WINCC-based one-key board changing control system

By designing a one-click board modification control system based on WINCC, the problem of long time for glass board modification is solved, rapid board modification is achieved, and production efficiency and product quality are improved.

CN119504124APending Publication Date: 2025-02-25BENGBU TRIUMPH ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411592824.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

In the prior art, glass plate modification time is long, resulting in low production efficiency and product quality, and cumbersome operation process.

Method used

A one-click modification control system based on WINCC is designed, including data preparation module, edge puller adjustment module, correction fine adjustment module and database. By collecting and analyzing data in real time, the speed and angle of the edge puller are automatically adjusted to achieve rapid modification of the glass plate.

Benefits of technology

The system can significantly shorten the time for board modification, improve production efficiency and product quality, reduce operating steps, and ensure that the glass liquid has sufficient time to flow and stabilize in the adjusted state.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119504124A_ABST
    Figure CN119504124A_ABST
Patent Text Reader

Abstract

The invention discloses a WINCC-based one-key plate changing control system, relates to the technical field of glass manufacturing, and solves the technical problem of long glass plate changing time caused by multiple operations in the prior art. The method comprises the following steps: collecting and acquiring a board changing specification and existing data through a database, calculating and obtaining a board changing amplitude value according to the board changing specification and the existing data, and comparing the board changing amplitude value with an expected threshold value to obtain an adjustment amplitude; dividing based on the adjustment amplitude to obtain grouped data, constructing an Excel table, inputting the Excel table into WINCC to obtain an adjustment file, setting a delay period, and endowing corresponding step delay in the step group data and opposite delay corresponding to an edge roller according to the pulling speed; adjusting and controlling the edge roller on the basis of the adjusting file, and switching the working state and steps of the edge roller on the basis of step delay and opposite delay control; and performing fine adjustment on the data in the WINCC according to the real-time state data and the grouped data in the adjustment process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of glass manufacturing, and in particular is a one-key board changing control system based on WINCC. Background Art

[0002] Usually in float glass production, the thickness and width of the glass plate are adjusted mainly by adjusting the speed, angle, travel and pressing depth of the edge drawing machine. The glass produced during the adjustment period is basically waste, so the length of the plate change time directly determines the quality rate of glass production. Since the float glass production line is a super-large inertia system, it usually takes tens of minutes from adjusting the edge drawing machine state to the changed glass coming out of the cold end. The classic control method of input, adjustment, feedback and multiple cycles is obviously not practical.

[0003] In the prior art, the glass plate is modified by obtaining the steps and adjustment data table that need to be adjusted according to the target modification specifications, and the changes of the glass plate after adjustment are observed through small experiments according to the adjustment data table, and the glass plate is modified by multiple experiments. Such a method requires multiple experiments and comparison of the results to finally obtain the modified glass plate. Due to the physical properties of the glass liquid, it is necessary to wait for the glass liquid to stabilize before the adjustment effect can be obtained after adjustment. Therefore, multiple operation steps will make the operation process cumbersome and the modification time long, thereby affecting work efficiency.

[0004] The present invention provides a one-key board changing control system based on WINCC to solve the above technical problems. Summary of the invention

[0005] The present invention aims to solve at least one of the technical problems existing in the prior art; to this end, the present invention proposes a one-key panel changing control system based on WINCC, which is used to solve the technical problem in the prior art that it takes a long time to change a glass panel due to multiple operations.

[0006] To achieve the above-mentioned object, the first aspect of the present invention provides a one-key board modification control system based on WINCC, comprising: a data preparation module, a side edge machine adjustment module, a correction fine-tuning module and a database;

[0007] Data preparation module: used to obtain the specifications of the modified board and the existing data; obtain the adjustment range according to the specifications of the modified board and the existing data; obtain grouped data based on the adjustment range; construct an initial Excel table, enter the grouped data into the Excel table to obtain an adjustment data table; collect the real-time status data of the glass plate in the tin plate through sensors in real time;

[0008] Edge drawing machine adjustment data table: used to input the adjustment data table into WINCC to obtain the adjustment file, and perform real-time adjustment and control of the edge drawing machine based on the adjustment file;

[0009] Correction and fine-tuning module: used to adjust WINCC according to real-time status data and grouping data to obtain correction data, and save the correction data in the database.

