By designing drilling and installing separate anchor rod installation trolleys, the problems of high operational difficulty and low construction efficiency caused by excessive integration of anchor rod mechanized construction equipment functions in the existing technology are solved, and more efficient and accurate anchor rod installation and construction are achieved .
Patent Information
- Application Number
- CN202411766062.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-04
- Publication Date
- 2025-02-18
AI Technical Summary
The existing mechanized construction equipment functions of anchor rods are over-integrated, which makes it difficult to operate on-site equipment and is inefficient in the construction of large-section tunnels.
A drilling and installation separation anchor rod installation trolley is designed. The drilling operation is separated from the anchor rod installation operation through the separation structure between the anchor rod installation arm assembly and the intermediate drilling arm, and the drilling operation is further improved through the multi-directional adjustment structure. Positioning efficiency.
By separating the drilling and installation operations, the operation difficulty of on-site equipment is reduced, the efficiency of moving the vehicle in large-section tunnels is improved, and more precise positioning and construction paths are achieved through intelligent modules, avoiding the risks of manual positioning and installation.
Smart Images

Figure CN119466906A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to an anchor bolt installation trolley and method for separating drilling and installation. Background Art
[0002] At present, the main installation forms of anchor rods are divided into two forms: manual installation and mechanical installation. Manual installation often uses a tunnel drilling rig to drill holes, and then uses the drilling rig basket to manually push anchor rods and perform grouting operations. This construction method has certain safety hazards. The tunnel has just been blasted and a safety support system has not yet been fully formed. Personnel are easily injured by falling rocks during installation operations near the face.
[0003] With the advancement of technology, the existing anchor construction has achieved mechanization of the entire process of drilling, anchoring and grouting to a certain extent. Chinese patent CN117365595A discloses an anchor trolley and working method for a complete set of anchor support that can realize drilling, anchoring and grouting. The anchor trolley can replace manual installation of anchors and integrate the drilling, anchoring and grouting functions to a certain extent, thereby improving the construction efficiency. However, in the actual anchor construction process of the tunnel, the functional modules are integrated on one boom, resulting in a complex structure, inconvenient operation, uncontrollable failure rate, and limited single-arm construction efficiency to a certain extent, resulting in low efficiency in moving vehicles for large-section tunnel construction.
[0004] Chinese patent CN113669093A discloses an anchor arm precision guiding system and an anchor trolley using the system, which realizes the simultaneous operation of drilling and anchor installation, avoids the step-by-step implementation of drilling and anchor installation in traditional mechanisms, and reduces the complexity of operation to a certain extent. However, only one anchor can be constructed at a time. After each anchor is installed, the arm needs to return to the ground for anchor loading operations, which takes up a lot of construction time. In addition, it is limited to mortar anchor construction, and the construction scope is limited.
[0005] Chinese patent CN211081696U provides an anchor trolley, which solves the structural complexity problem of the traditional integrated drilling, anchoring and grouting arm, while retaining the hanging basket structure to assist in the operation. However, the installation of anchors still relies on manual insertion of anchors one by one into the propulsion mechanism for installation. There is a risk of falling during the transfer process, and the number of rod warehouses on the hanging basket is limited. The applicable anchor length is also affected by the size of the hanging basket. Anchor alignment is mainly carried out by personnel adjusting the hanging basket and the propulsion beam posture, which is inconvenient to operate and restricts construction efficiency.
[0006] In summary, there is an urgent need for a trolley that can improve the efficiency of drilling and anchor installation construction to solve the problems existing in the prior art. Summary of the invention
[0007] The purpose of the present invention is to provide an anchor installation trolley and method for separating drilling and installation, so as to solve the technical problems in the prior art of excessive integration of the functions of anchor mechanized construction equipment, which leads to difficulty in on-site equipment operation and low efficiency in moving vehicles in large-section tunnels. The specific technical scheme is as follows:
[0008] The present invention provides an anchor bolt installation trolley with separated drilling and installation, comprising: a vehicle body; a left anchor bolt installation arm assembly, the left anchor bolt installation arm assembly comprising a first movable mechanism, an anchor bolt propulsion mechanism, an anchor bolt warehouse and an anchor bolt manipulator, the first movable mechanism is fixed to the vehicle body, the anchor bolt propulsion mechanism is connected to the first movable mechanism, the anchor bolt warehouse is connected to the anchor bolt propulsion mechanism, the manipulator is connected to the anchor bolt propulsion mechanism, the first movable mechanism is used to adjust the axial position, pitch angle, horizontal angle and rotation angle of the anchor bolt propulsion mechanism, the manipulator is used to grab anchor bolts from the anchor bolt warehouse and place them The vehicle body is provided with a plurality of movable mechanisms, each of which is connected to a plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms. The plurality of movable mechanisms are connected to the plurality of movable mechanisms, and the plurality of movable mechanisms are connected to the plurality of movable mechanisms.
[0009] A further improvement of the anchor installation trolley with separated drilling and installation of the present invention is that the first movable mechanism includes a first axial length adjustment component, a first pitch angle adjustment component, a first horizontal angle adjustment component and a first rotation angle adjustment component, the first end of the first pitch angle adjustment component is connected to the vehicle body and the second end is connected to the first axial length adjustment component; the first end of the first horizontal angle adjustment component is connected to the vehicle body and the second end is connected to the first axial length adjustment component; the first end of the first axial length adjustment component is connected to the vehicle body and the second end is connected to the first rotation angle adjustment component; the first end of the first rotation angle adjustment component is connected to the first axial length adjustment component and the second end is connected to the anchor propulsion mechanism.
[0010] A further improvement of the anchor installation trolley with separated drilling and installation of the present invention is that the first rotation angle adjustment component includes a rotation arm, a first rotation swing drive component, a second rotation swing drive component and a rotation pitch drive component. The rotation arm is connected to the second end of the first axial length adjustment component, and the rotation pitch drive component is connected between the side surface of the rotation arm and the side surface of the first axial length adjustment component. The rotation pitch drive component drives the rotation arm to pitch up and down around the first axial length adjustment component. The first rotation swing drive component is connected to the front end of the rotation arm, and the second rotation swing drive component is connected to one side of the rotation arm. The first rotation swing drive component is driven to swing left and right around the rotation arm through the extension and contraction of the second rotation swing drive component, and one side of the first rotation swing drive component is connected to the anchor propulsion mechanism.
