long silt removal time during the dredging of railway tunnel drainage ditches, key technologies for mechanized dredging of tunnel drainage ditches are studied, including vacuum suction, high-pressure dredging and cleaning, sewage recycling, automatic unloading, etc. Therefore, a railway tunnel drainage ditch dredging vehicle with independent intellectual property rights is developed, which integrates flushing, dredging, sewage suction, sewage separation and recycling treatment, immediate reuse, loading and unloading, etc., to meet the needs of mechanized dredging, silt cleaning, collection and off-site unloading of drainage ditches, dense wells, precipitation wells and other railway tunnel drainage facilities.
[0058] In order to solve the above problems, a mechanical boom device for a railway silt clearing vehicle and a railway silt clearing vehicle are provided in an embodiment of the present application.
[0059] According to a first aspect of an embodiment of the present application, a mechanical boom device for a railway silt removal vehicle (hereinafter referred to as the mechanical boom device) is provided, such as Figure 1-7 As shown, including:
[0060] The horizontally arranged mechanical arm frame 101 comprises two arms parallel to each other. The mechanical arm frame 101 is rotatably arranged on the railway silt removal vehicle. The mechanical arm frame 101 can be rotated by a mechanical arm frame driving device;
[0061] The sewage suction pipe reel 102 is horizontally arranged and rotatably arranged on the mechanical arm frame 101. The sewage suction pipe reel 102 can rotate in a horizontal plane through a sewage suction pipe reel driving device;
[0062] The sewage suction pipe 103 is slidably arranged on the arm on the left side of the mechanical arm frame 101. The sewage discharge end of the sewage suction pipe 103 is connected to the sewage suction pipe reel 102. The sewage suction pipe reel 102 can coil and retract the sewage suction pipe 103 by self-rotation.
[0063] The telescopic mechanism 105 is slidably connected to the arm on the left side of the mechanical arm frame 101, and can extend or shorten the path of the sewage suction pipe 103 on the arm. The telescopic mechanism can be pushed out and retracted along the arm direction by a pneumatic or hydraulic cylinder;
[0064] The guide mechanism is connected to the free end of the telescopic mechanism 105 and can guide the sewage suction pipe 103 downward into the working point.
[0065] During specific implementation, the mechanical arm frame 101 is rotated by the mechanical arm frame driving device to rotate the entire mechanical boom device to the designated operating point, and the travel of the telescopic mechanism is adjusted by the pneumatic or hydraulic cylinder so that the common length of the telescopic mechanism 105 and the arm matches the length of the sewage suction pipe 103. The guide mechanism is located above the operating point, and the sewage suction pipe reel driving device is started to release the sewage suction pipe 103 by rotating the sewage suction pipe reel 102. At the same time, the guide mechanism is started to guide and assist in the release of the sewage suction pipe 103. The sewage suction pipe 103 starts from the sewage suction pipe reel 102, passes through the arm and the telescopic mechanism 105 on the left side of the mechanical arm frame 101 in turn, and then extends downward through the guide mechanism to enter the operating point; after the dredging operation is completed, the sewage suction pipe reel driving device drives the sewage suction pipe reel 102 to rotate in the opposite direction, and rewinds the sewage suction pipe 103 back onto the sewage suction pipe reel 102.
[0066] As a preferred solution, the guiding mechanism includes:
[0067] The auxiliary roller 106 and the retractable driving wheel 107 are respectively connected to the free ends of the telescopic mechanism 105 through roller guide frames. The auxiliary roller 106 is located above the retractable driving wheel 107. A downward inclined passage is formed between the auxiliary roller 106 and the retractable driving wheel 107. The sewage suction pipe 103 extends along the downward inclined passage to enter the working point. A driving motor is arranged on the roller guide frame of the retractable driving wheel 107, and the output shaft of the driving motor is connected to the retractable driving wheel 107.
[0068] During specific implementation, in the above-mentioned dredging operation, when the guide mechanism is assisting in the release, the drive motor is started, the retractable driving wheel 107 rotates, and cooperates with the auxiliary roller 106 to jointly assist in the release of the suction pipe 103 by the rotating turntable 102. At the same time, the auxiliary roller 106 and the retractable driving wheel 107 can guide the suction pipe 103 so that it can be accurately extended to the operation point; when the guide mechanism is recovering the suction pipe 103, the drive motor is started, the retractable driving wheel 107 rotates in the opposite direction, and cooperates with the auxiliary roller 106 to jointly assist in the recovery of the suction pipe 103 by the rotating turntable 102.
