Method and apparatus in node used for wireless communication
By implicitly indicating the minimum scheduling offset value set in the wireless communication system, the problem of untimely buffering of the data channel in the SBFD scenario is solved, and lower terminal power consumption and higher spectrum efficiency are achieved.
Patent Information
- Application Number
- CN202310905276.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-21
- Publication Date
- 2025-01-21
AI Technical Summary
In the SBFD scenario, the base station and the terminal need a protection period during symbol switching, resulting in untimely buffering of the data channel, which may lead to transmission failure or introduce unnecessary delays.
By implicitly indicating the minimum scheduling offset value set in the DCI, the resources occupied by the DCI, the time domain resources occupied by the channel or signal, and the reference signal resources of the physical layer channel QCL are used to determine the minimum scheduling offset value set, thereby optimizing Scheduling across time slots.
This method reduces unnecessary data channel buffering, reduces the activation time of radio frequency circuits, reduces terminal power consumption, improves spectrum efficiency, and saves signaling overhead.
Smart Images

Figure CN119342603A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to a transmission method and device in a wireless communication system, and in particular to a method and device for wireless signal transmission in a wireless communication system supporting a cellular network. Background Art
[0002] In the future, the application scenarios of wireless communication systems will become more and more diversified, and different application scenarios will put forward different performance requirements for the system. In order to meet the different performance requirements of various application scenarios, the 3GPP (3rd Generation Partner Project) RAN (Radio Access Network) #72 plenary meeting decided to study the new radio (NR) (or 5G), and the WI (Work Item) of NR technology was passed at the 3GPP RAN #75 plenary meeting, and the standardization work of NR began.
[0003] In the existing NR system, spectrum resources are statically divided into FDD (Frequency Division Duplexing) spectrum and TDD (Time Division Duplexing) spectrum. For TDD spectrum, both base stations and UE (User Equipment) work in half-duplex mode. This half-duplex mode avoids self-interference and can alleviate the impact of cross-link interference (CLI), but it also brings problems such as reduced resource utilization and increased latency. To address these problems, supporting flexible duplex mode or variable link direction (uplink or downlink or flexible) on TDD spectrum or FDD spectrum has become a possible solution. In the 3GPP RAN#88e meeting and the 3GPP Rel-18 (Release-18, Version 18) workshop, supporting more flexible duplex mode or full-duplex mode in NR Rel-18 has received widespread attention and discussion, especially the SubBand non-overlapping Full Duplex (SBFD) mode on the gNB (NR Node B) side. Communications in this mode will be severely interfered with, including self-interference and CLI. To solve the interference problem, advanced interference cancellation techniques are needed, including antenna isolation, beamforming, RF (Radio Frequency) level interference cancellation, and digital interference cancellation. Summary of the invention
[0004] In order to reduce unnecessary buffering and processing of the data channel by the terminal before decoding DCI (Downlink Control Information), in the existing standard, the base station can configure up to 2 minimum applicable scheduling offsets for each DL (DownLink) BWP (BandWidth Part), namely K 0min , used for downlink cross-time slot scheduling, and can configure up to 2 minimum applicable scheduling offsets for each UL (UpLink) BWP, i.e. K 2min , used for uplink cross-time slot scheduling; the terminal dynamically adjusts K according to the instructions in the scheduling DCI 0min and K 2min , achieving the effect of reducing terminal power consumption.
[0005] However, in the SBFD scenario, the base station may use different panels / antennas for SBFD symbols and non-SBFD symbols, and the terminal also needs to re-tune the filter and adjust the sampling rate when switching between SBFD symbols and non-SBFD symbols. Therefore, the switch between SBFD symbols and non-SBFD symbols may require a guard period to switch panels, tune filters, and adjust timing. If the base station configures a smaller K for the UE, 0min and K 2min , which may cause transmission failure due to untimely buffering of the data channel, and a too large K 0min and K 2min Unnecessary transmission delay will be introduced. Therefore, the minimum applicable scheduling offset for cross-time slot scheduling in the SBFD scenario needs to be enhanced.
[0006] In response to the above problems, the present application discloses a solution. It should be noted that although the original intention of this application is for SBFD scenarios, this application can also be applied to other non-SBFD scenarios; further, the use of a unified design scheme for different scenarios (such as other non-SBFD scenarios, including but not limited to capacity enhancement systems, short-range communication systems, unlicensed spectrum communications, IoT (Internet of Things), URLLC (Ultra Reliable Low Latency Communication) networks, Internet of Vehicles, etc.) can also help reduce hardware complexity and costs. In the absence of conflict, the embodiments and features in any node of the present application can be applied to any other node. In the absence of conflict, the embodiments and features in the embodiments of the present application can be arbitrarily combined with each other.
[0007] In particular, the interpretation of the terminology, nouns, functions, and variables in this application (if not otherwise specified) can refer to the definitions in the 3GPP specification protocols TS38 series and TS37 series. If necessary, reference can be made to 3GPP standards TS38.211, TS38.212, TS38.213, TS38.214, TS38.215, TS38.300, TS38.304, TS38.305, TS38.321, TS38.331, TS37.355, TS38.423 to assist in understanding this application.
[0008] As an example, the interpretation of the terms in the present application refers to the definitions of the TS38 series of specification protocols of 3GPP.
[0009] As an example, the interpretation of the terms in the present application refers to the definitions of the TS37 series of specification protocols of 3GPP.
[0010] The present application discloses a method in a first node used for wireless communication, which includes:
[0011] receiving a first DCI, the first DCI comprising a first field, the first field included in the first DCI being used to indicate a minimum applicable scheduling offset;
[0012] The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0013] -resources occupied by the first DCI;
[0014] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0015] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0016] As an embodiment, the problem to be solved by the present application includes: how to determine the minimum applicable scheduling offset indicated by the DCI.
[0017] As an embodiment, the problem to be solved by the present application includes: when the first node is configured with multiple candidate minimum scheduling offset value sets, how to determine the minimum scheduling offset value set to which the minimum applicable scheduling offset indicated by the DCI belongs.
[0018] As an embodiment, the characteristics of the above method include: the present application indicates the minimum scheduling offset from the minimum scheduling offset value set through the first field of the first DCI, thereby solving the above problem.
[0019] As an embodiment, the characteristics of the above method include: the first node in the present application is configured with multiple candidate minimum scheduling offset value sets, and the DCI indicating the minimum scheduling offset value implicitly indicates the minimum scheduling offset value set from multiple candidate minimum scheduling offset value sets, thereby solving the above problem.
[0020] As an embodiment, the characteristics of the above method include: in the present application, the minimum scheduling offset value set is determined from the multiple candidate minimum scheduling offset value sets based on one of the resources occupied by the DCI indicating the minimum scheduling offset value, the time domain resources occupied by the channel or signal scheduled by the DCI indicating the minimum scheduling offset value, and the reference signal resources of the physical layer channel QCL scheduled by the DCI indicating the minimum scheduling offset value, thereby solving the above problem.
[0021] As an embodiment, the characteristics of the above method include: the minimum applicable scheduling offset is K 0min and / or K 2min , the first minimum applicable scheduling offset is applicable to dynamic downlink scheduling and / or dynamic uplink scheduling.
[0022] As an embodiment, the benefits of the above method include: supporting cross-time slot scheduling, reducing unnecessary data channel buffering, reducing the activation time of the radio frequency circuit in the time domain, and facilitating reducing terminal power consumption.
[0023] As an embodiment, the benefits of the above method include: no need to explicitly indicate the minimum scheduling offset value set, thus saving signaling overhead.
[0024] As an embodiment, the benefits of the above method include: configuring multiple minimum scheduling offset value sets to better adapt to cross-time slot scheduling in different scenarios.
[0025] According to one aspect of the present application, the above method is characterized in that the resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0026] As an embodiment, the characteristics of the above method include: the first DCI implicitly indicates a minimum scheduling offset value set, and the implicit indication includes indicating the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets according to the CORESET pool occupied by the first DCI.
[0027] As an embodiment, the characteristics of the above method include: the physical layer channel occupied by the first DCI includes PDCCH, and the CORESET to which the PDCCH belongs is configured with a coresetPoolIndex parameter.
[0028] As an embodiment, the characteristics of the above method include: the present application supports the scenario of non-coherent joint transmission.
[0029] As an embodiment, the characteristics of the above method include: the first node can determine the TRP, default QCL reference and resource type of the downlink channel transmission scheduled by the first DCI based on the CORESET pool occupied by the first DCI.
[0030] As an embodiment, the benefits of the above method include: scheduling of different CORESET pools reduces transmission interference as much as possible and improves transmission reliability.
[0031] As an embodiment, the benefits of the above method include: configuring different candidate minimum scheduling offset value sets for DCI scheduling of different CORESET pools, or associating the candidate minimum scheduling offset value sets with the CORESET pool, using different minimum applicable scheduling offsets for different resources, and having better scheduling flexibility and resource allocation flexibility.
[0032] As an embodiment, the benefits of the above method include: avoiding the use of additional signaling to indicate the minimum scheduling offset value set, thereby improving spectrum efficiency and saving signaling overhead.
[0033] According to one aspect of the present application, the above method is characterized in that the multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0034] As an embodiment, the characteristics of the above method include: the first DCI implicitly indicates a minimum scheduling offset value set, and the implicit indication includes indicating the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets according to the time domain resources occupied by the channel or signal scheduled by the first DCI.
[0035] As an embodiment, the characteristics of the above method include: the first DCI implicitly indicates a minimum scheduling offset value set, and the implicit indication includes indicating the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets based on whether the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set.
[0036] As an embodiment, the characteristics of the above method include: the first type of symbol set includes full-duplex symbols.
[0037] As an embodiment, the characteristics of the above method include: the present application is applicable to a full-duplex scenario, and the full-duplex scenario includes a SBFD scenario.
[0038] As an embodiment, the benefits of the above method include: supporting full-duplex scenarios, which is beneficial to increasing uplink coverage.
[0039] As an embodiment, the benefits of the above method include: the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set are respectively aimed at the scenarios where the channel or signal scheduled by the first DCI occupies full-duplex and non-full-duplex time domain resources, thereby reducing the design complexity of cross-time slot scheduling in the full-duplex scenario and facilitating implementation.
[0040] As an embodiment, the benefits of the above method include: avoiding the use of additional signaling to indicate the minimum scheduling offset value set, thereby improving spectrum efficiency and saving signaling overhead.
[0041] According to one aspect of the present application, the above method is characterized in that the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0042] As an embodiment, the characteristics of the above method include: the first DCI implicitly indicates a minimum scheduling offset value set, and the implicit indication includes indicating the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets based on the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0043] As an embodiment, the characteristics of the above method include: the first DCI implicitly indicates a minimum scheduling offset value set, and the implicit indication includes indicating the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets based on a reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs.
[0044] As an embodiment, the characteristics of the above method include: full-duplex symbols and non-full-duplex symbols may use different panels / antennas, and the reference signal resource set can implicitly determine the type of time domain resources occupied by the physical layer channel scheduled by the first DCI based on the reference signal resources of the physical layer channel QCL scheduled by the first DCI, thereby determining the corresponding minimum scheduling offset value set.
[0045] As an embodiment, the benefits of the above method include: the reference signal resources of the physical layer channel QCL scheduled by the first DCI in different scenarios are different, which is conducive to adjusting the filtering parameters of the corresponding channel estimator and improving transmission robustness.
[0046] As an embodiment, the benefits of the above method include: avoiding the use of additional signaling to indicate the minimum scheduling offset value set, thereby improving spectrum efficiency and saving signaling overhead.
[0047] According to one aspect of the present application, the above method is characterized in that the multiple candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window.
[0048] As an embodiment, the characteristics of the above method include: the given time window is equal to the duration of multiple consecutive time slots.
[0049] As an embodiment, the characteristics of the above method include: the given time window is a TDD UL / DL pattern period.
[0050] As an embodiment, the characteristics of the above method include: the transition point includes a transition point between a full-duplex symbol and a non-full-duplex symbol and a transition point between a non-full-duplex symbol and a full-duplex symbol, the full-duplex symbol includes an SBFD symbol, and the non-full-duplex symbol includes a non-SBFD symbol.
[0051] As an embodiment, the benefits of the above method include: achieving a balance between transmission robustness and transmission delay.
[0052] As an embodiment, the benefits of the above method include: reasonably configuring the candidate minimum scheduling offset according to the number of the maximum conversion points, avoiding data channel buffering failure caused by the presence of protection periods between conversion points, thereby improving transmission performance.
[0053] According to one aspect of the present application, the above method is characterized in that the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
[0054] As an embodiment, the characteristics of the above method include: the present application supports self-scheduling scenarios.
[0055] As an embodiment, the benefits of the above method include: reducing system complexity and facilitating implementation.
[0056] According to one aspect of the present application, the above method is characterized in that the CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool, the first CORESET pool is used for scheduling in a first type of symbol set and the second CORESET pool is used for scheduling in symbols outside the first type of symbol set; or, the multiple reference signal resource sets are respectively the first reference signal resource set and the second reference signal resource set, the first reference signal resource set is used for transmission in the first type of symbol set and the second reference signal resource set is used for transmission in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration.
