Transformer substation fault early warning method and device, electronic equipment and storage medium
Through three-dimensional modeling and inspection route formulation, the problems of low inspection efficiency and difficulty in fault warning are solved, and accurate fault positioning and efficient early warning are achieved.
Patent Information
- Application Number
- CN202411645602.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-18
- Publication Date
- 2025-02-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Substation inspection efficiency is low and it is difficult to effectively warn of substation equipment failures.
By obtaining the operation data and topological data of the substation equipment, three-dimensional modeling is carried out based on the pre-established three-dimensional modeling model, and a three-dimensional model of the substation equipment is generated, thereby identifying the equipment to be inspected, formulating the fault inspection route, and conducting verification and inspection. , and finally issued an early warning based on the inspection results.
It improves patrol efficiency, realizes accurate positioning and effective early warning of substation equipment failures, and saves human resources.
Smart Images

Figure CN119420042A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of fault warning technology, and in particular to a transformer substation fault warning method, device, electronic equipment and storage medium. Background Art
[0002] During the operation of the substation / converter station, the power system operation and maintenance personnel need to inspect and enter data on the equipment, instruments and lines in the station, and then determine the substation equipment failure based on the inspection results. The inspection efficiency is low; and some faults are difficult to identify, so it is difficult to effectively warn of substation equipment failures. Summary of the invention
[0003] The present invention provides a transformer substation fault early warning method, device, electronic equipment and storage medium, which are used to solve the technical problems of low transformer substation inspection efficiency and difficulty in effectively early warning transformer substation equipment failure.
[0004] The present invention provides a transformer substation fault early warning method, comprising:
[0005] Obtain operation data and topology data of substation equipment;
[0006] Using the operation data and the topology data, performing three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment;
[0007] Identifying equipment to be inspected from the three-dimensional model;
[0008] Based on the three-dimensional model, formulate a fault inspection route for the equipment to be inspected;
[0009] Verifying the fault inspection route;
[0010] When the verification is passed, the preset inspection equipment is controlled to inspect the equipment to be inspected along the inspection route to obtain the inspection result;
[0011] Fault information of the substation equipment is determined according to the inspection results, and an early warning is issued based on the fault information.
[0012] Optionally, the method further comprises:
[0013] Obtain topological data samples and corresponding three-dimensional model samples of substation equipment samples of various topological types;
[0014] Extracting device characteristic data from the topology data sample;
[0015] Extracting model feature data corresponding to the device feature data from the three-dimensional model sample;
[0016] Using the device characteristic data as input data and the model characteristic data as output data, training a preset network to obtain a trained network;
[0017] The trained network is used to learn the process of establishing a three-dimensional scene model of substation equipment according to the output data to generate a three-dimensional model.
[0018] Optionally, the step of using the operation data and the topology data to perform three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment includes:
[0019] Extracting characteristic data from the topology data and screening abnormal operation data from the device data;
[0020] Based on the feature data, establishing a three-dimensional scene model of the substation equipment according to the three-dimensional modeling model;
[0021] Based on the abnormal operation data, determining an abnormal operation point in the substation equipment;
[0022] A label to be inspected is added at a position corresponding to the abnormal operation point in the three-dimensional scene model of the substation equipment to generate a three-dimensional model.
[0023] Optionally, the equipment to be inspected includes equipment corresponding to the abnormal operation point.
[0024] Optionally, the step of formulating a fault inspection route for the equipment to be inspected based on the three-dimensional model includes:
[0025] Determining the three-dimensional coordinates of the tag to be inspected in the three-dimensional model;
[0026] A fault inspection route is formulated according to the three-dimensional coordinates.
[0027] Optionally, the step of verifying the fault inspection route includes:
[0028] Performing a simulated inspection on the fault inspection route in the three-dimensional model, and monitoring the simulated inspection process to obtain monitoring results;
[0029] If the monitoring result is that all the devices to be inspected have completed the inspection, and the inspection devices are not disturbed or damaged during the inspection process, it is determined that the fault inspection route has passed the verification.
[0030] Optionally, it also includes:
[0031] Performing routine inspection on the conventional equipment in the substation equipment except the equipment to be inspected, and obtaining routine inspection results;
[0032] A routine warning is issued based on the routine inspection results.
