Belt wiping tool for shaft of inspection well

By designing a wellbore tape wiping tool including fixing, collecting and hanging mechanisms, the problems of uneven tape wiping and large mortar loss in the prior art are solved, and uniformity and efficient construction of tape are achieved.

CN119427524APending Publication Date: 2025-02-14SHANDONG HUITONG CONSTR GRP CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411793733.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-09
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

In the prior art, the lack of suitable tools for the wellbore wiping tool results in a narrow width, uneven thickness, and large mortar loss, which affects the construction speed and project quality.

Method used

A wellbore tape wiping tool for inspection wellbore including an upper wellbore, a lower wellbore, a hanging and placement mechanism, a collection mechanism and a fixing mechanism are designed. The galvanized material plate is fixed by rotating operation of the fixing mechanism, the collection mechanism recycles excess mortar, and the hanging and placement mechanism ensures that the width of the wiper is consistent.

Benefits of technology

The uniformity of the width and thickness of the wiper is achieved, the mortar loss is reduced, the construction speed and project quality are improved, and the disassembly and recycling of tools is facilitated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119427524A_ABST
    Figure CN119427524A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of shaft tape wiping, in particular to an inspection well shaft tape wiping tool which comprises an upper shaft, and a lower shaft is mounted on the upper shaft in a clamped mode. A mounting groove is formed in the lower shaft; a plurality of hanging mechanisms are clamped on the upper shaft; a collecting mechanism is fixed on the hanging mechanism; a galvanized plate is mounted on the collecting mechanism; a fixing mechanism is mounted on the galvanized plate; a positioning groove is formed in the galvanized plate; when the two fixing mechanisms are assembled together, the two galvanized plates can abut against each other, the fixing mechanisms are rotated through a tool, and the galvanized plates can be fixed; when mortar is poured into the galvanized material plate, the collecting mechanism can recycle redundant mortar, and therefore waste can be prevented; the hanging mechanism is installed at the top end of the upper shaft, and then the hanging mechanism can drive the galvanized plate to be connected to the center of the gap between the upper shaft and the lower shaft in a sleeved mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shaft smearing, in particular to a shaft smearing tool for an inspection shaft. Background Art

[0002] Applying cement mortar tape at the mortar pipe interface is an effective safeguard to prevent leakage at the pipe interface when water is flowing; the main interface types of mortar pipes include flat pipe interfaces, tongue-and-groove pipe interfaces and socket-and-spigot pipe interfaces; among them, the width of the tape at the flat pipe and tongue-and-groove pipe interfaces varies according to the requirements of different pipe diameters; brick-built inspection wells are strictly prohibited in municipal inspection wells, and assembled inspection well shafts are widely used. The gaps in the inspection well shafts after splicing need to be treated with mortar tape.

[0003] However, during construction, workers do not have suitable smearing tools, which can easily lead to uneven width and thickness of the smearing tape after completion, and the mortar loss caused by construction is large, which can easily affect the construction speed and make it difficult to ensure the quality of the project. When manually applying mortar in the gap between the two wellbores, due to the large thickness of the mortar, it is easy to fall off the wellbore after applying the mortar, and the fallen mortar cannot be recycled through the collection component, which may lead to waste of materials. Summary of the invention

[0004] In view of the problems in the prior art, the present invention provides a tool for wiping a belt in an inspection well shaft.

[0005] The technical solution adopted by the present invention to solve the technical problem is: a wellbore wiping tool for an inspection well, comprising an upper wellbore, on which a lower wellbore is clamped and installed; a mounting groove is provided on the lower wellbore; a plurality of hanging mechanisms are clamped and placed on the upper wellbore; a collecting mechanism is fixed on the hanging mechanism; a galvanized material plate is installed on the collecting mechanism; a fixing mechanism is installed on the galvanized material plate; a positioning groove is provided on the galvanized material plate;

[0006] Specifically, the fixing mechanism includes a first protrusion and a rotating rod. The first protrusions are fixedly installed at both ends of one of the galvanized material plates, and the second protrusions are fixedly installed at both ends of the other galvanized material plate. The first protrusion is rotatably connected with a rotating rod, and a slider is threadedly connected to the rotating rod. The second protrusion is fixedly connected with a limiting block, and the limiting block is snap-fitted with the first protrusion. A limiting groove is provided on the first protrusion, and the slider is snap-fitted with the limiting block. The slider is slidably connected with the first protrusion. The limiting block is snap-fitted with the limiting groove, and the ends of the two first protrusions and the second protrusion conflict with each other. The slider is arranged in a "convex" shape.

