Source-network combination, storage, charging and battery replacement integrated device based on local green power
By introducing a dynamic adjustment unit into the charging and swapping integrated device, the state change data of the energy storage battery is collected and processed in real time, and the problem of difficulty in real-time monitoring and optimization of the charging process in the prior art is solved, and more efficient and safe charging of the energy storage battery is achieved.
Patent Information
- Application Number
- CN202510097632.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2045-01-22
AI Technical Summary
The existing charging and swapping integrated device is difficult to monitor the status changes of the energy storage battery in real time, resulting in the inability to obtain the charging demand parameters of the energy storage battery after charging and swapping in time, which in turn affects the optimization of the charging process and may cause damage to the battery.
A dynamic adjustment unit is introduced, including a monitoring module and an adjustment module, which collects the state change data of the energy storage battery during charging and swapping in real time, and processes it through the data processor, outputs the charging demand parameters of the current energy storage battery, and adjusts the charging parameters in real time.
Through real-time monitoring and dynamic adjustment of charging parameters, the service effect and life of the energy storage battery are improved, the charging process is optimized, and the charging efficiency and device service life are improved.
Smart Images

Figure CN119543380A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of source-grid-load-storage technology, and specifically refers to a source-grid-storage-charging-switch integrated device based on local green electricity. Background Art
[0002] Against the backdrop of the current energy structure transformation and technological progress, the use of integrated power grid and storage (integrated power grid, load and storage) and green electricity (green electricity) are becoming the key to promoting the efficient use of renewable energy. Integrated power grid and storage technology achieves optimal allocation and efficient management of energy by integrating power generation, transmission, storage and consumption, while green electricity represents the widespread application of clean energy such as wind and solar energy. Together, they support a low-carbon, environmentally friendly energy future. However, existing technologies have some challenges and defects in the integrated application of integrated power grid and storage and green electricity, especially in the charging and swapping management of energy storage batteries.
[0003] For example, an important problem faced by existing integrated charging and swapping devices when charging and swapping energy storage batteries is the lack of real-time response and adjustment capabilities to changes in battery status. During the charging and swapping process, key parameters such as battery voltage, current and temperature will change. However, in actual applications, it is difficult for existing devices to monitor the status of energy storage batteries after charging and swapping in real time, so that it is impossible to obtain the charging demand parameters of the energy storage batteries after charging and swapping in time, making it difficult to optimize the charging process, which may cause damage to the battery, thereby affecting the service life and safety of the energy storage battery and limiting the use of the device. Summary of the invention
[0004] The purpose of the present invention is to provide a source-grid integrated storage-charging-swap device based on local green electricity, which is used to solve one of the above-mentioned problems existing in the prior art.
[0005] Specifically, the present invention is achieved through the following technical solutions: A source-grid-storage-charging-switchable integrated device based on local green electricity, comprising a power supply side, a grid side, an energy storage side and a user load side, wherein the power supply side generates electricity based on a wind and solar power generation unit to generate green electricity and outputs it to the grid side; the grid side transmits the green electricity to the user load side and the energy storage side based on a transmission network, and the user load side is an electricity terminal; the energy storage side is used to store the surplus electricity transmitted by the grid side and consumed by the user load side, and dynamically supply power to the user load side based on the power consumption demand of the user load side, and the energy storage side also includes: The packaging shell is fixedly arranged and has a cavity inside, and the two sides inside the cavity are divided into a charging area and a battery replacement area; The storage and charging unit includes a plurality of energy storage batteries located in the charging area and installed on a charging rack in the charging area, wherein the charging rack is provided with a plurality of charging slots corresponding to the energy storage batteries from top to bottom, and the plurality of energy storage batteries are correspondingly inserted in the charging slots and connected to the charging modules in the charging slots, and the charging modules are connected to the grid side through lines; The battery replacement mechanism is arranged in the battery replacement area, and completes the battery replacement work by grabbing and replacing the energy storage battery on the charging rack. A battery replacement door is provided on one side of the battery replacement area, and the energy storage battery that has been grabbed and replaced can be taken out through the battery replacement door; The dynamic adjustment unit is arranged in the charging area, and includes a monitoring module and an adjustment module. The monitoring module is used to collect state change data of the energy storage battery during charging and replacing, and transmit it to the data processor located at the upper part of the charging area for processing to output the charging requirement parameters of the energy storage battery after the current replacement. After receiving the charging requirement parameters of the current energy storage battery output by the data processor, the adjustment module performs feedback adjustment on the charging parameters of the charging module of the corresponding energy storage battery in real time.