[0011] A further improvement of the anchor installation trolley with separated drilling and installation of the present invention is that the anchor pushing mechanism includes an anchor pushing beam base, an anchor pushing beam, an anchor pushing pitch angle adjustment member and an anchor pushing operation assembly, the pushing beam base is connected to one side of the first rotary swing driving member, the anchor pushing pitch angle adjustment member is connected between the pushing beam base and the first rotary swing driving member, the anchor pushing beam is slidably connected to the anchor pushing beam base, and the anchor pushing operation assembly is installed on the anchor pushing beam.
[0012] A further improvement of the anchor installation trolley with separated drilling and installation functions of the present invention is that the anchor pushing operation component includes an anchor pusher pushing drive, a wire rope assembly, an anchor pusher assembly, a hydraulic reel and an intermediate drill supporter, the anchor pusher pushing drive is connected to the anchor pushing beam, the anchor pusher assembly is installed above the anchor pushing beam, the intermediate drill supporter is slidably installed on the anchor pushing beam, the wire rope assembly is connected to the anchor pushing beam and is located between the anchor pusher assembly and the intermediate drill supporter, the anchor pusher pushing drive drives the wire rope assembly to move by telescoping, and then drives the anchor pusher assembly, the hydraulic reel and the intermediate drill supporter to move back and forth to perform the anchor pushing action.
[0013] A further improvement of the anchor rod installation trolley with separated drilling and installation functions of the present invention is that a scanner system is installed on the frame, and a collection element is fixed on the anchor rod installation arm assembly, and the collection element includes multiple angle measuring parts, a first telescopic amount measuring part and a second telescopic amount measuring part, the first telescopic amount measuring part is installed on the length adjustment component, and the second telescopic amount measuring part is installed on the anchor rod pushing beam base.
[0014] A further improvement of the anchor rod installation trolley with separated drilling and installation functions of the present invention is that the anchor rod magazine includes a swivel rod driving member, a rod magazine chuck and a swivel shaft, the rod magazine chuck is used to load anchor rods, the swivel shaft is rotatably connected to the anchor rod pushing beam, the rod magazine chuck is sleeved and fixed on the swivel shaft, and the swivel rod driving member is drivably connected to the swivel shaft.
[0015] A further improvement of the anchor installation trolley with separate drilling and installation according to the present invention is that the second movable mechanism includes a second axial length adjustment component, a second pitch angle adjustment component, a second horizontal angle adjustment component and a second rotation angle adjustment component, the first end of the second pitch angle adjustment component is connected to the vehicle body and the second end is connected to the second axial length adjustment component; the first end of the second horizontal angle adjustment component is connected to the vehicle body and the second end is connected to the second axial length adjustment component; the first end of the second axial length adjustment component is connected to the vehicle body and the second end is connected to the second rotation angle adjustment component; the first end of the second rotation angle adjustment component is connected to the second axial length adjustment component and the second end is connected to the rock drilling propulsion mechanism.
[0016] A further improvement of the anchor installation trolley with separate drilling and installation of the present invention is that the rock drilling propulsion mechanism includes a propulsion beam pitch seat, a propulsion beam base, a rock drilling propulsion beam and a propulsion beam pitch seat pitch driving member, the propulsion beam pitch seat is connected to the second rotation angle adjustment assembly, the propulsion beam base is connected to the propulsion beam pitch seat, the propulsion beam pitch seat pitch driving member is connected between the propulsion beam pitch seat and the propulsion beam base, and the rock drilling propulsion beam is slidably connected to the propulsion beam base.
[0017] The present invention also provides a method for using the anchor bolt installation trolley with separate drilling and installation as described above, comprising the following steps: moving the anchor bolt installation trolley to a tunnel face to be constructed via the trolley body;
[0018] The axial position, pitch angle, horizontal angle and rotation angle of the rock drilling propulsion mechanism are adjusted by the second movable mechanism of the middle drill arm, so that the rock drilling propulsion mechanism can drill holes in a circular direction from top to bottom on the face to be constructed to form two rings of holes;
[0019] The middle drill arm adjusts its posture through the second movable mechanism to reserve space for the construction of the left anchor bolt installation arm assembly and the right anchor bolt installation arm assembly;
[0020] The left anchor rod installation arm assembly and the right anchor rod installation arm assembly adjust the axial position, pitch angle, horizontal angle and rotation angle of the anchor rod propulsion mechanism through the first movable mechanism to adjust the posture to find the drilling position, and the left anchor rod installation arm assembly and the right anchor rod installation arm assembly are longitudinally staggered for construction;
[0021] The left anchor rod installation arm assembly performs the anchor rod installation construction at the top of the first ring arch. The manipulator grabs the anchor rod from the anchor rod library and places it on the anchor rod pushing mechanism to push it into the borehole. The anchor rod is installed in the borehole from top to bottom until the installation is completed at the left wall position.
[0022] The right anchor rod installation arm assembly performs the anchor rod installation construction at the second ring arch top position. The manipulator grabs the anchor rod from the anchor rod library and places it on the anchor rod pushing mechanism to push it into the borehole. The anchor rod is installed in the borehole from top to bottom until the installation is completed at the right wall position.
[0023] The left anchor rod installation arm assembly adjusts its posture to the second ring arch top position through the first movable mechanism to carry out anchor rod grouting construction, and completes the anchor rod grouting construction on the left side of the second ring from top to bottom;
[0024] The right anchor rod installation arm assembly adjusts its posture to the first ring arch top position through the first movable mechanism to carry out anchor rod grouting construction, and completes the anchor rod grouting construction on the left side of the first ring from top to bottom.