[0010] Preferably, the adjustment range is obtained according to the modified board specifications and existing data, including:

[0011] Extract the board specifications and existing data; the existing data includes the current speed and current swing angle of the edge drawing machine;

[0012] Input the modified board specifications into the database and match them with the historical process records to obtain expected data; the expected data includes the expected speed, expected swing angle, expected left travel distance and expected right travel distance of the edge drawing machine required to achieve the modified board specifications; the historical process records include all historical expected data and historical existing data of the modified board in the historical process;

[0013] The difference between the expected speed and the current speed is marked as the speed difference of the modified board, and the difference between the expected swing angle and the current swing angle is marked as the swing angle difference of the modified board; through the formula TZX = (e |XV| -1)+BJ×2π+|ZJ|+|YJ| to calculate the board change amplitude value TZX; where XV represents the board change speed difference, BJ represents the board change angle difference, ZJ represents the expected left data, and YJ represents the expected right distance;

[0014] Set the expected threshold; take the integer part of the board change amplitude value and the expected threshold entropy value plus 1 to get the adjustment step number; integrate the adjustment step number, board change speed difference, board change angle difference, expected left travel distance and expected right travel distance to get the adjustment amplitude.

[0015] Preferably, the step of obtaining grouped data by dividing based on the adjustment amplitude includes:

[0016] Extract the adjustment range;

[0017] The ratios of the board changing speed difference, board changing swing angle difference, expected left distance, and expected right distance to the adjustment steps are marked as group adjustment speed, group adjustment swing angle, group adjustment left distance, and group adjustment right distance, respectively, and are sorted and divided in ascending order to obtain group data with the same number as the adjustment steps.

[0018] Preferably, the step of inputting the adjustment data table into WINCC to obtain the adjustment file comprises:

[0019] Construct a delay action in the global script of WINCC and set the delay period corresponding to the delay action;

[0020] The grouped data in the adjustment data table are assigned execution flags in the sorting order, wherein the execution flags are 1, 2, 3, ... n, n is a positive integer, and n represents the number of adjustment steps;

[0021] Mark the grouped data with execution flag as step group data;

[0022] Assign a unit number and a pair delay corresponding to each pair of edge drawing machines in each set of step group data, and assign a step delay corresponding to each set of step group data; each set of step delay is greater than the pair delay corresponding to each pair of edge drawing machines;

[0023] Mark the WINCC file containing the adjustment data table as an adjustment file.

[0024] Preferably, the step of assigning a machine group number and a pair delay corresponding to each pair of edge drawing machines in each set of step group data and assigning a step delay to each set of step group data includes:

[0025] The unit numbers of the side-pulling machines in each step group data are marked in the numerical order of the work to be performed, the unit numbers of the side-pulling machines that do not need to perform work are marked as 0, the start-up time of the side-pulling machine with unit number 1 is marked as the delay time of the side-pulling machine with unit number 1, and the product of the computer unit number minus one and the delay period is summed with the start-up time of the side-pulling machine with unit number 1 to obtain the corresponding delay time;

[0026] The pulling coefficient is obtained according to the expected speed and current speed in the step group data; twice the product of the delay time of the edge pulling machine with the largest unit number in the step group data and the pulling coefficient is marked as the step delay time of the step group data.

[0027] Preferably, the step of obtaining the pull coefficient according to the expected speed and the current speed in the step group data includes:

[0028] A1: Extract the expected speed and current speed of all the edge drawing machines in the step group data;

[0029] A2: Determine whether the average value of the expected speed in the step group data is greater than the current speed; if yes, jump to A3; if no, jump to A4;

[0030] A3: The ratio of the expected average speed to the current speed is marked as the pull coefficient

[0031] A4: The ratio of the current speed to the expected average speed is marked as the pull coefficient.

