Method, device and equipment for measuring maximum power and maximum current of air conditioner

Through automated measurement equipment, adjust the input voltage and operating temperature, and obtain the operating data of the air conditioner in real time, solving the problem of inefficient and low accuracy in the measurement of maximum operating power and maximum operating current of the air conditioner in the existing technology, achieving efficient and accurate Measurement results.

CN119438690APending Publication Date: 2025-02-14QINGDAO HAIER AIR CONDITIONING ELECTRONICS CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310988806.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-08-07
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

The measurement methods of the maximum operating power and maximum operating current of existing air conditioners rely on manual operation, resulting in high cost, low accuracy and low efficiency.

Method used

Through the measuring device, the control commands are automatically sent, the input voltage and operating temperature are adjusted, the operating power and current data of the air conditioner are obtained in real time, and the maximum operating power and maximum operating current and their corresponding operating temperature and input voltage are recorded.

Benefits of technology

Improves measurement efficiency and accuracy, reduces labor costs, and reduces the possibility of operational errors and data errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119438690A_ABST
    Figure CN119438690A_ABST
Patent Text Reader

Abstract

The invention provides a method, device and equipment for measuring the maximum power and the maximum current of an air conditioner, and is applied to the field of air conditioner control. The method comprises the steps that corresponding control instructions are sent to a to-be-measured air conditioner and a working condition machine, and measurement data of the to-be-measured air conditioner are obtained; the measurement data comprises operation power and operation current of the to-be-measured air conditioner under different working condition temperatures and different input voltages; the maximum operation power and the maximum operation current as well as the working condition temperature and the input voltage corresponding to the maximum operation power and the maximum operation current are screened out from the measurement data. According to the method and device for measuring the maximum power and the maximum current of the air conditioner and the measuring equipment, the input voltage and the working condition temperature are automatically adjusted through the measuring equipment, system stability is judged, data parameters are recorded, and the measuring efficiency and the measuring accuracy are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of air conditioner control, and in particular to a method, device and measuring equipment for measuring the maximum power and maximum current of an air conditioner. Background Art

[0002] As people's living standards continue to improve and the level of intelligence of home appliances continues to increase, smart home appliances are becoming more and more popular. Users can use air conditioners for heating in winter to increase the indoor temperature, and can also use air conditioners for cooling in summer to reduce the indoor temperature.

[0003] The maximum operating power and maximum operating current of the air conditioner need to be measured before leaving the factory. In related technologies, measurement personnel mostly manually adjust the input voltage and operating temperature, and manually record the relevant data after the air conditioner runs stably.

[0004] However, such a measurement method not only requires high labor costs, but also has the possibility of operating errors or recording errors due to the numerous operating steps, which greatly affects the accuracy and efficiency of the measurement. Summary of the invention

[0005] The purpose of this application is to provide a method, device and measuring equipment for measuring the maximum power and maximum current of an air conditioner, which are used to automatically adjust the input voltage and operating temperature through the measuring equipment, as well as to judge the system stability and record data parameters, thereby greatly improving the measurement efficiency and measurement accuracy.

[0006] The present application provides a method for measuring the maximum power and maximum current of an air conditioner, comprising:

[0007] By sending corresponding control instructions to the air conditioner to be tested and the operating condition machine, the measurement data of the air conditioner to be tested is obtained; the measurement data includes: the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; the maximum operating power and the maximum operating current, as well as the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current are screened out from the measurement data; wherein the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; the fourth control instruction is used to increase the operating temperature.

[0008] Optionally, the measurement data of the air conditioner under test is obtained by cyclically sending corresponding control instructions to the air conditioner under test, including: when the air conditioner is not in operation, sending the first control instruction to the air conditioner under test and sending the second control instruction to the operating condition machine, to control the air conditioner under test to power on and operate according to the first input voltage at the lowest operating temperature; obtaining the power change of the air conditioner under test in real time, and when the power change rate of the air conditioner under test is less than a preset change rate threshold, recording the operating power and operating current of the air conditioner under the lowest operating temperature and the first input voltage; wherein the first input voltage is the product of the rated voltage of the air conditioner under test and a first multiple; and the first multiple is less than 1.