[0025] The application of the technical solution of the present invention has the following beneficial effects:
[0026] The anchor bolt installation trolley with separated drilling and installation of the present invention separates the drilling operation from the anchor bolt installation operation through the separation structure of the anchor bolt installation arm assembly and the middle drill arm, and improves the efficiency of positioning during the construction process through the multi-directional adjustment structure of the first movable mechanism and the second movable mechanism, and solves the technical problem of the difficulty of on-site equipment operation and low efficiency of moving vehicles in large-section tunnels caused by the excessive integration of the functions of anchor bolt mechanized construction equipment in the prior art. The present invention collects and plans the action points of the working arm through devices such as three-dimensional laser scanning and sensors, so that the points can be accurately positioned during the drilling operation and anchor bolt installation construction, so that the actions of the anchor bolt installation arm assembly and the middle drill arm are constructed according to the optimized path, avoiding the operation of manually assisting the positioning and anchor bolt installation with the help of a hanging basket, and filling multiple anchor bolts in the anchor bolt warehouse to meet the installation construction of multiple anchor bolts, avoiding the need for the arm frame to return to the ground for repeated filling of anchor bolts, and improving the efficiency of anchor bolt installation construction.
[0027] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0029] Figure 1 It is a schematic diagram of the overall structure of the anchor bolt installation trolley with separate drilling and installation functions of the present invention;
[0030] Figure 2 It is a structural schematic diagram of the left anchor bolt installation arm assembly of the anchor bolt installation trolley with separate drilling and installation functions of the present invention;
[0031] Figure 3 It is a schematic diagram of the arrangement of the collection components of the anchor bolt installation trolley with separate drilling and installation according to the present invention;
[0032] Figure 4 It is a structural schematic diagram of the right anchor bolt installation arm assembly of the anchor bolt installation trolley with separate drilling and installation functions of the present invention;
[0033] Figure 5 It is a structural schematic diagram of the anchor bar warehouse of the anchor bar installation trolley with separate drilling and installation according to the present invention;
[0034] Figure 6 It is a schematic structural diagram of the middle drill arm of the anchor bolt installation trolley with separate drilling and installation functions of the present invention;
[0035] Figure 7 This is a rear view of the anchor bolt installation trolley with separate drilling and installation functions according to the present invention in the construction state;
[0036] Figure 8 It is a side view of the anchor bolt installation trolley with separate drilling and installation functions of the present invention in the construction state.
[0037] Among them, 1. Hose reel; 2. Transmission system; 3. Frame; 4. Engine power system; 5. Air compression system; 6. Hydraulic system; 7. Cab; 8. Scanner system; 9. Left anchor rod mounting arm assembly; 901. Fixed mounting seat; 902. Articulated base; 903. Pitch cylinder; 904. Yaw cylinder; 905. First telescopic arm; 906. First telescopic cylinder; 907. Rotating arm; 908. Swing cylinder; 909. Rotating arm swing Moving cylinder; 910, slewing arm pitching cylinder; 911, anchor rod propulsion beam base; 912, fixed extension seat; 913, anchor rod propulsion beam; 914, anchor rod propulsion beam base pitching cylinder; 915, anchor rod propulsion beam compensation cylinder; 916, hydraulic reel; 917, anchor rod propulsion device operating assembly; 918, wire rope assembly; 919, intermediate drill support; 920, anchor rod propulsion device propulsion cylinder; 921, anchor rod warehouse; 9211, slewing motor; 921 2. Rod library chuck; 9213. Rotary axis; 9214. Folding quick release mechanism; 922. Manipulator; 923. First angle encoder; 924. Second angle encoder; 925. Third angle encoder; 926. Fourth angle encoder; 927. Fifth angle encoder; 928. Sixth angle encoder; 929. Pull wire sensor; 930. Pull wire sensor; 10. Intermediate drill arm; 1001. Mounting base; 1002. Articulated seat; 1 003, second telescopic arm; 1004, arm swing cylinder; 1005, arm pitch cylinder; 1006, second telescopic cylinder; 1007, double-rotation reducer mechanism; 1008, propulsion beam pitch seat; 1009, propulsion beam base; 1010, rock drilling propulsion beam; 1011, propulsion beam pitch seat pitch cylinder; 11, right anchor rod installation arm assembly; 12, indication laser; 13, electrical control system; 14, cable drum; 15, grouting system. DETAILED DESCRIPTION
[0038] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0039] See also Figures 1 to 8As shown, an anchor bolt installation trolley with separated drilling and installation comprises: a vehicle body; a left anchor bolt installation arm assembly 9, wherein the left anchor bolt installation arm assembly 9 comprises a first movable mechanism, an anchor bolt propulsion mechanism, an anchor bolt warehouse 921 and an anchor bolt manipulator 922, wherein the first movable mechanism is fixed to the vehicle body, the anchor bolt propulsion mechanism is connected to the first movable mechanism, the anchor bolt warehouse 921 is connected to the anchor bolt propulsion mechanism, the manipulator 922 is connected to the anchor bolt propulsion mechanism, the first movable mechanism is used to adjust the axial position, pitch angle, horizontal angle and rotation angle of the anchor bolt propulsion mechanism, and the manipulator 922 is used to grab anchor bolts from the anchor bolt warehouse 921. Placed on the anchor rod propulsion mechanism for propulsion; a right anchor rod mounting arm assembly 11, the structure of the right anchor rod mounting arm assembly 11 is the same as that of the left anchor rod mounting arm assembly 9, and the position is symmetrical; an intermediate drill arm 10, the intermediate drill arm 10 is located between the left anchor rod mounting arm assembly 9 and the right anchor rod mounting arm assembly 11, the intermediate drill arm 10 includes a second movable mechanism and a rock drilling propulsion mechanism, the second movable mechanism is fixed on the vehicle body, the rock drilling propulsion mechanism is connected to the second movable mechanism, the second movable mechanism is used to adjust the axial position, pitch angle, horizontal angle and rotation angle of the rock drilling propulsion mechanism, and the rock drilling propulsion mechanism is used for drilling operations.