[0069] As a preferred solution, Figure 2 As shown, the sewage suction end of the sewage suction pipe 103 is connected to a sewage suction pipe port assembly 200, and the sewage suction pipe port assembly 200 includes:
[0070] Connect the hard pipe seat 201 and sleeve it inside the sewage suction pipe 103;
[0071] The connection fixing card 202 is sleeved on the sewage suction pipe 103. After the connection fixing card 202 is tightened and locked, the sleeved connection hard pipe seat 201 and the sewage suction pipe 103 can be fastened;
[0072] The connecting hard pipe 203 is connected to the connecting hard pipe seat 201 through a flange;
[0073] The dirt suction filter 204 is detachably disposed at the end of the connecting hard pipe 203 .
[0074] Specifically, the end of the connecting hard pipe 203 can be replaced with a suction filter of different apertures according to the conditions of the desilting location, such as Figure 2 As shown, the sewage suction filter net 1 204 can be replaced with the sewage suction filter net 205 or the sewage suction filter net 3 206.
[0075] During the specific implementation, before the dredging operation, the sludge at the operation point can be sampled and tested to determine the appropriate suction filter. If blockage occurs during the dredging operation, the machine should be stopped in time and the filter should be replaced to avoid malfunction of the dredging vehicle.
[0076] As a preferred solution, a flushing water pipe reel 108 is provided on the arm on the right side of the robotic arm frame 101. The flushing water pipe reel 108 can coil and retract the water pipe. The input end of the water pipe of the pipeline support 104 is connected to a high-pressure water pump. The flushing water pipe reel 108 can be rotated by a flushing water pipe reel driving device, thereby coiling and retracting the water pipe.
[0077] During specific implementation, when encountering a sludge operation point with low water content, or encountering stubborn sludge that is difficult to suck in, start the flushing mechanism drive device, flush the water pipe reel 108 to release the water pipe by rotation, turn on the high-pressure water pump, and use the sprayed high-pressure water flow to flush and clean the operation point, and cooperate with the sewage suction pipe 103 to suck the sewage.
[0078] As a preferred solution, the mechanical boom device further includes a pipeline bracket 104 , which is disposed on the mechanical arm frame 101 , and the control harness and pipelines can be arranged through the pipeline bracket 104 .
[0079] According to a second aspect of an embodiment of the present application, a railway silt removal vehicle is provided, comprising:
[0080] Any of the above mechanical boom devices;
[0081] Install the frame 701;
[0082] A sewage storage tank 703 is mounted on a mounting frame 701;
[0083] Two vertical side brackets 705 are respectively installed on the mounting frame 701 and located on both sides of the sewage storage tank 703. A ladder is installed on the side bracket 705 to facilitate management and maintenance by the staff;
[0084] A support bracket 702 is disposed above the sewage storage tank 703, and the support bracket 702 is connected to the tops of the two side brackets 705;
[0085] The boom connection assembly 500 , the mechanical arm frame 101 is rotatably connected to the support bracket 702 via the boom connection assembly 500 .
[0086] In specific implementation, the support bracket 702 and the side brackets 705 on both sides jointly support and protect the sewage storage tank 703 and the mechanical boom device to ensure the safety of the railway silt removal vehicle. From the perspective of space utilization, equipment maintenance, and safety, the mechanical boom device should be kept in the retracted state during the period of stopping work (standby) and during the transportation of the railway silt removal vehicle, that is, the mechanical boom device should be completely rotated to the top of the railway silt removal vehicle to prevent the mechanical boom device from rotating outward.
[0087] Take the car collection state as the initial state, such as Figure 7 As shown, the mechanical arm device is rotated by the mechanical arm frame driving device, and rotates from the vehicle collection position 801 by θ1 to the rotation position one 802, and can also rotate from the vehicle collection position 801 by θ2 to the rotation position two 803, and rotates back along the rotation path when retracting;
[0088] The mechanical boom device is extended from the boom retracted position L1 to the boom extended position L2 through the telescopic mechanism 105, and retracts along the extended path when retracting;
[0089] The mechanical boom device drives the water pipe to extend and retract by rotating the flushing water pipe reel 108 at an angle of θ3;
[0090] The mechanical boom device drives the suction pipe 103 to extend and retract by rotating the suction pipe reel 102 at an angle of θ4. During this process, the auxiliary roller 106 and the retracting driving wheel 107 cooperate with the auxiliary suction pipe 103 to complete the extension or retraction process.
