High-dipping thin ore body mining method suitable for broken surrounding rock conditions
By using two-step continuous mining and spiral ramp layering platform in sharp inclined thin ore body, the problem of excessive exposure area of the mining site under crushed surrounding rock conditions is solved, and safety and engineering volume are achieved The optimization avoids cross-burning and roof cracking.
Patent Information
- Application Number
- CN202411663684.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2044-11-20
AI Technical Summary
Under crushing surrounding rock conditions, the mining of sharply inclined thin ore bodies often leads to excessive exposure area of the mining site, resulting in large-scale sprinklers and cracking of the roof, posing serious safety hazards.
Using a two-step continuous mining method, by arranging spiral ramps and layered platforms in the middle of the ore body, the contact lane project volume is reduced, the exposed area of the mining roof and side support is controlled, and the mining is supported by vertical access and permanent point columns. to avoid spilling and cracking of the roof.
It effectively reduces the construction space demand, reduces the project volume of the contact lane, improves the operation safety, avoids safety hazards caused by crushing surrounding rocks, and ensures the convenience of ore transportation and equipment operation.
Smart Images

Figure CN119308677A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground mining, in particular to a steeply inclined thin ore body mining method suitable for broken surrounding rock conditions. Background Art
[0002] Steeply inclined thin ore bodies refer to ore bodies with an inclination angle greater than 55° and an ore body thickness less than 5m. They are commonly found in lead-zinc, gold, tungsten and other deposits. The upward horizontal layered filling mining method is often used to mine such ore bodies. When mining using the upward horizontal layered filling mining method, it is generally arranged along the direction of the ore body, and the length of the stope is about 40.0 to 60.0m. Especially when mining some independent ore bodies, only one stope is often arranged; the mining process is two mining and one filling, and the empty roof height is generally 6.0 to 8.0m. If the above mining method is used in the condition of broken surrounding rock of the ore body, due to the large exposed area of the side wall of the stope, large-scale cross-bursting often occurs, and even causes the roof to crack, causing great safety hazards. Summary of the invention
[0003] In order to reduce the space required for construction, reduce the exposed area of the side walls of the mining area, and improve the safety of operations, the present application provides a steeply inclined thin ore body mining method suitable for broken surrounding rock conditions.
[0004] The present application provides a steeply inclined thin ore body mining method suitable for broken surrounding rock conditions, which adopts the following technical solutions:
[0005] A steeply inclined thin ore body mining method suitable for broken surrounding rock conditions comprises the following steps:
[0006] S1. Conduct engineering geological condition survey on the ore body and its surrounding rock to determine the stope structure parameters;
[0007] S2, dividing the ore body into chambers and pillars along the strike according to the length of the stope, and continuous mining in two steps;
[0008] S3. Carry out the mining and cutting works in the mining field;
[0009] S4. Arrange a ramp at a certain distance from the middle of the ore body, construct a connecting tunnel from the ramp to the other side of the ore body, and then construct a mining access to both sides from the vertical connecting tunnel close to the side with better surrounding rock stability, and carry out mining and filling in steps;
[0010] S5. After the first layer is mined, backfilling is carried out. After the filling is completed and the design strength is reached, the second layer is mined, and the cycle continues until the mining of the stope is completed.
[0011] Optionally, in step S1, it is necessary to perform rock mass quality classification and stability evaluation on the ore body, and then further determine the stope structure parameters according to the Mathews graphical method and numerical simulation software.
[0012] Optionally, in step S2, the length of the stope in step one is consistent with that of the stope in step two, the stope width is the thickness of the ore body, and the stope layer height is 3.0-4.0 m.
[0013] Optionally, the mining and cutting works in step S3 include: ore chute, waste rock chute and filling return air shaft.
[0014] Optionally, in step S4, the ramp is a spiral ramp, a layered platform is formed at each layer height of the ramp, and a connecting tunnel is constructed from each layered platform of the ramp to the other side of the ore body; each layered platform is connected to a different layer.
