Steel tube bundle assembling device and method for steel structure building

By designing a steel pipe bundle assembly device including a guide clamping mechanism, a fixture mechanism and a cross clamping mechanism, the problems of low efficiency and poor quality of the traditional assembly method are solved, automatic welding assembly is realized, and assembly efficiency and building safety are improved. .

CN119457592APending Publication Date: 2025-02-18JIANGXI WENSHANG HANGZHOU XIAOLUJIAN TECHNOLOGY CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411690811.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

Traditional steel pipe bundle assembly methods are inefficient, manual welding can easily lead to steel pipe deviation, affecting the welding quality and overall load-bearing capacity. At the same time, it is difficult for auxiliary devices to adjust the position of the steel pipe, resulting in a long assembly time.

Method used

Design a steel pipe bundle assembly device for steel structure buildings, including base, fixing components, fixing mechanism, welding mechanism and conveying mechanism. The steel pipe is fixed by a guide clamping mechanism, the clamping mechanism is aligned and clamped, and automatic welding assembly is achieved using hydraulic telescopic rods and cross clamping mechanisms.

Benefits of technology

It effectively improves the welding and installation quality of steel pipes, realizes automatic welding and assembly of steel pipe bundles, significantly accelerates assembly efficiency, shortens construction cycles, and improves the overall safety of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119457592A_ABST
    Figure CN119457592A_ABST
Patent Text Reader

Abstract

The invention discloses a steel tube bundle assembling device and method for a steel structure building, the device comprises a fixing assembly, a clamp mechanism and a guide clamping mechanism, a guide clamping rod is arranged in the guide clamping mechanism, and the clamp mechanism comprises a clamp assembly and a cross clamping mechanism; steel pipes can be completely fixed through the guide clamping mechanism, so that the steel pipes cannot deviate in the welding process, the welding quality of the steel pipes is improved, the steel pipes can be effectively clamped and conveyed into the fixing assembly through the two clamp mechanisms to be welded, the positions of the steel pipes are adjusted, the welding faces of the two steel pipes can be aligned, and the welding efficiency is improved. The assembling quality and the assembling efficiency of the steel pipe bundle are effectively improved, the overall safety of a building is improved, the construction period is shortened, the position of a guide clamping rod can be adjusted, then steel pipes of various models are clamped, the clamp mechanism can clamp and convey the steel pipes of various models through a cross-shaped clamping mechanism, and the assembling efficiency of the steel pipe bundle is improved. And the overall application range of the device is expanded.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steel structure buildings, and in particular to a steel pipe bundle assembly device and method for steel structure buildings. Background Art

[0002] A steel pipe bundle is a composite component made up of multiple steel pipes connected by welding or bolting. In steel structure buildings, steel pipe bundles are often used as the main load-bearing and lateral force resisting components, and their assembly quality and efficiency directly affect the safety and construction period of the entire building.

[0003] Currently, the traditional assembly of steel pipe bundles generally involves laying multiple steel pipes flat on the ground and welding them manually or using auxiliary devices. The manual welding assembly method is not only inefficient, but the steel pipe bundles, which are not fully secured, may shift during welding, resulting in poor welding quality and affecting the overall load-bearing capacity of the steel pipe bundle. Traditional auxiliary devices mostly use a movable clamp to clamp the steel pipe bundles for welding. Although this method can fix the steel pipe bundles, it is difficult to adjust the position of the steel pipe bundles. The process of aligning two steel pipes often takes a lot of time, which makes the assembly efficiency of steel pipe bundles low and slows down the construction cycle of the entire building.