[0033] The present invention also provides a transformer substation fault early warning device, comprising:
[0034] Operation data and topology data acquisition module, used to obtain operation data and topology data of substation equipment;
[0035] A three-dimensional model building module, used to use the operation data and the topology data to perform three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment;
[0036] A device identification module for inspection, used to identify the device for inspection from the three-dimensional model;
[0037] A fault inspection route formulation module, used to formulate a fault inspection route for the equipment to be inspected based on the three-dimensional model;
[0038] A verification module, used for verifying the fault inspection route;
[0039] The inspection module is used to control the preset inspection equipment to inspect the equipment to be inspected along the inspection route and obtain the inspection result when the verification is passed;
[0040] The early warning module is used to determine the fault information of the substation equipment according to the inspection result and issue an early warning based on the fault information.
[0041] The present invention also provides an electronic device, the device comprising a processor and a memory:
[0042] The memory is used to store program code and transmit the program code to the processor;
[0043] The processor is used to execute the substation fault early warning method as described in any one of the above items according to the instructions in the program code.
[0044] The present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium is used to store program codes, and the program codes are used to execute the substation fault early warning method as described in any one of the above items.
[0045] It can be seen from the above technical scheme that the present invention has the following advantages: the present invention provides a method for early warning of substation faults, including: obtaining operation data and topological data of substation equipment; using operation data and topological data, performing three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of substation equipment; obtaining the equipment to be inspected from the three-dimensional model; formulating a fault inspection route for the equipment to be inspected based on the three-dimensional model; verifying the fault inspection route; when the verification passes, controlling the preset inspection equipment to inspect the equipment to be inspected along the inspection route to obtain the inspection result; determining the fault information of the substation equipment according to the inspection result, and issuing an early warning based on the fault information. The present invention can establish an inspection route through a three-dimensional model, and then conduct an inspection according to the inspection route to determine the fault of the substation, accurately locate the fault, and ensure the normal operation of the substation equipment, thereby improving the inspection efficiency and realizing effective early warning of substation equipment failures, and saving human resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0047] Figure 1 A flowchart of a method for early warning of a substation fault provided by an embodiment of the present invention;
[0048] Figure 2 A flowchart of a method for early warning of a substation fault provided by another embodiment of the present invention;
[0049] Figure 3 A structural block diagram of a substation fault warning device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0050] The embodiments of the present invention provide a substation fault early warning method, device, electronic device and storage medium, which are used to solve the technical problems of low substation inspection efficiency and difficulty in effectively warning substation equipment failures.
[0051] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] See also Figure 1 , Figure 1 A flowchart of a method for early warning of a substation fault provided by an embodiment of the present invention.
[0053] In one embodiment, a substation fault early warning method provided by the present invention may include the following steps:
[0054] Step 101, obtaining operation data and topology data of substation equipment.
[0055] A substation is a place in the power system where voltage and current are transformed, electrical energy is received and distributed.
[0056] Step 102 , using the operation data and the topology data, and performing three-dimensional modeling based on a pre-established three-dimensional modeling model, to generate a three-dimensional model of the substation equipment.
[0057] In the embodiment of the present invention, the three-dimensional model of the substation can be generated based on the pre-established three-dimensional modeling model by acquiring the operation data and topology data of the substation equipment.
[0058] Step 103: Identify the equipment to be inspected from the three-dimensional model.
[0059] Step 104: formulate a fault inspection route for the equipment to be inspected based on the three-dimensional model.
[0060] In the embodiment of the present invention, the equipment to be inspected can be marked in the three-dimensional model, and a fault inspection route can be formulated according to the equipment to be inspected. The specific fault inspection route can be formulated according to actual conditions, and the embodiment of the present invention does not specifically limit it.
[0061] Step 105, verifying the fault inspection route.
[0062] After the fault inspection route is formulated, the fault inspection route can be verified to determine whether the fault inspection route meets the inspection requirements.
[0063] Step 106, when the verification is passed, the preset inspection equipment is controlled to inspect the equipment to be inspected along the inspection route to obtain the inspection result.
[0064] In the embodiment of the present invention, the inspection device may be an inspection drone or an inspection robot, and the embodiment of the present invention does not specifically limit the inspection device.
[0065] Step 107, determining the fault information of the substation equipment according to the inspection results, and issuing an early warning based on the fault information.
[0066] After the inspection is completed, the fault information of the substation can be determined according to the inspection results to generate an early warning signal corresponding to the fault information and issue an early warning.
[0067] In one example, the fault information may include the fault point, fault type, and fault level of the faulty equipment in the substation.
[0068] The embodiment of the present invention establishes an inspection route through a three-dimensional model, and then conducts inspections according to the inspection route to determine the fault of the substation, and accurately locate the fault to ensure the normal operation of the substation equipment, thereby improving the inspection efficiency, achieving effective early warning of substation equipment failures, and saving human resources.