[0015] Optionally, during the mining process of step S4, if the thickness of the ore body is less than the width of two access roads, after one access road is constructed, the remaining ore bodies are mined in the form of expansion and brushing.
[0016] Optionally, during the mining process of step S4, if the thickness of the ore body reaches more than 2 access widths, mining is carried out through a vertical access after one access is constructed, and permanent point columns are left to support the mining area.
[0017] In summary, this application includes the following beneficial technical effects:
[0018] 1. The present application reduces the distance between the ramp and the stope by setting up a spiral ramp and a layered platform, greatly reducing the engineering workload of the connecting tunnel. At the same time, each layered platform is responsible for one layer, which reduces the slope of the connecting tunnel and facilitates ore transportation and equipment operation.
[0019] 2. First, make a professional estimate and analysis of the ore body, and then divide the length of the mining area. The second step is to first mine an approach, then mine a vertical approach, and then make this approach into a permanent concrete point column to control the exposure area of the mining area roof and side walls, avoid the occurrence of cross-over of broken surrounding rock and even cracks in the ore body roof, and ensure the safety of personnel operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a top view of a typical mining plan where the thickness of the ore body is only 1 to 2 access widths;
[0021] Figure 2 for Figure 1 AA section diagram in;
[0022] Figure 3 for Figure 1 BB cross-section diagram in FIG.
[0023] Figure 4 It is a top view of a typical mining plan when the thickness of the ore body reaches more than 2 access widths;
[0024] Figure 5 for Figure 4 Schematic diagram of CC cross section in ;
[0025] Figure 6 for Figure 4 DD cross-section diagram in ;
[0026] Description of reference numerals:
[0027] 1. Ramp; 2. Ore chute; 3. Waste rock chute; 4. Connecting tunnel; 5. Backfill retaining wall; 6- Mining access; 7. First layer; 8. Ore body; 9. Backfill air shaft; 10. Second layer; 11. Drilling rig; 12. Blast hole; 13. Mine pillar. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1-6 This application is described in further detail.
[0029] Embodiment 1;
[0030] refer to Figures 1 to 3 The present application discloses a method for mining a steeply inclined thin ore body suitable for broken surrounding rock conditions, which comprises the following steps:
[0031] Step S1: The rock mass quality and stability of the ore body and its upper and lower wall surrounding rocks are graded and evaluated, and then the stope structure parameters are obtained according to the Mathews graphical method and numerical simulation software; here, the upper wall surrounding rock (quartz porphyry) of the ore body is III-IV rock mass, the lower wall surrounding rock (Shidengzi limestone) is II-III rock mass, and the upper wall exposure area is 100m 3 For example, in order to control the stability of the hanging wall, the stope structure parameters are set to 3.0×30.0m.
[0032] Step S2: Taking the ore body with a length of 60.0m as an example, the ore body is divided into two stopes along the strike, and continuous mining is carried out in two steps. The length of the stope in step one is the same as that in step two, both of which are 30.0m. The stope width is the thickness of the ore body, and the stope layer height is 3.0m.
[0033] Step S3, constructing the mining and cutting project in the mining field, including the ore chute 2, the waste rock chute 3 and the filling return air shaft.
[0034] Step S4, first arrange a spiral ramp 1 at a distance of 6.0m from the ore body on the side with better surrounding rock stability in the middle of the ore body, and make a layered platform (3m, 6m, 9m ore body, etc.) every 3.0m on the ramp 1, and construct a connecting tunnel 4 from each layered platform of the ramp 1 to the other side of the ore body, and then construct a 2.6×3.0m mining approach to both sides of the vertical connecting tunnel 4 close to the side with better surrounding rock stability; in this embodiment of the present application, if the thickness of the ore body is less than the width of two approaches, the remaining ore bodies are mined in the form of expansion and brushing after one approach is constructed.