[0004] Therefore, it is necessary to provide a steel tube bundle assembly device and method for steel structure buildings to solve the problems mentioned in the background art. Summary of the Invention

[0005] To achieve the above objectives, the present invention provides the following technical solution: a steel pipe bundle assembly device for steel structure buildings, comprising a base, a fixing component, a clamping mechanism, a welding mechanism, and a conveying mechanism, wherein the fixing component is fixedly mounted on the base, clamping mechanisms are symmetrically arranged on both sides of the fixing component, the fixing component includes four symmetrically arranged support columns, two crossbeams and a locking rod are fixedly mounted on two support columns on the same side, and a guide clamping mechanism is provided between two opposite support columns, two sliding seats are slidably mounted on the locking rod, a welding seat is raised and lowered on the sliding seat by a hydraulic telescopic rod, a welding mechanism is slidably mounted on the welding seat, and the conveying mechanism is used to convey steel pipes, and multiple conveying grooves are opened on the conveying surface of the conveying mechanism;

[0006] The guide clamping mechanism includes a guide clamping rod, an L-shaped limiting rod, and a locking block. Two sliders are slidably mounted on the support column via a coaxial reverse screw. Support rods are hinged to the sliders, and the other ends of the two support rods are hinged to the guide clamping rod. An L-shaped limiting rod is slidably mounted on the guide clamping rod via a screw, and the two L-shaped limiting rods are slidably locked together. Fixing blocks are fixed on both sides of the guide clamping rod, and a locking block with a downward-sloping face is slidably mounted on each fixing block via a spring.

[0007] Preferably, the clamp mechanism includes a fixed bracket, a movable cross bar and a clamp assembly, wherein the movable cross bar is slidably provided on the fixed bracket by means of a second screw, the clamp assembly is slidably provided on the movable cross bar, and two clamping rods 2 are fixedly provided on the fixed bracket, and the two clamping rods 2 are slidably connected to the two clamping rods 1 respectively.

[0008] Preferably, the clamp assembly includes a moving block, a turntable 1 and a turntable 2, wherein the moving block is slidably arranged on the moving cross bar, a hydraulic telescopic rod 2 is fixedly arranged on the moving block, a turntable 1 is fixedly arranged on the output end of the hydraulic telescopic rod 2, a turntable 2 is rotatably arranged on the turntable 1, and a cross clamping mechanism is fixedly arranged on the turntable 2.

[0009] Preferably, the cross-shaped locking mechanism includes a cross-shaped fixing frame, a drive rod, and a support rod. The cross-shaped fixing frame is fixedly mounted on the turntable two. The cross-shaped fixing frame has four locking slots in a cross shape. The drive rod is rotatably mounted in the locking slots. The output end of the drive rod is hinged to the support rod. A hydraulic telescopic rod three is fixedly mounted in the locking slots. A T-shaped connecting rod one is fixedly mounted at the output end of the hydraulic telescopic rod three. The drive rod has a T-shaped groove one. The connecting rod one is inserted into the T-shaped groove one and slides along the T-shaped groove one.

[0010] Preferably, a T-shaped connecting rod 2 is slidably provided on one side of the support rod close to the turntable 2, and four T-slots 2 are circumferentially opened on the turntable 2. The connecting rod 2 is inserted into the T-slot 2 and slides along the T-slot 2, and the end of the connecting rod 2 that is inserted into the T-slot 2 is a rectangular rod.

[0011] Preferably, the first clamping rod is provided with a first slide groove, in which two first racks are symmetrically slidably arranged, and the second clamping rod is provided with a second slide groove, in which a second rack is slidably arranged;

[0012] A rotating shaft is rotatably mounted on the slide block, and two gears are fixedly mounted on the rotating shaft. The rotating shaft can be engaged with the first slide groove and the second slide groove and slide along the first slide groove and the second slide groove. The two gears can respectively mesh with the first rack and the second rack.

[0013] Preferably, the turntable has an arc-shaped groove, and an annular hydraulic chamber is formed in the arc-shaped groove;

[0014] An arc-shaped rotating block is fixedly installed on the turntable 2, and an annular hydraulic rod is fixedly installed on the arc-shaped rotating block. The arc-shaped rotating block rotates along the arc-shaped rotating groove, and the annular hydraulic rod slides along the annular hydraulic cavity in a sealed manner.