[0057] As an embodiment, the characteristics of the above method include: the scheduling in the first category of symbol set and the scheduling in symbols outside the first category of symbol set correspond to different CORESET pools respectively.
[0058] As an embodiment, the characteristics of the above method include: transmission in the first type of symbol set and transmission in symbols outside the first type of symbol set correspond to different reference signal resource sets respectively.
[0059] As an embodiment, the benefits of the above method include: the first CORESET pool and the second CORESET pool are respectively for scheduling on full-duplex resources and non-full-duplex resources, which reduces the design complexity of cross-time slot scheduling in full-duplex scenarios and is easy to implement.
[0060] As an embodiment, the benefits of the above method include: the first reference signal resource set and the second reference signal resource set are respectively for scheduling on full-duplex resources and non-full-duplex resources, reducing the design complexity of cross-time slot scheduling in a full-duplex scenario and facilitating implementation.
[0061] According to one aspect of the present application, the above method is characterized in that the first node is a user equipment.
[0062] According to one aspect of the present application, the above method is characterized in that the first node is a relay node.
[0063] The present application discloses a method in a second node used for wireless communication, which includes:
[0064] Sending a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset;
[0065] The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0066] -resources occupied by the first DCI;
[0067] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0068] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0069] According to one aspect of the present application, the above method is characterized in that the resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0070] According to one aspect of the present application, the above method is characterized in that the multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0071] According to one aspect of the present application, the above method is characterized in that the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0072] According to one aspect of the present application, the above method is characterized in that the multiple candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window.
[0073] According to one aspect of the present application, the above method is characterized in that the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
[0074] According to one aspect of the present application, the above method is characterized in that the CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool, the first CORESET pool is used for scheduling in a first type of symbol set and the second CORESET pool is used for scheduling in symbols outside the first type of symbol set; or, the multiple reference signal resource sets are respectively the first reference signal resource set and the second reference signal resource set, the first reference signal resource set is used for transmission in the first type of symbol set and the second reference signal resource set is used for transmission in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration.
[0075] According to one aspect of the present application, the above method is characterized in that the second node is a base station.
[0076] According to one aspect of the present application, the above method is characterized in that the second node is a user equipment.
[0077] According to one aspect of the present application, the above method is characterized in that the second node is a relay node.
[0078] The present application discloses a device for a first node used for wireless communication, comprising:
[0079] A first receiver receives a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset;
[0080] The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0081] -resources occupied by the first DCI;
[0082] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0083] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0084] The present application discloses a device for a second node used for wireless communication, comprising:
[0085] A first transmitter sends a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset;
[0086] The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0087] -resources occupied by the first DCI;
[0088] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0089] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0090] As an embodiment, compared with the traditional solution, the present application has the following advantages but not limited to:
[0091] Configure multiple minimum scheduling offset value sets and use different minimum applicable scheduling offsets for different resources, which has better scheduling flexibility and resource allocation flexibility, and better adapts to cross-time slot scheduling in different scenarios;
[0092] No need to explicitly indicate the minimum scheduling offset value set, which improves spectrum efficiency and saves signaling overhead;
[0093] The design complexity of cross-time slot scheduling in full-duplex scenarios is reduced and easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0094] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0095] Figure 1 A flowchart showing first node transmission according to an embodiment of the present application is shown;
[0096] Figure 2 A schematic diagram of a network architecture according to an embodiment of the present application is shown;
[0097] Figure 3 A schematic diagram showing an embodiment of a wireless protocol architecture of a user plane and a control plane according to an embodiment of the present application;
[0098] Figure 4 A schematic diagram showing a first communication device and a second communication device according to an embodiment of the present application is shown;
[0099] Figure 5 A flow chart showing transmission between a first node and a second node according to an embodiment of the present application is shown;
[0100] Figure 6 A schematic diagram showing a relationship between resources occupied by a first DCI and a minimum scheduling offset value set according to an embodiment of the present application;
[0101] Figure 7 A schematic diagram showing a relationship between a CORESET pool occupied by a first DCI and a first symbol set according to an embodiment of the present application;
[0102] Figure 8 A schematic diagram showing a relationship between a channel or signal scheduled by a first DCI and a first type of symbol set according to an embodiment of the present application;
[0103] Fig. 9 A schematic diagram showing a relationship between a minimum scheduling offset value set and a time domain resource occupied by a channel or signal scheduled by a first DCI according to an embodiment of the present application;
[0104] Fig.10 A schematic diagram showing the relationship between a minimum scheduling offset value set and a reference signal resource of a physical layer channel QCL scheduled by a first DCI according to an embodiment of the present application;
[0105] Fig.11 A schematic diagram showing a relationship between multiple reference signal resource sets and a first type of symbol set according to an embodiment of the present application;
[0106] Fig.12 A schematic diagram showing candidate minimum scheduling offset values according to an embodiment of the present application is shown;
[0107] Fig.13 A schematic diagram showing a relationship between a first DCI and a minimum scheduling offset value set according to an embodiment of the present application;
[0108] Fig.14 A schematic diagram showing a first type of symbol set according to an embodiment of the present application is shown;
[0109] Fig.15 A structural block diagram of a processing device used in a first node according to an embodiment of the present application is shown;
[0110] Fig.16 A structural block diagram of a processing device used in a second node according to an embodiment of the present application is shown. DETAILED DESCRIPTION
[0111] The technical solution of the present application will be further described in detail below in conjunction with the accompanying drawings. It should be noted that, unless there is a conflict, the embodiments in the present application and the features in the embodiments can be combined with each other arbitrarily.
[0112] Example 1
[0113] Embodiment 1 illustrates a flowchart of the first node transmission according to an embodiment of the present application, as shown in the attached Figure 1 As shown in the attached Figure 1 In the example, each box represents a step. In particular, the order of the steps in the box does not represent a specific time sequence between the steps.
[0114] In step 101 , the first node receives a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset.
[0115] In embodiment 1, the first field included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0116] -resources occupied by the first DCI;
[0117] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0118] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0119] As an embodiment, the DCI refers to: Downlink Control Information, downlink control information.
[0120] As an embodiment, the QCL refers to: Quasi Co-Location.
[0121] As an embodiment, the QCL refers to: Quasi Co-Located.
[0122] As an embodiment, the first node receives the first DCI.
[0123] As an embodiment, the first DCI is an uplink scheduling signaling.
[0124] As an embodiment, the first DCI is used to schedule an uplink channel or an uplink signal.
[0125] As an embodiment, the format of the first DCI is a DCI format for scheduling an uplink channel or an uplink signal.
[0126] As an embodiment, the format of the first DCI is DCI format0_X, where X is a positive integer.
[0127] As an embodiment, the format of the first DCI is DCI format0_1.
[0128] As an embodiment, the first DCI is a downlink scheduling signaling.
[0129] As an embodiment, the first DCI is used to schedule a downlink channel or a downlink signal.
[0130] As an embodiment, the format of the first DCI is a DCI format for scheduling a downlink channel or a downlink signal.
[0131] As an embodiment, the format of the first DCI is DCI format 1_X, where X is a positive integer.
[0132] As an embodiment, the format of the first DCI is DCI format 1_1.
[0133] As an embodiment, a CRC (Cyclic Redundancy Check) of the first DCI is scrambled by a RNTI (Radio Network Temporary Identifier) dedicated to a user equipment (User Equipment-dedicated, UE-dedicated).
[0134] As an embodiment, the first DCI includes at least one DCI field.
[0135] As an embodiment, the first DCI includes the first domain.
[0136] As an embodiment, the first domain included in the first DCI includes at least 1 bit.
[0137] As an embodiment, the first domain included in the first DCI includes 1 bit.
[0138] As an embodiment, the first field included in the first DCI includes at least log2K1 bits.
[0139] As an embodiment, the first field included in the first DCI includes log2 K1 bits.
[0140] As an embodiment, the first field included in the first DCI includes a Minimum applicable scheduling offset indicator field.
[0141] As an embodiment, the first field included in the first DCI is a Minimum applicable scheduling offset indicator field.
[0142] As an embodiment, the unit of the minimum applicable scheduling offset is a time slot.
[0143] As an embodiment, the unit of the minimum applicable scheduling offset is a symbol.
[0144] As an embodiment, the unit of the minimum applicable scheduling offset is millisecond (ms).
[0145] As an embodiment, the minimum applicable scheduling offset corresponds to K in 3GPP (3rd Generation Partner Project) TS (Technical Specification) 38 protocol. 0min .
[0146] As an embodiment, the minimum applicable scheduling offset corresponds to K in the 3GPP TS 38 protocol. 2min .
[0147] As an embodiment, the minimum applicable scheduling offset corresponds to K in the 3GPP TS 38 protocol. 0min and K 2min .
[0148] As an embodiment, the first field included in the first DCI is used to indicate the minimum applicable scheduling offset.
[0149] As an embodiment, the first domain included in the first DCI implicitly indicates the minimum applicable scheduling offset.
[0150] As an embodiment, the implicit indication described in the present application includes indirect indication by indicating other IEs including the minimum applicable scheduling offset.
[0151] As an embodiment, the first field included in the first DCI is used to indicate the minimum applicable scheduling offset from the minimum scheduling offset value set.
[0152] As an embodiment, the first field included in the first DCI indicates the minimum applicable scheduling offset from the minimum scheduling offset value set.
[0153] As an embodiment, the first node is configured with the minimum scheduling offset value set.
[0154] As an embodiment, the minimum scheduling offset value set is configured on the active BWP (BandWidth Part) of the first node.
[0155] As an embodiment, the minimum scheduling offset value set is configured per BWP.
[0156] As an embodiment, the minimum scheduling offset value set is configured on the active UL (UpLink) BWP of the first node, and the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set, and the minimum applicable scheduling offset is applied to uplink scheduling.
[0157] As an embodiment, the minimum scheduling offset value set is configured on the active DL (DownLink) BWP of the first node, and the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set, and the minimum applicable scheduling offset is applied to downlink scheduling.
[0158] As an embodiment, the minimum scheduling offset value set is configured on the active UL BWP and the active DL BWP of the first node respectively, and the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set on the active UL BWP, and the minimum applicable scheduling offset is applied to uplink scheduling; and, the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set on the active DL BWP, and the minimum applicable scheduling offset is applied to downlink scheduling.
[0159] As a sub-embodiment of this embodiment, the minimum scheduling offset value set on the active UL BWP is different from the minimum scheduling offset value set on the active DL BWP.
[0160] As an embodiment, the benefits of the above method include: being applicable to downlink and / or uplink cross-time slot scheduling, reducing terminal power consumption, and saving energy.
[0161] As an embodiment, the first node receives a second DCI, and the first node assumes that the scheduling delay between the channel or signal scheduled by the second DCI and the second DCI in the cell scheduled by the second DCI is not less than the minimum applicable scheduling offset, and the second DCI is later than the first DCI.
[0162] As an embodiment, the minimum applicable scheduling offset is applied to the active BWP, and the first node assumes that before the new minimum applicable scheduling offset for the active BWP takes effect, the scheduling delay between the channel or signal scheduled by DCI on the active BWP and the DCI is not less than the minimum applicable scheduling offset.
[0163] As an embodiment, the minimum applicable scheduling offset is applied to the active BWP, and the first node assumes that after the minimum applicable scheduling offset takes effect, the scheduling delay between the channel or signal scheduled by DCI on the active BWP and the DCI is not less than the minimum applicable scheduling offset.
[0164] As an embodiment, the meaning of "the minimum applicable scheduling offset is applied to uplink scheduling" in the present application includes: the minimum applicable scheduling offset is applied to the active UL BWP, and the first node assumes that before the new minimum applicable scheduling offset for the active UL BWP takes effect, the scheduling delay between the uplink channel or uplink signal scheduled by DCI on the active UL BWP and the DCI is not less than the minimum applicable scheduling offset.
[0165] As an embodiment, the meaning of "the minimum applicable scheduling offset is applied to uplink scheduling" in the present application includes: the minimum applicable scheduling offset is applied to the active UL BWP, and the first node assumes that after the minimum applicable scheduling offset takes effect, the scheduling delay between the uplink channel or uplink signal scheduled by DCI on the active UL BWP and the DCI is not less than the minimum applicable scheduling offset.
[0166] As an embodiment, the meaning of "the minimum applicable scheduling offset is applied to downlink scheduling" in the present application includes: the minimum applicable scheduling offset is applied to the active DL BWP, and the first node assumes that before the new minimum applicable scheduling offset for the active DL BWP takes effect, the scheduling delay between the downlink channel or downlink signal scheduled by DCI on the active DL BWP and the DCI is not less than the minimum applicable scheduling offset.
[0167] As an embodiment, the meaning of "the minimum applicable scheduling offset is applied to downlink scheduling" in the present application includes: the minimum applicable scheduling offset is applied to the active DL BWP, and the first node assumes that after the minimum applicable scheduling offset takes effect, the scheduling delay between the downlink channel or downlink signal scheduled by DCI on the active DL BWP and the DCI is not less than the minimum applicable scheduling offset.