[0091] As a preferred solution, Figure 3 As shown, the boom connection assembly 500 includes:
[0092] The boom base flange 501 and the support bracket 702 are provided with a vehicle frame pre-installed flange 704, and the boom base flange 501 is connected to the vehicle frame pre-installed flange 704 through the boom base connecting bolts 503;
[0093] A hollow pipe is provided in the middle of the sewage suction pipe base 502, the boom base flange 501 and the frame pre-installed flange 704, the hollow pipe is connected to the sewage storage tank 703, the sewage suction pipe base 502 is connected to the top of the hollow pipe by rotation and sealing, and the sewage suction pipe base 502 is fixedly connected to the support bracket 702;
[0094] A suction pipe joint is installed in the middle of the suction pipe reel 102 , one end of which is connected to the sewage discharge end of the suction pipe 103 , and the other end of which is downwardly connected to the top rotation seal of the suction pipe base 502 .
[0095] In the process of implementing the present application, the inventors found that, in the standby state, it is relatively easy to maintain the mechanical boom device in the above-mentioned vehicle receiving position 801. However, during transportation, due to the bumpy road surface, the mechanical boom device is not easy to maintain in the above-mentioned vehicle receiving position 801. Therefore, it is necessary to install a locking mechanism to limit the mechanical boom device under the vehicle receiving position 801.
[0096] In view of the above problems, a preferred solution is provided in the embodiments of the present application. Figure 4 As shown, a locking device 400 is installed on the support bracket 702, and the locking device 400 includes:
[0097] The lock fixing seat 402 is arranged on the support bracket 702, and the lock tongue 403 of the lock fixing seat 402 is arranged upward. The installation position of the lock fixing seat 402 is such that in the folded state, the lock tongue 403 can block the mechanical arm frame 101 from rotating outward after being extended, and the lock tongue 403 does not affect the mechanical arm frame 101 from rotating outward after being retracted;
[0098] A controller 401 capable of controlling the lock tongue 403 to extend or retract;
[0099] The position sensor 404 can monitor the position information of the locking tongue 403 .
[0100] In specific implementation, two locking devices 400 can be symmetrically installed on the support bracket 702 to limit the rotation of the robotic arm frame 101 to both sides. After entering the vehicle retracting state, the lock tongue 403 is extended through the controller, and the position sensor can be used to confirm whether the lock tongue 403 is extended / retracted. The position information of the lock tongue 403 needs to be confirmed before driving the robotic arm frame 101 to rotate.
[0101] In the process of realizing the present application, the inventors found that during transportation, the end of the sewage suction pipe 103 would swing irregularly with the bumps of the vehicle, which would not only affect driving safety but also easily scratch the pipe.
[0102] In view of the above problems, a preferred solution is provided in the embodiments of the present application. Figure 5 As shown, a sewage suction pipe protection frame assembly 300 is installed on the mounting frame 701. The sewage suction pipe protection frame assembly 300 is arranged in the vehicle folding state, directly below the sewage suction pipe 103 that naturally droops. The sewage suction pipe protection frame assembly 300 includes:
[0103] The protective support 301 is vertically mounted on the mounting frame 701;
[0104] The fixed lock 303 includes a lock body and a lock buckle. The lock body is arranged on the protective support 301. The lock body is recessed with a semicircular arc groove. The lock buckle is a semicircular ring. One end of the lock buckle is hinged to the lock body.
[0105] The rotating cover plate 302 is arranged on the lock body, and locking is completed by rotating the cover plate 302 after the lock buckle and the lock body are closed.
[0106] In specific implementation, before transportation, open the rotating cover 302, rotate the lock to fully open, put the suction pipe 103 into the lock body, close the lock, and lock the rotating cover 302 to complete the fixation of the suction pipe 103 in the storage state. After arriving near the operation point, unlock the suction pipe protection frame assembly 300 again to release the suction pipe 302. In the process of realizing this application, the inventor found that since the mechanical boom device can be locked in the storage state, then during dredging, in order to further stabilize the suction pipe, a limit assembly can also be installed at a certain position in the working state.
[0107] In view of the above-mentioned problem, a preferred solution is provided in the embodiment of the present application. In the present embodiment, only the example of limiting the mechanical boom device to the second rotation position 803 is used for explanation. It must be noted that it does not mean that the limit assembly can only be installed here.