[0007] Specifically, the diameter of the upper wellbore is equal to the diameter of the lower wellbore, the upper wellbore is clamped and installed in the installation groove, the two galvanized material plates are in contact with the side walls of the upper wellbore and the lower wellbore, and the galvanized material plates are located in the gap between the upper wellbore and the lower wellbore, the diameter of the upper wellbore is smaller than the inner diameter of the galvanized material plate, and the diameter of the top end of the galvanized material plate is larger than the diameter of the bottom end of the galvanized material plate.

[0008] Specifically, the collecting mechanism includes a collecting frame and a positioning rod. The collecting frame is fixedly connected to the galvanized material plate. The bottom end of the collecting frame is threadedly connected to the positioning rod. The positioning rod passes through the inner wall of the supporting frame. The supporting frame is in conflict with the collecting frame. A through groove is provided on the collecting frame. The diameter of the collecting frame is larger than the diameter of the galvanized material plate, and the width of the through groove is larger than the width of the positioning groove.

[0009] Specifically, the hanging mechanism includes a first clamping ring and a second clamping ring, and the first clamping ring and the second clamping ring are fixedly connected to the two support frames respectively, the first clamping ring is fixedly connected to a clamping block, the second clamping ring is provided with a clamping groove, the clamping block and the second clamping ring are clamped and connected, the first clamping ring and the second clamping ring are fixedly installed with a connecting rod, the top of the connecting rod is fixedly connected with a hook, the two groups of the hooks and connecting rods are symmetrically arranged, and the hooks are hung on the top of the upper wellbore.

[0010] The beneficial effects of the present invention are:

[0011] (1) The inspection well shaft wiping tool described in the present invention can make the two galvanized material plates contact each other when the two fixing mechanisms are assembled together, and the galvanized material plates can be fixed by rotating the fixing mechanism using the tool, that is: when installing the wiping tool, the operator can first engage the limit block fixed on the first protrusion into the limit groove provided in the second protrusion. When the limit block is engaged into the inside of the second protrusion, the two ends of the two galvanized material plates can be in a state of contact; then, the tool is used to rotate the rotating rod installed on the first protrusion. The rotating rod rotates inside the first protrusion, which can make the slider threaded on the rotating rod slide in the direction close to the limit block. When the slider is engaged into the inside of the limit block, the slider can limit the limit block, thereby facilitating the fixation of the two galvanized material plates and facilitating the removal of the galvanized material plates from the shaft after the wiping is completed.

[0012] (2) The present invention relates to a tool for smearing a manhole shaft, wherein the collecting mechanism is located at the bottom end of a galvanized plate. When mortar is poured into the galvanized plate, the collecting mechanism can recycle excess mortar, thereby facilitating prevention of waste. That is, after two galvanized plates are assembled together, the collecting frames installed at their bottom ends are also assembled together. The end of the support frame can be fixed to the collecting frame by means of a positioning rod threadedly installed on the collecting frame. The top ends of the two support frames are respectively fixed to a first clamping ring and a second clamping ring, thereby supporting the support frame by means of the first clamping ring and the second clamping ring. Since a positioning groove is provided between the galvanized plate and the upper and lower manhole shafts, the mortar is poured into the positioning groove, thereby performing smearing treatment on the gap between the upper and lower manhole shafts. Furthermore, the diameter of the top end of the galvanized plate is greater than the diameter of its bottom end. After the mortar is poured, a tool is used to rotate on the top end of the galvanized plate, thereby smoothing the top of the poured smearing tape by the tool. While facilitating the limiting of the smearing tape width, it can also prevent the situation in which the smearing tape thickness varies due to manual operation.