[0006] It should be noted that this solution, by introducing a dynamic adjustment unit, including a monitoring module and an adjustment module, can collect real-time data on state changes of the energy storage battery during charging and swapping, and output the charging requirement parameters of the energy storage battery after the current swap. This effectively solves the technical problem that the prior art cannot obtain the charging requirement parameters of the energy storage battery after charging and swapping in a timely manner, which makes it difficult to optimize the charging process and may cause damage to the battery. This greatly improves the use effect and life of the energy storage battery and greatly improves the use effect of the device. At the same time, it can more accurately evaluate the battery condition, provide more reasonable charging parameters for the charging module, achieve precise control of the energy storage battery, and effectively improve the integrated application performance and reliability of source-grid storage and green electricity technology.
[0007] Specifically, the monitoring module is arranged in several charging slots respectively, and collects the state change data of the energy storage battery in the charging slot during charging and swapping. The monitoring module includes a temperature sensor, a current sensor and a voltage sensor. The temperature sensor is installed on the side wall of the charging slot, and the temperature measuring part at one end is close to the energy storage battery, which is used to collect the temperature change data of the energy storage battery during charging and swapping. The current sensor and voltage sensor are integrated on the charging module in the charging slot, which are used to collect the current change data and voltage change data of the charging module when the energy storage battery is charged and swapped.
[0008] The data processor is respectively connected to the temperature sensor, the current sensor and the voltage sensor signals, and performs calculation processing on the temperature change data, the current change data and the voltage change data collected by the temperature sensor, the current sensor and the voltage sensor after receiving the temperature change data, the current change data and the voltage change data. The calculation processing process of the data processor includes: Step 1: synchronize the timestamps of the received temperature change data, current change data, and voltage change data, and process them for consistency by cleaning, deduplication, and format conversion; Step 2, sampling and aligning the temperature change data, current change data and voltage change data after consistency processing in step 1; Step 3, using a weighted average algorithm to perform feature data fusion processing on the temperature change data, current change data, and voltage change data after sampling alignment, and output a unified feature data collection; Step 4: Calculate and process the feature data collection through the energy storage battery charging evaluation model, and evaluate the status parameters of the energy storage battery currently in the charging and swapping state, and then calculate and output the charging demand parameters of the current energy storage battery based on the status parameters of the energy storage battery currently in the charging and swapping state.
[0009] Specifically, in step 3, the feature data fusion process satisfies the following calculation process: ;in, Indicates at a point in time Temperature change data, Indicates at a point in time Current change data, Indicates at a point in time Voltage change data, , , Respectively represent the weights of temperature change data, current change data and voltage change data, represents the total number of time points, Represents the output feature data collection.
[0010] Preferably, in step 4, the energy storage battery charging evaluation model is constructed based on a Gaussian process regression model, and the Gaussian process regression model includes a feature input layer, a kernel function calculation layer and a result output layer; The feature input layer is used to extract dynamically changing data source points in the feature data collection as model input to the kernel function calculation layer; The kernel function calculation layer defines the similarity measurement of the dynamically changing data source points based on the dynamically changing data source points as the model input, and calculates and infers the dependency output between the dynamically changing data feature points by constructing a covariance matrix, and then iteratively calculates the posterior probability distribution of the condition parameters of the energy storage battery currently in the charging and swapping state based on the dependency between the dynamically changing data feature points calculated and output by the covariance matrix, and matches and compares the calculated posterior probability distribution of the condition parameters with the expected threshold value, so as to evaluate and obtain the condition parameters of the energy storage battery currently in the charging and swapping state and output them; After the result output layer receives the status parameters of the energy storage battery currently in the charging and swapping state output by the kernel function calculation layer, it comprehensively calculates the charging requirement parameters of the energy storage battery currently in the charging and swapping state based on the energy storage battery status parameters and the charging rate requirements and outputs them.