[0009] Optionally, the measurement data of the air conditioner to be tested is obtained by cyclically sending corresponding control instructions to the air conditioner to be tested, including: when the input voltage of the air conditioner to be tested is less than the second input voltage, sending the third control instruction to the air conditioner to control the air conditioner to be tested to increase the input voltage of the air conditioner to be tested according to the target voltage increment on the basis of the current input voltage; obtaining the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, recording the operating power and operating current of the air conditioner to be tested under the current operating temperature and current input voltage; wherein, the second input voltage is the product of the rated voltage of the air conditioner to be tested and a second multiple; the second multiple is greater than 1; the target voltage increment is the product of the rated voltage of the air conditioner to be tested and the target multiple; the target multiple can be divided by a target multiple difference integer; the target multiple difference is the difference between the second multiple and the first multiple.

[0010] Optionally, the measurement data of the air conditioner to be tested is obtained by cyclically sending corresponding control instructions to the air conditioner to be tested, including: when the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is lower than the maximum operating temperature, sending the first control instruction to the air conditioner to be tested, and sending the fourth control instruction to the operating machine to control the air conditioner to be tested to operate according to the first input voltage at the increased operating temperature; obtaining the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is lower than the preset change rate threshold, recording the operating power and operating current of the air conditioner to be tested at the current operating temperature and the first input voltage.

[0011] Optionally, the measurement data of the air conditioner to be tested is obtained by cyclically sending corresponding control instructions to the air conditioner to be tested, including: when the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is equal to the maximum operating temperature, ending the measurement of the air conditioner to be tested.

[0012] Optionally, filtering out the maximum operating power and the maximum operating current, and the operating temperature corresponding to the maximum operating power and the maximum operating current from the measurement data, includes: comparing the operating power and the operating current corresponding to each operating temperature, and filtering out the maximum operating power, the first operating temperature corresponding to the maximum operating power, and the first input voltage, as well as the maximum operating current, the second operating temperature corresponding to the maximum operating current, and the second input voltage.

[0013] Optionally, the measurement data of the air conditioner to be tested is obtained by sending corresponding control instructions to the air conditioner to be tested and the operating machine, including: displaying the measurement progress information at the current moment in real time on the display screen of the measuring device; wherein the measurement information includes at least one of the following: the input voltage at the current moment, the operating temperature at the current moment.

[0014] The present application also provides a device for measuring the maximum power and maximum current of an air conditioner, comprising:

[0015] An instruction sending module is used to send corresponding control instructions to the air conditioner to be tested and the operating condition machine; a data acquisition module is used to obtain measurement data of the air conditioner to be tested; the measurement data include: the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; a data processing module is used to filter out the maximum operating power and the maximum operating current, as well as the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current from the measurement data; wherein the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the operating temperature.

[0016] Optionally, the instruction sending module is specifically used to send the first control instruction to the air conditioner under test and the second control instruction to the operating machine when the air conditioner is not in operation, so as to control the air conditioner under test to power on and operate according to the first input voltage at the lowest operating temperature; the data acquisition module is specifically used to obtain the power change of the air conditioner under test in real time, and when the power change rate of the air conditioner under test is less than a preset change rate threshold, record the operating power and operating current of the air conditioner under the lowest operating temperature and the first input voltage; wherein the first input voltage is the product of the rated voltage of the air conditioner under test and a first multiple; the first multiple is less than 1.

[0017] Optionally, the instruction sending module is specifically used to send the third control instruction to the air conditioner to be tested when the input voltage of the air conditioner to be tested is less than the second input voltage, so as to control the air conditioner to be tested to increase the input voltage of the air conditioner to be tested according to the target voltage increment on the basis of the current input voltage; the data acquisition module is specifically used to obtain the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, record the operating power and operating current of the air conditioner to be tested under the current operating temperature and current input voltage; wherein, the second input voltage is the product of the rated voltage of the air conditioner to be tested and a second multiple; the second multiple is greater than 1; the target voltage increment is the product of the rated voltage of the air conditioner to be tested and the target multiple; the target multiple can be divided by a target multiple difference integer; the target multiple difference is the difference between the second multiple and the first multiple.

[0018] Optionally, the instruction sending module is specifically used to send the first control instruction to the air conditioner under test and send the fourth control instruction to the operating machine when the input voltage of the air conditioner under test is equal to the second input voltage and the operating temperature of the air conditioner under test is lower than the maximum operating temperature, so as to control the air conditioner under test to operate according to the first input voltage under the increased operating temperature; the data acquisition module is specifically used to acquire the power change of the air conditioner under test in real time, and record the operating power and operating current of the air conditioner under the current operating temperature and the first input voltage when the power change rate of the air conditioner under test is lower than the preset change rate threshold.

[0019] Optionally, the device also includes: a control module; the control module is used to end the measurement of the air conditioner to be tested when the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is equal to the maximum operating temperature.