[0040] In this embodiment, Figure 1 and Figure 4 As shown, the vehicle body is equipped with two anchor rod installation arm assemblies, namely the left anchor rod installation arm assembly 9 and the right anchor rod installation arm assembly 11. The two anchor rod installation arm assemblies have the same structure, and the only difference is that the anchor rod warehouse 921 and the manipulator 922 are symmetrically arranged. Figure 1As shown, the vehicle body includes a hose drum 1, a transmission system 2, a frame 3, an engine power system 4, an air compression system 5, a hydraulic system 6, a cab 7, a scanner system 8, an indication laser 12, an electrical control system 13, a cable drum 14 and a grouting system 15. The installation structure of each component of the vehicle body adopts the arrangement structure of a conventional anchor trolley. Among them, the left anchor rod mounting arm assembly 9, the middle drill arm 10, the right anchor rod mounting arm assembly 11, the indication laser 12, the scanner system 8, the cab 7, the hydraulic system 6, the air compression system 5, the engine power system 4, the water pipe drum 1, the cable drum 14, and the grouting pump system are arranged on the frame 3 from front to back in sequence, and the transmission system 2 is arranged below the frame 3; the left anchor rod mounting arm assembly 9 and the right anchor rod mounting arm assembly 11 are fixedly connected to the frame 3 through a mounting seat and arranged on the left and right sides of the frame 3, the middle drill arm 10 is fixedly connected to the frame 3 through a mounting seat and arranged in the middle position of the front end of the frame 3, the scanner system 8 is arranged above the overlap position of the frame 3 on the rear side of the left anchor rod mounting arm assembly 9, the scanner system 8 is fixedly connected to the frame 3 through a mounting seat, and the indication laser 12 is arranged and installed in the middle position of the front end of the frame 3, and the indication laser 12 is fixedly connected to the frame 3 through a fixed mounting seat 901. All the oil cylinders of the present invention can be replaced by other telescopic member driving members, such as air cylinders, electric telescopic rods, etc.
[0041] Preferably, the first movable mechanism includes a first axial length adjustment component, a first pitch angle adjustment component, a first horizontal angle adjustment component and a first rotation angle adjustment component, the first end of the first pitch angle adjustment component is connected to the vehicle body and the second end is connected to the first axial length adjustment component; the first end of the first horizontal angle adjustment component is connected to the vehicle body and the second end is connected to the first axial length adjustment component; the first end of the first axial length adjustment component is connected to the vehicle body and the second end is connected to the first rotation angle adjustment component; the first end of the first rotation angle adjustment component is connected to the first axial length adjustment component and the second end is connected to the anchor rod propulsion mechanism.
[0042] Specifically, the first end of the first movable mechanism is provided with a fixed mounting seat 901 and an articulated seat 1002, the fixed mounting seat 901 is fixedly connected to the frame 3 by bolts, and the articulated base 902 is connected to the fixed mounting seat 901 by an articulated pin. In this embodiment, the first axial length adjustment component includes a first telescopic arm 905 and a first telescopic cylinder 906; the first pitch angle adjustment component is a pitch cylinder 903; the first horizontal angle adjustment component is a yaw cylinder 904 and a swing cylinder 908. The first telescopic arm 905 is driven to pitch up and down and yaw left and right by the pitch cylinder 903 and the yaw cylinder 904, and the two ends of the pitch cylinder 903 and the yaw cylinder 904 are respectively articulated with the articulated base 902 and the first telescopic arm 905 by an articulated pin, and the front end of the first telescopic arm 905 is fixedly connected to the slewing arm 907 by a pin.
[0043] Preferably, Figure 2 As shown, the first slewing angle adjustment component includes a slewing arm 907, a first slewing swing driving member, a second slewing swing driving member and a slewing pitch driving member, the slewing arm 907 is connected to the second end of the first axial length adjustment component, the slewing pitch driving member is connected between the side of the slewing arm 907 and the side of the first axial length adjustment component, the slewing pitch driving member drives the slewing arm 907 to pitch up and down around the first axial length adjustment component, the first slewing swing driving member is connected to the front end of the slewing arm 907, the second slewing swing driving member is connected to one side of the slewing arm 907, the first slewing swing driving member is telescopically driven to swing left and right around the slewing arm 907, and one side of the first slewing swing driving member is connected to the anchor rod propulsion mechanism. In this embodiment, the first slewing swing driving member is a swing cylinder 908; the second slewing swing driving member is a slewing arm swing oil cylinder 909; and the slewing pitch driving member is a slewing arm pitch oil cylinder 910. A swivel arm pitch cylinder 910 is arranged below the swivel arm 907 and the first telescopic arm 905 through an ear seat connection, and the swivel arm pitch cylinder 910 drives the swivel arm 907 to pitch up and down around the first telescopic arm 905. A swing cylinder 908 is hingedly arranged at the front end of the swivel arm 907 through a hinge pin, and a swivel arm swing cylinder 909 is arranged on one side of the swivel arm 907. The swivel arm swing cylinder 909 is extended and retracted to drive the swing cylinder 908 to swing left and right around the swivel arm 907.
[0044] Preferably, Figure 2As shown, the anchor rod propulsion mechanism includes an anchor rod propulsion beam base 911, an anchor rod propulsion beam 913, an anchor rod propulsion pitch angle adjustment member, and an anchor rod propulsion operation assembly. The propulsion beam base 1009 is connected to one side of the first rotary swing driving member, the anchor rod propulsion pitch angle adjustment member is connected between the propulsion beam base 1009 and the first rotary swing driving member, the anchor rod propulsion beam 913 is slidably connected to the anchor rod propulsion beam base 911, and the anchor rod propulsion operation assembly is installed on the anchor rod propulsion beam 913. In this embodiment, the anchor rod propulsion pitch angle adjustment member is a rotary arm pitch cylinder 910. A fixed extension seat 912 is welded on one side of the swing cylinder 908, and the anchor rod propulsion beam base 911 is hinged to the other end of the fixed extension seat 912. A slewing arm pitching oil cylinder 910 is arranged between the anchor rod propulsion beam base 911 and the fixed extension seat 912. The two ends of the slewing arm pitching oil cylinder 910 are respectively connected to the anchor rod propulsion beam base 911 and the upper ear plate of the fixed extension seat 912 through a pin shaft. The anchor rod propulsion beam base 911 is controlled to swing up and down around the fixed extension seat 912 by the telescopic movement of the slewing arm pitching oil cylinder 910. An anchor propulsion beam 913 is arranged above the beam base 911 through a slider connection. In addition to the slider connection, an anchor propulsion beam base compensation cylinder 915 is also arranged between the anchor propulsion beam 913 and the anchor propulsion beam base 911. One end of the anchor propulsion beam base compensation cylinder 915 is hinged to the ear plate below the anchor propulsion beam 913, and the other end is hinged to the anchor propulsion beam base 911 through the ear plate. The anchor propulsion beam 913 is controlled to move forward and backward along the anchor propulsion beam base 911 through the telescopic movement of the anchor propulsion beam base compensation cylinder 915.