[0011] In the above scheme, the dynamic adjustment unit is the core of this scheme. It monitors the state changes of the energy storage battery in the charging and swapping process in real time, and dynamically adjusts the charging parameters according to these changes to optimize the battery's use effect and life. Specifically, the monitoring module in the dynamic adjustment unit includes a temperature sensor, a current sensor and a voltage sensor installed in the charging slot, so that it can collect the temperature change data, current change data and voltage change data of the energy storage battery in real time during the charging and swapping process, and transmit the collected data to the data processor. The data processor first synchronizes the timestamp of the received data to ensure that all data points are consistent in time. Then, the data is processed for consistency through cleaning, deduplication and format conversion to eliminate noise and outliers, and unify data of different formats into the same format. The preprocessed data enters the feature data fusion processing stage, and the weighted average algorithm is used to fuse the sampled and aligned data to form a unified feature data collection (it should be further explained that during the data fusion processing, a comprehensive weighted average is calculated by comprehensively considering the importance of temperature, current and voltage data (that is, weights) to accurately reflect the current state of the battery). The obtained feature data collection is then applied to the charging evaluation model, which is built based on the Gaussian process regression algorithm. It analyzes dynamically changing data source points, defines the similarity measure between data points, constructs a covariance matrix, and calculates the posterior probability distribution to evaluate the status parameters of the energy storage battery under the current charging and swapping state, and obtains the charging demand parameters of the energy storage battery under the current charging and swapping state based on the status parameters. Finally, the adjustment module feeds back and adjusts the charging parameters of the charging module in real time according to the charging demand parameters output by the data processor. This may include adjusting the charging current, voltage or charging strategy to ensure that the battery is charged in the optimal state, avoiding overcharging or undercharging, thereby extending the life of the energy storage battery and improving charging efficiency.
[0012] Compared with the prior art, the present invention has the following advantages and beneficial effects: 1. The present invention introduces a dynamic adjustment unit, including a monitoring module and an adjustment module, which can collect the state change data of the energy storage battery during charging and replacement in real time, and output the charging demand parameters of the energy storage battery after the current replacement. It solves the problem that the charging parameters cannot be adjusted in real time in the prior art, thereby improving the use effect and life of the energy storage battery. At the same time, by adopting a weighted average algorithm and a Gaussian process regression model, it can more accurately evaluate the battery status, provide more reasonable charging parameters for the charging module, and achieve precise control of the energy storage battery, effectively improve the integrated application performance and reliability of source-grid storage and green electricity technology, and optimize the charging process, thereby improving the charging efficiency and service life of the device; 2. The present invention provides dual physical protection for the charging connector by providing a charging terminal housing and a plug ring. The charging terminal housing is located on the side wall of the charging slot, which can resist external impact and damage and protect the charging connector from physical damage. The plug ring is sleeved on the outside of the docking rod, which further enhances the wear resistance and impact resistance of the docking rod, effectively preventing damage to the docking rod in daily use and extending the service life of the charging module. Furthermore, in the annular gap formed between the plug ring and the docking rod, a plurality of cleaning nozzles distributed in a circular array are provided at the corresponding charging interface position. When the charging plug rod is inserted into the charging interface, the extrusion portion at its front end is interference fit with the sealing gasket, squeezing the inflatable bag in the sealing gasket, so that the gas inside the inflatable bag enters the cleaning nozzle through the gas pipeline and is ejected from the nozzle to purge the charging interface. This automatic dust cleaning mechanism can timely remove dust and impurities at the charging interface, keep the charging contact surface clean, and thus improve charging efficiency and reliability. In addition, a sealing gasket is provided on the inner ring surface of the plug ring near its end, and an air bag is provided inside the sealing gasket. The design of the air bag not only provides an additional sealing effect to prevent dust and moisture from invading the charging interface, but also provides a stable support and buffer for the charging rod through the elastic effect of the air bag, ensuring a close fit between the charging rod and the charging interface, and enhancing the stability and reliability of the charging connection. 