[0015] A method for assembling steel pipe bundles in a steel structure building includes the following steps:

[0016] S1. Fix the fixing component to the ground, and adjust the position of the two clamping mechanisms according to the required length of the welded steel pipe, and fix the two clamping mechanisms.

[0017] S2. The steel pipe to be welded is transported to the bottom of the fixing component using the conveying mechanism, and the distance between the two guide clamping rods is adjusted according to the width of the steel pipe.

[0018] S3. By sliding the moving crossbar and the moving block, the cross clamping mechanism is aligned with the end of the steel pipe. The turntable one and the turntable two are driven to slide by the hydraulic telescopic rod two, so that the cross clamping mechanism extends into the steel pipe.

[0019] S4. Drive the drive rod to deflect by the hydraulic telescopic rod three, so that the four support rods support the steel pipe and fix the steel pipe, and rotate the turntable two so that the welding surface of the steel pipe is in a horizontal position;

[0020] S5. The steel pipe is transported between the two guide clamping rods by sliding the moving crossbar and the moving block, and the steel pipe is placed on the two guide clamping rods by the clamping block.

[0021] S6. Repeat steps S3 to S5, place the next steel pipe on the two guide clamping rods, and align the two steel pipes by sliding the second hydraulic telescopic rod during the placement process. Then drive the two guide clamping rods to slide to clamp the two steel pipes and drive the L-shaped limiting rod to slide down to press the two steel pipes together. Then use the welding mechanism to weld the two steel pipes.

[0022] S7. Repeat steps S3 to S6 until the welding of the steel pipe bundle is completed. Loosen the guide clamping rod and the L-shaped limiting rod, and remove the welded steel pipe bundle from the side of the fixing component for subsequent processing.

[0023] Compared with the prior art, the present invention provides a steel tube bundle assembly device and method for steel structure buildings, which has the following beneficial effects:

[0024] In this invention, the guide clamping mechanism in the fixing component can completely fix the steel pipe, preventing it from shifting during welding and thus effectively improving the welding and installation quality. Two clamping mechanisms can effectively clamp and transport the steel pipe to the fixing component for welding, and the position of the steel pipe can be adjusted during transport to ensure alignment of the welding surfaces of the two steel pipes placed in the fixing component. This achieves automatic welding and assembly of the steel pipe bundle, effectively accelerating the assembly quality and efficiency, improving the overall safety of the building, and shortening the construction cycle. Furthermore, the position of the guide clamping rod in the guide clamping mechanism is adjustable, allowing for clamping of various types of steel pipes. A cross-clamping mechanism is also included in the clamping mechanism, enabling it to clamp and transport various types of steel pipes, thereby expanding the overall applicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0026] Figure 2 This is a schematic diagram of the fixing component in this invention;

[0027] Figure 3 This is a schematic diagram of the guide clamping mechanism in this invention;

[0028] Figure 4 This is a schematic diagram of the clamping mechanism in this invention;

[0029] Figure 5 This is a schematic diagram of the cross-shaped locking mechanism in this invention;

[0030] Figure 6 This is a schematic diagram of the structure of the slide and the locking rod in this invention;

[0031] In the diagram: 1. Base; 2. Fixing assembly; 21. Support column; 211. Slider; 212. Support rod; 22. Crossbeam; 23. Snap-fit ​​rod one; 231. Slide groove one; 24. Slide seat; 241. Rotating shaft; 3. Clamping mechanism; 31. Fixed bracket; 32. Moving crossbar; 33. Clamping assembly; 331. Moving block; 332. Turntable one; 333. Turntable two; 334. T-slot two; 335. Arc-shaped rotating groove; 336. Arc-shaped rotating block; 34. Second locking rod; 341. Second sliding groove; 35. Cross-shaped locking mechanism; 351. Cross-shaped fixing frame; 352. Drive rod; 353. Support rod; 354. Locking groove; 355. Third hydraulic telescopic rod; 356. Second connecting rod; 4. Welding mechanism; 5. Conveying mechanism; 6. Guide clamping mechanism; 61. Guide clamping rod; 611. Fixing block; 62. L-shaped limit rod; 63. Locking block. Detailed Implementation