[0069] See also Figure 2 , Figure 2 A flowchart of a method for early warning of a substation failure provided by another embodiment of the present invention. In an embodiment of the present invention, the method for early warning of a substation failure may include the following steps:
[0070] Step 201, obtaining operation data and topology data of substation equipment.
[0071] Step 202: extract characteristic data from the topology data, and filter abnormal operation data from the device data.
[0072] Step 203: Based on the feature data, a three-dimensional scene model of the substation equipment is established according to the three-dimensional modeling model.
[0073] Step 204: determining abnormal operation points in the substation equipment based on the abnormal operation data.
[0074] Step 205: Add a to-be-inspected label at a position corresponding to the abnormal operation point in the three-dimensional scene model of the substation equipment to generate a three-dimensional model.
[0075] In an embodiment of the present invention, feature data in the topological data of the substation equipment can be extracted, a three-dimensional scene model of the substation can be established based on the feature data and the three-dimensional modeling model, and abnormal operation data in the equipment data can be screened. Based on the abnormal operation data, abnormal operation points in the substation equipment are determined, and labels to be inspected are added at positions corresponding to the abnormal operation points in the three-dimensional scene model to generate a three-dimensional model.
[0076] In one example, the 3D model can be established by the following steps:
[0077] S1, obtaining topological data samples of substation equipment samples of various topological types and corresponding three-dimensional model samples.
[0078] S2, extracting device feature data from topology data samples.
[0079] S3, extracting model feature data corresponding to the device feature data from the three-dimensional model sample.
[0080] S4, using the device feature data as input data and the model feature data as output data, training the preset network to obtain a trained network.
[0081] S5, through the trained network, the process of establishing a three-dimensional scene model of the substation equipment according to the output data is learned to generate a three-dimensional modeling model.
[0082] In a specific implementation, topological data samples and corresponding three-dimensional model samples of substation equipment samples of various topological types can be obtained, and then equipment feature data can be extracted from the topological data samples, and model feature data corresponding to the equipment feature data can be extracted from the three-dimensional model samples. The equipment feature data is used as the input data of the model, and the model feature data is used as the output data of the model. The preset network is trained to obtain a trained network, and then the process of establishing a three-dimensional scene model of the output data is learned through the trained network to generate a three-dimensional modeling model.
[0083] Step 206: Identify the equipment to be inspected from the three-dimensional model.
[0084] In the embodiment of the present invention, the equipment to be inspected includes equipment corresponding to the abnormal operating point in the three-dimensional model.
[0085] Step 207: Formulate a fault inspection route for the equipment to be inspected based on the three-dimensional model.
[0086] In one embodiment, step 207 may include the following steps:
[0087] S71, determining the three-dimensional coordinates of the tag to be inspected in the three-dimensional model.
[0088] S72, formulate a fault inspection route according to the three-dimensional coordinates.
[0089] In a specific implementation, a tag to be inspected may be configured for each device to be inspected. Each tag to be inspected has three-dimensional coordinates corresponding to the location of the device to be inspected. A fault inspection route for the device to be inspected may be developed through the three-dimensional coordinates.
[0090] In an example, the fault inspection route can be formulated based on the relative distance between the three-dimensional coordinates, or based on the mutual influence relationship between different devices to be inspected. It can be specifically formulated based on actual inspection needs, and the embodiment of the present invention does not specifically limit this.
[0091] Step 208, verifying the fault inspection route.
[0092] In one embodiment, step 208 may include the following steps:
[0093] S81, simulate inspection of the fault inspection route in the three-dimensional model, monitor the simulated inspection process, and obtain monitoring results.
[0094] S82, if the monitoring result is that all the equipment to be inspected have completed the inspection, and the inspection equipment is not disturbed or damaged during the inspection, it is determined that the fault inspection route has passed the verification.
[0095] In the specific implementation, a fault inspection route can be used to perform simulated inspections in a three-dimensional model, and the simulated inspection process can be monitored to obtain monitoring results; if, based on the monitoring results, it is determined that the inspection is to be performed according to the fault inspection route, all equipment to be inspected can be inspected, and the inspection equipment is not disturbed or damaged during the inspection process, then the fault inspection route meets the requirements, otherwise it does not meet the requirements; if the fault inspection route does not meet the requirements, the fault inspection route is adjusted according to the monitoring results and the model data of the three-dimensional model until the fault inspection route meets the requirements.
[0096] Step 209, when the verification is passed, the preset inspection equipment is controlled to inspect the equipment to be inspected along the inspection route to obtain the inspection result.
[0097] Step 210, determining the fault information of the substation equipment according to the inspection results, and issuing an early warning based on the fault information.