3. The present invention symmetrically arranges support plates on both sides of the charging slot, and opens guide grooves on the support plates. These guide grooves are arranged along the length direction of the support plates, and are connected to the outside at one end, and a blocking baffle is provided at the other end, thereby ensuring the accurate guidance and positioning of the energy storage battery during the installation process. At the same time, a plurality of guide rollers are arranged in an array in the guide groove, so that the grabbing structure can move more smoothly when grabbing the energy storage battery for charging and replacing. Furthermore, in this solution, after the energy storage battery is installed in place, the plug connector at one end of the clamping block is inserted into the plug slot, and a magnetic connection is achieved through the connecting piece and the magnetic suction piece at the middle position of the slot bottom, and then the energy storage battery is charged and replaced. The plug connector is provided with a stable magnetic attraction force, and the wedge-shaped inclined surfaces on both sides of the plug connector guide and cooperate with the top block in the cavity. That is, in the process of gradual insertion of the plug connector, the plug connector can lift the top block through the wedge-shaped inclined surfaces on both sides of the plug connector, thereby prompting the top block to move under the guidance of the plug connector, so as to push the flip plate in the cavity to flip, and then the flipping action of the flip plate drives the limit card block to be inserted into the limit groove at the other end of the card block to complete the limit fixation of the card block, thereby promoting the stable installation of the energy storage battery, to ensure that the energy storage battery is installed and fixed, to avoid displacement, and then affecting the normal charging and replacement of the energy storage battery. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings: Figure 1 It is an overall schematic diagram of the present invention; Figure 2 It is a schematic diagram of the energy storage side structure of the present invention; Figure 3 For the present invention Figure 2 A local enlarged structural diagram of the charging module is shown in FIG. Figure 4 It is a schematic diagram of the support plate structure of the mounting member of the present invention; Figure 5 It is a schematic diagram of the structure of the fastener on the support plate of the present invention; Figure 5 Figure (a) represents the specific state when the energy storage battery is not installed, while Figure (b) represents the specific state after the energy storage battery is installed; Figure 6 It is a schematic structural diagram of the grabbing component of the present invention.
[0014] Marks and corresponding parts names in the attached drawings: 1. Encapsulation shell; 10. Battery exchange area; 100. Battery exchange mechanism; 101. Grabbing component; 1010. Support frame; 1011. Pneumatic push rod; 1012. Grabbing plate; 1013. Negative pressure suction cup; 1014. Vacuum pump; 102. Multi-joint robotic arm; 11. Charging area; 110. Charging rack; 111. Energy storage battery; 112. Charging module; 1120. Charging terminal shell; 1121. Docking rod; 11210. Charging interface; 1122. Plug ring; 1123. Cleaning nozzle; 1124. Sealed Sealing gasket; 1125, inflatable bag; 1126, charging rod; 11260, extrusion part; 113, support plate; 1130, guide groove; 1131, guide roller; 114, blocking baffle; 115, card block; 1150, plug connector; 1160, plug slot; 11600, magnetic suction piece; 1161, limit card block; 117, cavity; 118, flip plate; 1180, top block; 12, power replacement door; 20, temperature sensor; 21, current sensor; 22, voltage sensor; 23, data processor. DETAILED DESCRIPTION
[0015] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following.
[0016] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is further described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.
[0017] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.
[0018] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.