[0045] Preferably, Figure 2As shown, the anchor rod propulsion operation assembly includes an anchor rod propulsion driving member, a wire rope assembly 918, an anchor rod propulsion assembly, a hydraulic reel 916 and an intermediate supporter 919. The anchor rod propulsion driving member is connected to the anchor rod propulsion beam 913, the anchor rod propulsion assembly is installed above the anchor rod propulsion beam 913, the intermediate supporter 919 is slidably installed on the anchor rod propulsion beam 913, the wire rope assembly 918 is connected to the anchor rod propulsion beam 913 and is located between the anchor rod propulsion assembly and the intermediate supporter 919. The anchor rod propulsion driving member drives the wire rope assembly 918 to move by telescoping, thereby driving the anchor rod propulsion assembly, the hydraulic reel 916 and the intermediate supporter 919 to move forward and backward to perform the action of anchor rod propulsion. In this embodiment, the anchor rod propulsion driving member is a rod propulsion cylinder. An anchor pusher operating assembly 917 is arranged and installed above the anchor pusher beam 913, and the anchor pusher operating assembly 917 is connected to the anchor pusher beam 913 through a slider mechanism. A hydraulic reel 916 is arranged behind the anchor pusher operating assembly 917, and a slider mechanism is arranged at the base of the hydraulic reel 916, which is connected to the anchor pusher beam 913 through the slider mechanism. An intermediate drill support 919 is arranged at the front end of the anchor pusher assembly, and a plurality of slider structures are arranged at the base of the intermediate drill support 919, which are connected to the anchor pusher beam 913 through the slider structure. An anchor pusher propulsion cylinder 920 is arranged in the middle of the anchor pusher beam 913, and one end of the anchor pusher propulsion cylinder 920 is connected to The anchor rod pushing beam 913 is fixedly connected, and the other end is connected to the base of the intermediate drill support 919 by an ear plate. The wire rope assembly 918 is arranged between the anchor rod pushing device operating component 917 and the intermediate drill support 919. One end of the wire rope assembly 918 is fixedly connected to the anchor rod pushing beam 913, bypasses the base pulley mechanism of the intermediate drill support 919 in the middle, and the other end is fixedly connected to the base of the anchor rod pushing device operating component 917. The anchor rod pushing device propulsion cylinder 920 drives the wire rope assembly 918 to move by telescoping, thereby driving the anchor rod pushing device operating component 917, the hydraulic reel 916, and the intermediate drill support 919 to move back and forth, thereby satisfying the anchor rod pushing action.
[0046] Preferably, Figure 3As shown, a collection element is fixed on the anchor rod installation arm assembly, and the collection element includes a plurality of angle measuring parts, a first telescopic amount measuring part and a second telescopic amount measuring part, the first telescopic amount measuring part is installed on the length adjustment component, and the second telescopic amount measuring part is installed on the anchor rod advancement beam base 911. The first telescopic amount measuring part is a pull-wire sensor 929, and the second telescopic amount measuring part is a pull-wire sensor 930, and both the pull-wire sensor 929 and the pull-wire sensor 930 are pull-wire displacement sensors. Angle measuring parts are installed at each joint of the left anchor mounting arm assembly 9, including a first angle encoder 923 responsible for measuring the swing angle of the boom, a second angle encoder 924 responsible for measuring the pitch angle of the boom, a third angle encoder 925 responsible for measuring the pitch angle of the slewing arm 907, a fourth angle encoder 926 responsible for measuring the swing angle of the slewing arm 907, a fifth angle encoder 927 responsible for measuring the rotation angle of the swing cylinder 908, and a sixth angle encoder 928 responsible for measuring the pitch angle of the anchor propulsion beam base 911. Angle encoders are configured at each joint to collect the position and posture of the boom in space, a pull-wire sensor 929 that can measure the telescopic amount of the boom is configured under the first telescopic arm 905 to measure the telescopic amount of the boom, and a pull-wire sensor 930 is arranged inside the anchor propulsion beam base 911 to measure the telescopic amount of the anchor propulsion beam 913 along the anchor propulsion beam base 911. The joints of the middle drill arm 10 are also equipped with control elements such as angle encoders and wire sensors; the scanner system 8 is arranged above the overlapping position of the frame 3, and the scanner system 8 is fixedly connected to the frame 3 through the mounting seat. The indicator laser 12 is arranged and installed in the middle position of the front end of the frame 3, and the three-dimensional laser scanning, sensor and other components are combined to collect and plan the action points of the working arm, so that the arm frame movement can be constructed according to the optimized path. The anchor installation trolley of the present invention is equipped with intelligent modules such as scanners, wires, angle encoders, etc., which can automatically generate drilling logs and anchor hole location maps. The anchor installation arm can find holes according to the hole location map memory, and the double anchor installation arm can quickly find holes and plan the construction process and path.
[0047] Preferably, Figure 5As shown, the anchor bar warehouse 921 includes a rotary rod driving member, a rod warehouse chuck 9212 and a rotary shaft 9213. The rod warehouse chuck 9212 is used to load anchor rods. The rotary shaft 9213 is rotatably connected to the anchor rod advancing beam 913. The rod warehouse chuck 9212 is sleeved and fixed on the rotary shaft 9213. The rotary rod driving member is drivingly connected to the rotary shaft 9213. The anchor bar warehouse 921 is arranged and installed on one side of the anchor rod advancing beam 913. The anchor bar warehouse 921 is fixedly connected to one side of the beam body of the anchor rod advancing beam 913 by bolts through a plurality of brackets. A plurality of manipulators 922 are arranged on the same side of the anchor rod advancing beam 913 and the anchor bar warehouse 921. The manipulators 922 are fixedly connected to the anchor rod advancing beam 913 by brackets and bolts. The manipulators 922 can swing to grab the anchor rods from the anchor bar warehouse 921 and place them at the advancing position of the anchor rod advancing beam 913. The rotary drive component is a rotary motor 9211. The anchor rod warehouse 921 also includes a folding quick-release mechanism 9214. During operation, the anchor rods are first filled into the rod warehouse. The folding quick-release structure 9214 is opened, and personnel can load the anchor rods into the rod warehouse chuck 9212 without hindrance. After an anchor rod is installed into the hole, the rotary motor 9211 drives the rotary shaft 9213 to rotate and then drives the rod warehouse chuck 9212 to rotate a certain angle to a position where the manipulator 922 can grasp it. The manipulator 922 closes its claws to take the anchor rod out of the rod warehouse chuck 9212, swings it to the working position, and pushes it forward. The structural design of the large-capacity articulated fast-loading anchor rod warehouse 921 of the present invention can continuously provide anchor rods during anchor rod installation construction, thereby continuously carrying out anchor rod installation construction and improving the efficiency of anchor rod installation construction.