[0032] Preferably, the real-time adjustment and control of the edge drawing machine based on the adjustment file includes:

[0033] S1: Match the current step group data in the adjustment file that matches the current execution flag;

[0034] S2: Determine whether the step delay of the current step group data is 0 after deducting 1; if yes, mark the execution flag of the current step group data as 0, and mark the execution flag of the next step group data as 1; if no, jump to S3;

[0035] S3: traverse the pair delay in the current step group data, and determine whether the pair delay minus 1 is greater than 0; if yes, then reduce the pair delay by 1; if no, then jump to S4;

[0036] S4: Determine whether the delay is greater than -1; if yes, adjust the corresponding edge-pulling machine according to the current step group data, and assign the corresponding delay to -1 after the adjustment; if no, mark the corresponding edge-pulling machine as an adjusted edge-pulling machine.

[0037] Preferably, the step of fine-tuning the data in WINCC according to the real-time status data and the grouping data to obtain the corrected data comprises:

[0038] The real-time status data of the glass plate in the tin bath is collected in real time by the sensor; the real-time status data includes the real-time thickness, real-time length and real-time width of the glass plate;

[0039] Input the group data into the database to obtain the group status data corresponding to the group data. After each group data is adjusted, determine whether the group status data is the same as the real-time status data; if yes, mark the adjustment effect as standard group adjustment; if no, mark the adjustment effect as group to be adjusted;

[0040] The difference between the group status data and the real-time status data of the group whose adjustment effect is to be adjusted is marked as correction data; the correction data is input into the database and matched with the historical expected data to obtain a correction plan, which includes correction speed, correction swing angle, correction left distance and correction right distance, and the group data is adjusted according to the correction plan.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] 1. The present invention collects and obtains the specifications of the modified board and the existing data through a database, calculates the amplitude value of the modified board according to the specifications of the modified board and the existing data, compares the amplitude value of the modified board with the expected threshold value to obtain the adjustment amplitude, and divides different adjustment amplitudes according to the specifications of the modified board, thereby avoiding the influence of sudden changes on the production process, ensuring the stability of the production process, and reasonably dividing the operation steps, which can also shorten the time of the modified board; based on the adjustment amplitude division, grouped data is obtained and an Excel table is constructed and input into WINCC to obtain an adjustment file, and a delay cycle is set, and the corresponding step delay in the step group data and the corresponding delay of the edge drawing machine are assigned according to the pulling speed, which can ensure that the glass liquid has enough time to flow and stabilize in the adjusted state, and give the equipment adjustment time to ensure the quality of the finished product; the edge drawing machine is adjusted and controlled based on the adjustment file, and the working state of the edge drawing machine and the switching of the steps are controlled based on the step delay and the delay, which can make the process more orderly and improve the production efficiency and product quality; in the adjustment process, the real-time status data collected by the sensor can be compared with the grouped data, and the data can be fine-tuned according to the comparison result, which can improve the stability and consistency of the production process, thereby improving the yield rate.

[0043] 2. The present invention combines the expected data with the board modification specifications to obtain the amplitude required for change, calculates the board modification amplitude value according to the board modification speed difference, board modification swing angle difference, expected left distance and expected right distance required for the board modification of the edge pulling machine, compares the board modification amplitude value with the preset expected threshold value to obtain the number of adjustment steps, and can obtain the number of adjustment steps based on the amplitude required for adjustment. The smaller the amplitude, the fewer the number of adjustment steps required, which can reduce the process flow operations, reduce the board modification time, and improve the efficiency of board modification. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0045] Figure 1 The following is a flowchart of an embodiment of the present invention.

[0046] Figure 2 It is a system composition diagram of the present invention.