[0032] Please see Figures 1-6 In this embodiment of the invention, a steel pipe bundle assembly device for a steel structure building includes a base 1, a fixing component 2, a clamping mechanism 3, a welding mechanism 4, and a conveying mechanism 5. The fixing component 2 is fixedly mounted on the base 1. The clamping mechanisms 3 are symmetrically arranged on both sides of the fixing component 2. The fixing component 2 includes four symmetrically arranged support columns 21. Two crossbeams 22 and a locking rod 23 are fixedly mounted on two support columns 21 located on the same side. A guide clamping mechanism 6 is arranged between two opposite support columns 21. Two sliding seats 24 are slidably mounted on the locking rod 23. A welding seat is raised and lowered on the sliding seat 24 by a hydraulic telescopic rod. A welding mechanism 4 is slidably mounted on the welding seat. The conveying mechanism 5 is used to convey steel pipes, and multiple conveying grooves are opened on the conveying surface of the conveying mechanism 5.

[0033] The guide clamping mechanism 6 includes a guide clamping rod 61, an L-shaped limiting rod 62, and a locking block 63. Two sliders 211 are slidably mounted on the support column 21 via a coaxial reverse screw. Support rods 212 are hinged to the sliders 211, and the other ends of the two support rods 212 are hinged to the guide clamping rod 61. An L-shaped limiting rod 62 is slidably mounted in the guide clamping rod 61 via a screw, and the two L-shaped limiting rods 62 are slidably locked together. Fixing blocks 611 are fixedly mounted on both sides of the guide clamping rod 61, and a locking block 63 with a downward-sloping inclined surface is slidably mounted in each fixing block 611 via a spring.

[0034] The clamp mechanism 3 includes a fixed bracket 31, a movable cross bar 32 and a clamp assembly 33, wherein the movable cross bar 32 is slidably provided on the fixed bracket 31 by means of a second screw, the clamp assembly 33 is slidably provided on the movable cross bar 32, and two clamping rods 2 34 are fixedly provided on the fixed bracket 31, and the two clamping rods 2 34 are slidably connected to the two clamping rods 1 23 respectively.

[0035] In implementation, the base 1 is fixed to the ground. Then, the positions of the two clamping mechanisms 3 are adjusted and fixed according to the length of the steel pipe. During this process, the second clamping rod 34 slides along the first clamping rod 23. Then, the steel pipe is transported to the bottom of the fixing component 2 using the conveying mechanism 5. Then, the distance between the two guide clamping rods 61 is adjusted according to the width of the welded surface of the steel pipe. The steel pipe is clamped by the two clamping mechanisms 3 and then transported between the two guide clamping rods 61. After contacting the clamping block 63, the clamping block 63 is pushed to slide. After disengaging from the clamping block 63, the clamping block 63 is reset under the action of the spring, thus placing the steel pipe smoothly between the two guide clamping rods 61. Then, the clamping mechanism 3 is used to place the next steel pipe between the two guide clamping rods 61 in the same way. Before placement, the two steel pipes are aligned using the two clamping mechanisms 3. Then, the slider 211 is driven to slide, causing the two guide clamping rods 61 to clamp the two steel pipes. Simultaneously, the two L-shaped limiting rods 62 are driven to slide down and press the two steel pipes together, thus completely fixing the two steel pipes. Then, the sliding block 24 is used to move the welding mechanism 4 to weld the two steel pipes. After welding, the guide clamping rods 61 and L-shaped limiting rods 62 are released, and the two clamping mechanisms 3 are used to place new steel pipes for welding until the entire steel pipe bundle is welded and assembled. The welded and assembled steel pipe bundle can be removed from the side of the fixing component 2, thereby realizing the automatic welding and assembly of the steel pipe bundle, effectively improving the assembly quality and efficiency of the steel pipe bundle, further improving the safety of the entire building and shortening the construction cycle.