[0168] As an embodiment, K1 is a positive integer greater than 1.
[0169] As an embodiment, K1 is equal to 2.
[0170] As an embodiment, the K1 candidate minimum scheduling offset values are all for uplink scheduling.
[0171] As an embodiment, the K1 candidate minimum scheduling offset values are all for downlink scheduling.
[0172] As an embodiment, different minimum scheduling offset value sets are configured on the active UL BWP and the active DL BWP of the first node, respectively, and the minimum scheduling offset value set on the active UL BWP and the minimum scheduling offset value set on the active DLBWP respectively include K1 candidate minimum scheduling offset values.
[0173] As an embodiment, the minimum scheduling offset value set includes 2 candidate minimum scheduling offset values.
[0174] As an embodiment, the first field included in the first DCI is used to indicate the minimum applicable scheduling offset from the K1 candidate minimum scheduling offset values.
[0175] As an embodiment, the first field included in the first DCI indicates the minimum applicable scheduling offset from the K1 candidate minimum scheduling offset values.
[0176] As an embodiment, the first node is configured with multiple candidate minimum scheduling offset value sets.
[0177] As an embodiment, a plurality of candidate minimum scheduling offset value sets are respectively configured on the active UL BWP and the active DL BWP of the first node.
[0178] As an embodiment, the multiple candidate minimum scheduling offset value sets are all for downlink scheduling.
[0179] As an embodiment, the multiple candidate minimum scheduling offset value sets are all for uplink scheduling.
[0180] As an embodiment, multiple candidate minimum scheduling offset value sets are configured on the active UL BWP and active DL BWP of the first node respectively; the multiple candidate minimum scheduling offset value sets on the active UL BWP are all for uplink scheduling, and the multiple candidate minimum scheduling offset value sets on the active DL BWP are all for downlink scheduling.
[0181] As an embodiment, the first node is configured with 2 candidate minimum scheduling offset value sets.
[0182] As an embodiment, two candidate minimum scheduling offset value sets are configured on the active UL BWP and the active DL BWP of the first node respectively.
[0183] As an embodiment, two candidate minimum scheduling offset value sets are configured on the active UL BWP and the active DL BWP of the first node respectively; the two candidate minimum scheduling offset value sets on the active UL BWP are both for uplink scheduling, and the two candidate minimum scheduling offset value sets on the active DL BWP are both for downlink scheduling.
[0184] As an embodiment, any candidate minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets includes at least one candidate minimum scheduling offset value.
[0185] As an embodiment, any candidate minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets includes K1 candidate minimum scheduling offset values.
[0186] As an embodiment, the active BWP described in the present application refers to: the BWP scheduled by the first DCI.
[0187] As an embodiment, the active BWP described in the present application refers to: the BWP in the BWP pair to which the BWP scheduled by the first DCI belongs.
[0188] As an embodiment, the first DCI does not indicate the switching of the active BWP, and the active UL BWP and active DL BWP mentioned in this application refer to the currently active UL BWP and the currently active DL BWP, respectively.
[0189] As an embodiment, the first DCI does not include a Bandwidth part indicator field, and the active UL BWP and active DL BWP mentioned in this application refer to the currently active UL BWP and the currently active DL BWP, respectively.
[0190] As an embodiment, the first DCI indicates active BWP switching, and the active UL BWP and active DL BWP mentioned in this application refer to the UL BWP and DL BWP indicated by the first DCI, respectively.
[0191] As an embodiment, the first DCI includes a Bandwidth part indicator field, and the active UL BWP and active DL BWP mentioned in this application respectively refer to the UL BWP and DL BWP indicated by the Bandwidth part indicator field of the first DCI.
[0192] As an embodiment, determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on resources occupied by the first DCI.
[0193] As an embodiment, the resources occupied by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0194] As an embodiment, the resources occupied by the first DCI include frequency domain resources occupied by the first DCI.
[0195] As a sub-embodiment of this embodiment, the frequency domain resources occupied by the first DCI include the sub-frequency band occupied by the first DCI.
[0196] As a sub-embodiment of this embodiment, the frequency domain resources occupied by the first DCI include the BWP (BandWidth, partial bandwidth) occupied by the first DCI.
[0197] As a sub-embodiment of this embodiment, the frequency domain resources occupied by the first DCI include a carrier occupied by the first DCI.
[0198] As a sub-embodiment of this embodiment, the frequency domain resources occupied by the first DCI include the service cell occupied by the first DCI.
[0199] As a sub-embodiment of this embodiment, the frequency domain resources occupied by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0200] As an embodiment, the resources occupied by the first DCI include time domain resources occupied by the first DCI.
[0201] As a sub-embodiment of this embodiment, the time domain resources occupied by the first DCI include the symbols occupied by the first DCI.
[0202] As a sub-embodiment of this embodiment, the time domain resources occupied by the first DCI include the time slot occupied by the first DCI.
[0203] As a sub-embodiment of this embodiment, the time domain resources occupied by the first DCI include a subframe occupied by the first DCI.
[0204] As a sub-embodiment of this embodiment, the time domain resources occupied by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0205] As an embodiment, the symbol described in the present application is a single-carrier symbol.
[0206] As an embodiment, the symbol described in the present application is a multi-carrier symbol.
[0207] As an embodiment, the multi-carrier symbol described in the present application is a SC-FDMA (Single Carrier-Frequency Division Multiple Access) symbol.
[0208] As an embodiment, the multi-carrier symbol described in the present application is a FBMC (Filter Bank MultiCarrier) symbol.
[0209] As an embodiment, the multi-carrier symbol described in the present application is an OFDM (Orthogonal Frequency Division Multiplexing) symbol.
[0210] As an embodiment, the symbol described in the present application is obtained after the output of a transform precoding is subjected to OFDM symbol generation.
[0211] As an embodiment, the multi-carrier symbol described in the present application is a DFT-s-OFDM (Discrete Fourier Transform-spread-OFDM) symbol.
[0212] As an embodiment, the multi-carrier symbols described in the present application include CP-OFDM (Cyclic Prefix-OFDM, cyclic prefix-orthogonal frequency division multiplexing) symbols.
[0213] As an embodiment, the resources occupied by the first DCI include the spatial resources occupied by the first DCI.
[0214] As a sub-embodiment of this embodiment, the spatial resources occupied by the first DCI include a TCI (Transmission Configuration Indicator) adopted by the first DCI.
[0215] As a sub-embodiment of this embodiment, the spatial domain resources occupied by the first DCI include reference signal resources of a DMRS (DeModulation Reference Signal) QCL included in the first DCI.
[0216] As a sub-embodiment of this embodiment, the spatial resources occupied by the first DCI include reference signal resources of the REs (Resource Elements) QCL occupied by the first DCI.
[0217] As a sub-embodiment of this embodiment, the spatial resources occupied by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0218] Typically, one RE occupies one symbol in the time domain and one subcarrier in the frequency domain.
[0219] As an embodiment, the resources occupied by the first DCI include a PDCCH (Physical Downlink Control CHannel) candidate occupied by the first DCI.
[0220] As a sub-embodiment of this embodiment, the PDCCH candidate occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0221] As an embodiment, the resources occupied by the first DCI include a CORESET (COntrol REsource SET) pool in which the REs occupied by the first DCI are located.
[0222] As a sub-embodiment of this embodiment, the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0223] As an embodiment, the resources occupied by the first DCI include the CORESET where the REs occupied by the first DCI are located.
[0224] As a sub-embodiment of this embodiment, the CORESET occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0225] As an embodiment, the resources occupied by the first DCI include a search space set (Search Space Set, SSset) in which the REs occupied by the first DCI are located.
[0226] As a sub-embodiment of this embodiment, the SS set occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0227] As an embodiment, the resources occupied by the first DCI include a search space (Search Space) in which the REs occupied by the first DCI are located.
[0228] As a sub-embodiment of this embodiment, the Search Space occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0229] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the time domain resources occupied by the channel or signal scheduled by the first DCI.
[0230] As an embodiment, the time domain resources occupied by the channel or signal scheduled by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0231] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the time domain resources occupied by the channel scheduled by the first DCI.
[0232] As an embodiment, the time domain resources occupied by the channel scheduled by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0233] As an embodiment, the channel scheduled by the first DCI includes PDSCH (Physical Downlink Shared CHannel).
[0234] As a sub-embodiment of this embodiment, the time domain resources occupied by the PDSCH scheduled by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0235] As an embodiment, the channel scheduled by the first DCI includes PUSCH (Physical Uplink Shared CHannel, physical uplink shared channel).
[0236] As a sub-embodiment of this embodiment, the time domain resources occupied by the PUSCH scheduled by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0237] As an embodiment, the time domain resources occupied by the channel scheduled by the first DCI include the symbols occupied by the channel scheduled by the first DCI.
[0238] As an embodiment, the time domain resources occupied by the channel scheduled by the first DCI include the time slot occupied by the channel scheduled by the first DCI.
[0239] As an embodiment, the time domain resources occupied by the channel scheduled by the first DCI include the subframe occupied by the channel scheduled by the first DCI.
[0240] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the time domain resources occupied by the signal scheduled by the first DCI.
[0241] As an embodiment, the time domain resources occupied by the signal scheduled by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0242] As an embodiment, the signal scheduled by the first DCI includes a CSI-RS (Channel State Information-Reference Signal) triggered by the first DCI.
[0243] As a sub-embodiment of this embodiment, the first DCI includes a CSI request field, and the CSI request field is used to trigger the CSI-RS.
[0244] As a sub-embodiment of this embodiment, the time domain resources occupied by the CSI-RS triggered by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0245] As an embodiment, the signal scheduled by the first DCI includes an SRS (Sounding Reference Signal) triggered by the first DCI.
[0246] As a sub-embodiment of this embodiment, the first DCI includes an SRS request field, and the SRS request field is used to trigger the SRS.
[0247] As a sub-embodiment of this embodiment, the time domain resources occupied by the SRS triggered by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0248] As an embodiment, the time domain resources occupied by the signal scheduled by the first DCI include the symbols occupied by the signal scheduled by the first DCI.
[0249] As an embodiment, the time domain resources occupied by the signal scheduled by the first DCI include the time slot occupied by the signal scheduled by the first DCI.
[0250] As an embodiment, the time domain resources occupied by the signal scheduled by the first DCI include the subframe occupied by the signal scheduled by the first DCI.
[0251] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0252] As an embodiment, the reference signal resources of the physical layer channel QCL scheduled by the first DCI are used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0253] In one embodiment, the QCL includes QCL parameters.
[0254] As an embodiment, the QCL includes a QCL assumption.
[0255] As an embodiment, the QCL types include TypeA, TypeB, TypeC and TypeD.
[0256] As an embodiment, the QCL parameters of Type A include Doppler shift, Doppler spread, average delay and delay spread.
[0257] As an embodiment, the QCL parameters of the Type B QCL include Doppler shift and Doppler spread.
[0258] As an embodiment, the QCL parameters of the Type C QCL include Doppler shift and average delay.
[0259] As an embodiment, the QCL parameter of Type D includes a spatial reception parameter (spatial Rx parameter).
[0260] As an embodiment, the QCL includes at least one of Doppler shift, Doppler spread, average delay, delay spread, spatial Tx parameter or spatial Rx parameter.
[0261] As an embodiment, the specific definitions of TypeA, TypeB, TypeC and TypeD refer to Section 5.1.5 of 3GPP TS 38.214.
[0262] As an embodiment, the reference signal resources of the physical layer channel QCL scheduled by the first DCI include CSI-RS resources.
[0263] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI is a CSI-RS resource.
[0264] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI is an NZP (non-zero-power) CSI-RS resource.
[0265] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI is a TRS (Tracking Reference Signal) resource.
[0266] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI is an SRS resource.
[0267] As an embodiment, the reference signal resources of the physical layer channel QCL scheduled by the first DCI include SSB.
[0268] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI is an SSB.
[0269] As an embodiment, the SSB described in this application refers to: SS / PBCH block, synchronization signal block.
[0270] As an embodiment, the SSB described in this application refers to: Synchronisation Signal / Physical Broadcast CHannel block, synchronization signal / physical broadcast channel block.
[0271] Typically, the reception occasions of PBCH (Physical Broadcast CHannel), PSS (Primary Synchronization Signal) and SSS (Secondary Synchronization Signal) are in consecutive symbols and form an SS / PBCH block.
[0272] As an embodiment, the reference signal resources of the physical layer channel QCL scheduled by the first DCI include one or more ports.
[0273] As a sub-embodiment of this embodiment, the one or more ports included in the reference signal resources of the physical layer channel QCL scheduled by the first DCI are respectively CSI-RS ports.
[0274] As a sub-embodiment of this embodiment, the one or more ports included in the reference signal resources of the physical layer channel QCL scheduled by the first DCI are antenna ports (antenna port(s)).