[0048] Preferably, Figure 6As shown, the second movable mechanism includes a second axial length adjustment component, a second pitch angle adjustment component, a second horizontal angle adjustment component and a second rotation angle adjustment component. The first end of the second pitch angle adjustment component is connected to the vehicle body and the second end is connected to the second axial length adjustment component; the first end of the second horizontal angle adjustment component is connected to the vehicle body and the second end is connected to the second axial length adjustment component; the first end of the second axial length adjustment component is connected to the vehicle body and the second end is connected to the second rotation angle adjustment component; the first end of the second rotation angle adjustment component is connected to the second axial length adjustment component and the second end is connected to the rock drilling propulsion mechanism. In this embodiment, the second axial length adjustment component includes a second telescopic arm 1003 and a second telescopic cylinder 1006; the second pitch angle adjustment component is a boom tilt cylinder 1005; the second horizontal angle adjustment component is a boom tilt cylinder 1004; and the second rotation angle adjustment component includes a double-rotation reducer mechanism 1007. The head end of the second movable mechanism is provided with a mounting base 1001 and an articulated seat 1002, the mounting base 1001 is fixedly connected to the middle position of the front end of the frame 3 by bolts, the articulated seat 1002 is connected to the fixed mounting seat 901 by an articulated pin, and the second telescopic arm 1003 is driven to pitch up and down and swing left and right by the arm swing cylinder 1005 and the arm swing cylinder 1004, and the two ends of the arm swing cylinder 1005 and the arm swing cylinder 1004 are respectively articulated with the articulated seat 1002 and the second telescopic arm 1003 by the intersection pin, and the telescopic cylinder arranged in the cavity of the second telescopic arm 1003 has its two ends connected to the second telescopic arm 1003 by the articulated pin. The front and rear arms of the telescopic arm 1003 are connected, and the telescopic movement of the second telescopic arm 1003 is controlled by the telescopic cylinder. A double-rotation reducer mechanism 1007 is fixedly connected to the front end of the second telescopic arm 1003. The double-rotation reducer includes a reducer No. 1 that can rotate 360 degrees in the horizontal direction along the axis of the second telescopic arm 1003, and also includes a No. 2 reducer that can rotate 360 degrees horizontally perpendicular to the direction of the second telescopic arm 1003. The double-rotation reducer mechanism 1007 can drive the rock drilling propulsion beam 1010 to move horizontally or vertically, and a propulsion beam pitch seat 1008 is fixedly connected below the No. 2 reducer of the double-rotation reducer mechanism 1007.
[0049] Preferably, Figure 6As shown, the rock drilling propulsion mechanism includes a propulsion beam pitch seat 1008, a propulsion beam base 1009, a rock drilling propulsion beam 1010 and a propulsion beam pitch seat 1008 pitch driving member, the propulsion beam pitch seat 1008 is connected to the second rotation angle adjustment assembly, the propulsion beam base 1009 is connected to the propulsion beam pitch seat 1008, the propulsion beam pitch seat 1008 pitch driving member is connected between the propulsion beam pitch seat 1008 and the propulsion beam base 1009, and the rock drilling propulsion beam 1010 is slidably connected to the propulsion beam base 1009. In this embodiment, the propulsion beam pitch seat 1008 pitch driving member is a propulsion beam pitch seat pitch cylinder 1011. The thrust beam base 1009 is hinged to the thrust beam pitch base through an articulated pin, and a thrust beam pitch base pitch cylinder 1011 is arranged between the thrust beam pitch base 1008 and the thrust beam base 1009. Both ends of the thrust beam pitch base pitch cylinder 1011 are respectively connected to the thrust beam pitch base 1008 and the thrust beam base 1009 by articulated pins. The thrust beam base 1009 is controlled to swing around the thrust beam pitch base 1008 by driving the thrust beam pitch base pitch cylinder 1011 to extend and retract. The rock drilling thrust beam 1010 is connected to the thrust beam base 1009 through a slider structure, and the rock drilling thrust beam 1010 is driven by the swinging movement of the thrust beam base 1009. Electric control components such as angle encoders and wire sensors are also arranged at various joint points of the middle drill arm 10 to collect and arrange the arm posture.
[0050] like Figure 7 and Figure 8 As shown, the present invention also provides a method for using the anchor bolt installation trolley with separate drilling and installation as described above, comprising the following steps: moving the anchor bolt installation trolley to the face to be constructed through the vehicle body, and parking it stably along the center line of the tunnel, and propping up the legs;
[0051] The axial position, pitch angle, horizontal angle and rotation angle of the rock drilling propulsion mechanism are adjusted by the second movable mechanism of the middle drill arm 10, so that the rock drilling propulsion mechanism can drill holes in a circular direction from top to bottom on the face to be constructed to form two rings of holes;
[0052] The middle drill arm 10 adjusts its posture through the second movable mechanism to reserve space for the construction of the left anchor bolt installation arm 9 and the right anchor bolt installation arm assembly 11;
[0053] The left anchor rod installation arm assembly 9 and the right anchor rod installation arm assembly 11 adjust the axial position, pitch angle, horizontal angle and rotation angle of the anchor rod propulsion mechanism through the first movable mechanism to adjust the posture to find the drilling position, and the left anchor rod installation arm assembly 9 and the right anchor rod installation arm assembly 11 are longitudinally staggered for construction;
[0054] The left anchor rod installation arm assembly 9 performs the anchor rod installation construction at the top of the first ring arch. The manipulator 922 grabs the anchor rod from the anchor rod library 921 and places it on the anchor rod pushing mechanism to push it into the borehole. The anchor rod installation is completed from top to bottom until the installation at the left wall position is completed.