[0013] (3) The inspection well shaft wiping tool described in the present invention installs a hanging mechanism on the top of the upper well shaft, so that the hanging mechanism can drive the galvanized material plate to be sleeved on the central part of the gap between the upper well shaft and the lower well shaft, so as to facilitate the width of the well shaft wiping belt to be kept consistent while also supporting the collection mechanism, that is: because the first clamping ring and the second clamping ring are both connected to the support frame, when the two collection frames are spliced ​​together, the clamping block installed on the first clamping ring will be engaged with the clamping groove provided in the second clamping ring, so that the end of the first clamping ring will conflict with the end of the second clamping ring, so that The first clamping ring is spliced ​​with the second clamping ring; when using the smearing tool, the collection frame, the galvanized material plate, the first clamping ring and the second clamping ring are sequentially sleeved on the side walls of the upper shaft and the lower shaft. When the galvanized material plate is located in the gap between the upper shaft and the lower shaft, the hook can be hung on the top of the upper shaft through the connecting rod fixed on the first clamping ring and the second clamping ring. Since the hook is fixedly connected to the connecting rod and the hook is arranged in an L-shaped structure, the gravity exerted on the first clamping ring and the second clamping ring can be supported by the connecting rod, which makes it easy to limit the position of the galvanized material plate when pouring mortar. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0015] Figure 1 A schematic diagram of the overall structure of a preferred embodiment of a wellbore stripping tool for an inspection well provided by the present invention;

[0016] Figure 2 for Figure 1 An enlarged schematic diagram of the structure of section A is shown;

[0017] Figure 3It is a schematic diagram of the connection structure between the upper wellbore and the lower wellbore of the present invention;

[0018] Figure 4 It is a structural schematic diagram of the lower shaft of the present invention;

[0019] Figure 5 It is a schematic diagram of the connection structure between the first protrusion and the rotating rod of the present invention;

[0020] Figure 6 This is a schematic diagram of the connection structure between the galvanized material plate and the collection frame of the present invention;

[0021] Figure 7 for Figure 6 An enlarged schematic diagram of the structure of part B is shown;

[0022] Figure 8 It is a schematic diagram of the connection structure between the hook and the connecting rod of the present invention;

[0023] Fig. 9 It is a schematic diagram of the connection structure between the support frame and the positioning rod of the present invention;

[0024] Fig.10 It is a schematic diagram of the connection structure between the limit block and the sliding block of the present invention.

[0025] In the figure: 1. upper shaft; 2. lower shaft; 3. hanging mechanism; 301. hook; 302. connecting rod; 303. first clamping ring; 304. clamping block; 305. second clamping ring; 306. clamping slot; 4. collecting mechanism; 401. supporting frame; 402. collecting frame; 403. through slot; 404. positioning rod; 5. galvanized material plate; 6. fixing mechanism; 601. first protrusion; 602. rotating rod; 603. second protrusion; 604. limiting block; 605. limiting slot; 606. sliding block; 7. positioning slot; 8. mounting slot. DETAILED DESCRIPTION

[0026] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0027] like Figure 1 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 8 , Fig. 9 and Fig.10As shown, the present invention discloses a wellbore wiping tool, comprising an upper wellbore 1, on which a lower wellbore 2 is mounted; a mounting groove 8 is provided on the lower wellbore 2; a plurality of hanging mechanisms 3 are mounted on the upper wellbore 1; a collecting mechanism 4 is fixed on the hanging mechanism 3; a galvanized material plate 5 is mounted on the collecting mechanism 4; a fixing mechanism 6 is mounted on the galvanized material plate 5; a positioning groove 7 is provided on the galvanized material plate 5;

[0028] Specifically, Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 7 , Figure 8 and Fig.10 As shown, the fixing mechanism 6 includes a first protrusion 601 and a rotating rod 602, the first protrusion 601 is fixedly installed at both ends of one of the galvanized material plates 5, and the second protrusion 603 is fixedly installed at both ends of the other galvanized material plate 5, the first protrusion 601 is rotatably connected with the rotating rod 602, the rotating rod 602 is threadedly connected with a slider 606, the second protrusion 603 is fixedly connected with a limiting block 604, the limiting block 604 is snap-fitted and connected with the first protrusion 601, the first protrusion 601 is provided with a limiting groove 605, the slider 606 is snap-fitted and connected with the limiting block 604, the slider 606 is slidably connected with the first protrusion 601, the limiting block 604 is snap-fitted and installed at the limiting groove 605, the ends of the two first protrusions 601 and the second protrusion 603 are in conflict with each other, and the slider 606 is arranged in a "convex" shape.