[0036] In this embodiment, Figure 4 and Figure 5 The clamp assembly 33 includes a moving block 331, a turntable 1 332 and a turntable 2 333, wherein the moving block 331 is slidably arranged on the moving cross bar 32, a hydraulic telescopic rod 2 is fixedly arranged on the moving block 331, a turntable 1 332 is fixedly arranged on the output end of the hydraulic telescopic rod 2, a turntable 2 333 is rotatably arranged on the turntable 1 332, and a cross clamping mechanism 35 is fixedly arranged on the turntable 2 333;

[0037] The cross-shaped locking mechanism 35 includes a cross-shaped fixing frame 351, a drive rod 352, and a support rod 353. The cross-shaped fixing frame 351 is fixedly mounted on the turntable 333. The cross-shaped fixing frame 351 has four locking slots 354 in a cross shape. The drive rod 352 is rotatably mounted in the locking slots 354. The output end of the drive rod 352 is hinged to the support rod 353. A hydraulic telescopic rod 355 is fixedly mounted in the locking slots 354. A T-shaped connecting rod is fixedly mounted at the output end of the hydraulic telescopic rod 355. The drive rod 352 has a T-shaped groove. The connecting rod is inserted into the T-shaped groove and slides along the T-shaped groove.

[0038] In implementation, the sliding of the movable crossbar 32 drives the cross clamping mechanism 35 to move vertically, and the sliding of the movable block 331 drives the cross clamping mechanism 35 to move laterally. The horizontal position of the cross clamping mechanism 35 is adjusted by the extension and retraction of the hydraulic telescopic rod 2, thereby effectively clamping and transporting the steel pipe between the two guide clamping rods 61. After the cross clamping mechanism 35 clamps the steel pipe, the rotation of the turntable 2 333 can adjust the placement position of the steel pipe, so that the welding surfaces of the two steel pipes are aligned. The extension and retraction of the hydraulic telescopic rod 2 is used to align the two steel pipes, further improving the welding quality. In addition, when clamping the steel pipe, the cross clamping assembly 35 mainly uses four support rods 353 to clamp the steel pipe, and the support range of the four support rods 353 is controlled by four independently set hydraulic telescopic rods 355, so that the support range of the support rods 353 is adjustable, that is, it can effectively clamp various types of steel pipes, further expanding the overall applicability of the device.

[0039] In this embodiment, Figure 5 The support rod 353 has a T-shaped connecting rod 356 slidably disposed on the side near the turntable 333. The turntable 333 has four T-shaped grooves 334 circumferentially formed. The connecting rod 356 is inserted into the T-shaped grooves 334 and slides along the T-shaped grooves 334. The end of the connecting rod 356 that is inserted into the T-shaped grooves 334 is a rectangular rod.

[0040] Specifically, one end of the connecting rod 356 that is inserted into the T-slot 334 is set as a rectangular rod, so that the connecting rod 356 can always remain perpendicular to the turntable 333 during the sliding process, thereby ensuring that the support rod 353 can also remain perpendicular to the turntable 333 during the sliding process. That is, the four support rods 353 always maintain a cross shape during the opening and closing process, thus ensuring that the support rods 353 can firmly clamp the steel pipe.

[0041] In this embodiment, Figure 4 and Figure 6 The first locking rod 23 is provided with a sliding groove 231, and two racks are symmetrically slidably arranged in the sliding groove 231. The second locking rod 34 is provided with a sliding groove 341, and a rack is slidably arranged in the sliding groove 341.

[0042] A rotating shaft 241 is rotatably mounted on the slide block 24. Two gears are fixedly mounted on the rotating shaft 241. The rotating shaft 241 can engage with the first slide groove 231 and the second slide groove 341 and slide along the first slide groove 231 and the second slide groove 341. The two gears can mesh with the first rack and the second rack respectively, and the sliding distance between the first rack and the second rack is the distance between two teeth. The rotation of the rotating shaft 241 is driven by a drive motor.