[0275] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI includes a reference signal.
[0276] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI includes a reference signal transmitted in the reference signal resource.
[0277] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI corresponds to a TCI.
[0278] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI corresponds to an SRI (SRS Resource Indicator).
[0279] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: reference signal resources of the DMRS port QCL of the physical layer channel scheduled by the first DCI.
[0280] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: all reference signal resources of the DMRS port QCL of the physical layer channel scheduled by the first DCI.
[0281] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: any reference signal resource of the DMRS port QCL of the physical layer channel scheduled by the first DCI.
[0282] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: reference signal resources of the antenna port QCL of the physical layer channel scheduled by the first DCI.
[0283] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: all reference signal resources of the antenna port QCL of the physical layer channel scheduled by the first DCI.
[0284] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: any reference signal resource of the antenna port QCL of the physical layer channel scheduled by the first DCI.
[0285] As an embodiment, the feature "reference signal resources of the QCL of the physical layer channel scheduled by the first DCI" means: reference signal resources of the REsQCL of the physical layer channel scheduled by the first DCI.
[0286] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: all reference signal resources of the REsQCL of the physical layer channel scheduled by the first DCI.
[0287] As an embodiment, the feature "reference signal resources of the physical layer channel QCL scheduled by the first DCI" means: any reference signal resource of the REsQCL of the physical layer channel scheduled by the first DCI.
[0288] As an embodiment, the physical layer channel scheduled by the first DCI is a physical layer downlink channel, the reference signal resources of the physical layer channel QCL scheduled by the first DCI are downlink reference signal resources, and the first node assumes that the same QCL parameters are used to receive the physical layer channel scheduled by the first DCI and to receive the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0289] As an embodiment, the physical layer channel scheduled by the first DCI is a physical layer downlink channel, the reference signal resources of the physical layer channel QCL scheduled by the first DCI are uplink reference signal resources, and the first node assumes that the same QCL parameters are used to receive the physical layer channel scheduled by the first DCI and to send the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0290] As an embodiment, the physical layer channel scheduled by the first DCI is a physical layer uplink channel, the reference signal resources of the physical layer channel QCL scheduled by the first DCI are downlink reference signal resources, and the first node assumes that the same QCL parameters are used to send the physical layer channel scheduled by the first DCI and receive the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0291] As an embodiment, the physical layer channel scheduled by the first DCI is a physical layer uplink channel, the reference signal resources of the physical layer channel QCL scheduled by the first DCI are uplink reference signal resources, and the first node assumes that the same QCL parameters are used to send the physical layer channel scheduled by the first DCI and to send the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0292] Example 2
[0293] Embodiment 2 illustrates a schematic diagram of a network architecture according to an embodiment of the present application, as shown in the attached Figure 2 shown.
[0294] Attached Figure 2The network architecture of LTE (Long-Term Evolution), LTE-A (Long-Term Evolution Advanced), and future 5G systems is described. The network architecture of LTE, LTE-A, and future 5G systems is called EPS (Evolved Packet System). The 5G NR or LTE network architecture may be referred to as 5GS (5G System) / EPS 200 or some other appropriate terminology. 5GS / EPS 200 may include one or more UEs 201, a UE 241 communicating with UE 201 via a sidelink, NG-RAN (Next Generation Radio Access Network) 202, 5G-CN (5G Core Network) / EPC (Evolved Packet Core) 210, HSS (Home Subscriber Server) / UDM (Unified Data Management) 220, and Internet service 230. 5GS / EPS 200 may be interconnected with other access networks, but these entities / interfaces are not shown for simplicity. Figure 2As shown, 5GS / EPS 200 provides packet-switched services, however, those skilled in the art will readily appreciate that the various concepts presented throughout this application can be extended to networks that provide circuit-switched services. NG-RAN 202 includes NR Node B (gNB) 203 and other gNBs 204. gNB 203 provides user and control plane protocol terminations toward UE 201. gNB 203 can be connected to other gNBs 204 via an Xn interface (e.g., backhaul). gNB 203 may also be referred to as a base station, a base transceiver station, a radio base station, a radio transceiver, a transceiver function, a Basic Service Set (BSS), an Extended Service Set (ESS), a TRP (Transmission and Reception Point), or some other suitable term. gNB 203 provides an access point to 5G-CN / EPC 210 for UE 201. Examples of UE 201 include cellular phones, smart phones, Session Initiation Protocol (SIP) phones, laptop computers, personal digital assistants (PDAs), satellite radios, global positioning systems, multimedia devices, video devices, digital audio players (e.g., MP3 players), cameras, game consoles, drones, aircraft, narrowband physical network devices, machine type communication devices, land vehicles, cars, wearable devices, or any other similar functional devices. Those skilled in the art may also refer to UE 201 as a mobile station, a subscriber station, a mobile unit, a subscriber unit, a wireless unit, a remote unit, a mobile device, a wireless device, a wireless communication device, a remote device, a mobile subscriber station, an access terminal, a mobile terminal, a wireless terminal, a remote terminal, a handset, a user agent, a mobile client, a client, or some other suitable term. gNB 203 is connected to 5G-CN / EPC 210 via S1 / NG interface. 5G-CN / EPC 210 includes MME (Mobility Management Entity) / AMF (Authentication Management Field) / SMF (Session Management Function) 211, other MME / AMF / SMF 214, S-GW (Service Gateway) / UPF (User Plane Function) 212 and P-GW (Packet Data Network Gateway) / UPF 213.MME / AMF / SMF 211 is a control node that handles signaling between UE 201 and 5G-CN / EPC 210. In general, MME / AMF / SMF 211 provides bearer and connection management. All user IP (Internet Protocol) packets are transmitted through S-GW / UPF 212, and S-GW / UPF 212 itself is connected to P-GW / UPF 213. P-GW provides UE IP address allocation and other functions. P-GW / UPF 213 is connected to Internet services 230. Internet services 230 include operator-corresponding Internet protocol services, which may specifically include Internet, intranet, IMS (IP Multimedia Subsystem) and packet switching services.
[0295] As an embodiment, the first node in the present application includes the UE 201.
[0296] As an embodiment, the second node in the present application includes the gNB 203.
[0297] As an embodiment, the UE 201 includes a mobile phone.
[0298] As an embodiment, the UE 201 is a vehicle including a car.
[0299] As an embodiment, the gNB 203 is a macro cell base station.
[0300] As an embodiment, the gNB 203 is a micro cell base station.
[0301] As an embodiment, the gNB 203 is a pico cell base station.
[0302] As an embodiment, the gNB 203 is a home base station (Femtocell).
[0303] As an embodiment, the gNB 203 is a base station device that supports a large delay difference.
[0304] As an embodiment, the gNB 203 is a flying platform device.
[0305] As an embodiment, the gNB 203 is a satellite device.
[0306] As an embodiment, the gNB 203 is a test device (e.g., a transceiver that simulates some functions of a base station, a signaling tester).
[0307] As an embodiment, the wireless link from the UE 201 to the gNB 203 is an uplink, and the uplink is used to perform uplink transmission.
[0308] As an embodiment, the wireless link from the gNB 203 to the UE 201 is a downlink, and the downlink is used to perform downlink transmission.
[0309] As an embodiment, the wireless link between the UE 201 and the gNB 203 includes a cellular network link.
[0310] As an embodiment, the UE 201 and the gNB 203 are connected via a Uu air interface.
[0311] As an embodiment, the sender of the first DCI includes the gNB 203.
[0312] As an embodiment, the recipient of the first DCI includes the UE 201.
[0313] As an embodiment, the UE 201 supports downlink cross-time slot scheduling.
[0314] As an embodiment, the UE 201 supports uplink cross-time slot scheduling.
[0315] As an embodiment, the gNB 203 supports downlink cross-time slot scheduling.
[0316] As an embodiment, the gNB 203 supports uplink cross-timeslot scheduling.
[0317] As an embodiment, the UE 201 supports SBFD (SubBand non-overlapping FullDuplex).
[0318] As an embodiment, the UE 201 supports a more flexible duplex mode or a full-duplex mode.
[0319] As an embodiment, the gNB 203 supports SBFD.
[0320] As an embodiment, the gNB 203 supports a more flexible duplex mode or a full-duplex mode.
[0321] Example 3
[0322] Embodiment 3 illustrates a schematic diagram of an embodiment of a wireless protocol architecture of a user plane and a control plane according to an embodiment of the present application, as shown in the attached figure. Figure 3shown.
[0323] Figure 3 is a schematic diagram illustrating an embodiment of a radio protocol architecture for a user plane 350 and a control plane 300, Figure 3The radio protocol architecture of the control plane 300 for a first communication node device (RSU (Road Side Unit) in UE or V2X (Vehicle to Everything), vehicle-mounted device or vehicle-mounted communication module) and a second node device (gNB, RSU in UE or V2X, vehicle-mounted device or vehicle-mounted communication module), or between two UEs is shown in three layers: Layer 1 (Layer 1, L1), Layer 2 (Layer 2, L2) and Layer 3 (Layer 3, L3). L1 is the lowest layer and implements various PHY (PHYsical layer) signal processing functions. L1 will be referred to as PHY 301 in this article. L2 305 is above PHY 301 and is responsible for the link between the first node device and the second node device, or between two UEs through PHY 301. L2305 includes a MAC (Medium Access Control) sublayer 302, an RLC (Radio Link Control) sublayer 303, and a PDCP (Packet Data Convergence Protocol) sublayer 304, which terminate at the second node device. The PDCP sublayer 304 provides multiplexing between different radio bearers and logical channels. The PDCP sublayer 304 also provides security by encrypting data packets, and provides inter-zone mobility support for the first communication node device between the second communication node device. The RLC sublayer 303 provides segmentation and reassembly of upper layer data packets, retransmission of lost data packets, and reordering of data packets to compensate for out-of-order reception caused by HARQ (Hybrid Automatic Repeat reQuest). The MAC sublayer 302 provides multiplexing between logical and transport channels. The MAC sublayer 302 is also responsible for allocating various radio resources (e.g., resource blocks) in a cell between the first communication node devices. The MAC sublayer 302 is also responsible for HARQ operations. The RRC (Radio Resource Control) sublayer 306 in L3 in the control plane 300 is responsible for obtaining radio resources (ie, radio bearers) and configuring lower layers using RRC signaling between the second communication node device and the first communication node device.The radio protocol architecture of the user plane 350 includes layer 1 (L1) and layer 2 (L2). The radio protocol architecture for the first communication node device and the second communication node device in the user plane 350 is substantially the same as the corresponding layers and sublayers in the control plane 300 for the physical layer 351, the PDCP sublayer 354 in L2 355, the RLC sublayer 353 in L2 355, and the MAC sublayer 352 in L2 355, but the PDCP sublayer 354 also provides header compression for upper layer data packets to reduce radio transmission overhead. L2 355 in the user plane 350 also includes a SDAP (Service Data Adaptation Protocol) sublayer 356, which is responsible for mapping between QoS (Quality of Service) flows and data radio bearers (DRBs) to support the diversity of services. Although not shown in the figure, the first communication node device may have several upper layers above L2 355, including a network layer (e.g., IP (Internet Protocol) layer) terminating at the P-GW on the network side and an application layer terminating at the other end of the connection (e.g., a remote UE, a server, etc.).
[0324] As an example, Figure 3 The wireless protocol architecture in is applicable to the first node in this application.
[0325] As an example, Figure 3 The wireless protocol architecture in is applicable to the second node in this application.
[0326] As an embodiment, the first DCI is generated by the PHY 301 or PHY 351.
[0327] Example 4
[0328] Embodiment 4 illustrates a schematic diagram of a first communication device and a second communication device according to an embodiment of the present application, as shown in the attached figure. Figure 4 Attached Figure 4 is a block diagram of a first communication device 410 and a second communication device 450 communicating with each other in an access network.
[0329] The first communication device 410 includes a controller / processor 475 , a memory 476 , a receive processor 470 , a transmit processor 416 , a multi-antenna receive processor 472 , a multi-antenna transmit processor 471 , a transmitter / receiver 418 and an antenna 420 .
[0330] The second communication device 450 includes a controller / processor 459, a memory 460, a data source 467, a transmit processor 468, a receive processor 456, a multi-antenna transmit processor 457, a multi-antenna receive processor 458, a transmitter / receiver 454 and an antenna 452.