[0047] Figure 3 The present invention is a complete flow chart for adjusting and controlling the edge drawing machine in one embodiment of the present invention. DETAILED DESCRIPTION

[0048] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] See also Figure 1-Figure 3 , the first aspect of the present invention provides a one-key board modification control system based on WINCC, including: a data preparation module, a side edge machine adjustment module, a correction fine-tuning module and a database;

[0050] Data preparation module: used to obtain the modified board data and existing data; obtain the adjustment range based on the modified board data and existing data; obtain grouped data based on the adjustment range; construct an initial Excel table, enter the grouped data into the Excel table to obtain an adjusted data table; collect the real-time status data of the glass plate in the tin plate through sensors.

[0051] Exemplarily, the plate modification data in the production plan is extracted from the database, requiring that the glass plate with an original length of 25 mm, width of 10 mm and thickness of 1 mm be modified to a glass plate with a length of 45 mm, width of 30 mm and thickness of 2 mm; the plate modification specifications are input into the historical plate modification data with the same plate modification specifications in the database to obtain the expected speed, expected swing angle, expected left travel distance and expected right travel distance required for each pair of edge drawing machines for the plate modification; in this embodiment, there are 10 pairs of edge drawing machines, and the current speed and current swing angle of each pair of edge drawing machines are still set according to the original plan; the current speed of the first pair of edge drawing machines is 10 meters per hour, and the current swing angle of the clamping device is 1.2 degrees; the expected speed is 12 meters per hour, the expected swing angle is 2.0 degrees, the expected left travel distance is 15 mm, and the expected right travel distance is 12 mm; the current expected speed is subtracted from the current speed to obtain a plate modification speed difference of 2 meters per hour, and the expected swing angle is subtracted from the current swing angle to obtain a plate modification swing angle difference of 0.3 degrees; through the formula TZX=(e |XV| -1)+BJ×2π+|ZJ|+|YJ|The calculated modified board amplitude value is TZX=35.28.

[0052] In this embodiment, the expected threshold is set to 10. The expected threshold is used to obtain the approximate adjustment range of each operation step based on historical data. If too much adjustment is made at one time, it may cause a long adjustment time, and the glass liquid cannot be stable in a flowing state for a long time, resulting in poor effect after adjustment; if too little adjustment is made at one time, it will cause a long time for changing the board; the integer of the board changing amplitude value and the expected threshold entropy value plus 1 is taken to obtain 4 adjustment steps in this embodiment, and the adjustment step number, board changing speed difference, board changing swing angle difference, expected left distance and expected right distance are combined to obtain the adjustment amplitude.

[0053] The adjustment amplitude was divided into four groups. The first group's group adjustment speed was 0.5 meters per hour, the group adjustment swing angle was 0.075 degrees, the group adjustment left line distance was 3.75 millimeters, and the group adjustment right line distance was 3 millimeters. The adjustment amplitudes of the other three groups were the same, and four groups of group data were obtained.

[0054] Construct an initial Excel table, create a sheet for each set of grouped data in order and input the grouped data into it, to obtain an adjustment data table with a total of 4 sheets; and place a position sensor on the tin plate carrying the glass liquid to collect the real-time thickness, real-time length and real-time width of the glass liquid in real time.

[0055] Edge drawing machine adjustment data table: used to input the adjustment data table into WINCC to obtain the adjustment file, and perform real-time adjustment and control of the edge drawing machine based on the adjustment file.

[0056] Exemplarily, an adjustment data table is added to WINCC (process monitoring system), and the delay period is set to 1 second in WINCC; an execution flag is assigned to each group of grouped data, the execution flag of the first group is 1, the execution flag of the second group is 2, the execution flag of the third group is 3, and the execution flag of the fourth group is 4; the grouped data with execution flags are marked as step group data.