[0055] The right anchor rod installation arm assembly 11 performs the anchor rod installation construction at the second ring arch position, grabs the anchor rod from the anchor rod library 921 through the manipulator 922, places it on the anchor rod pushing mechanism, and pushes it into the borehole, and installs the anchor rod in the borehole from top to bottom until the installation is completed at the right wall position;
[0056] After the first cycle of construction is completed, the left anchor rod installation arm assembly 9 adjusts its posture to the second ring arch top position through the first movable mechanism to carry out anchor rod grouting construction, and completes the second ring left anchor rod grouting construction from top to bottom;
[0057] The right anchor rod installation arm assembly 11 adjusts its posture to the first ring arch top position through the first movable mechanism to carry out anchor rod grouting construction, and completes the anchor rod grouting construction on the left side of the first ring from top to bottom.
[0058] The grouting system includes a grouting pump and a grouting pipeline. The grouting pipeline is connected between the grouting pump and the anchor pusher assembly. The anchor pusher assembly has a pipeline for the grouting material to pass through. The anchor pusher assembly is connected to the end of the anchor. During the anchor grouting construction, the grouting pump pumps the grouting material through the grouting pipeline and the anchor pusher assembly to grout the anchor. The present invention separates the drilling and anchor installation functions. The left anchor installation arm assembly 9 and the right anchor installation arm assembly 11 are staggered and synchronously constructed to improve the construction efficiency. The structure is simple, the operation is convenient, and the failure rate is low.
[0059] The anchor bolt installation trolley with separated drilling and installation of the present invention separates the drilling operation from the anchor bolt installation operation through the separation structure of the anchor bolt installation arm assembly and the intermediate drill arm 10, and improves the efficiency of positioning during the construction process through the multi-directional adjustment structure of the first movable mechanism and the second movable mechanism, and solves the technical problem of the difficulty of on-site equipment operation and low efficiency of moving vehicles in large-section tunnels caused by the excessive integration of the functions of anchor bolt mechanized construction equipment in the prior art. The present invention collects and plans the action points of the working arm through devices such as three-dimensional laser scanning and sensors, so that the points can be accurately positioned during the drilling operation and anchor bolt installation construction, so that the actions of the anchor bolt installation arm assembly and the intermediate drill arm 10 are constructed according to the optimized path, avoiding the operation of manually assisting the positioning and anchor bolt installation with the help of a hanging basket, and loading multiple anchor bolts through the anchor bolt warehouse 921 to meet the installation construction of multiple anchor bolts, avoiding the need for the arm frame to return to the ground for repeated filling of anchor bolts, and improving the efficiency of anchor bolt installation construction.
[0060] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An anchor bolt installation trolley with separate drilling and installation, characterized in that: include: Vehicle body; A left anchor rod installation arm assembly (9), the left anchor rod installation arm assembly (9) comprising a first movable mechanism, an anchor rod propulsion mechanism, an anchor rod storage (921) and an anchor rod manipulator (922), the first movable mechanism being fixed to the vehicle body, the anchor rod propulsion mechanism being connected to the first movable mechanism, the anchor rod storage (921) being connected to the anchor rod propulsion mechanism, the manipulator (922) being connected to the anchor rod propulsion mechanism, the first movable mechanism being used for adjusting the axial position, pitch angle, horizontal angle and rotation angle of the anchor rod propulsion mechanism, the manipulator (922) being used for grabbing anchor rods from the anchor rod storage (921) and placing them on the anchor rod propulsion mechanism for propulsion; A right anchor rod installation arm assembly (11), wherein the structure of the right anchor rod installation arm assembly (11) is the same as that of the left anchor rod installation arm assembly (9), and the positions of the right anchor rod installation arm assembly (11) are symmetrical; An intermediate drill arm (10), the intermediate drill arm (10) is located between the left anchor rod mounting arm assembly (9) and the right anchor rod mounting arm assembly (11), the intermediate drill arm (10) comprises a second movable mechanism and a rock drilling propulsion mechanism, the second movable mechanism is fixed to the vehicle body, the rock drilling propulsion mechanism is connected to the second movable mechanism, the second movable mechanism is used to adjust the axial position, pitch angle, horizontal angle and rotation angle of the rock drilling propulsion mechanism, and the rock drilling propulsion mechanism is used for drilling operation.
2. The anchor bolt installation trolley with separate drilling and installation according to claim 1, characterized in that: The first movable mechanism includes a first axial length adjustment component, a first pitch angle adjustment component, a first horizontal angle adjustment component and a first rotation angle adjustment component, wherein the first end of the first pitch angle adjustment component is connected to the vehicle body and the second end is connected to the first axial length adjustment component; the first end of the first horizontal angle adjustment component is connected to the vehicle body and the second end is connected to the first axial length adjustment component; the first end of the first axial length adjustment component is connected to the vehicle body and the second end is connected to the first rotation angle adjustment component; the first end of the first rotation angle adjustment component is connected to the first axial length adjustment component and the second end is connected to the anchor rod propulsion mechanism.
3. The anchor bolt installation trolley with separate drilling and installation according to claim 2, characterized in that: The first rotation angle adjustment component includes a rotation arm (907), a first rotation swing drive component, a second rotation swing drive component and a rotation pitch drive component, the rotation arm (907) is connected to the second end of the first axial length adjustment component, the rotation pitch drive component is connected between the side of the rotation arm (907) and the side of the first axial length adjustment component, the rotation pitch drive component drives the rotation arm (907) to pitch up and down around the first axial length adjustment component, the first rotation swing drive component is connected to the front end of the rotation arm (907), the second rotation swing drive component is connected to one side of the rotation arm (907), the first rotation swing drive component is driven to swing left and right around the rotation arm (907) by the extension and contraction of the second rotation swing drive component, and one side of the first rotation swing drive component is connected to the anchor rod propulsion mechanism.
4. The anchor bolt installation trolley with separate drilling and installation according to claim 3, characterized in that: The anchor rod propulsion mechanism includes an anchor rod propulsion beam base (911), an anchor rod propulsion beam (913), an anchor rod propulsion pitch angle adjustment member and an anchor rod propulsion operation assembly, wherein the propulsion beam base (1009) is connected to one side of a first rotary swing driving member, the anchor rod propulsion pitch angle adjustment member is connected between the propulsion beam base (1009) and the first rotary swing driving member, the anchor rod propulsion beam (913) is slidably connected to the anchor rod propulsion beam base (911), and the anchor rod propulsion operation assembly is installed on the anchor rod propulsion beam (913).