[0043] In practice, the slide block 24 can slide along the first locking rod 23 and the second locking rod 34 respectively, and the sliding force is achieved through the meshing transmission of the two gears with the first rack and the second rack. When the distance between the first locking rod 23 and the second locking rod 34 changes, that is, when the teeth of the first rack and the second rack are misaligned, the sliding of the first rack and the second rack ensures that no matter how the first locking rod 23 and the second locking rod 34 slide, the two gears can mesh with the first rack and the second rack.

[0044] In this embodiment, Figure 5 The turntable 1 332 is provided with an arc-shaped groove 335, and an annular hydraulic cavity is provided in the arc-shaped groove 335;

[0045] An arc-shaped rotating block 336 is fixedly installed on the turntable 333, and an annular hydraulic rod is fixedly installed on the arc-shaped rotating block 336. The arc-shaped rotating block 336 rotates along the arc-shaped rotating groove 335, and the annular hydraulic rod slides along the annular hydraulic cavity.

[0046] A method for assembling steel pipe bundles in a steel structure building includes the following steps:

[0047] S1. Fix the fixing assembly 2 on the ground, adjust the positions of the two clamp mechanisms 3 according to the length of the steel pipe to be welded, and fix the two clamp mechanisms 3;

[0048] In addition, when adjusting the position of the two clamping mechanisms 3, the sliding of the first clamping rod 23 and the second clamping rod 34 can keep the two clamping mechanisms 3 and the fixing component 2 in the same horizontal direction, thereby ensuring that the two clamping mechanisms 3 can effectively place the steel pipe into the fixing component 2.

[0049] S2. The steel pipe to be welded is transported to the bottom of the fixing component 2 using the conveying mechanism 5, and the distance between the two guide clamping rods 61 is adjusted according to the width of the steel pipe. The surface of the conveying mechanism 5 is provided with multiple conveying grooves, which can restrict the steel pipe so that the steel pipe will not deviate significantly during the conveying process. This allows the cross clamping mechanism 35 in the clamping mechanism 3 to effectively extend into the steel pipe and clamp it.

[0050] S3. By sliding the moving crossbar 32 and the moving block 331, the cross locking mechanism 35 is aligned with the end of the steel pipe. The turntable 1 332 and the turntable 2 333 are driven to slide by the hydraulic telescopic rod 2, so that the cross locking mechanism 35 extends into the steel pipe.

[0051] S4. Drive the drive rod 352 to deflect by the hydraulic telescopic rod 355, so that the four support rods 353 support the steel pipe and fix the steel pipe, and rotate the turntable 333 so that the welding surface of the steel pipe is in a horizontal position, that is, the welding surface of the steel pipe is aligned according to the welding requirements of the steel pipe.

[0052] S5, using the sliding movement of the movable cross bar 32 and the movable block 331 to transport the steel pipe to between the two guide clamping rods 61, and placing the steel pipe on the two guide clamping rods 61 through the clamping block 63;

[0053] In this process, the L-shaped limiting rod 62 is first loosened so that the steel pipe is not restricted by the L-shaped limiting rod 62 during placement. That is, the L-shaped limiting rod 62 only presses the steel pipe before welding.

[0054] S6. Repeat steps S3 to S5, place the next steel pipe on the two guide clamping rods 61, and align the two steel pipes by sliding the hydraulic telescopic rod 2 during the placement process. Then drive the two guide clamping rods 61 to slide to clamp the two steel pipes and drive the L-shaped limiting rod 62 to slide down to press the two steel pipes together. Then use the welding mechanism 4 to weld the two steel pipes.

[0055] S7. Repeat steps S3 to S6 until the welding of the steel pipe bundle is completed. Loosen the guide clamping rod 61 and the L-shaped limiting rod 62, and remove the welded steel pipe bundle from the side of the fixing component 2 for subsequent processing.