[0020] Optionally, the data processing module is specifically used to compare the operating power and operating current corresponding to each operating temperature, and to screen out the maximum operating power, the first operating temperature corresponding to the maximum operating power, and the first input voltage, as well as the maximum operating current, the second operating temperature corresponding to the maximum operating current, and the second input voltage.

[0021] Optionally, the device also includes: a display module; the display module is used to display the measurement progress information at the current moment in real time on the display screen of the measuring device; wherein the measurement information includes at least one of the following: the input voltage at the current moment, the operating temperature at the current moment.

[0022] The present application also provides a measuring device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of the method for measuring the maximum power and maximum current of the air conditioner as described in any one of the above are implemented.

[0023] The present application also provides a computer program product, comprising a computer program / instruction, which, when executed by a processor, implements the steps of any of the above-mentioned methods for measuring the maximum power and maximum current of an air conditioner.

[0024] The present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of the method for measuring the maximum power and maximum current of the air conditioner as described in any one of the above are implemented.

[0025] The present application also provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the steps of the method for measuring the maximum power and the maximum current of the air conditioner as described in any one of the above are implemented.

[0026] The present application provides a method, device and measuring equipment for measuring the maximum power and maximum current of an air conditioner. First, by sending corresponding control instructions to the air conditioner to be tested and the working condition machine, the measurement data of the air conditioner to be tested is obtained; the measurement data includes: the operating power and operating current of the air conditioner to be tested under different working temperature and different input voltage; then, the maximum operating power and the maximum operating current, as well as the working temperature and input voltage corresponding to the maximum operating power and the maximum operating current are screened out from the measurement data; wherein, the control instructions sent by the measuring equipment to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the working temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the working temperature. In this way, the input voltage and working temperature can be automatically adjusted by the measuring equipment, and the system stability can be judged and the data parameters can be recorded, which greatly improves the measurement efficiency and measurement accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0028] Figure 1 It is a schematic diagram of the operating principle of the air conditioner provided by this application;

[0029] Figure 2 It is one of the flow charts of the method for measuring the maximum power and the maximum current of the air conditioner provided by the present application;

[0030] Figure 3 This is the second flow chart of the method for measuring the maximum power and maximum current of the air conditioner provided by the present application;

[0031] Figure 4 It is a structural schematic diagram of a device for measuring the maximum power and maximum current of an air conditioner provided in the present application;

[0032] Figure 5 It is a structural schematic diagram of the electronic device provided by this application. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0034] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0035] The operating principle of the air conditioner involved in the embodiment of the present application is described in detail below:

[0036] like Figure 1 As shown in the figure, the compressor compresses the refrigerant (coolant) and transports it to the condenser through a pipeline. The high-temperature and high-pressure gaseous refrigerant releases heat in the condenser and becomes a medium-temperature and high-pressure liquid refrigerant. After that, the medium-temperature and high-pressure liquid refrigerant is depressurized by a capillary tube (throttling unit) and becomes a low-temperature and low-pressure liquid refrigerant. The low-temperature and low-pressure liquid refrigerant is transported to the evaporator to evaporate from liquid to gas, and absorbs a large amount of heat during the evaporation process. Finally, the low-temperature and low-pressure gaseous refrigerant in the evaporator is transported to the compressor to participate in the next cycle. When the air conditioner is cooling, the heat exchanger of the outdoor unit is the condenser, and the heat exchanger of the indoor unit is the evaporator; conversely, when the air conditioner is heating, the heat exchanger of the outdoor unit is the evaporator, and the heat exchanger of the indoor unit is the condenser.

[0037] In order to be able to accurately control the air conditioner when in use, the maximum performance parameters of the air conditioner (including: the maximum operating power and maximum operating current of the air conditioner, etc.) need to be known before the air conditioner leaves the factory (especially new air conditioners). In the related art, most of them are manual measurements, which are costly and have poor accuracy. Based on this, the embodiment of the present application provides a method for measuring the maximum power and maximum current of an air conditioner, which realizes automatic measurement through measuring equipment that is respectively connected to the air conditioner to be tested and the working condition machine for communication, which not only reduces the measurement cost, but also improves the measurement efficiency and measurement accuracy.

[0038] The following is a detailed description of the method for measuring the maximum power and maximum current of the air conditioner provided in the embodiment of the present application through specific embodiments and application scenarios in conjunction with the accompanying drawings.