[0019] Example Please refer to the attached Figure 1 to Figure 2This embodiment provides a source-grid-storage-charging-swap device based on local green electricity, including a power supply side, a grid side, an energy storage side and a user load side. The power supply side generates electricity based on a wind and solar power generation unit to generate green electricity, and outputs it to the grid side; the grid side transmits the green electricity to the user load side and the energy storage side based on the transmission network, and the user load side is an electricity terminal; the energy storage side is used to store the surplus electricity transmitted by the grid side and consumed by the user load side, and dynamically supply power to the user load side based on the power consumption demand of the user load side. The energy storage side also includes: The packaging shell 1 is fixedly arranged and has a cavity 117 inside. The two sides inside the cavity 117 are divided into a charging area 11 and a battery replacement area 10; The storage and charging unit includes a plurality of energy storage batteries 111 located in the charging area 11 and installed on a charging rack 110 in the charging area 11. The charging rack 110 is provided with a plurality of charging slots corresponding to the energy storage batteries 111 from top to bottom. The plurality of energy storage batteries 111 are correspondingly inserted in the charging slots and connected to the charging modules 112 in the charging slots. The charging modules 112 are connected to the grid side through lines. The battery replacement mechanism 100 is arranged in the battery replacement area 10, and completes the battery replacement work by grabbing and replacing the energy storage battery 111 on the charging rack 110. A battery replacement door 12 is provided on one side of the battery replacement area 10, and the energy storage battery 111 that has been grabbed and replaced can be taken out through the battery replacement door 12; The dynamic adjustment unit is arranged in the charging area 11, and includes a monitoring module and an adjustment module. The monitoring module is used to collect state change data of the energy storage battery 111 during charging and replacement, and transmit it to the data processor 23 located at the upper part of the charging area 11 for processing to output the charging requirement parameters of the energy storage battery 111 after the current replacement. After receiving the charging requirement parameters of the current energy storage battery 111 output by the data processor 23, the adjustment module performs feedback adjustment on the charging parameters of the charging module 112 corresponding to the energy storage battery 111 in real time.
[0020] It should be understood that in the prior art, due to slight differences in the manufacturing and use of the energy storage battery 111, these differences will gradually accumulate in the long-term charge and discharge cycle, resulting in inconsistency in the performance of the energy storage battery 111. If no dynamic adjustment is performed, this inconsistency will cause some of the energy storage batteries 111 to be overcharged or over-discharged, thereby accelerating the aging of the energy storage battery 111, reducing the performance and service life of the energy storage battery 111, and increasing safety hazards, such as the risk of thermal runaway caused by local overheating; at the same time, the fluctuation of the grid load requires the energy storage side to respond quickly to maintain the stability of the grid. If the energy storage side cannot dynamically adjust the charging parameters according to the real-time demand of the grid and the battery status, it will lead to energy waste and low efficiency, and it will not be able to effectively balance the grid load, affecting the reliability of power supply.
[0021] Therefore, the dynamic adjustment unit of this embodiment can monitor the battery status in real time and dynamically adjust the charging parameters according to the data, which plays a vital role in maintaining the health of the battery, improving energy utilization efficiency, and ensuring the stability and safety of the power grid. It can optimize the charging and discharging process, reduce battery stress, and extend the life of the energy storage battery 111. At the same time, it improves the adaptability and response speed of the energy storage side to changes in the power grid, ensuring the continuity and reliability of power supply.
[0022] Specifically, if Figure 3 As shown, the monitoring module is correspondingly arranged in a plurality of charging slots, and collects state change data of the energy storage battery 111 in the charging slot during charging and swapping. The monitoring module includes a temperature sensor 20, a current sensor 21 and a voltage sensor 22. The temperature sensor 20 is installed on the side wall of the charging slot, and a temperature measuring portion at one end thereof is close to the energy storage battery 111, and is used to collect temperature change data of the energy storage battery 111 during charging and swapping. The current sensor 21 and the voltage sensor 22 are integrated on the charging module 112 in the charging slot, and are used to collect current change data and voltage change data of the charging module 112 when the energy storage battery 111 is charged and swapped.
[0023] For this embodiment, the temperature change data, current and voltage change data are crucial for evaluating the health status and charging efficiency of the battery, because temperature monitoring is crucial for preventing battery overheating and thermal runaway, because the battery generates heat during the charging and discharging process, and improper temperature control may cause the performance of the energy storage battery 111 to degrade or even be damaged, while the current and voltage change data are crucial for evaluating the health status and charging efficiency of the battery, which can accurately indicate the performance state changes inside the battery. Therefore, in this embodiment, in order to facilitate real-time monitoring of the key parameters of the energy storage battery 111, the monitoring module (including the temperature sensor 20, the current sensor 21 and the voltage sensor 22) is respectively installed in the charging slot, so as to facilitate real-time monitoring and collection of relevant key parameters of the energy storage battery 111, so as to facilitate the evaluation and analysis of the state of the energy storage battery 111 during charging and replacement, and then facilitate accurate control and optimization of the energy storage battery 111 during charging and replacement, thereby improving the safety and efficiency of the energy storage side, and ensuring the safe use of the device and extending its life.