[0056] The above is only a preferred specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any technician familiar with this technical field, within the technical scope disclosed by the present invention, who makes equivalent replacements or changes based on the technical solutions and inventive concepts of the present invention, should be covered by the scope of protection of the present invention.

Claims

1. A steel pipe bundle assembly device for a steel structure building, characterized in that: The invention comprises a base (1), a fixing component (2), a clamping mechanism (3), a welding mechanism (4) and a conveying mechanism (5), wherein the fixing component (2) is fixedly arranged on the base (1), the clamping mechanisms (3) are symmetrically arranged on both sides of the fixing component (2), the fixing component (2) comprises four symmetrically arranged support columns (21), two support columns (21) located on the same side are fixedly arranged with two cross beams (22) and a clamping rod (23), and a guide clamping mechanism (6) is arranged between the two support columns (21) arranged opposite to each other, two slide seats (24) are slidably arranged on the clamping rod (23), a welding seat is arranged on the slide seat (24) which is lifted and lowered by a hydraulic telescopic rod, a welding mechanism (4) is slidably arranged on the welding seat, and the conveying mechanism (5) is used for conveying steel pipes, and a plurality of conveying grooves are provided on the conveying surface of the conveying mechanism (5); The guide clamping mechanism (6) comprises a guide clamping rod (61), an L-shaped limit rod (62) and a clamping block (63), wherein two slide blocks (211) are provided on the support column (21) for sliding in opposite directions via a coaxial reverse screw, a support rod (212) is hinged on the slide block (211), the other ends of the two support rods (212) are hinged on the guide clamping rod (61), an L-shaped limit rod (62) is provided in the guide clamping rod (61) for sliding driving via a screw, and the two L-shaped limit rods (62) are slidably clamped, fixed blocks (611) are fixedly provided on both sides of the guide clamping rod (61), and a clamping block (63) with an inclined surface facing downward is slidably provided in the fixed block (611) via a spring limit.

2. The steel pipe bundle assembly device for a steel structure building according to claim 1, characterized in that: The clamp mechanism (3) comprises a fixed bracket (31), a movable cross bar (32) and a clamp assembly (33), wherein the fixed bracket (31) is provided with a movable cross bar (32) which is driven by a second lead screw to slide, the clamp assembly (33) is slidably provided on the movable cross bar (32), and two second clamping rods (34) are fixedly provided on the fixed bracket (31), and the two second clamping rods (34) are respectively slidably connected to the two first clamping rods (23).

3. The steel pipe bundle assembly device for a steel structure building according to claim 2, characterized in that: The clamp assembly (33) comprises a moving block (331), a first turntable (332) and a second turntable (333), wherein the moving block (331) is slidably arranged on the moving cross bar (32), a second hydraulic telescopic rod is fixedly arranged on the moving block (331), a first turntable (332) is fixedly arranged at the output end of the second hydraulic telescopic rod, a second turntable (333) is rotatably arranged on the first turntable (332), and a cross clamping mechanism (35) is fixedly arranged on the second turntable (333).

4. The steel pipe bundle assembly device for a steel structure building according to claim 3, characterized in that: The cross-fastening mechanism (35) comprises a cross-fixing frame (351), a driving rod (352) and a supporting rod (353), wherein the cross-fixing frame (351) is fixedly arranged on the second rotating disk (333), the cross-fixing frame (351) is provided with four fastening grooves (354) in a cross shape, the driving rod (352) is rotatably arranged in the fastening groove (354), the output end of the driving rod (352) is hinged to the supporting rod (353), a hydraulic telescopic rod three (355) is fixedly arranged in the fastening groove (354), a T-shaped connecting rod one is fixedly arranged at the output end of the hydraulic telescopic rod three (355), the driving rod (352) is provided with a T-shaped slot one, the connecting rod one is inserted into the T-shaped slot one and slides along the T-shaped slot one.