[0331] In transmission from the first communication device 410 to the second communication device 450, at the first communication device 410, upper layer data packets from the core network are provided to the controller / processor 475. The controller / processor 475 implements the functionality of L2. In the DL, the controller / processor 475 provides header compression, encryption, packet segmentation and reordering, multiplexing between logical and transport channels, and allocation of radio resources to the second communication device 450 based on various priority metrics. The controller / processor 475 is also responsible for HARQ operations, retransmission of lost packets, and signaling to the second communication device 450. The transmit processor 416 and the multi-antenna transmit processor 471 implement various signal processing functions for L1 (i.e., physical layer). The transmit processor 416 implements coding and interleaving to facilitate forward error correction (FEC) at the second communication device 450, as well as mapping of signal constellations based on various modulation schemes (e.g., binary phase shift keying (BPSK), quadrature phase shift keying (QPSK), M-PSK, M-quadrature amplitude modulation (M-QAM)). The multi-antenna transmit processor 471 performs digital spatial precoding on the coded and modulated symbols, including codebook-based precoding and non-codebook-based precoding and beamforming processing, to generate one or more parallel streams. The transmit processor 416 then maps each parallel stream to a subcarrier, multiplexes the modulated symbols with a reference signal (e.g., pilot) in the time domain and / or frequency domain, and then uses an Inverse Fast Fourier Transform (IFFT) to generate a physical channel carrying a time domain multi-carrier symbol stream. The multi-antenna transmit processor 471 then performs a transmit analog precoding / beamforming operation on the time domain multi-carrier symbol stream. Each transmitter 418 converts the baseband multi-carrier symbol stream provided by the multi-antenna transmit processor 471 into a radio frequency stream, and then provides it to different antennas 420.
[0332] In the transmission from the first communication device 410 to the second communication device 450, at the second communication device 450, each receiver 454 receives a signal through its corresponding antenna 452. Each receiver 454 recovers the information modulated onto the RF carrier and converts the RF stream into a baseband multi-carrier symbol stream and provides it to the receiving processor 456. The receiving processor 456 and the multi-antenna receiving processor 458 implement various signal processing functions of L1. The multi-antenna receiving processor 458 performs a receiving analog precoding / beamforming operation on the baseband multi-carrier symbol stream from the receiver 454. The receiving processor 456 uses a fast Fourier transform (FFT) to convert the baseband multi-carrier symbol stream after the receiving analog precoding / beamforming operation from the time domain to the frequency domain. In the frequency domain, the physical layer data signal and the reference signal are demultiplexed by the receiving processor 456, where the reference signal will be used for channel estimation, and the data signal is recovered after multi-antenna detection in the multi-antenna receiving processor 458 to any parallel stream with the second communication device 450 as the destination. The symbols on each parallel stream are demodulated and recovered in the receiving processor 456, and soft decisions are generated. The receiving processor 456 then decodes and deinterleaves the soft decisions to recover the upper layer data and control signals transmitted by the first communication device 410 on the physical channel. The upper layer data and control signals are then provided to the controller / processor 459. The controller / processor 459 implements the functions of L2. The controller / processor 459 may be associated with a memory 460 storing program codes and data. The memory 460 may be referred to as a computer-readable medium. In DL, the controller / processor 459 provides multiplexing, packet reassembly, decryption, header decompression, and control signal processing between the transmission and logical channels to recover the upper layer data packets from the core network. The upper layer data packets are then provided to all protocol layers above L2. Various control signals may also be provided to L3 for L3 processing. The controller / processor 459 is also responsible for error detection using ACKnowledgement (ACK) and / or negative ACKnowledgement (Negative ACKnowledgement, NACK) protocols to support HARQ operations.
[0333] In the transmission from the second communication device 450 to the first communication device 410, at the second communication device 450, a data source 467 is used to provide upper layer data packets to the controller / processor 459. The data source 467 represents all protocol layers above L2. Similar to the transmission function at the first communication device 410 described in DL, the controller / processor 459 implements header compression, encryption, packet segmentation and reordering, and multiplexing between logical and transport channels based on the radio resource allocation of the first communication device 410, and implements L2 functions for the user plane and the control plane. The controller / processor 459 is also responsible for HARQ operations, retransmission of lost packets, and signaling to the first communication device 410. The transmit processor 468 performs modulation mapping and channel coding processing, and the multi-antenna transmit processor 457 performs digital multi-antenna spatial precoding, including codebook-based precoding and non-codebook-based precoding, and beamforming processing. Then, the transmit processor 468 modulates the generated parallel stream into a multi-carrier / single-carrier symbol stream, which is then provided to different antennas 452 via the transmitter 454 after analog precoding / beamforming operations in the multi-antenna transmit processor 457. Each transmitter 454 first converts the baseband symbol stream provided by the multi-antenna transmit processor 457 into a radio frequency symbol stream, and then provides it to the antenna 452.
[0334] In the transmission from the second communication device 450 to the first communication device 410, the function at the first communication device 410 is similar to the reception function at the second communication device 450 described in the transmission from the first communication device 410 to the second communication device 450. Each receiver 418 receives a radio frequency signal through its corresponding antenna 420, converts the received radio frequency signal into a baseband signal, and provides the baseband signal to the multi-antenna reception processor 472 and the reception processor 470. The reception processor 470 and the multi-antenna reception processor 472 jointly implement the functions of L1. The controller / processor 475 implements the L2 functions. The controller / processor 475 can be associated with a memory 476 storing program codes and data. The memory 476 can be referred to as a computer-readable medium. The controller / processor 475 provides demultiplexing between transmission and logical channels, packet reassembly, decryption, header decompression, control signal processing to recover the upper layer data packets from the second communication device 450. The upper layer data packets from the controller / processor 475 can be provided to the core network. The controller / processor 475 is also responsible for error detection using an ACK and / or NACK protocol to support HARQ operations.
[0335] As an embodiment, the second communication device 450 includes: at least one processor and at least one memory, the at least one memory including computer program code; the at least one memory and the computer program code are configured to be used together with the at least one processor. The second communication device 450 device receives at least a first DCI, the first DCI includes a first field, the first field included in the first DCI is used to indicate a minimum applicable scheduling offset; the first field included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of a plurality of candidate minimum scheduling offset value sets, the K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the plurality of candidate minimum scheduling offset value sets depends on one of the following three:
[0336] -resources occupied by the first DCI;
[0337] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0338] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0339] As an embodiment, the second communication device 450 includes: a memory storing a computer-readable instruction program, wherein the computer-readable instruction program generates an action when executed by at least one processor, and the action includes: receiving a first DCI.
[0340] As an embodiment, the first communication device 410 includes: at least one processor and at least one memory, the at least one memory including computer program code; the at least one memory and the computer program code are configured to be used together with the at least one processor. The first communication device 410 device at least sends a first DCI, the first DCI includes a first field, the first field included in the first DCI is used to indicate a minimum applicable scheduling offset; the first field included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of a plurality of candidate minimum scheduling offset value sets, the K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the plurality of candidate minimum scheduling offset value sets depends on one of the following three:
[0341] -resources occupied by the first DCI;
[0342] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0343] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0344] As an embodiment, the first communication device 410 includes: a memory storing a computer-readable instruction program, wherein the computer-readable instruction program generates an action when executed by at least one processor, and the action includes: sending a first DCI.
[0345] As an embodiment, the first node in the present application includes the second communication device 450.
[0346] As an embodiment, the second node in the present application includes the first communication device 410.
[0347] As an embodiment, at least one of {the antenna 420, the transmitter 418, the transmit processor 416, the multi-antenna transmit processor 471, the controller / processor 475, and the memory 476} is used to send a first DCI; and at least one of {the antenna 452, the receiver 454, the receive processor 456, the multi-antenna receive processor 458, the controller / processor 459, the memory 460, and the data source 467} is used to receive a first DCI.
[0348] Example 5
[0349] Embodiment 5 illustrates a flow chart of transmission between a first node and a second node according to an embodiment of the present application. Figure 5 In the embodiment, the first node U1 and the second node N2 communicate with each other via a wireless link. It should be noted that the sequence in this embodiment does not limit the signal transmission sequence and implementation sequence in this application.
[0350] For the first node U1, a first DCI is received in step S510.
[0351] For the second node N2, a first DCI is sent in step S520.
[0352] In embodiment 5, the first DCI includes a first domain, and the first domain included in the first DCI is used to indicate a minimum applicable scheduling offset; the first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0353] -resources occupied by the first DCI;
[0354] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0355] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0356] As an embodiment, the first node U1 is the first node in this application.
[0357] As an embodiment, the second node N2 is the second node in this application.
[0358] As an embodiment, the air interface between the second node N2 and the first node U1 includes a wireless interface between a base station device and a user equipment.
[0359] As an embodiment, the air interface between the second node N2 and the first node U1 includes a wireless interface between a relay node device and a user equipment.
[0360] As an embodiment, the air interface between the second node N2 and the first node U1 includes a wireless interface between user equipments.
[0361] As an embodiment, the second node N2 is a base station maintaining a service cell of the first node U1.
[0362] As an embodiment, the first DCI is transmitted on a downlink physical control channel (ie, a downlink channel that can only be used to carry physical layer control signaling).
[0363] As an embodiment, the physical layer channel occupied by the first DCI includes PDCCH.
[0364] As an embodiment, the physical layer channel scheduled by the first DCI includes PDSCH.
[0365] As an embodiment, the physical layer channel scheduled by the first DCI includes PUSCH.
[0366] Example 6
[0367] Embodiment 6 illustrates a schematic diagram of the relationship between the resources occupied by the first DCI and the minimum scheduling offset value set according to an embodiment of the present application, as shown in the attached figure. Figure 6 As shown in the attached Figure 6 wherein the resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets; the multiple candidate minimum scheduling offset value sets are in the attached Figure 6 It is represented as {candidate minimum scheduling offset value set #1,…, minimum scheduling offset value set,…, candidate minimum scheduling offset value set #Q1}, where Q1 is a positive integer greater than 1.
[0368] As an embodiment, the resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0369] As an embodiment, the feature "the resources occupied by the first DCI include a CORESET pool" means that: the physical layer channel occupied by the first DCI includes a PDCCH, and the CORESET to which the PDCCH belongs belongs to a CORESET pool.
[0370] As an embodiment, the feature "the resources occupied by the first DCI include a CORESET pool" means that the physical layer channel occupied by the first DCI includes a PDCCH, and the CORESET associated with the search space to which the PDCCH belongs belongs to a CORESET pool.
[0371] As an embodiment, the multiple candidate minimum scheduling offset value sets are all for downlink scheduling.
[0372] As an embodiment, the multiple candidate minimum scheduling offset value sets are all for uplink scheduling.
[0373] As an embodiment, the multiple candidate minimum scheduling offset value sets are a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set, and Q1 is equal to 2; the first DCI occupies a first CORESET pool, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the first DCI occupies a second CORESET pool, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set; the first CORESET pool and the second CORESET pool are different.
[0374] As a sub-embodiment of this embodiment, the two candidate minimum scheduling offset value sets are configured on the active UL BWP and the active DL BWP of the first node respectively, and the two candidate minimum scheduling offset value sets on the active UL BWP are different from the two candidate minimum scheduling offset value sets on the active DL BWP; the first DCI occupies the first CORESET pool, the minimum scheduling offset value set applied for uplink scheduling is the first candidate minimum scheduling offset value set on the active UL BWP of the first node, and the minimum scheduling offset value set applied for downlink scheduling is the first candidate minimum scheduling offset value set on the active DL BWP of the first node; the first DCI occupies the second CORESET pool, the minimum scheduling offset value set applied for uplink scheduling is the second candidate minimum scheduling offset value set on the active UL BWP of the first node, and the minimum scheduling offset value set applied for downlink scheduling is the second candidate minimum scheduling offset value set on the active DL BWP of the first node.
[0375] As a subsidiary embodiment of this sub-embodiment, the minimum scheduling offset value set applied to the uplink is different from the minimum scheduling offset value set applied to the downlink.
[0376] As a sub-embodiment of this embodiment, the CORESETs in the first CORESET pool are configured for scheduling in SBFD resources.
[0377] As a sub-embodiment of this embodiment, the CORESETs in the second CORESET pool are used for scheduling in resources other than resources configured for SBFD.
[0378] As a sub-embodiment of this embodiment, the first CORESET pool and the second CORESET pool correspond to two different coresetPoolIndex respectively.
[0379] As a sub-embodiment of this embodiment, the first CORESET pool and the second CORESET pool correspond to two different TRPs (Transmission and Reception Points) respectively.
[0380] As a sub-embodiment of this embodiment, the first CORESET pool and the second CORESET pool correspond to PCI and AdditionalPCI respectively.
[0381] As a sub-embodiment of this embodiment, the first CORESET pool and the second CORESET pool correspond to two different PCIs respectively.
[0382] As an embodiment, the multiple candidate minimum scheduling offset value sets are Q1 candidate minimum scheduling offset value sets, and Q1 is a positive integer greater than 2; the Q1 candidate minimum scheduling offset value sets correspond to Q1 CORESET pools respectively, and the first DCI occupies a given CORESET pool among the Q1 CORESET pools, and the given CORESET pool corresponds to the minimum scheduling offset value set in the Q1 candidate minimum scheduling offset value sets; the given CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the Q1 candidate minimum scheduling offset value sets.
[0383] As a sub-embodiment of this embodiment, Q1 candidate minimum scheduling offset value sets are respectively configured on the active UL BWP and the active DL BWP of the first node; the Q1 candidate minimum scheduling offset value set on the active UL BWP is different from the Q1 candidate minimum scheduling offset value set on the active DL BWP; the given CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set applied to the uplink from the Q1 candidate minimum scheduling offset value set on the active UL BWP, and to determine the minimum scheduling offset value set applied to the downlink from the Q1 candidate minimum scheduling offset value set on the active DL BWP.