5. The anchor bolt installation trolley with separate drilling and installation according to claim 4, characterized in that: The anchor rod propulsion operation assembly includes an anchor rod propulsion drive, a wire rope assembly (918), an anchor rod propulsion assembly, a hydraulic reel (916) and an intermediate drill support (919). The anchor rod propulsion drive is connected to the anchor rod propulsion beam (913), the anchor rod propulsion assembly is installed above the anchor rod propulsion beam (913), the intermediate drill support (919) is slidably installed on the anchor rod propulsion beam (913), the wire rope assembly (918) is connected to the anchor rod propulsion beam (913) and is located between the anchor rod propulsion assembly and the intermediate drill support (919), the anchor rod propulsion drive drives the wire rope assembly (918) to move by telescoping, and then drives the anchor rod propulsion assembly, the hydraulic reel (916) and the intermediate drill support (919) to move back and forth to perform the anchor rod propulsion action.
6. The anchor bolt installation trolley with separate drilling and installation according to claim 4, characterized in that: A scanner system (8) is installed on the vehicle frame, and a collection element is fixed on the anchor rod mounting arm assembly, wherein the collection element includes a plurality of angle measuring parts, a first telescopic amount measuring part and a second telescopic amount measuring part, wherein the first telescopic amount measuring part is installed on the length adjustment component, and the second telescopic amount measuring part is installed on the anchor rod propulsion beam base (911).
7. The anchor bolt installation trolley with separate drilling and installation according to claim 4, characterized in that: The anchor rod magazine (921) includes a rotary rod driving member, a rod magazine chuck (9212) and a rotating shaft (9213), wherein the rod magazine chuck (9212) is used for loading anchor rods, the rotating shaft (9213) is rotatably connected to the anchor rod pushing beam (913), the rod magazine chuck (9212) is sleeved and fixed on the rotating shaft (9213), and the rotary rod driving member is drivingly connected to the rotating shaft (9213).
8. The anchor bolt installation trolley with separate drilling and installation functions according to claim 1, characterized in that: The second movable mechanism includes a second axial length adjustment component, a second pitch angle adjustment component, a second horizontal angle adjustment component and a second rotation angle adjustment component, wherein the first end of the second pitch angle adjustment component is connected to the vehicle body and the second end is connected to the second axial length adjustment component; the first end of the second horizontal angle adjustment component is connected to the vehicle body and the second end is connected to the second axial length adjustment component; the first end of the second axial length adjustment component is connected to the vehicle body and the second end is connected to the second rotation angle adjustment component; the first end of the second rotation angle adjustment component is connected to the second axial length adjustment component and the second end is connected to the rock drilling propulsion mechanism.
9. The anchor bolt installation trolley with separate drilling and installation functions according to claim 1, characterized in that: The rock drilling propulsion mechanism comprises a propulsion beam pitch seat (1008), a propulsion beam base (1009), a rock drilling propulsion beam (1010) and a propulsion beam pitch seat (1008) pitch driving member, wherein the propulsion beam pitch seat (1008) is connected to the second rotation angle adjustment assembly, the propulsion beam base (1009) is connected to the propulsion beam pitch seat (1008), the propulsion beam pitch seat (1008) pitch driving member is connected between the propulsion beam pitch seat (1008) and the propulsion beam base (1009), and the rock drilling propulsion beam (1010) is slidably connected to the propulsion beam base (1009).
10. A method for using the anchor bolt installation trolley with separate drilling and installation as claimed in claim 1, characterized in that: The steps include: Move the anchor bolt installation trolley to the face to be constructed through the vehicle body; The axial position, pitch angle, horizontal angle and rotation angle of the rock drilling propulsion mechanism are adjusted by a second movable mechanism of the middle drill arm (10), so that the rock drilling propulsion mechanism can drill holes in a circular direction from top to bottom on the face to be constructed to form two rings of holes; The middle drill arm (10) adjusts its posture through the second movable mechanism to reserve space for the construction of the left anchor rod installation arm assembly (9) and the right anchor rod installation arm assembly (11); The left anchor rod installation arm assembly (9) and the right anchor rod installation arm assembly (11) adjust the axial position, pitch angle, horizontal angle and rotation angle of the anchor rod propulsion mechanism through the first movable mechanism to adjust the posture to find the drilling position, and the left anchor rod installation arm assembly (9) and the right anchor rod installation arm assembly (11) are longitudinally staggered for construction; The left anchor rod installation arm assembly (9) performs anchor rod installation construction at the top of the first ring arch. The manipulator (922) grabs the anchor rod from the anchor rod library (921) and places it on the anchor rod pushing mechanism to push it into the borehole. The anchor rod is installed in the borehole from top to bottom until the installation is completed at the left wall position. The right anchor rod installation arm assembly (11) performs anchor rod installation construction at the second ring arch top position, grabs anchor rods from the anchor rod library (921) through the manipulator (922), places them on the anchor rod pushing mechanism, and pushes them into the borehole, and installs anchor rods in the borehole from top to bottom until the installation is completed at the right wall position; The left anchor rod installation arm assembly (9) adjusts its posture to the second ring arch top position through the first movable mechanism to carry out anchor rod grouting construction, and completes the anchor rod grouting construction on the left side of the second ring from top to bottom; The right anchor rod installation arm assembly (11) adjusts its posture to the first ring arch top position through the first movable mechanism to carry out anchor rod grouting construction, and completes the anchor rod grouting construction on the left side of the first ring from top to bottom.
Citation Information
Patent Citations
Accurate guiding system of anchor rod arm and anchor rod trolley using same
CN113669093A
Anchor rod trolley for realizing whole set of anchor rod support of drilling, bolting and grouting and working method of anchor rod trolley
CN117365595A
Anchor rod trolley
CN211081696U
Drill jumbo
CN105298387A
Intelligent drill jumbo
CN107575161A
Cited By
Drilling and exploring unit for coal mine
CN120465927A
Arch anchor separation type arch drilling, bolting and grouting combined operation trolley and construction method
CN122040253A