5. The steel pipe bundle assembly device for a steel structure building according to claim 4, characterized in that: A T-shaped connecting rod 2 (356) is slidably provided on one side of the support rod (353) close to the second rotating disk (333); four T-shaped slots 2 (334) are circumferentially provided on the second rotating disk (333); the second connecting rod (356) is inserted into the second T-shaped slot (334) and slides along the second T-shaped slot (334); and one end of the second connecting rod (356) inserted into the second T-shaped slot (334) is a rectangular rod.

6. The steel pipe bundle assembly device for a steel structure building according to claim 2, characterized in that: The first clamping rod (23) is provided with a first slide groove (231), and two first racks are symmetrically slidably arranged in the first slide groove (231); the second clamping rod (34) is provided with a second slide groove (341), and a second rack is slidably arranged in the second slide groove (341); A rotating shaft (241) is rotatably arranged on the slide seat (24), and two gears are fixedly arranged on the rotating shaft (241). The rotating shaft (241) can be inserted into the first slide groove (231) and the second slide groove (341) and slide along the first slide groove (231) and the second slide groove (341), and the two gears can respectively mesh with the first rack and the second rack.

7. The steel pipe bundle assembly device for a steel structure building according to claim 3, characterized in that: The rotating disk 1 (332) is provided with an arc-shaped rotating groove (335), and an annular hydraulic cavity is provided in the arc-shaped rotating groove (335); An arc-shaped rotating block (336) is fixedly provided on the rotating disk 2 (333), an annular hydraulic rod is fixedly provided on the arc-shaped rotating block (336), the arc-shaped rotating block (336) rotates along the arc-shaped rotating groove (335), and the annular hydraulic rod slides sealingly along the annular hydraulic cavity.

8. A method for assembling a steel pipe bundle of a steel structure building, which uses the steel pipe bundle assembly device of a steel structure building as claimed in claim 5, characterized in that: The steps include: S1, fixing the fixing assembly (2) on the ground, adjusting the positions of the two clamping mechanisms (3) according to the length of the steel pipe to be welded, and fixing the two clamping mechanisms (3); S2, using the conveying mechanism (5) to convey the steel pipe to be welded to the bottom of the fixing assembly (2), and adjusting the distance between the two guide clamping rods (61) according to the width of the steel pipe; S3, using the sliding movement of the moving cross bar (32) and the moving block (331) to align the cross clamping mechanism (35) with the end of the steel pipe, and driving the turntable 1 (332) and the turntable 2 (333) to slide by means of the hydraulic telescopic rod 2, so that the cross clamping mechanism (35) extends into the steel pipe; S4, driving the driving rod (352) to deflect by means of the hydraulic telescopic rod three (355), so that the four supporting rods (353) are supported on the steel pipe and fix the steel pipe, and rotating the rotating disk two (333) so that the welding surface of the steel pipe is in a horizontal position; S5, using the sliding movement of the movable cross bar (32) and the movable block (331) to transport the steel pipe between the two guide clamping rods (61), and placing the steel pipe on the two guide clamping rods (61) through the clamping block (63); S6, repeating steps S3 to S5, placing the next steel pipe on the two guide clamping rods (61), and aligning the two steel pipes by sliding the second hydraulic telescopic rod during the placement process, then driving the two guide clamping rods (61) to slide to clamp the two steel pipes and driving the L-shaped limit rod (62) to slide downward to press the two steel pipes, and then welding the two steel pipes using the welding mechanism (4); S7, repeating steps S3 to S6 until the welding of the steel pipe bundle is completed, loosening the guide clamping rod (61) and the L-shaped limit rod (62), and removing the welded steel pipe bundle from the side of the fixing assembly (2) for subsequent processing.

Citation Information

Cited By

  • Exterior facing curtain wall aluminum plate production and transfer equipment

    CN119929496A

  • An aluminum plate production and transfer equipment for exterior finishing curtain walls

    CN119929496B