[0384] As a sub-embodiment of this embodiment, at least one CORESET pool among the Q1 CORESET pools is configured for scheduling in SBFD resources.
[0385] As a sub-embodiment of this embodiment, the Q1 CORESET pools correspond to Q1 different CORESETPoolIndex respectively.
[0386] As a sub-embodiment of this embodiment, the Q1 CORESET pools correspond to Q1 TRPs respectively.
[0387] As a sub-embodiment of this embodiment, the Q1 CORESET pools correspond to Q1 PCIs respectively.
[0388] As an embodiment, the CORESET pool occupied by the first DCI means: the CORESET pool to which the CORESET where the REs occupied by the first DCI are located belongs.
[0389] As an embodiment, the CORESET pool occupied by the first DCI means: the CORESET pool to which the CORESET associated with the Search Space where the PDCCH Candidate occupied by the first DCI is located belongs.
[0390] As an embodiment, one PCI identifies one cell.
[0391] As an embodiment, the PCI mentioned in this application refers to: Physical Cell Identifier, physical cell identifier.
[0392] As an embodiment, the PCI mentioned in this application refers to: Physical Cell Identity, physical cell identity.
[0393] As an embodiment, the PCI mentioned in this application refers to: Physical-layer Cell Identity, physical layer cell identity.
[0394] As an embodiment, the PCI described in this application refers to: PhysCellId.
[0395] As an embodiment, the PCI described in this application is a non-negative integer.
[0396] As an embodiment, the PCI described in this application is a non-negative integer not greater than 1007.
[0397] As an embodiment, the cell identified by the AdditionalPCI described in this application is not a serving cell.
[0398] As an embodiment, the cell identified by the AdditionalPCI in the present application is a cell used for inter-cell mobility.
[0399] As an embodiment, the cell identified by the AdditionalPCI in the present application is a cell used for inter-cell beam management.
[0400] As an embodiment, the cell identified by the AdditionalPCI in the present application is a cell used for L1 (Layer 1) / L2 (Layer 2) inter-cell mobility.
[0401] As an embodiment, the cell identified by the AdditionalPCI in the present application is a cell used for L1 / L2 inter-cell beam management.
[0402] As an embodiment, the SBFD resources in the present application include: symbols configured as downlink symbols by TDD uplink and downlink configuration signaling and used for uplink transmission.
[0403] As an embodiment, the SBFD resources in the present application include: symbols configured as flexible symbols by TDD uplink and downlink configuration signaling and used for uplink transmission.
[0404] As an embodiment, the SBFD resources in the present application include the first type of symbols in Embodiment 14 of the present application.
[0405] As an embodiment, the resources for SBFD in the present application include: a subband configured for uplink transmission in a DL BWP.
[0406] As an embodiment, the resources for SBFD in the present application include: frequency domain resources configured in a DL carrier for uplink transmission.
[0407] As an embodiment, the resources for SBFD in the present application include: the first subband in Embodiment 14 of the present application.
[0408] Example 7
[0409] Embodiment 7 illustrates a schematic diagram of the relationship between the CORESET pool occupied by the first DCI and the first symbol set according to an embodiment of the present application, as shown in the attached figure. Figure 7 As shown in the attached Figure 7 In the scheme, the first CORESET pool is used for scheduling in the first type of symbol set; the second CORESET pool is used for scheduling in symbols outside the first type of symbol set.
[0410] In Embodiment 7, the CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool; the first type of symbol set includes symbols used for uplink transmission and indicated as downlink by the TDD uplink and downlink configuration.
[0411] As an embodiment, the CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool; the first CORESET pool is used for scheduling in a first type of symbol set; the second CORESET pool is used for scheduling in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration.
[0412] As an embodiment, the time domain resources occupied by the channel or signal scheduled by the DCI of any CORESET in the first type of CORESET pool overlap with the first type of symbol set; the time domain resources occupied by the channel or signal scheduled by the DCI of any CORESET in the second type of CORESET pool are orthogonal to the first type of symbol set.
[0413] As an embodiment, the time domain resources occupied by the channel or signal scheduled by the DCI of any CORESET in the first category CORESET pool belong to the first category symbol set; the time domain resources occupied by the channel or signal scheduled by the DCI of any CORESET in the second category CORESET pool belong to symbols outside the first category symbol set.
[0414] As an embodiment, the first category symbol set includes the first category symbols in Example 14 of the present application.
[0415] Example 8
[0416] Embodiment 8 illustrates a schematic diagram of the relationship between the channel or signal scheduled by the first DCI and the first type of symbol set according to an embodiment of the present application, as shown in the attached figure. Figure 8 As shown in the attached Figure 8 In the figure, the horizontal axis represents time; the gray-filled area represents the time domain resources occupied by the first type of symbol set in time; the cross-filled area represents the time domain resources occupied by the channel or signal scheduled by the first DCI in time, wherein the gray-bottom cross-filled area represents the time domain resources where the channel or signal scheduled by the first DCI overlaps with the first type of symbol set in time.
[0417] In Example 8, situation (a) indicates that the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set; situation (b) indicates that the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set.
[0418] As an embodiment, the time domain resources occupied by the channel or signal scheduled by the first DCI are continuous.
[0419] As an embodiment, the time domain resources occupied by the channel or signal scheduled by the first DCI are discontinuous.
[0420] As an embodiment, the time domain resources occupied by the channel or signal scheduled by the first DCI are periodic.
[0421] As an embodiment, the first type of symbol set includes at least one symbol.
[0422] As an embodiment, the first type of symbol set includes 1 symbol.
[0423] As an embodiment, the first type of symbol set includes multiple consecutive symbols.
[0424] As an embodiment, the first type of symbol set includes multiple symbols, and there are two discontinuous symbols among the multiple symbols.
[0425] As an embodiment, the first type of symbol set includes multiple symbols, and the multiple symbols are periodic in the time domain.
[0426] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set" means that at least one symbol occupied by the channel or signal scheduled by the first DCI belongs to the first type of symbol set.
[0427] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set" means that all symbols occupied by the channel or signal scheduled by the first DCI belong to the first type of symbol set.
[0428] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set" means that there is one symbol among the symbols occupied by the channel or signal scheduled by the first DCI that does not belong to the first type of symbol set.
[0429] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set" means that: there is at least one symbol among the symbols occupied by the channel or signal scheduled by the first DCI that belongs to the first type of symbol set, and there is at least one symbol among the symbols occupied by the channel or signal scheduled by the first DCI that does not belong to the first type of symbol set.
[0430] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set" means that the first type of symbol set includes at least one symbol occupied by the channel or signal scheduled by the first DCI.
[0431] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set" means that the first type of symbol set includes all symbols occupied by the channel or signal scheduled by the first DCI.
[0432] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set" means that all symbols occupied by the channel or signal scheduled by the first DCI have no overlap with the first type of symbol set in the time domain.
[0433] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set" means that all symbols occupied by the channel or signal scheduled by the first DCI do not belong to the first type of symbol set.
[0434] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set" means that all symbols occupied by the channel or signal scheduled by the first DCI are symbols outside the first type of symbol set.
[0435] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set" means that the first type of symbol set does not include the symbols occupied by the channel or signal scheduled by the first DCI.
[0436] As an embodiment, the feature "the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set" means that the symbols in the first type of symbol set are not occupied by the channel or signal scheduled by the first DCI.
[0437] Example 9
[0438] Embodiment 9 illustrates a schematic diagram of the relationship between the minimum scheduling offset value set and the time domain resources occupied by the channel or signal scheduled by the first DCI according to an embodiment of the present application, as shown in the attached Fig. 9 As shown in the attached Fig. 9In the embodiment, case (a) indicates that the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; case (b) indicates that the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0439] In Embodiment 9, the multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set.
[0440] As an embodiment, the multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0441] As an embodiment, the first node of the present application is configured with the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set.
[0442] As an embodiment, the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set are both for downlink scheduling.
[0443] As an embodiment, the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set are both for uplink scheduling.
[0444] As an embodiment, the active DL BWP of the first node is configured with two candidate minimum scheduling offset value sets, and the two candidate minimum scheduling offset value sets are respectively the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0445] As an embodiment, the active UL BWP of the first node is configured with two candidate minimum scheduling offset value sets, and the two candidate minimum scheduling offset value sets are respectively the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0446] As an embodiment, the active DL BWP of the first node is configured with two candidate minimum scheduling offset value sets, and the two candidate minimum scheduling offset value sets are respectively the first candidate minimum scheduling offset value set and the second candidate minimum scheduling offset value set; the active UL BWP of the first node is configured with two candidate minimum scheduling offset value sets, and the two candidate minimum scheduling offset value sets are respectively the third candidate minimum scheduling offset value set and the fourth candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, the minimum scheduling offset value set on the DL BWP is the first candidate minimum scheduling offset value set and the minimum scheduling offset value set on the UL BWP is the third candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, the minimum scheduling offset value set on the DL BWP is the second candidate minimum scheduling offset value set and the minimum scheduling offset value set on the UL BWP is the fourth candidate minimum scheduling offset value set.
[0447] Example 10
[0448] Embodiment 10 illustrates a schematic diagram of the relationship between the minimum scheduling offset value set and the reference signal resource of the physical layer channel QCL scheduled by the first DCI according to an embodiment of the present application, as shown in the attached Fig.10 As shown in the attached Fig.10 In the embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0449] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0450] As an embodiment, the multiple reference signal resource sets are respectively a first reference signal resource set and a second reference signal resource set, the multiple candidate minimum scheduling offset value sets include 2 candidate minimum scheduling offset value sets, the 2 candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to the first reference signal resource set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to the second reference signal resource set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0451] As a sub-embodiment of this embodiment, the two candidate minimum scheduling offset value sets are configured on the active UL BWP and the active DL BWP of the first node respectively, and the two candidate minimum scheduling offset value sets on the active UL BWP are different from the two candidate minimum scheduling offset value sets on the active DL BWP; the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to the first reference signal resource set, the minimum scheduling offset value set applied for uplink scheduling is the first candidate minimum scheduling offset value set on the active UL BWP of the first node, and the minimum scheduling offset value set applied for downlink scheduling is the first candidate minimum scheduling offset value set on the active DL BWP of the first node; the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to the second reference signal resource set, the minimum scheduling offset value set applied for uplink scheduling is the second candidate minimum scheduling offset value set on the active UL BWP of the first node, and the minimum scheduling offset value set applied for downlink scheduling is the second candidate minimum scheduling offset value set on the active DL BWP of the first node.
[0452] As a subsidiary embodiment of this sub-embodiment, the minimum scheduling offset value set applied to uplink scheduling is different from the minimum scheduling offset value set applied to downlink scheduling.
[0453] As a sub-embodiment of this embodiment, the first reference signal resource set is configured for transmission in SBFD resources.
[0454] As a sub-embodiment of this embodiment, the second reference signal resource set is configured for transmission in resources other than SBFD resources.
[0455] As an embodiment, the multiple candidate minimum scheduling offset value sets are respectively Q1 candidate minimum scheduling offset value sets, and Q1 is a positive integer greater than 2; the Q1 candidate minimum scheduling offset value sets respectively correspond to Q1 reference signal resource sets, and the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to a given reference signal resource set in the Q1 reference signal resource sets, and the given reference signal resource set corresponds to the minimum scheduling offset value set in the Q1 candidate minimum scheduling offset value set; the given reference signal resource set to which the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong is used to determine the minimum scheduling offset value set from the Q1 candidate minimum scheduling offset value sets.
[0456] As a sub-embodiment of this embodiment, Q1 candidate minimum scheduling offset value sets are respectively configured on the active UL BWP and the active DL BWP of the first node; the Q1 candidate minimum scheduling offset value set on the active UL BWP is different from the Q1 candidate minimum scheduling offset value set on the active DL BWP; the given reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set applied to the uplink from the Q1 candidate minimum scheduling offset value set on the active UL BWP, and to determine the minimum scheduling offset value set applied to the downlink from the Q1 candidate minimum scheduling offset value set on the active DL BWP.
[0457] As a sub-embodiment of this embodiment, at least one reference signal resource set in the Q1 reference signal resource set is configured for transmission in SBFD resources.
[0458] As an embodiment, the reference signal resource set in the present application includes at least one reference signal resource, and one reference signal resource in the at least one reference signal resource includes at least one of a CSI-RS resource or an SSB.
[0459] As a sub-embodiment of this embodiment, the reference signal resource set is the first reference signal resource set.
[0460] As a sub-embodiment of this embodiment, the reference signal resource set is the second reference signal resource set.
[0461] As a sub-embodiment of this embodiment, the reference signal resource set is any one of the Q1 reference signal resource sets.
[0462] As a sub-embodiment of this embodiment, the reference signal resource set is one of the Q1 reference signal resource sets.