[0108] like Figure 1 and Figure 6 As shown, a limit assembly 600 is installed on the support bracket 702, and the limit assembly 600 includes:
[0109] The position limiting mounting seat 602 is arranged on the supporting bracket 702, and a plug hole in the vertical direction is arranged on the position limiting mounting seat 602, and a plurality of connecting bolts 603 are screwed on the position limiting mounting seat 602 perpendicularly to the plug hole;
[0110] The limiting installation pin 601 is inserted into the insertion hole, and then the limiting installation pin 601 is limited by tightening the connecting bolt 603.
[0111] In specific implementation, the limiting assembly 600 is used together with the blocking block 109, which is arranged on the support bracket 702. The installation position of the blocking block 109 is based on the fact that when the mechanical arm device is located at the second rotation position 803, the blocking block 109 can block the mechanical arm frame 101 from rotating outward from the outside of the mechanical arm frame 101; the installation position of the limiting mounting seat 602 and the final height of the limiting mounting pin 601 are based on the fact that when the mechanical arm device is located at the second rotation position 803, the limiting mounting pin 601 is inserted into the socket and tightened, and the limiting mounting pin 601 can block the mechanical arm frame 101 from rotating inward from the inside of the mechanical arm frame 101. The blocking block 109 and the limiting assembly 600 respectively complete the limiting of the inner and outer sides of the mechanical arm frame 101, and limit the mechanical arm device at the second rotation position 803. After the dredging operation is completed, it is only necessary to loosen the connecting bolt 603 and pull the limit mounting pin 601 out of the limit mounting seat 602, so that the inner limit of the robot arm frame 101 is released and the robot can return along the original path.
[0112] It should be noted that the limiting assembly 600 and the locking device 400 provided in this embodiment can be replaced with each other, and the driving device mentioned in this embodiment can be a hydraulic drive or an electric drive device.
[0113] The embodiments of the present application provide a mechanical boom device for a railway silt removal vehicle and a railway silt removal vehicle. The rotation of the entire device is achieved by setting a rotatable mechanical arm frame; the path length of the sewage suction pipe on the frame arm can be adjusted by a telescopic mechanism; the sewage suction pipe can be retracted and extended by setting a rotatable sewage suction pipe reel, which can meet the operation requirements of different angles and depths; the sewage suction pipe is guided and assisted in being retracted and extended by setting a guiding mechanism; the sewage suction pipe and water pipe are provided to meet the sewage suction and high-pressure flushing operations; a sewage suction pipe port assembly with a replaceable filter is provided to meet various silt removal requirements; a protective support is provided to achieve stable transportation; a locking mechanism and a limit assembly are provided to complete the locking of the mechanical boom device in a specific state, thereby greatly improving the space utilization and stability; a combined truss structure is adopted to meet the intensity of the operation during operation, and the locomotive operation and transportation space can be reasonably utilized when the vehicle is retracted. The present application provides a mechanical boom device for a railway dredging vehicle and a railway dredging vehicle, which can mechanize the solution to the construction dredging problem during the dredging and unblocking of railway tunnel drainage ditches. The mechanical boom supports smooth coordination of various actions and can meet the requirements of sewage suction and high-pressure flushing operations within a certain range, greatly reducing the labor intensity of drainage ditch dredging operations and having strong practicality.
[0114] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0115] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0116] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0117] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0118] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A mechanical boom device for a railway silt removal vehicle, characterized in that: include: A mechanical arm frame (101) is rotatably arranged on the railway silt removal vehicle; A sewage suction pipe reel (102) is rotatably arranged on the mechanical arm frame (101); A sewage suction pipe (103) is slidably arranged on the arm of the mechanical arm frame (101); a sewage discharge end of the sewage suction pipe (103) is connected to the sewage suction pipe reel (102); and the sewage suction pipe reel (102) can coil and retract the sewage suction pipe (103) by self-rotation; A telescopic mechanism (105) is slidably connected to the arm of the mechanical arm frame (101) and is capable of extending or shortening the path of the sewage suction pipe (103) on the arm; The guide mechanism is connected to the free end of the telescopic mechanism (105) and can guide the sewage suction pipe (103) downward into the working point.
2. The mechanical boom device for railway silt removal vehicle according to claim 1, characterized in that: The guiding mechanism comprises: The auxiliary roller (106) and the retractable driving wheel (107) are respectively connected to the free end of the telescopic mechanism (105) through a roller guide frame. The auxiliary roller (106) is located above the retractable driving wheel (107). A downward inclined passage is formed between the auxiliary roller (106) and the retractable driving wheel (107). The sewage suction pipe (103) extends along the downward inclined passage to enter the working point.