[0057] Eight pairs of side pulling machines are needed to complete the adjustment task of the first set of step group data. They are assigned unit numbers 1 to 8 in the order of work, and the remaining two teams of side pulling machines are assigned unit number 0; the starting time of the side pulling machine with unit number 1 is 15 seconds, and the pairing delay of the side pulling machine with unit number 1 is 15 seconds, and the delay period is 1 second. The pairing delay of the side pulling machine with unit number 2 is 16 seconds, and the pairing delay of the side pulling machine with unit number 3 is 17 seconds. The pairing delays of the side pulling machines for the first set of step group data are obtained in sequence.

[0058] Determine whether the average value of the expected speed in the step group data is greater than the current speed. In this embodiment, the average value of the expected speed of the first group of step group data is 10.25 meters per hour, which is greater than the current speed. The current speed is divided by the expected speed average value to obtain a pulling coefficient of 0.97; the delay of the largest unit number for the edge drawing machine is 22 seconds, and the step delay is 47.3 seconds. The WINCC file containing the adjustment data table is marked as an adjustment file.

[0059] It should be noted that the purpose of setting the step delay is that after each step of operation, the glass liquid needs time to make corresponding changes and stabilize, so as to avoid bubbles and cracks in the glass plate due to instability of the glass liquid, and at the same time ensure that the effect of each adjustment step is fully manifested; and the step delay obtained in each group needs to be greater than the delay in the step group data. Equipment adjustment requires a certain amount of time, and it is also necessary to ensure that each change can be adjusted in place, so sufficient space needs to be left for equipment adjustment.

[0060] It should be noted that the stabilization time of the glass liquid depends on factors such as the viscosity, temperature and pulling speed of the glass liquid. However, during the production process, no other additional substances will be added to the glass liquid, so the viscosity of the glass liquid will not change, and the glass liquid will be kept at a constant temperature during the production process. However, if the thickness needs to be changed, the pulling speed of the edge drawing machine needs to be changed, and the pulling speed will affect the stabilization time of the glass liquid. The faster the pulling speed, the longer the stabilization time of the glass liquid, and the slower the pulling speed, the faster the glass liquid can stabilize.

[0061] After starting to change the board, match the step group data with the current execution flag of 1 for adjustment, and judge in real time whether the step delay of the current step group data is 0 after deducting 1. If the step delay of the current step group data is 0 after deducting 1, it means that the current step group data has been adjusted and the outgoing step delay has also been reached. Mark the execution flag of the next group of step group data as 1, and mark the execution flag of the adjusted step group data as 0; if the step delay of the current step group data is not 0 after deducting 1, it means that the current step group data has not been adjusted, and repeat it. The pair delay of the side-pull machine in the current step group data is judged whether it is greater than 0 after the pair delay is reduced by 1. If it is greater than 0, the pair delay is reduced by 1; if the pair delay is not greater than 0 after the pair delay is reduced by 1, there are only two cases where the pair delay is 0 or -1. When the pair delay of the side-pull machine is 0, it means that the corresponding side-pull machine needs to be adjusted. After the adjustment, the pair delay of the side-pull machine is marked as -1; if the pair delay is -1, it means that the side-pull machine has been adjusted, and the corresponding side-pull machine is marked as an adjusted side-pull machine.

[0062] It should be noted that the delay can not only control the adjustment of the edge pulling machine, but also control the edge pulling machine to work in an orderly manner according to the working sequence, thus ensuring the orderliness of the work.

[0063] Correction and fine-tuning module: used to adjust WINCC according to real-time status data and grouping data to obtain correction data, and save the correction data in the database.

[0064] Exemplarily, during the step delay period after each set of step group data is adjusted, the real-time status data collected by the position sensor is compared with the group status data to obtain the adjustment effect. If the group status data does not match the real-time status data, it means that the adjustment effect has not achieved the expected effect. The difference between the group status data and the real-time status data is marked as correction data, and the correction data is input into the database to obtain the correction speed, correction swing angle, correction left distance and correction right distance that need to be adjusted by the edge pulling machine, and the correction plan is integrated to obtain the correction plan. According to the correction plan, the parameters of the edge pulling machine are adjusted, and the edge pulling machine is controlled to be adjusted so that it can achieve the expected effect, and the correction data is recorded in the database; if the same type of correction data appears multiple times, it means that the equipment may be damaged or there is a problem with the equipment parameter settings.