[0029] Specifically, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 and Fig.10As shown, the diameter of the upper shaft 1 is equal to the diameter of the lower shaft 2, the upper shaft 1 is installed in the mounting groove 8, the two galvanized plates 5 are in contact with the side walls of the upper shaft 1 and the lower shaft 2, and the galvanized plates 5 are located in the gap between the upper shaft 1 and the lower shaft 2, the diameter of the upper shaft 1 is smaller than the inner diameter of the galvanized plate 5, the diameter of the top of the galvanized plate 5 is larger than the diameter of the bottom of the galvanized plate 5, when the two fixing mechanisms 6 are assembled together, the two galvanized plates 5 can be made to contact each other, and the galvanized plates 5 can be fixed by rotating the fixing mechanism 6 with a tool, that is: when the operator installs the wiping tool, he can first move the limit block fixed on the first protrusion 601 604 is engaged with the limiting groove 605 provided in the second protrusion 603. When the limiting block 604 is engaged with the inside of the second protrusion 603, the two ends of the two galvanized material plates 5 can be in a state of conflict; then, the rotating rod 602 installed on the first protrusion 601 is rotated by using a tool, and the rotating rod 602 rotates inside the first protrusion 601, so that the slider 606 threadedly connected on the rotating rod 602 can slide toward the direction close to the limiting block 604. When the slider 606 is engaged with the inside of the limiting block 604, the slider 606 can limit the limiting block 604, thereby facilitating the fixation of the two galvanized material plates 5, and also facilitating the removal of the galvanized material plates 5 from the wellbore after the tape is applied.

[0030] Specifically, Figure 1 , Figure 2 , Figure 3 , Figure 5 , Figure 6 , Figure 7 , Figure 8 and Fig. 9As shown, the collecting mechanism 4 includes a collecting frame 402 and a positioning rod 404, the collecting frame 402 is fixedly connected to the galvanized material plate 5, the bottom end of the collecting frame 402 is threadedly connected to the positioning rod 404, the positioning rod 404 passes through the inner wall of the support frame 401, the support frame 401 conflicts with the collecting frame 402, and the collecting frame 402 is provided with a through groove 403, the diameter of the collecting frame 402 is larger than the diameter of the galvanized material plate 5, the width of the through groove 403 is larger than the width of the positioning groove 7, the collecting mechanism 4 is located at the bottom end of the galvanized material plate 5, when mortar is poured into the galvanized material plate 5, the collecting mechanism 4 can recycle excess mortar, which is beneficial to prevent waste, that is: after the two galvanized material plates 5 are assembled together, the collecting frames 402 installed at their bottom ends are also assembled together, and the collecting frames 4 are connected to the collecting frames 4. 02 The threaded positioning rod 404 can fix the end of the support frame 401 on the collection frame 402, and the top ends of the two support frames 401 are respectively fixed on the first clamping ring 303 and the second clamping ring 305, so that the support frame 401 can be supported by the first clamping ring 303 and the second clamping ring 305; since a positioning groove 7 is provided between the galvanized material plate 5 and the upper shaft 1 and the lower shaft 2, the mortar is poured into the positioning groove 7, and the gap between the upper shaft 1 and the lower shaft 2 can be treated with a tape; and the diameter of the top end of the galvanized material plate 5 is larger than the diameter of its bottom end. After the mortar is poured, a tool is used to rotate on the top end of the galvanized material plate 5, and then the top of the poured tape can be smoothed by the tool, so that it is convenient to limit the width of the tape and prevent the situation where the thickness of the tape is different due to manual operation.