[0039] like Figure 2 As shown, an embodiment of the present application provides a method for measuring the maximum power and maximum current of an air conditioner, and the method may include the following steps 201 and 202:

[0040] Step 201: Acquire measurement data of the air conditioner to be tested by sending corresponding control instructions to the air conditioner to be tested and the working condition machine.

[0041] Among them, the measurement data includes: the operating power and operating current of the air conditioner under different operating temperatures and different input voltages; the control instructions sent by the measuring device to the air conditioner under test include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; the fourth control instruction is used to increase the operating temperature.

[0042] It should be noted that, in the embodiment of the present application, when the air conditioner is being measured, the indoor unit and the indoor unit of the air conditioner to be tested are respectively located in different working condition rooms, and the measuring device can adjust the working temperature in the working condition room. The measuring device is respectively connected to the air conditioner to be tested and the working condition machine in communication, and the input voltage of the air conditioner to be tested can be adjusted by controlling the variable frequency power supply of the air conditioner to be tested, and the working condition temperature can be adjusted by controlling the working condition machine. At the same time, the measuring device can also obtain the operating power and operating current of the air conditioner to be tested in real time through the communication connection with the air conditioner to be tested.

[0043] Exemplarily, the working temperature is the ambient temperature of the working room where the outdoor unit of the air conditioner to be tested is located. In the embodiment of the present application, the temperature of the working room where the indoor unit is located is constant at 27°C, and the ambient temperature of the working room where the outdoor unit is located varies in the range of 36°C to 46°C. In the embodiment of the present application, the adjustment of the working temperature is the adjustment of the ambient temperature of the working room where the outdoor unit is located.

[0044] Specifically, the above step 201 may include the following steps 201a1 and 201a2:

[0045] Step 201a1, when the air conditioner is not in operation, sending the first control instruction to the air conditioner to be tested and sending the second control instruction to the operating condition machine to control the air conditioner to be tested to power on and operate at the first input voltage at the lowest operating temperature.

[0046] Step 201a2: acquiring the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than a preset change rate threshold, recording the operating power and operating current of the air conditioner to be tested at the minimum operating temperature and the first input voltage.

[0047] The first input voltage is the product of the rated voltage of the air conditioner to be tested and a first multiple; the first multiple is less than 1.

[0048] Exemplarily, the first input voltage is the initialization voltage during the measurement process, and the first input voltage is also the lower limit of the input voltage adjustment value of the air conditioner to be measured during the measurement process, that is, the minimum input voltage; the minimum operating temperature is the initialization operating temperature. That is, the first control instruction is used to adjust the input voltage of the air conditioner to be measured to the first input voltage, and the second control instruction is used to adjust the operating temperature to the minimum operating temperature.

[0049] For example, Figure 3 As shown, after the measurement starts, the air conditioner to be tested is first controlled to operate at a voltage V=0.8*rated voltage (i.e., the first input voltage) at an operating temperature T=36°C (i.e., the above-mentioned minimum operating temperature) by sending a first control instruction to the air conditioner to be tested and a second control instruction to the operating conditioner. Afterwards, when the air conditioner is running stably (the judgment condition is that the rate of change of the power P of the air conditioner to be tested is less than 50 watts per minute w / min, i.e., the above-mentioned preset rate of change threshold), the operating power and operating current of the air conditioner to be tested at the minimum operating temperature and the first input voltage are recorded.

[0050] Specifically, the above step 201 may further include the following steps 201b1 and 201b2:

[0051] Step 201b1, when the input voltage of the air conditioner under test is less than the second input voltage, send the third control instruction to the air conditioner under test to control the air conditioner under test to increase the input voltage of the air conditioner under test according to the target voltage increment based on the current input voltage.

[0052] Exemplarily, the second input voltage is the upper limit of the input voltage adjustment value of the air conditioner under test during the measurement process, that is, the maximum input voltage. When the current input voltage of the air conditioner under test is less than the second input voltage, the input voltage needs to be increased and then measured again.

[0053] Step 201b2, acquiring the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, recording the operating power and operating current of the air conditioner to be tested under the current operating temperature and current input voltage.

[0054] Among them, the second input voltage is the product of the rated voltage of the air conditioner to be tested and a second multiple; the second multiple is greater than 1; the target voltage increment is the product of the rated voltage of the air conditioner to be tested and the target multiple; the target multiple can be divided by a target multiple difference integer; the target multiple difference is the difference between the second multiple and the first multiple.