[0065] It should be noted that if the edge drawing machine needs to be adjusted, the step delay of the corresponding step group data needs to be extended to ensure the adjustment effect.

[0066] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.

[0067] Working principle of the present invention:

[0068] The present invention obtains board modification specifications and existing data through a database, calculates board modification amplitude values ​​according to the board modification specifications and the existing data, compares the board modification amplitude values ​​with an expected threshold value to obtain an adjustment amplitude, and obtains grouped data based on the adjustment amplitude; inputs the grouped data into an Excel table to determine adjustment steps to obtain an adjustment data table; inputs the adjustment data table into WINCC for application, sets a delay period, and controls an edge drawing machine according to the adjustment data table to perform board modification; assigns a unit number, a pair delay, and a step delay of the step group data corresponding to each pair of edge drawing machines in each group of step group data to obtain an adjustment file; controls the edge drawing machine to perform board modification based on the adjustment file, collects real-time status data in real time through a sensor, obtains an adjustment effect according to a comparison result of the real-time status data and the grouped data, and adjusts the parameter data of the edge drawing machine based on the adjustment effect.

[0069] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A one-key board change control system based on WINCC, characterized in that: include: Data preparation module, edge drawing machine adjustment module, correction and fine-tuning module and database; Data preparation module: used to obtain board specifications and existing data; The adjustment range is obtained according to the specifications of the modified plate and the existing data; the grouping data is obtained by division based on the adjustment range; an initial Excel table is constructed, and the grouping data is entered into the Excel table to obtain an adjustment data table; the real-time status data of the glass plate in the tin plate is collected in real time through the sensor; Edge drawing machine adjustment data table: used to input the adjustment data table into WINCC to obtain the adjustment file, and perform real-time adjustment and control of the edge drawing machine based on the adjustment file; Correction and fine-tuning module: used to adjust WINCC according to real-time status data and grouping data to obtain correction data, and save the correction data in the database.

2. The one-key board changing control system based on WINCC according to claim 1 is characterized in that: The adjustment range is obtained based on the revised board specifications and existing data, including: Extract the board specifications and existing data; the existing data includes the current speed and current swing angle of the edge drawing machine; Input the modified board specifications into the database and match them with the historical process records to obtain expected data; the expected data includes the expected speed, expected swing angle, expected left travel distance and expected right travel distance of the edge drawing machine required to achieve the modified board specifications; the historical process records include all historical expected data and historical existing data of the modified board in the historical process; The difference between the expected speed and the current speed is marked as the speed difference of the modified board, and the difference between the expected swing angle and the current swing angle is marked as the swing angle difference of the modified board; through the formula TZX = (e |XV| -1)+BJ×2π+|ZJ|+|YJ| to calculate the board change amplitude value TZX; where XV represents the board change speed difference, BJ represents the board change angle difference, ZJ represents the expected left data, and YJ represents the expected right distance; Set the expected threshold; take the integer part of the board change amplitude value and the expected threshold entropy value plus 1 to get the adjustment step number; integrate the adjustment step number, board change speed difference, board change angle difference, expected left travel distance and expected right travel distance to get the adjustment amplitude.

3. The one-key board changing control system based on WINCC according to claim 1 is characterized in that: The step of obtaining grouped data by dividing based on the adjustment amplitude includes: Extract the adjustment range; The ratios of the board changing speed difference, board changing swing angle difference, expected left distance, and expected right distance to the adjustment steps are marked as group adjustment speed, group adjustment swing angle, group adjustment left distance, and group adjustment right distance, respectively, and are sorted and divided in ascending order to obtain group data with the same number as the adjustment steps.