[0024] Based on the above embodiment, the data processor 23 is respectively connected to the temperature sensor 20, the current sensor 21 and the voltage sensor 22, and performs calculation processing on the temperature change data, the current change data and the voltage change data collected by the temperature sensor 20, the current sensor 21 and the voltage sensor 22 after receiving the temperature change data, the current change data and the voltage change data. The calculation processing process of the data processor 23 includes: Step 1: synchronize the timestamps of the received temperature change data, current change data, and voltage change data, and process them for consistency by cleaning, deduplication, and format conversion; Step 2, sampling and aligning the temperature change data, current change data and voltage change data after consistency processing in step 1; Step 3, using a weighted average algorithm to perform feature data fusion processing on the temperature change data, current change data, and voltage change data after sampling alignment, and output a unified feature data collection; Step 4, calculate and process the feature data collection through the energy storage battery 111 charging evaluation model, and evaluate the status parameters of the energy storage battery 111 currently in the charging and swapping state, and then calculate and output the charging demand parameters of the current energy storage battery 111 based on the status parameters of the energy storage battery 111 currently in the charging and swapping state.
[0025] It should be shown that this embodiment realizes accurate monitoring and optimized management of the charging and swapping status of the energy storage battery 111 through a sophisticated data processor 23 workflow. The data processor 23 is first connected to the temperature sensor 20, the current sensor 21, and the voltage sensor 22 to ensure that the key parameters of the energy storage battery 111 during the charging and swapping process can be fully collected. Specifically, the technical solution disclosed in this embodiment significantly improves the battery performance and the efficiency of the energy storage side through a series of innovative data preprocessing and analysis technologies. First, the data processor 23 ensures the temporal consistency of data collected from different sensors through timestamp synchronization technology, which is a prerequisite for data fusion. Then, data cleaning and format conversion technology are used to eliminate noise and outliers, and unify data in different formats for subsequent processing. This step not only improves the quality of the data, but also provides an accurate data basis for feature extraction and model training. After sampling alignment, a weighted average algorithm is used to perform feature data fusion processing on the data. This algorithm takes into account the accuracy and importance of different sensor data, and optimizes the data fusion results by assigning different weights, thereby outputting a unified feature data collection. In addition, in this embodiment, the energy storage battery 111 charging evaluation model is used to evaluate the energy storage battery 111 when it is charged and replaced, which can provide probability prediction and uncertainty estimation, which is particularly important for battery health management and predictive maintenance. It enhances the accuracy and reliability of the state evaluation of the energy storage battery 111, and can calculate the charging demand parameters of the energy storage battery 111 to dynamically adjust the charging strategy to avoid overcharging or undercharging, reduce damage to the energy storage battery 111, and thus improve the use efficiency and life of the energy storage battery 111.
[0026] Furthermore, based on the above embodiment, in step 3, the feature data fusion processing satisfies the following calculation process: ;in, Indicates at a point in time Temperature change data, Indicates at a point in time Current change data, Indicates at a point in time Voltage change data, , , Respectively represent the weights of temperature change data, current change data and voltage change data (it should be noted that the weight setting is based on the importance and reliability of each parameter on the battery status, and when allocating specific weights, it can be adjusted according to the importance of each data source on the battery status). represents the total number of time points, Represents the output feature data collection.
[0027] It should be noted that the weighted average algorithm in the above embodiment can more accurately evaluate the state of the energy storage battery 111. Specifically, it can be dynamically adjusted according to the characteristics and importance of different data, so as to achieve higher accuracy and efficiency in the data fusion process, thereby providing more accurate input data for the charging evaluation model, and then calculating more reasonable charging demand parameters, optimizing the charging process, so as to improve the use efficiency and life of the energy storage battery 111.