[0055] For example, Figure 3 As shown, after completing a measurement, if the input voltage V of the air conditioner to be tested is less than 1.2*rated voltage (i.e., the second input voltage mentioned above), a third control instruction needs to be sent to the air conditioner to be tested to increase the input voltage of the air conditioner to be tested and re-measure the operating power and operating current.

[0056] Specifically, the above step 201 may further include the following steps 201c1 and 201c2:

[0057] Step 201c1, when the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is lower than the maximum operating temperature, send the first control instruction to the air conditioner to be tested, and send the fourth control instruction to the operating machine to control the air conditioner to be tested to operate according to the first input voltage at the increased operating temperature.

[0058] Step 201c2, obtaining the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, recording the operating power and operating current of the air conditioner to be tested under the current operating temperature and the first input voltage.

[0059] For example, after the operating temperature is adjusted, the input voltage needs to be reinitialized in order to obtain the operating power and operating current corresponding to each input voltage of the air conditioner to be tested under the new operating temperature.

[0060] For example, Figure 3 As shown, after completing a measurement, if the operating temperature T is less than 46°C (i.e., the above-mentioned maximum operating temperature), it is necessary to send a fourth control instruction to the operating machine to increase the operating temperature (by 1°C each time). At the same time, a first control instruction is sent to the air conditioner to be tested to initialize the input voltage of the air conditioner to be tested, and re-measure the operating power and operating current.

[0061] Exemplarily, by cyclically executing the above steps 201b1, 201b2, 201c1 and 201c2, the operating power and the operating current of the air conditioner under different operating temperatures and different input voltages can be obtained.

[0062] Specifically, the above step 201 may further include the following step 201d:

[0063] Step 201d: When the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is equal to the maximum operating temperature, end the measurement of the air conditioner to be tested.

[0064] For example, in the embodiment of the present application, the process of the input voltage from the lowest input voltage to the highest input voltage is the input voltage cycle, and the process of the operating temperature from the lowest operating temperature to the highest operating temperature is the operating temperature cycle. The input voltage cycle is nested in the operating temperature cycle, that is, each time the operating temperature changes, an input voltage cycle needs to be executed. After the above operating temperature cycle is executed, the entire measurement process can be terminated.

[0065] It should be noted that in the embodiment of the present application, after adjusting the input voltage and operating temperature of the air conditioner to be tested, it is necessary to re-perform the measurement step to obtain the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages. The measurement steps are the same each time, that is, when the rate of change of the operating power of the air conditioner to be tested is less than the preset rate of change threshold, the relevant data is recorded.

[0066] In a possible implementation, the above-mentioned measuring device can also display the current measurement progress in real time on the display screen, including: current input voltage, current operating temperature and other related information.

[0067] Specifically, the above step 201 may further include the following step 201e:

[0068] Step 201e: Displaying the current measurement progress information in real time on the display screen of the measuring device.

[0069] The measurement information includes at least one of the following: the input voltage at the current moment, and the operating temperature at the current moment.

[0070] It is understandable that each new air conditioner needs to be measured before leaving the factory, so the measurement method must be compatible with all air conditioners. In the embodiment of the present application, the method of measuring the air conditioner by the measuring device only requires a program that can execute the corresponding control instructions and feedback the operating power and operating current to be built into the air conditioner, and the maximum operating power and maximum operating current can be measured using the measurement method provided in the embodiment of the present application. Good compatibility and less changes to the air conditioner.

[0071] Step 202: Filter out the maximum operating power and the maximum operating current, and the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current from the measurement data.

[0072] For example, after the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages are obtained, the maximum operating power and the maximum operating current, as well as the corresponding operating temperature and input voltage, can be screened out.

[0073] Specifically, the above step 202 may include the following steps 202a:

[0074] Step 202a, compare the operating power and operating current corresponding to each operating temperature, and filter out the maximum operating power, the first operating temperature corresponding to the maximum operating power, and the first input voltage, as well as the maximum operating current, the second operating temperature corresponding to the maximum operating current, and the second input voltage.

[0075] It should be noted that the operating temperature corresponding to the maximum operating power and the operating temperature corresponding to the maximum operating current may be the same or different; the input voltage corresponding to the maximum operating power and the input voltage corresponding to the maximum operating current may be the same or different. That is, the first operating temperature and the second operating temperature may be the same or different; the first input voltage and the second input voltage may be the same or different.