4. The one-key board changing control system based on WINCC according to claim 1 is characterized in that: The step of inputting the adjustment data table into WINCC to obtain the adjustment file includes: Construct a delay action in the global script of WINCC and set the delay period corresponding to the delay action; The grouped data in the adjustment data table are assigned execution flags in the sorting order, wherein the execution flags are 1, 2, 3, ... n, n is a positive integer, and n represents the number of adjustment steps; Mark the grouped data with execution flag as step group data; Assign a unit number and a pair delay corresponding to each pair of edge drawing machines in each set of step group data, and assign a step delay corresponding to each set of step group data; each set of step delay is greater than the pair delay corresponding to each pair of edge drawing machines; Mark the WINCC file containing the adjustment data table as an adjustment file.

5. The one-key board changing control system based on WINCC according to claim 4 is characterized in that: The step of assigning a machine group number and a pair delay corresponding to each pair of edge drawing machines in each set of step group data and assigning a step delay to each set of step group data includes: The unit numbers of the side-pulling machines in each step group data are marked in the numerical order of the work to be performed, the unit numbers of the side-pulling machines that do not need to perform work are marked as 0, the start-up time of the side-pulling machine with unit number 1 is marked as the delay time of the side-pulling machine with unit number 1, and the product of the computer unit number minus one and the delay period is summed with the start-up time of the side-pulling machine with unit number 1 to obtain the corresponding delay time; The pulling coefficient is obtained according to the expected speed and current speed in the step group data; twice the product of the delay time of the edge pulling machine with the largest unit number in the step group data and the pulling coefficient is marked as the step delay time of the step group data.

6. The one-key board changing control system based on WINCC according to claim 5 is characterized in that: The step of obtaining the pull coefficient according to the expected speed and the current speed in the step group data includes: A1: Extract the expected speed and current speed of all the edge drawing machines in the step group data; A2: Determine whether the average value of the expected speed in the step group data is greater than the current speed; if yes, jump to A3; if no, jump to A4; A3: The ratio of the expected average speed to the current speed is marked as the pull coefficient A4: The ratio of the current speed to the expected average speed is marked as the pull coefficient.

7. The one-key board changing control system based on WINCC according to claim 1 is characterized in that: The real-time adjustment and control of the edge drawing machine based on the adjustment file includes: S1: Match the current step group data in the adjustment file that matches the current execution flag; S2: Determine whether the step delay of the current step group data is 0 after deducting 1; if yes, mark the execution flag of the current step group data as 0, and mark the execution flag of the next step group data as 1; if no, jump to S3; S3: traverse the pair delay in the current step group data, and determine whether the pair delay minus 1 is greater than 0; if yes, then reduce the pair delay by 1; if no, then jump to S4; S4: Determine whether the delay is greater than -1; if yes, adjust the corresponding edge-pulling machine according to the current step group data, and assign the corresponding delay to -1 after the adjustment; if no, mark the corresponding edge-pulling machine as an adjusted edge-pulling machine.

8. The one-key board changing control system based on WINCC according to claim 1 is characterized in that: The method of fine-tuning the data in WINCC according to the real-time status data and the grouping data to obtain the corrected data includes: The real-time status data of the glass plate in the tin bath is collected in real time by the sensor; the real-time status data includes the real-time thickness, real-time length and real-time width of the glass plate; Input the group data into the database to obtain the group status data corresponding to the group data. After each group data is adjusted, determine whether the group status data is the same as the real-time status data; if yes, mark the adjustment effect as standard group adjustment; if no, mark the adjustment effect as group to be adjusted; The difference between the group status data and the real-time status data of the group whose adjustment effect is to be adjusted is marked as correction data; the correction data is input into the database and matched with the historical expected data to obtain a correction plan, which includes correction speed, correction swing angle, correction left distance and correction right distance, and the group data is adjusted according to the correction plan.