[0463] Embodiment 11
[0464] Embodiment 11 illustrates a schematic diagram of the relationship between multiple reference signal resource sets and the first type of symbol set according to an embodiment of the present application, as shown in FIG. Fig.11 As shown in the attached Fig.11 In the embodiment, the first reference signal resource set is used for transmission in a first type of symbol set; the second reference signal resource set is used for transmission in symbols outside the first type of symbol set.
[0465] In embodiment 11, the multiple reference signal resource sets are respectively the first reference signal resource set and the second reference signal resource set.
[0466] As an embodiment, the multiple reference signal resource sets are respectively a first reference signal resource set and a second reference signal resource set; the first reference signal resource set is used for transmission in a first type of symbol set, and the second reference signal resource set is used for transmission in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration
[0467] As an embodiment, the time domain resources occupied by the physical layer channel scheduled by the first DCI overlap with the first type of symbol set, and the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to the first reference signal resource set; the time domain resources occupied by the physical layer channel scheduled by the first DCI are orthogonal to the first type of symbol set, and the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to the second reference signal resource set.
[0468] As an embodiment, the symbols occupied by the physical layer channel scheduled by the first DCI belong to the first category of symbol set, and the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to the first reference signal resource set; the symbols occupied by the physical layer channel scheduled by the first DCI are symbols outside the first category of symbol set, and the reference signal resources of the physical layer channel QCL scheduled by the first DCI belong to the second reference signal resource set.
[0469] As an embodiment, the first category symbol set includes the first category symbols in Example 14 of the present application.
[0470] Example 12
[0471] Embodiment 12 illustrates a schematic diagram of candidate minimum scheduling offset values according to an embodiment of the present application, as shown in the attached figure. Fig.12 As shown in the attached Fig.12 In the embodiment, a plurality of candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the plurality of candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window; the plurality of candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set are respectively expressed as {candidate minimum scheduling offset value #1, ..., candidate minimum scheduling offset value #n1, ..., candidate minimum scheduling offset value #N1}, where N1 is a positive integer greater than 1.
[0472] As an embodiment, the multiple candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window.
[0473] As an embodiment, the maximum number of transition points supported in the given time window is used to determine at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set.
[0474] As an embodiment, the given candidate minimum scheduling offset value is the at least one existing candidate minimum offset value, and the given candidate minimum scheduling offset value is linearly related to the maximum number of transition points supported in the given time window.
[0475] As an embodiment, the given candidate minimum scheduling offset value is the at least one existing candidate minimum offset value, and the given candidate minimum scheduling offset value depends on the product of the first value and the maximum number of transition points supported in the given time window.
[0476] As a sub-embodiment of this embodiment, the unit of the first value is milliseconds.
[0477] As a sub-embodiment of this embodiment, the unit of the first value is time slot.
[0478] As a sub-embodiment of this embodiment, the unit of the first numerical value is symbol.
[0479] As an embodiment, the given time window is the duration of a time slot.
[0480] As an embodiment, the given time window is the duration of one subframe.
[0481] As an embodiment, the given time window is a TDD UL / DL pattern period.
[0482] As an embodiment, the given time window is the duration of W1 consecutive time slots, and W1 is a positive integer greater than 1.
[0483] As a sub-embodiment of this embodiment, W1 is equal to 10.
[0484] As a sub-embodiment of this embodiment, W1 is equal to 20.
[0485] As a sub-embodiment of this embodiment, W1 is equal to 40.
[0486] As an embodiment, the given time window is a positive integer number of milliseconds.
[0487] As an embodiment, the transition point refers to a transition point between a SBFD symbol and a non-SBFD symbol.
[0488] As an embodiment, the switching point refers to a switching point between a full-duplex symbol and a non-full-duplex symbol.
[0489] As an embodiment, the transition point refers to a transition point between a non-SBFD symbol and a SBFD symbol.
[0490] As an embodiment, the transition point refers to a transition point between a non-full-duplex symbol and a full-duplex symbol.
[0491] As an embodiment, the transition point refers to a transition point between an SBFD symbol and a non-SBFD symbol and between a non-SBFD symbol and an SBFD symbol.
[0492] As an embodiment, the switching point refers to a switching point between a full-duplex symbol and a non-full-duplex symbol and between a non-full-duplex symbol and a full-duplex symbol.
[0493] As an embodiment, the conversion point refers to a conversion point between a symbol in the first category of symbol set and a symbol outside the first category of symbol set.
[0494] As an embodiment, the conversion point refers to a conversion point between symbols outside the first category of symbol set and symbols in the first category of symbol set.
[0495] As an embodiment, the conversion point refers to a conversion point between symbols in the first category symbol set and symbols outside the first category symbol set, and between symbols outside the first category symbol set and symbols in the first category symbol set.
[0496] Example 13
[0497] Embodiment 13 illustrates a schematic diagram of the relationship between the first DCI and the minimum scheduling offset value set according to an embodiment of the present application, as shown in the attached figure. Fig.13 As shown in the attached Fig.13 In the embodiment, determination of a minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the first DCI.
[0498] In Embodiment 13, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
[0499] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the resources occupied by the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
[0500] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the spatial domain resources associated with the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed; the spatial domain resources associated with the first DCI include the reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0501] As an embodiment, the first DCI does not include a carrier indication field, which means that the first DCI does not include a CIF (Carrier Indicator Field).
[0502] As an embodiment, the value of the carrier indication field included in the first DCI is fixed, which means that the value indicated by the carrier indication field included in the first DCI is all 0.
[0503] As an embodiment, the value of the carrier indication field included in the first DCI is fixed, which means that the value indicated by the carrier indication field included in the first DCI is all 1s.
[0504] As an embodiment, the value of the carrier indication field included in the first DCI is fixed, which means that the value indicated by the carrier indication field included in the first DCI is predefined.
[0505] As an embodiment, the value of the carrier indication field included in the first DCI is fixed, which means that the value indicated by the carrier indication field included in the first DCI is not used for cross-carrier scheduling.
[0506] Embodiment 14
[0507] Embodiment 14 illustrates a schematic diagram of a first type of symbol set according to an embodiment of the present application, as shown in the attached figure. Fig.14 As shown in the attached Fig.14 In the figure, the horizontal axis represents time and the vertical axis represents frequency; the area filled with vertical lines represents the time domain resources occupied by downlink symbols in time, the area filled with horizontal lines represents the time domain resources occupied by uplink symbols in time, the unfilled area represents the time domain resources occupied by flexible symbols in time, the area filled with solid gray represents the first subband, and the area occupied by the first subband represents the frequency domain resources in the downlink symbols and flexible symbols that can be used for uplink transmission in frequency.
[0508] In Embodiment 14, the first category of symbols includes downlink symbols and flexible symbols used for uplink transmission in the first subband indicated by the TDD uplink and downlink configuration, and the first category of symbol set includes the first category of symbols.
[0509] As an embodiment, the TDD refers to: Time Division Duplexing.
[0510] As an embodiment, the TDD refers to: Time Division Duplex.
[0511] As an embodiment, the TDD uplink and downlink configuration is indicated through RRC (Radio Resource Control) signaling.
[0512] As an embodiment, the TDD uplink and downlink configuration is indicated by TDD-UL-DL-ConfigCommon IE (Information Element).
[0513] As an embodiment, the TDD uplink and downlink configuration is indicated by TDD-UL-DL-ConfigDedicatedIE.
[0514] As an embodiment, the TDD uplink and downlink configuration is indicated by at least the former of TDD-UL-DL-ConfigCommon IE and TDD-UL-DL-ConfigDedicated IE.
[0515] As an embodiment, the TDD uplink and downlink configuration is indicated through the TDD-UL-DL-Pattern field.
[0516] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "TDD".
[0517] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "DL".
[0518] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "UL".
[0519] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "Config".
[0520] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "Common".
[0521] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "SBFD".
[0522] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "subband".
[0523] As an embodiment, the name of the RRC signaling carrying the TDD uplink and downlink configuration includes "duplex".
[0524] As an embodiment, the TDD uplink and downlink configuration is indicated by a MAC (Medium Access Control) CE (Control Element).
[0525] As an embodiment, the TDD uplink and downlink configuration is indicated through DCI.
[0526] As an embodiment, the TDD uplink and downlink configuration is indicated jointly by RRC layer signaling and physical layer signaling.
[0527] As an embodiment, the TDD uplink and downlink configuration is carried jointly by RRC layer signaling and physical layer signaling.
[0528] As a sub-embodiment of this embodiment, the RRC signaling includes at least the former of TDD-UL-DL-ConfigCommon IE and TDD-UL-DL-ConfigDedicated IE.
[0529] As a sub-embodiment of this embodiment, the physical layer signaling includes a partial or entire field of a DCI.
[0530] As a sub-embodiment of this embodiment, the physical layer signaling is SFI (Slot Format Indicator).
[0531] As an embodiment, the TDD uplink and downlink configuration indicates the downlink time slots and downlink symbols within the period.
[0532] As an embodiment, at least one time slot in the TDD uplink and downlink configuration indication period is a downlink time slot and / or at least one symbol is a downlink symbol.
[0533] As an embodiment, the first subband occupies at least one RB (Resource Block) set in the frequency domain.
[0534] As a sub-embodiment of this embodiment, the one RB set is a group of continuous RBs.
[0535] As a sub-embodiment of this embodiment, the RB set is configured by a higher layer parameter "IntraCellGuardBandsPerSCS".
[0536] As a sub-embodiment of this embodiment, the RB set is configured by a higher layer parameter "intraCellGuardBandsUL-List".
[0537] As a sub-embodiment of this embodiment, a guard band exists between two adjacent RB sets.
[0538] As an embodiment, there are guard bands on both sides of the first sub-band in the frequency domain.
[0539] As an embodiment, a guard band exists on one side of the first sub-band in the frequency domain.
[0540] As an embodiment, there are no guard bands on both sides of the first sub-band in the frequency domain.
[0541] As a sub-embodiment of the above three embodiments, the guard band is not used for uplink transmission or downlink transmission.
[0542] As an embodiment, the first subband occupies at least one RB in the frequency domain.
[0543] As a sub-embodiment of this embodiment, the at least one RB includes one RB.
[0544] As a sub-embodiment of this embodiment, the at least one RB includes multiple consecutive RBs.
[0545] As an embodiment, the RB in the present application includes a PRB (Physical Resource Block).
[0546] As an embodiment, the RB in this application refers to PRB.
[0547] Typically, one RB occupies 12 consecutive subcarriers in the frequency domain.
[0548] As an embodiment, the first subband occupies multiple subcarriers in the frequency domain.
[0549] As an embodiment, the first subband belongs to a UL carrier.
[0550] As an embodiment, the frequency domain resources occupied by the first subband belong to a UL carrier.
[0551] As an embodiment, the UL carrier described in the present application includes a normal uplink (Normal UL, NUL) carrier.
[0552] As an embodiment, the UL carrier described in the present application includes a supplementary uplink (Supplementary UL, SUL) carrier.
[0553] As an embodiment, the first subband belongs to a DL carrier.
[0554] As an embodiment, the frequency domain resources occupied by the first subband belong to a DL carrier.
[0555] As an embodiment, the first subband belongs to a BWP.
[0556] As an embodiment, the first subband belongs to a UL BWP.
[0557] As an embodiment, the frequency domain resources occupied by the first subband belong to a UL BWP.
[0558] As an embodiment, the first subband belongs to a DL BWP.
[0559] As an embodiment, the frequency domain resources occupied by the first subband belong to a DL BWP.
[0560] As an embodiment, there are overlapping frequency domain resources between the first subband and a UL BWP.
[0561] As an embodiment, there are no overlapping frequency domain resources between the first subband and a UL BWP.
[0562] As an embodiment, the first sub-band includes a SBFD (SubBand non-overlapping FullDuplex) sub-band.
[0563] As an embodiment, the first sub-band is a SBFD sub-band.
[0564] As an embodiment, one SBFD subband described in the present application is used for uplink transmission.
[0565] As an embodiment, one SBFD sub-band described in the present application can (or may or is allowed to) be used for uplink transmission.
[0566] As an embodiment, the one SBFD subband described in the present application is a UL subband.
[0567] As an embodiment, the first type of symbol set includes a positive integer number of symbols greater than 1.
[0568] As an embodiment, the first category symbol set includes the first category symbols.
[0569] As an embodiment, the first category symbol set only includes the first category symbols.
[0570] As an embodiment, the first type of symbol set includes full-duplex symbols.
[0571] As an embodiment, the first type of symbol set includes SBFD symbols.
[0572] As an embodiment, the symbols in the first symbol set are configured for SBFD.
[0573] As an embodiment, the first type of symbol set includes downlink symbols used for uplink transmission indicated by the TDD uplink and downlink configuration.
[0574] As an embodiment, the first type of symbol set includes flexible symbols used for uplink transmission indicated by the TDD uplink and downlink configuration.
[0575] As an embodiment, the symbols in the first type of symbol set are all downlink symbols used for uplink transmission as indicated by the TDD uplink and downlink configuration.