[0076] The method for measuring the maximum power and maximum current of an air conditioner provided in the embodiment of the present application, first, by sending corresponding control instructions to the air conditioner to be tested and the working condition machine, the measurement data of the air conditioner to be tested is obtained; the measurement data includes: the operating power and operating current of the air conditioner to be tested under different working temperature and different input voltage; then, the maximum operating power and the maximum operating current, as well as the working temperature and input voltage corresponding to the maximum operating power and the maximum operating current are screened out from the measurement data; wherein, the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the working temperature; the third control instruction is used to increase the input voltage; the fourth control instruction is used to increase the working temperature. In this way, the input voltage and working temperature can be automatically adjusted by the measuring device, and the system stability judgment and data parameter recording can be performed, which greatly improves the measurement efficiency and measurement accuracy.

[0077] It should be noted that the method for measuring the maximum power and maximum current of the air conditioner provided in the embodiment of the present application can be executed by a device for measuring the maximum power and maximum current of the air conditioner, or a control module in the device for measuring the maximum power and maximum current of the air conditioner for executing the method for measuring the maximum power and maximum current of the air conditioner. In the embodiment of the present application, the device for measuring the maximum power and maximum current of the air conditioner is used as an example to illustrate the device for measuring the maximum power and maximum current of the air conditioner provided in the embodiment of the present application.

[0078] It should be noted that, in the embodiments of the present application, the above-mentioned methods shown in the drawings. The methods for measuring the maximum power and maximum current of the air conditioner are all illustrated by combining an accompanying drawing in the embodiments of the present application as an example. In specific implementation, the methods for measuring the maximum power and maximum current of the air conditioner shown in the above-mentioned method drawings can also be implemented in combination with any other drawings that can be combined as shown in the above-mentioned embodiments, and will not be repeated here.

[0079] The following is a description of the device for measuring the maximum power and maximum current of the air conditioner provided in the present application. The method for measuring the maximum power and maximum current of the air conditioner described below and described above can refer to each other.

[0080] Figure 4 A schematic diagram of a device for measuring the maximum power and maximum current of an air conditioner provided in an embodiment of the present application is shown in FIG. Figure 4 As shown, specifically including:

[0081] An instruction sending module 401 is used to send corresponding control instructions to the air conditioner to be tested and the operating condition machine; a data acquisition module 402 is used to obtain measurement data of the air conditioner to be tested; the measurement data include: the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; a data processing module 403 is used to filter out the maximum operating power and the maximum operating current, as well as the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current from the measurement data; wherein the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the operating temperature.

[0082] Optionally, the instruction sending module 401 is specifically used to send the first control instruction to the air conditioner to be tested and the second control instruction to the operating machine when the air conditioner is not in operation, so as to control the air conditioner to be tested to be powered on and operated according to the first input voltage at the lowest operating temperature; the data acquisition module 402 is specifically used to obtain the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than a preset change rate threshold, record the operating power and operating current of the air conditioner to be tested at the lowest operating temperature and the first input voltage; wherein the first input voltage is the product of the rated voltage of the air conditioner to be tested and a first multiple; the first multiple is less than 1.

[0083] Optionally, the instruction sending module 401 is specifically used to send the third control instruction to the air conditioner to be tested when the input voltage of the air conditioner to be tested is less than the second input voltage, so as to control the air conditioner to be tested to increase the input voltage of the air conditioner to be tested according to the target voltage increment on the basis of the current input voltage; the data acquisition module 402 is specifically used to obtain the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, record the operating power and operating current of the air conditioner to be tested under the current operating temperature and current input voltage; wherein, the second input voltage is the product of the rated voltage of the air conditioner to be tested and a second multiple; the second multiple is greater than 1; the target voltage increment is the product of the rated voltage of the air conditioner to be tested and the target multiple; the target multiple can be divided by a target multiple difference integer; the target multiple difference is the difference between the second multiple and the first multiple.

[0084] Optionally, the instruction sending module 401 is specifically used to send the first control instruction to the air conditioner under test and send the fourth control instruction to the operating machine to control the air conditioner under test to operate according to the first input voltage at the increased operating temperature when the input voltage of the air conditioner under test is equal to the second input voltage and the operating temperature of the air conditioner under test is lower than the maximum operating temperature; the data acquisition module 402 is specifically used to acquire the power change of the air conditioner under test in real time, and record the operating power and operating current of the air conditioner under the current operating temperature and the first input voltage when the power change rate of the air conditioner under test is lower than the preset change rate threshold.

[0085] Optionally, the device also includes: a control module; the control module is used to end the measurement of the air conditioner to be tested when the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is equal to the maximum operating temperature.