[0098] After the inspection is completed, the fault information of the substation can be determined according to the inspection results to generate an early warning signal corresponding to the fault information and issue an early warning.
[0099] Furthermore, in one embodiment, the substation fault early warning method of the present invention may also include: performing routine inspections on conventional equipment in the substation equipment except the equipment to be inspected to obtain routine inspection results; and issuing routine early warnings based on the routine inspection results.
[0100] The present invention establishes an inspection route through a three-dimensional model, and then conducts inspections according to the inspection route to determine the fault of the substation, and accurately locates the fault to ensure the normal operation of the substation equipment, thereby improving the inspection efficiency, achieving effective early warning of substation equipment failure, and saving human resources.
[0101] See also Figure 3 , Figure 3 A structural block diagram of a substation fault warning device provided by an embodiment of the present invention.
[0102] An embodiment of the present invention provides a substation fault early warning device, comprising:
[0103] An operation data and topology data acquisition module 301 is used to acquire operation data and topology data of substation equipment;
[0104] The three-dimensional model building module 302 is used to use the operation data and the topology data to perform three-dimensional modeling based on the pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment;
[0105] The device identification module 303 is used to identify the device to be inspected from the three-dimensional model;
[0106] A fault inspection route formulation module 304 is used to formulate a fault inspection route for the equipment to be inspected based on the three-dimensional model;
[0107] Verification module 305, used to verify the fault inspection route;
[0108] Inspection module 306, used to control the preset inspection equipment to inspect the equipment to be inspected along the inspection route and obtain the inspection result when the verification is passed;
[0109] The early warning module 307 is used to determine the fault information of the substation equipment according to the inspection results and issue an early warning based on the fault information.
[0110] In an embodiment of the present invention, it also includes:
[0111] A topology data sample and three-dimensional model sample acquisition module is used to acquire topology data samples and corresponding three-dimensional model samples of substation equipment samples of various topology types;
[0112] A device feature data extraction module is used to extract device feature data from topology data samples;
[0113] A model feature data extraction module is used to extract model feature data corresponding to device feature data from a three-dimensional model sample;
[0114] A training module is used to train a preset network using device feature data as input data and model feature data as output data to obtain a trained network;
[0115] The three-dimensional modeling model generation module is used to learn the process of establishing a three-dimensional scene model of substation equipment according to output data through a trained network to generate a three-dimensional modeling model.
[0116] In the embodiment of the present invention, the 3D model building module 302 includes:
[0117] The feature data and abnormal operation data extraction submodule is used to extract the feature data in the topology data and filter the abnormal operation data in the device data;
[0118] A three-dimensional scene model building submodule is used to build a three-dimensional scene model of the substation equipment based on the feature data and the three-dimensional modeling model;
[0119] An abnormal operation point determination submodule is used to determine an abnormal operation point in the substation equipment based on the abnormal operation data;
[0120] The three-dimensional model generation submodule is used to add a label to be inspected at a position corresponding to an abnormal operation point in the three-dimensional scene model of the substation equipment to generate a three-dimensional model.
[0121] In the embodiment of the present invention, the equipment to be inspected includes equipment corresponding to an abnormal operating point.
[0122] In the embodiment of the present invention, the fault inspection route formulation module 304 includes:
[0123] A three-dimensional coordinate determination submodule is used to determine the three-dimensional coordinates of the tag to be inspected in the three-dimensional model;
[0124] The fault inspection route formulation submodule is used to formulate a fault inspection route according to three-dimensional coordinates.
[0125] In the embodiment of the present invention, the verification module 305 includes:
[0126] The monitoring result acquisition submodule is used to simulate the inspection of the fault inspection route in the three-dimensional model, monitor the simulated inspection process, and obtain the monitoring results;
[0127] The verification pass determination submodule is used to determine that the fault inspection route has passed the verification if the monitoring result shows that all the equipment to be inspected has completed the inspection and the inspection equipment is not disturbed or damaged during the inspection.
[0128] In an embodiment of the present invention, it also includes:
[0129] The conventional inspection module is used to perform conventional inspections on conventional equipment in the substation except the equipment to be inspected, and obtain conventional inspection results;
[0130] The routine warning module is used to issue routine warnings based on routine inspection results.
[0131] An embodiment of the present invention further provides an electronic device, the device comprising a processor and a memory:
[0132] The memory is used to store the program code and transmit the program code to the processor;
[0133] The processor is used to execute the substation fault early warning method of the embodiment of the present invention according to the instructions in the program code.