[0035] Step S5, in the mining, the mining is carried out in the form of mining one and filling one, that is, filling is carried out after the first layer is mined, and a filling retaining wall 5 is set in the connecting tunnel 4 during the filling process. After the filling is completed and the design strength is reached, the second layer is mined, and the cycle is continued until the mining of the stope is completed.
[0036] Embodiment 2;
[0037] refer to Figures 4 to 6 The difference between this embodiment and embodiment 1 is that the thickness of the ore body is greater than the width of the two access roads. In step S4, after one access road is constructed, the vertical access road is mined. First, a vertical access road is mined at intervals of 10m. Secondly, the mined vertical access road is filled with high-strength concrete to make permanent point columns, and then other vertical access roads are mined. Finally, after the stratified mining is completed, the road is filled according to the design requirements.
[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for mining steeply inclined thin ore bodies suitable for broken surrounding rock conditions, characterized in that The steps include: S1. Conduct engineering geological condition survey on the ore body and its surrounding rock to determine the stope structure parameters; S2, dividing the ore body into chambers and pillars along the strike according to the length of the stope, and continuous mining in two steps; S3. Carry out the mining and cutting works in the mining field; S4. Arrange a ramp at a certain distance from the middle of the ore body, construct a connecting tunnel from the ramp to the other side of the ore body, and then construct a mining access to both sides from the vertical connecting tunnel close to the side with better surrounding rock stability, and carry out mining and filling in steps; S5. After the first layer is mined, backfilling is carried out. After the filling is completed and the design strength is reached, the second layer is mined, and the cycle continues until the mining of the stope is completed.
2. A steeply inclined thin ore body mining method suitable for broken surrounding rock conditions according to claim 1, characterized in that: In step S1, the rock mass quality and stability evaluation of the ore body are required, and then the stope structure parameters are further determined according to the Mathews graphical method and numerical simulation software.
3. The method for mining a steeply inclined thin ore body suitable for broken surrounding rock conditions according to claim 1, characterized in that: In step S2, the length of the stope in step one is consistent with that of the stope in step two, the stope width is the thickness of the ore body, and the stope layer height is 3.0-4.0 m.
4. The method for mining a steeply inclined thin ore body suitable for broken surrounding rock conditions according to claim 1, characterized in that: The mining and cutting project in step S3 includes: ore chute, waste rock chute and filling return air shaft.
5. The method for mining a steeply inclined thin ore body suitable for broken surrounding rock conditions according to claim 1, characterized in that: In step S4, the ramp is a spiral ramp, and a layered platform is formed at each layer height of the ramp. A connecting tunnel is constructed from each layered platform of the ramp to the other side of the ore body; each layered platform is connected to a different layer.
6. A steeply inclined thin ore body mining method suitable for broken surrounding rock conditions according to claim 5, characterized in that: During the mining process of step S4, if the thickness of the ore body is less than the width of two access roads, the remaining ore bodies are mined in the form of expansion and brushing after one access road is constructed.
7. A steeply inclined thin ore body mining method suitable for broken surrounding rock conditions according to claim 6, characterized in that: During the mining process in step S4, if the thickness of the ore body reaches more than 2 access widths, mining is carried out through a vertical access after one access is constructed, and permanent point columns are left to support the mining area.
Citation Information
Patent Citations
Improved inlet-route stoping method for large, thick and cracked ores under scattered body through top and bottom column
CN102678122A
Stope route arrangement mode and method beneficial to roof-contacted filling
CN103615285A
Mining method for hanging wall surrounding rock broken inclined medium thick orebody
CN108612530A
Method for mining inclined and steeply inclined thin ore body
CN114183142A
Cutting-well-free steeply inclined thin ore body mining method
CN115075820A
Cited By
Segmented-roadway-free mining method for steeply inclined thin ore body
CN120520651A
Upward horizontal layered filling mining method for gently inclined-inclined thick ore body
CN120592629A