[0086] Optionally, the data processing module 403 is specifically used to compare the operating power and operating current corresponding to each operating temperature, and to filter out the maximum operating power, the first operating temperature corresponding to the maximum operating power, and the first input voltage, as well as the maximum operating current, the second operating temperature corresponding to the maximum operating current, and the second input voltage.

[0087] Optionally, the device also includes: a display module; the display module is used to display the measurement progress information at the current moment in real time on the display screen of the measuring device; wherein the measurement information includes at least one of the following: the input voltage at the current moment, the operating temperature at the current moment.

[0088] The device for measuring the maximum power and maximum current of an air conditioner provided by the present application, first, by sending corresponding control instructions to the air conditioner to be tested and the working condition machine, the measurement data of the air conditioner to be tested is obtained; the measurement data includes: the operating power and operating current of the air conditioner to be tested under different working temperature and different input voltage; then, the maximum operating power and the maximum operating current, as well as the working temperature and input voltage corresponding to the maximum operating power and the maximum operating current are screened out from the measurement data; wherein, the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the working temperature; the third control instruction is used to increase the input voltage; the fourth control instruction is used to increase the working temperature. In this way, the input voltage and working temperature can be automatically adjusted by the measuring device, and the system stability judgment and data parameter recording can be performed, which greatly improves the measurement efficiency and measurement accuracy.

[0089] Figure 5 The physical structure diagram of an electronic device is shown as an example. The electronic device may be the above-mentioned air conditioner. Figure 5As shown, the electronic device may include: a processor (processor) 510, a communication interface (CommunicationsInterface) 520, a memory (memory) 530 and a communication bus 540, wherein the processor 510, the communication interface 520, and the memory 530 communicate with each other through the communication bus 540. The processor 510 can call the logic instructions in the memory 530 to execute a method for measuring the maximum power and maximum current of the air conditioner, the method comprising: obtaining measurement data of the air conditioner to be tested by sending corresponding control instructions to the air conditioner to be tested and the operating condition machine; the measurement data comprises: the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; filtering out the maximum operating power and the maximum operating current, as well as the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current from the measurement data; wherein the control instructions sent by the measuring device to the air conditioner to be tested comprise: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; the fourth control instruction is used to increase the operating temperature.

[0090] In addition, the logic instructions in the above-mentioned memory 530 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art, and the computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0091] On the other hand, the present application also provides a computer program product, which includes a computer program stored on a computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer can execute the method for measuring the maximum power and maximum current of the air conditioner provided by the above-mentioned methods, and the method includes: obtaining measurement data of the air conditioner to be tested by sending corresponding control instructions to the air conditioner to be tested and the operating condition machine; the measurement data includes: the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; the maximum operating power and maximum operating current, as well as the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current are screened out from the measurement data; wherein the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the operating temperature.

[0092] On the other hand, the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the above-mentioned methods for measuring the maximum power and maximum current of the air conditioner, the method comprising: obtaining measurement data of the air conditioner to be tested by sending corresponding control instructions to the air conditioner to be tested and the operating condition machine; the measurement data comprising: the operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; filtering out the maximum operating power and the maximum operating current, as well as the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current from the measurement data; wherein the control instructions sent by the measuring device to the air conditioner to be tested comprise: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the operating temperature.

[0093] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0094] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0095] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for measuring the maximum power and maximum current of an air conditioner, characterized in that: Applied to a measuring device, the measuring device is respectively connected to the air conditioner to be tested and the working condition machine for communication, the method comprises: By sending corresponding control instructions to the air conditioner to be tested and the working condition machine, the measurement data of the air conditioner to be tested is obtained; the measurement data includes: the operating power and operating current of the air conditioner to be tested under different working temperature and different input voltage; Filtering out the maximum operating power and the maximum operating current, and the operating temperature and the input voltage corresponding to the maximum operating power and the maximum operating current from the measurement data; Among them, the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the operating temperature.

2. The method according to claim 1, characterized in that The step of acquiring the measurement data of the air conditioner to be tested by cyclically sending corresponding control instructions to the air conditioner to be tested comprises: When the air conditioner is not in operation, sending the first control instruction to the air conditioner to be tested and sending the second control instruction to the working condition machine to control the air conditioner to be tested to be powered on and operated according to the first input voltage at the lowest working temperature; Acquire the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than a preset change rate threshold, record the operating power and operating current of the air conditioner to be tested under the lowest operating temperature and the first input voltage; The first input voltage is the product of the rated voltage of the air conditioner to be tested and a first multiple; the first multiple is less than 1.