3. The mechanical boom device for railway silt removal vehicle according to claim 1, characterized in that: The sewage suction end of the sewage suction pipe (103) is connected to a sewage suction pipe port assembly (200), and the sewage suction pipe port assembly (200) comprises: A connecting hard pipe seat (201) is sleeved in the sewage suction pipe (103); A connecting and fixing card (202) is sleeved outside the sewage suction pipe (103); after the connecting and fixing card (202) is tightened and locked, the sleeved connecting hard pipe seat (201) and the sewage suction pipe (103) can be fastened; A connecting hard pipe (203) connected to the connecting hard pipe seat (201) via a flange; A dirt suction filter screen (204) is detachably arranged at the end of the connecting hard pipe (203).
4. The mechanical boom device for railway silt removal vehicle according to claim 1, characterized in that: A flushing water pipe reel (108) is provided on another arm of the mechanical arm frame (101), and the flushing water pipe reel (108) is capable of winding and retracting a water pipe, and the input end of the water pipe of the pipe support (104) is connected to a high-pressure water pump.
5. The mechanical boom device for railway silt removal vehicle according to claim 1, characterized in that: It also includes a pipeline bracket (104), which is arranged on the mechanical arm frame (101) and can be used to arrange control harnesses and pipelines.
6. A railway silt removal vehicle, characterized in that: include: A mechanical boom device for a railway silt removal vehicle as described in any one of claims 1 to 5; Installing the frame (701); A sewage storage tank (703) is mounted on the mounting frame (701); Two side brackets (705) are respectively mounted on the mounting frame (701) and located on both sides of the sewage storage tank (703); A support bracket (702) is disposed above the sewage storage tank (703), and the support bracket (702) is connected to the tops of the two side brackets (705); A boom connection assembly (500), wherein the mechanical arm frame (101) is rotatably connected to the support bracket (702) via the boom connection assembly (500).
7. A railway silt removal vehicle according to claim 6, characterized in that: The boom connection assembly (500) comprises: A boom base flange (501), a frame pre-installed flange (704) is arranged on the support bracket (702), and the boom base flange (501) is connected to the frame pre-installed flange (704) via boom base connecting bolts (503); A sewage suction pipe base (502), a hollow pipe is arranged in the middle of the boom base flange (501) and the frame pre-installed flange (704), the hollow pipe is connected to the sewage storage tank (703), the sewage suction pipe base (502) is connected to the top of the hollow pipe by a rotary seal, and the sewage suction pipe base (502) is fixedly connected to the support bracket (702); A suction pipe joint is installed in the middle of the suction pipe reel (102), one end of which is connected to the sewage discharge end of the suction pipe (103), and the other end of which is downwardly connected to the top rotation seal of the suction pipe base (502).
8. The railway silt removal vehicle according to claim 6, characterized in that: The support bracket (702) is provided with a locking device (400), wherein the locking device (400) comprises: A lock fixing seat (402) is arranged on the supporting bracket (702), and a lock tongue (403) of the lock fixing seat (402) is arranged upward; A controller (401) capable of controlling the locking tongue (403) to extend or retract; The position sensor (404) is capable of monitoring the position information of the locking tongue (403).
9. The railway silt removal vehicle according to claim 6, characterized in that: The installation frame (701) is provided with a sewage suction pipe protection frame assembly (300), and the sewage suction pipe protection frame assembly (300) comprises: A protective support (301) is vertically mounted on the mounting frame (701); A fixed lock (303) comprising a lock body and a lock buckle, wherein the lock body is arranged on the protective support (301), the lock body is recessed with a semicircular arc groove, the lock buckle is a semicircular ring, and one end of the lock buckle is hinged to the lock body; A rotating cover plate (302) is arranged on the lock body, and locking is completed by the rotating cover plate (302) after the lock buckle and the lock body are closed.
10. The railway silt removal vehicle according to claim 6, characterized in that: The support bracket (702) is equipped with a limit assembly (600), and the limit assembly (600) includes: A position limiting mounting seat (602) is arranged on the supporting bracket (702), the position limiting mounting seat (602) is provided with a plug hole in a vertical direction, and a plurality of connecting bolts (603) are screwed on the position limiting mounting seat (602) perpendicularly to the plug hole; A position limiting installation pin (601), after the position limiting installation pin (601) is inserted into the insertion hole, the position limiting installation pin (601) is limited by tightening the connecting bolt (603).