[0134] The embodiment of the present invention further provides a computer-readable storage medium, which is used to store program codes, and the program codes are used to execute the substation fault early warning method of the embodiment of the present invention.
[0135] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0136] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0137] It will be appreciated by those skilled in the art that the embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the embodiments of the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the embodiments of the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0138] The embodiments of the present invention are described with reference to the flowcharts and / or block diagrams of the methods, terminal devices (systems), and computer program products according to the embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing terminal device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing terminal device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0139] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing terminal device to operate in a specific manner, so that the instructions stored in the computer readable memory produce a manufactured product including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing terminal device so that a series of operating steps are executed on the computer or other programmable terminal device to produce a computer-implemented process, thereby providing instructions for executing on the computer or other programmable terminal device to implement the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0141] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present invention.
[0142] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.
[0143] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A substation fault early warning method, characterized in that: include: Obtain operation data and topology data of substation equipment; Using the operation data and the topology data, performing three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment; Identifying equipment to be inspected from the three-dimensional model; Based on the three-dimensional model, formulate a fault inspection route for the equipment to be inspected; Verifying the fault inspection route; When the verification is passed, the preset inspection equipment is controlled to inspect the equipment to be inspected along the inspection route to obtain the inspection result; Fault information of the substation equipment is determined according to the inspection results, and an early warning is issued based on the fault information.
2. The method according to claim 1, characterized in that: The method further comprises: Obtain topological data samples and corresponding three-dimensional model samples of substation equipment samples of various topological types; Extracting device characteristic data from the topology data sample; Extracting model feature data corresponding to the device feature data from the three-dimensional model sample; Using the device characteristic data as input data and the model characteristic data as output data, training a preset network to obtain a trained network; The trained network is used to learn the process of establishing a three-dimensional scene model of substation equipment according to the output data to generate a three-dimensional model.
3. The method according to claim 1, characterized in that: The step of using the operation data and the topology data to perform three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment includes: Extracting characteristic data from the topology data and screening abnormal operation data from the device data; Based on the feature data, establishing a three-dimensional scene model of the substation equipment according to the three-dimensional modeling model; Based on the abnormal operation data, determining an abnormal operation point in the substation equipment; A label to be inspected is added at a position corresponding to the abnormal operation point in the three-dimensional scene model of the substation equipment to generate a three-dimensional model.
4. The method according to claim 3, characterized in that The equipment to be inspected includes equipment corresponding to the abnormal operating point.
5. The method according to claim 4, characterized in that The step of formulating a fault inspection route for the equipment to be inspected based on the three-dimensional model includes: Determining the three-dimensional coordinates of the tag to be inspected in the three-dimensional model; A fault inspection route is formulated according to the three-dimensional coordinates.
6. The method according to claim 1, characterized in that The step of verifying the fault inspection route includes: Performing a simulated inspection on the fault inspection route in the three-dimensional model, and monitoring the simulated inspection process to obtain monitoring results; If the monitoring result is that all the devices to be inspected have completed the inspection, and the inspection devices are not disturbed or damaged during the inspection process, it is determined that the fault inspection route has passed the verification.
7. The method according to any one of claims 1 to 6, characterized in that The method further comprises: Performing routine inspection on the conventional equipment in the substation equipment except the equipment to be inspected, and obtaining routine inspection results; A routine warning is issued based on the routine inspection results.
8. A substation fault early warning device, characterized in that: include: Operation data and topology data acquisition module, used to obtain operation data and topology data of substation equipment; A three-dimensional model building module, used to use the operation data and the topology data to perform three-dimensional modeling based on a pre-established three-dimensional modeling model to generate a three-dimensional model of the substation equipment; A device identification module for inspection, used to identify the device for inspection from the three-dimensional model; A fault inspection route formulation module, used to formulate a fault inspection route for the equipment to be inspected based on the three-dimensional model; A verification module, used for verifying the fault inspection route; The inspection module is used to control the preset inspection equipment to inspect the equipment to be inspected along the inspection route and obtain the inspection result when the verification is passed; The early warning module is used to determine the fault information of the substation equipment according to the inspection result and issue an early warning based on the fault information.
9. An electronic device, characterized in that: The device comprises a processor and a memory: The memory is used to store program codes and transmit the program codes to the processor; The processor is used to execute the substation fault early warning method according to any one of claims 1-7 according to the instructions in the program code.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store program codes, and the program codes are used to execute the substation fault early warning method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Inspection scheme generation method and device, electronic equipment and storage medium
CN117217460A
Inspection system and method based on digital twinning
CN118278924A
Substation equipment inspection method, device and equipment and storage medium
CN118367673A