[0031] Specifically, Figure 1 , Figure 2 , Figure 3 , Figure 8 and Fig. 9As shown, the hanging mechanism 3 includes a first snap ring 303 and a second snap ring 305, the two support frames 401 are respectively fixedly connected with the first snap ring 303 and the second snap ring 305, the first snap ring 303 is fixedly connected with a clamping block 304, the second snap ring 305 is provided with a clamping groove 306, the clamping block 304 and the second snap ring 305 are clamped and connected, the first snap ring 303 and the second snap ring 305 are fixedly installed with a connecting rod 302, the top of the connecting rod 302 is fixedly connected The hook 301 is connected to the upper shaft 1, and the two groups of hooks 301 and connecting rods 302 are symmetrically arranged. The hook 301 is hung on the top of the upper shaft 1, and the hanging mechanism 3 is installed on the top of the upper shaft 1, so that the hanging mechanism 3 can drive the galvanized material plate 5 to be sleeved in the center of the gap between the upper shaft 1 and the lower shaft 2, so that the width of the shaft wiping belt can be kept consistent while supporting the collecting mechanism 4, that is, because the first clamp ring 303 and the second clamp ring 305 are connected to the support frame 401 When the two collecting frames 402 are spliced ​​together, the block 304 installed on the first snap ring 303 will be engaged with the slot 306 provided in the second snap ring 305, so that the end of the first snap ring 303 will collide with the end of the second snap ring 305, so that the first snap ring 303 and the second snap ring 305 can be spliced ​​together; when using the wiping tool, the collecting frame 402, the galvanized material plate 5, the first snap ring 303 and the second snap ring 305 are sleeved on the side walls of the upper shaft 1 and the lower shaft 2 in turn, When the galvanized material plate 5 is located in the gap between the upper shaft 1 and the lower shaft 2, the hook 301 can be hung on the top of the upper shaft 1 through the connecting rod 302 fixed on the first clamping ring 303 and the second clamping ring 305. Since the hook 301 is fixedly connected to the connecting rod 302 and the hook 301 is arranged in an L-shaped structure, the gravity exerted on the first clamping ring 303 and the second clamping ring 305 can be supported by the connecting rod 302, thereby facilitating the limitation of the position of the galvanized material plate 5 when pouring the mortar.

[0032] When the present invention is in use, first, when installing the wiping tool, the operator can first engage the limit block 604 fixed on the first protrusion 601 with the limit groove 605 provided in the second protrusion 603. When the limit block 604 is engaged with the inside of the second protrusion 603, the two ends of the two galvanized material plates 5 can be in a state of conflict; then, the tool is used to rotate the rotating rod 602 installed on the first protrusion 601, and the rotating rod 602 rotates inside the first protrusion 601, so that the slider 606 threadedly connected on the rotating rod 602 can slide in the direction close to the limit block 604. When the slider 606 is engaged with the inside of the limit block 604, the slider 606 can limit the limit block 604, thereby facilitating the fixing of the two galvanized material plates 5, and also facilitating the removal of the galvanized material plates 5 from the shaft after the wiping is completed;

[0033] After the two galvanized material plates 5 are assembled together, the collecting frames 402 installed at their bottom ends are also assembled together. The end of the support frame 401 can be fixed on the collecting frame 402 through the positioning rod 404 threadedly installed on the collecting frame 402, and the top ends of the two support frames 401 are respectively fixed on the first clamping ring 303 and the second clamping ring 305, so that the support frame 401 can be supported by the first clamping ring 303 and the second clamping ring 305; since there is a positioning groove 7 between the galvanized material plate 5 and the upper shaft 1 and the lower shaft 2, the mortar is poured into the positioning groove 7, and the gap between the upper shaft 1 and the lower shaft 2 can be treated with a tape; and the diameter of the top end of the galvanized material plate 5 is larger than the diameter of its bottom end. After the mortar is poured, a tool is used to rotate on the top end of the galvanized material plate 5, and then the top of the poured tape can be smoothed by the tool, so that while it is convenient to limit the width of the tape, it can also prevent the situation where the thickness of the tape is different due to manual operation;

[0034] Since the first clamping ring 303 and the second clamping ring 305 are both connected to the support frame 401, when the two collection frames 402 are spliced ​​together, the clamping block 304 installed on the first clamping ring 303 will be engaged with the clamping groove 306 provided in the second clamping ring 305, so that the end of the first clamping ring 303 and the end of the second clamping ring 305 are in conflict, so that the first clamping ring 303 and the second clamping ring 305 can be spliced ​​together; when using the wiping tool, the collection frame 402, the galvanized material plate 5, the first clamping ring 303 and the second clamping ring 305 are sleeved on in turn. The side walls of the upper shaft 1 and the lower shaft 2, when the galvanized material plate 5 is located in the gap between the upper shaft 1 and the lower shaft 2, the hook 301 can be hung on the top of the upper shaft 1 through the connecting rod 302 fixed on the first clamping ring 303 and the second clamping ring 305. Since the hook 301 is fixedly connected to the connecting rod 302, and the hook 301 is arranged in an L-shaped structure, the gravity exerted on the first clamping ring 303 and the second clamping ring 305 can be supported by the connecting rod 302, so as to facilitate the limitation of the position of the galvanized material plate 5 when pouring the mortar.