[0576] As an embodiment, any symbol in the first type of symbol set is a downlink symbol used for uplink transmission indicated by the TDD uplink and downlink configuration or a flexible symbol used for uplink transmission indicated by the TDD uplink and downlink configuration.
[0577] As an embodiment, the symbols in the first type of symbol set are configured to be able to (or can or are allowed to) be uplink transmitted in the first subband.
[0578] As an embodiment, the symbols in the first type of symbol set are indicated to be able to (or may or are allowed to) be uplink transmitted in the first subband.
[0579] As an embodiment, the symbols in the first type of symbol set are configured to actually be uplink transmitted in the first subband.
[0580] As an embodiment, the symbols in the first type of symbol set are indicated to actually be uplink transmitted in the first subband.
[0581] As an embodiment, the first subband is indicated to be enabled on symbols in the first type of symbol set.
[0582] As an embodiment, the symbols in the first type of symbol set are used for sending and receiving at the same time.
[0583] As an embodiment, the symbols in the first type of symbol set support simultaneous uplink transmission and downlink transmission.
[0584] As an embodiment, the sender of the first DCI simultaneously receives and sends wireless signals on symbols in the first type of symbol set.
[0585] As an embodiment, the sender of the first DCI simultaneously performs uplink transmission and downlink transmission on the symbols in the first type of symbol set.
[0586] As an embodiment, the sender of the first DCI receives wireless signals on frequency domain resources included in the first subband of symbols in the first category of symbol set, and sends wireless signals on frequency domain resources outside the frequency domain resources included in the first subband.
[0587] As an embodiment, the sender of the first DCI performs uplink transmission on the frequency domain resources included in the first subband of the symbols in the first category of symbol set, and performs downlink transmission on the frequency domain resources outside the frequency domain resources included in the first subband.
[0588] Embodiment 15
[0589] Embodiment 15 illustrates a structural block diagram of a processing device used in a first node according to an embodiment of the present application, as shown in the attached Fig.15 As shown in the attached Fig.15 In the example, the processing device 1500 in the first node includes a first receiver 1501.
[0590] In embodiment 15, the first receiver 1501 receives a first DCI, the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset.
[0591] In embodiment 15, the first field included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0592] -resources occupied by the first DCI;
[0593] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0594] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0595] As an embodiment, the resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0596] As an embodiment, the multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0597] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0598] As an embodiment, the multiple candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window.
[0599] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
[0600] As an embodiment, the CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool, the first CORESET pool is used for scheduling in a first type of symbol set and the second CORESET pool is used for scheduling in symbols outside the first type of symbol set; or, the multiple reference signal resource sets are respectively the first reference signal resource set and the second reference signal resource set, the first reference signal resource set is used for transmission in the first type of symbol set and the second reference signal resource set is used for transmission in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration.
[0601] As an embodiment, the minimum applicable scheduling offset is applied to the active BWP, and the first node assumes that before the new minimum applicable scheduling offset for the active BWP takes effect, the scheduling delay between the channel or signal scheduled by DCI on the active BWP and the DCI is not less than the minimum applicable scheduling offset.
[0602] As an embodiment, the minimum applicable scheduling offset is applied to the active BWP, and the first node assumes that after the minimum applicable scheduling offset takes effect, the scheduling delay between the channel or signal scheduled by DCI on the active BWP and the DCI is not less than the minimum applicable scheduling offset.
[0603] As an embodiment, the minimum scheduling offset value set is configured on the active UL BWP and the active DL BWP of the first node 1500, respectively, and the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set on the active UL BWP, and the minimum applicable scheduling offset is applied to uplink scheduling; and, the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set on the active DL BWP, and the minimum applicable scheduling offset is applied to downlink scheduling.
[0604] As an embodiment, the symbols in the first type of symbol set are used for sending and receiving at the same time.
[0605] As an embodiment, the symbols in the first type of symbol set support simultaneous uplink transmission and downlink transmission.
[0606] As an embodiment, the sender of the first DCI simultaneously receives and sends wireless signals on symbols in the first type of symbol set.
[0607] As an embodiment, the sender of the first DCI simultaneously performs uplink transmission and downlink transmission on the symbols in the first type of symbol set.
[0608] As an embodiment, the first node is user equipment.
[0609] As an embodiment, the first node is a relay node device.
[0610] As an embodiment, the first receiver 1501 includes at least one of {antenna 452, receiver 454, receiving processor 456, multi-antenna receiving processor 458, controller / processor 459, memory 460, data source 467} in Embodiment 4.
[0611] Example 16
[0612] Embodiment 16 illustrates a structural block diagram of a processing device used in a second node according to an embodiment of the present application, as shown in the attached figure. Fig.16 As shown in the attached Fig.16 In the example, the processing device 1600 in the second node includes a first transmitter 1601.
[0613] In Embodiment 16, the first transmitter 1601 sends a first DCI, the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset.
[0614] In embodiment 16, the first field included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three:
[0615] -resources occupied by the first DCI;
[0616] - time domain resources occupied by the channel or signal scheduled by the first DCI;
[0617] -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
[0618] As an embodiment, the resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0619] As an embodiment, the multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
[0620] As an embodiment, the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
[0621] As an embodiment, the multiple candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window.
[0622] As an embodiment, the determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
[0623] As an embodiment, the CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool, the first CORESET pool is used for scheduling in a first type of symbol set and the second CORESET pool is used for scheduling in symbols outside the first type of symbol set; or, the multiple reference signal resource sets are respectively the first reference signal resource set and the second reference signal resource set, the first reference signal resource set is used for transmission in the first type of symbol set and the second reference signal resource set is used for transmission in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration.
[0624] As an embodiment, the minimum applicable scheduling offset is applied to the active BWP, and the first node assumes that before the new minimum applicable scheduling offset for the active BWP takes effect, the scheduling delay between the channel or signal scheduled by DCI on the active BWP and the DCI is not less than the minimum applicable scheduling offset.
[0625] As an embodiment, the minimum applicable scheduling offset is applied to the active BWP, and the first node assumes that after the minimum applicable scheduling offset takes effect, the scheduling delay between the channel or signal scheduled by DCI on the active BWP and the DCI is not less than the minimum applicable scheduling offset.
[0626] As an embodiment, the minimum scheduling offset value set is configured on the active UL BWP and the active DL BWP of the recipient of the first DCI, respectively, and the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set on the active UL BWP, and the minimum applicable scheduling offset is applied to uplink scheduling; and, the first domain of the first node indicates the minimum applicable scheduling offset from the minimum scheduling offset value set on the active DL BWP, and the minimum applicable scheduling offset is applied to downlink scheduling.
[0627] As an embodiment, the symbols in the first type of symbol set are used for sending and receiving at the same time.
[0628] As an embodiment, the symbols in the first type of symbol set support simultaneous uplink transmission and downlink transmission.
[0629] As an embodiment, the second node 1600 simultaneously receives and sends wireless signals on symbols in the first type of symbol set.
[0630] As an embodiment, the second node 1600 simultaneously performs uplink transmission and downlink transmission on symbols in the first type of symbol set.
[0631] As an embodiment, the second node is a base station device.
[0632] As an embodiment, the second node is user equipment.
[0633] As an embodiment, the second node is a relay node device.
[0634] As an embodiment, the first transmitter 1601 includes at least one of {antenna 420, transmitter 418, transmit processor 416, multi-antenna transmit processor 471, controller / processor 475, memory 476} in Embodiment 4.
[0635] A person of ordinary skill in the art can understand that all or part of the steps in the above method can be completed by instructing the relevant hardware through a program, and the program can be stored in a computer-readable storage medium, such as a read-only memory, a hard disk or an optical disk. Optionally, all or part of the steps in the above embodiment can also be implemented using one or more integrated circuits. Accordingly, each module unit in the above embodiment can be implemented in the form of hardware or in the form of a software function module, and the present application is not limited to any specific form of software and hardware combination. The user equipment, terminal and UE in the present application include but are not limited to drones, communication modules on drones, remote-controlled aircraft, aircraft, small aircraft, mobile phones, tablet computers, notebooks, vehicle-mounted communication equipment, transportation tools, vehicles, RSUs, wireless sensors, Internet cards, Internet of Things terminals, RFID (Radio Frequency Identification, Radio Frequency Identification Technology) terminals, NB-IoT (Narrow Band Internet of Things, Narrow Band Internet of Things) terminals, MTC (Machine Type Communication, Machine Type Communication) terminals, eMTC (enhanced MTC, enhanced MTC) terminals, data cards, Internet cards, vehicle-mounted communication equipment, low-cost mobile phones, low-cost tablet computers and other wireless communication devices. The base stations or system equipment in this application include but are not limited to macrocell base stations, microcell base stations, small cell base stations, home base stations, relay base stations, eNB (evolved Node B), gNB, TRP, GNSS (Global Navigation Satellite System), relay satellites, satellite base stations, aerial base stations, RSU, drones, test equipment, such as transceivers that simulate some functions of base stations or signaling testers and other wireless communication equipment.
[0636] It should be understood by those skilled in the art that the present invention may be implemented in other specified forms without departing from its core or essential features. Therefore, the embodiments disclosed herein should be considered illustrative rather than restrictive in any way. The scope of the invention is determined by the appended claims rather than the preceding description, and all modifications within their equivalent meanings and regions are considered to be included therein.
Claims
1. A first node used for wireless communication, characterized in that: include: A first receiver receives a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset; The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three: -resources occupied by the first DCI; - time domain resources occupied by the channel or signal scheduled by the first DCI; -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
2. The first node according to claim 1, characterized in that: The resources occupied by the first DCI include a CORESET pool; the CORESET pool occupied by the first DCI is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
3. The first node according to claim 1, characterized in that: The multiple candidate minimum scheduling offset value sets are respectively a first candidate minimum scheduling offset value set and a second candidate minimum scheduling offset value set; the time domain resources occupied by the channel or signal scheduled by the first DCI overlap with the first type of symbol set, and the minimum scheduling offset value set is the first candidate minimum scheduling offset value set; The time domain resources occupied by the channel or signal scheduled by the first DCI are orthogonal to the first type of symbol set, and the minimum scheduling offset value set is the second candidate minimum scheduling offset value set.
4. The first node according to claim 1, characterized in that: The reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs to a reference signal resource set among multiple reference signal resource sets; the reference signal resource set to which the reference signal resource of the physical layer channel QCL scheduled by the first DCI belongs is used to determine the minimum scheduling offset value set from the multiple candidate minimum scheduling offset value sets.
5. The first node according to any one of claims 1 to 4, characterized in that: The multiple candidate minimum scheduling offset value sets include a target candidate minimum scheduling offset value set, and at least one candidate minimum scheduling offset value among the multiple candidate minimum scheduling offset values included in the target candidate minimum scheduling offset value set depends on the maximum number of transition points supported in a given time window.
6. The first node according to any one of claims 1, 2, 4 or 5, characterized in that: Determination of the minimum scheduling offset value set among the multiple candidate minimum scheduling offset value sets depends on the first DCI, the first DCI does not include a carrier indication field, or the value of the carrier indication field included in the first DCI is fixed.
7. The first node according to claim 2 or 4, characterized in that: The CORESET pool occupied by the first DCI is the first CORESET pool or the second CORESET pool, the first CORESET pool is used for scheduling in a first type of symbol set and the second CORESET pool is used for scheduling in symbols outside the first type of symbol set; or, the multiple reference signal resource sets are respectively the first reference signal resource set and the second reference signal resource set, the first reference signal resource set is used for transmission in the first type of symbol set and the second reference signal resource set is used for transmission in symbols outside the first type of symbol set; the first type of symbol set includes symbols for uplink transmission that are indicated as downlink by the TDD uplink and downlink configuration.
8. A second node used for wireless communication, characterized in that: include: A first transmitter sends a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset; The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three: -resources occupied by the first DCI; - time domain resources occupied by the channel or signal scheduled by the first DCI; -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
9. A method for a first node used in wireless communication, characterized in that: include: receiving a first DCI, the first DCI comprising a first field, the first field included in the first DCI being used to indicate a minimum applicable scheduling offset; The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three: -resources occupied by the first DCI; - time domain resources occupied by the channel or signal scheduled by the first DCI; -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.
10. A method for a second node used in wireless communication, characterized in that: include: Sending a first DCI, where the first DCI includes a first field, and the first field included in the first DCI is used to indicate a minimum applicable scheduling offset; The first domain included in the first DCI indicates the minimum applicable scheduling offset from a minimum scheduling offset value set, the minimum scheduling offset value set includes K1 candidate minimum scheduling offset values, and the minimum applicable scheduling offset is one of the K1 candidate minimum scheduling offset values; the minimum scheduling offset value set is one of multiple candidate minimum scheduling offset value sets, and K1 is a positive integer greater than 1; the determination of the minimum scheduling offset value set in the multiple candidate minimum scheduling offset value sets depends on one of the following three: -resources occupied by the first DCI; - time domain resources occupied by the channel or signal scheduled by the first DCI; -Reference signal resources of the physical layer channel QCL scheduled by the first DCI.