3. The method according to claim 2, characterized in that The step of acquiring the measurement data of the air conditioner to be tested by cyclically sending corresponding control instructions to the air conditioner to be tested comprises: When the input voltage of the air conditioner to be tested is less than the second input voltage, sending the third control instruction to the air conditioner to be tested to control the air conditioner to be tested to increase the input voltage of the air conditioner to be tested according to the target voltage increment based on the current input voltage; Acquire the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, record the operating power and operating current of the air conditioner to be tested under the current operating temperature and current input voltage; Among them, the second input voltage is the product of the rated voltage of the air conditioner to be tested and a second multiple; the second multiple is greater than 1; the target voltage increment is the product of the rated voltage of the air conditioner to be tested and the target multiple; the target multiple can be divided by a target multiple difference integer; the target multiple difference is the difference between the second multiple and the first multiple.

4. The method according to claim 3, characterized in that The step of acquiring the measurement data of the air conditioner to be tested by cyclically sending corresponding control instructions to the air conditioner to be tested comprises: When the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is less than the maximum operating temperature, the first control instruction is sent to the air conditioner to be tested, and the fourth control instruction is sent to the operating condition machine to control the air conditioner to be tested to operate according to the first input voltage at the increased operating temperature; The power change of the air conditioner to be tested is acquired in real time, and when the power change rate of the air conditioner to be tested is less than the preset change rate threshold, the operating power and operating current of the air conditioner to be tested under the current operating temperature and the first input voltage are recorded.

5. The method according to claim 4, characterized in that The step of acquiring the measurement data of the air conditioner to be tested by cyclically sending corresponding control instructions to the air conditioner to be tested comprises: When the input voltage of the air conditioner to be tested is equal to the second input voltage and the operating temperature of the air conditioner to be tested is equal to the maximum operating temperature, the measurement of the air conditioner to be tested is terminated.

6. The method according to claim 1, characterized in that The step of screening out the maximum operating power and the maximum operating current, and the operating temperature corresponding to the maximum operating power and the maximum operating current from the measurement data includes: The operating powers and operating currents corresponding to the various operating temperatures are compared, and the maximum operating power, the first operating temperature corresponding to the maximum operating power, and the first input voltage, as well as the maximum operating current, the second operating temperature corresponding to the maximum operating current, and the second input voltage are screened out.

7. The method according to any one of claims 1 to 6, characterized in that The step of acquiring the measurement data of the air conditioner to be tested by sending corresponding control instructions to the air conditioner to be tested and the working condition machine comprises: Displaying the measurement progress information at the current moment in real time on the display screen of the measuring device; The measurement information includes at least one of the following: the input voltage at the current moment, and the operating temperature at the current moment.

8. A device for measuring the maximum power and maximum current of an air conditioner, characterized in that: Applied to a measuring device, the measuring device is respectively connected to the air conditioner to be tested and the working condition machine for communication, and the device comprises: An instruction sending module, used for sending corresponding control instructions to the air conditioner to be tested and the working condition machine; A data acquisition module, used to acquire measurement data of the air conditioner to be tested; the measurement data includes: operating power and operating current of the air conditioner to be tested under different operating temperatures and different input voltages; A data processing module, used to filter out the maximum operating power and the maximum operating current from the measurement data, and the operating temperature and input voltage corresponding to the maximum operating power and the maximum operating current; Among them, the control instructions sent by the measuring device to the air conditioner to be tested include: a first control instruction, a second control instruction, a third control instruction and a fourth control instruction; the first control instruction is used to initialize the input voltage; the second control instruction is used to initialize the operating temperature; the third control instruction is used to increase the input voltage; and the fourth control instruction is used to increase the operating temperature.

9. The device according to claim 8, characterized in that The instruction sending module is specifically used to send the first control instruction to the air conditioner to be tested and send the second control instruction to the working condition machine when the air conditioner is not in operation, so as to control the air conditioner to be tested to be powered on and operated according to the first input voltage at the lowest working temperature; The data acquisition module is specifically used to acquire the power change of the air conditioner to be tested in real time, and when the power change rate of the air conditioner to be tested is less than a preset change rate threshold, record the operating power and operating current of the air conditioner to be tested under the minimum operating temperature and the first input voltage; The first input voltage is the product of the rated voltage of the air conditioner to be tested and a first multiple; the first multiple is less than 1.

10. A measuring device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of the method for measuring the maximum power and the maximum current of the air conditioner as claimed in any one of claims 1 to 7 are implemented.