[0035] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0036] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A tool for wiping a belt in an inspection well, characterized in that: The invention comprises an upper wellbore (1), wherein a lower wellbore (2) is mounted on the upper wellbore (1); a mounting groove (8) is provided on the lower wellbore (2); a plurality of hanging mechanisms (3) are mounted on the upper wellbore (1); a collecting mechanism (4) is fixed on the hanging mechanism (3); a galvanized material plate (5) is mounted on the collecting mechanism (4); a fixing mechanism (6) is mounted on the galvanized material plate (5); and a positioning groove (7) is provided on the galvanized material plate (5); The fixing mechanism (6) comprises a first protrusion (601) and a rotating rod (602); the first protrusion (601) is fixedly installed at both ends of one of the galvanized material plates (5); the second protrusion (603) is fixedly installed at both ends of the other galvanized material plate (5); the first protrusion (601) is rotatably connected to the rotating rod (602); the rotating rod (602) is threadedly connected to a slider (606); the second protrusion (603) is fixedly connected to a limiting block (604); the limiting block (604) is snap-fitted with the first protrusion (601); the first protrusion (601) is provided with a limiting groove (605); the slider (606) is snap-fitted with the limiting block (604).

2. The inspection well shaft wiping tool according to claim 1 is characterized in that: The sliding block (606) is slidably connected to the first protrusion (601), and the limiting block (604) is snap-fitted and installed in the limiting groove (605).

3. The inspection well shaft wiping tool according to claim 1 is characterized in that: The ends of the two first protrusions (601) and the second protrusion (603) are in contact with each other, and the sliding block (606) is arranged in a "convex" shape.

4. The inspection well shaft wiping tool according to claim 1 is characterized in that: The diameter of the upper wellbore (1) is equal to the diameter of the lower wellbore (2), and the upper wellbore (1) is snap-fitted and installed in the installation groove (8).

5. The inspection well shaft wiping tool according to claim 1 is characterized in that: The two galvanized material plates (5) are in contact with the side walls of the upper shaft (1) and the lower shaft (2), and the galvanized material plates (5) are located in the gap between the upper shaft (1) and the lower shaft (2).

6. The inspection well shaft wiping tool according to claim 1, characterized in that: The diameter of the upper shaft (1) is smaller than the inner diameter of the galvanized material plate (5), and the diameter of the top end of the galvanized material plate (5) is larger than the diameter of the bottom end of the galvanized material plate (5).

7. The inspection well shaft wiping tool according to claim 1 is characterized in that: The collecting mechanism (4) comprises a collecting frame (402) and a positioning rod (404); the collecting frame (402) is fixedly connected to the galvanized material plate (5); the bottom end of the collecting frame (402) is threadedly connected to the positioning rod (404); the positioning rod (404) passes through the inner wall of the supporting frame (401); the supporting frame (401) is in contact with the collecting frame (402); and a through groove (403) is provided on the collecting frame (402).

8. The inspection well shaft wiping tool according to claim 7 is characterized in that: The diameter of the collecting frame (402) is greater than the diameter of the galvanized material plate (5), and the width of the through groove (403) is greater than the width of the positioning groove (7).

9. The inspection well shaft wiping tool according to claim 8, characterized in that: The hanging mechanism (3) comprises a first snap ring (303) and a second snap ring (305); the first snap ring (303) and the second snap ring (305) are fixedly connected to the two support frames (401) respectively; a clamping block (304) is fixedly connected to the first snap ring (303); a clamping groove (306) is provided on the second snap ring (305); the clamping block (304) and the second snap ring (305) are snap-fitted and connected; a connecting rod (302) is fixedly installed on the first snap ring (303) and the second snap ring (305); a hook (301) is fixedly connected to the top of the connecting rod (302).

10. The inspection well shaft wiping tool according to claim 9, characterized in that: The two groups of hooks (301) and connecting rods (302) are symmetrically arranged, and the hooks (301) are hung on the top of the upper wellbore (1).