[0028] As a preferred implementation scheme, in step 4, the energy storage battery 111 charging evaluation model is constructed based on a Gaussian process regression model, and the Gaussian process regression model includes a feature input layer, a kernel function calculation layer and a result output layer; The feature input layer is used to extract dynamically changing data source points in the feature data collection as model input to the kernel function calculation layer; The kernel function calculation layer defines the similarity measurement of the dynamically changing data source points based on the dynamically changing data source points as the model input, and calculates and infers the dependency relationship between the dynamically changing data feature points by constructing a covariance matrix to output, and then iteratively calculates the posterior probability distribution of the status parameters of the energy storage battery 111 currently in the charging and swapping state based on the dependency relationship between the dynamically changing data feature points calculated and output by the covariance matrix, and matches and compares the calculated posterior probability distribution of the status parameters with the expected threshold value to evaluate and obtain the status parameters of the energy storage battery 111 currently in the charging and swapping state and output them; After the result output layer receives the status parameters of the energy storage battery 111 currently in the charging and swapping state output by the kernel function calculation layer, it comprehensively calculates the charging requirement parameters of the energy storage battery 111 currently in the charging and swapping state based on the status parameters of the energy storage battery 111 and the charging rate requirement and outputs them.
[0029] It should be noted that in this embodiment, a Gaussian process regression model is used to construct a charging evaluation model for the energy storage battery 111. The model includes a feature input layer, a kernel function calculation layer and a result output layer. The feature input layer extracts dynamically changing data source points in the feature data collection. The kernel function calculation layer defines a similarity measure based on these data source points, and calculates the dependency between the dynamically changing data feature points by constructing a covariance matrix. This process not only provides a probabilistic prediction of the battery state, but also quantifies the uncertainty of the prediction. After the result output layer receives the battery state parameters output by the kernel function calculation layer, it comprehensively calculates the charging demand parameters based on these parameters and the charging rate requirement and outputs them, so that the state change of the energy storage battery 111 can be predicted more accurately, thereby dynamically adjusting the charging strategy, avoiding overcharging or undercharging, reducing damage to the energy storage battery 111, and improving the use efficiency and life of the energy storage battery 111.
[0030] It should also be noted that this solution is used for charging evaluation of energy storage battery 111 through Gaussian process regression model, which can handle uncertainty and nonlinear problems. By defining similarity metrics between data points and constructing covariance matrices, it provides a powerful tool to evaluate battery condition parameters. Compared with traditional machine learning methods, it can provide probabilistic prediction and uncertainty estimation, which is particularly important for battery health management and predictive maintenance. In other words, the technical solution disclosed in this embodiment comprehensively applies advanced technologies such as timestamp synchronization, data cleaning, feature data fusion and Gaussian process regression model, which not only improves the accuracy and efficiency of data processing, but also enhances the accuracy and reliability of state evaluation of energy storage battery 111. It can dynamically adjust the charging strategy to avoid overcharging or undercharging, reduce damage to energy storage battery 111, and thus improve the use efficiency and life of energy storage battery 111.
[0031] Based on the above embodiments, please refer to Figure 3The charging module 112 includes a charging terminal housing 1120 and a charging connector. The charging terminal housing 1120 is located on the side wall of the charging slot. The charging connector is installed on a side of the charging terminal housing 1120 corresponding to the energy storage battery 111. The charging connector includes a protruding docking rod 1121 and a charging interface 11210 opened at one end of the docking rod 1121. A protection component is also provided around the docking rod 1121 near the charging interface 11210. The protection component includes a plug ring 1121 sleeved on the outside of the docking rod 1121. 2, and one end of the plug-in ring 1122 is closer to the energy storage battery 111 than the end of the docking rod 1121, and an annular gap is formed between the inside of the plug-in ring 1122 and the docking rod 1121, and a plurality of cleaning nozzles 1123 distributed in an annular array are provided in the gap at the position corresponding to the charging interface 11210, and a sealing gasket 1124 is also provided on the inner ring surface of the plug-in ring 1122 near its end position, and an inflatable bag 1125 is provided inside the sealing gasket 1124, and the inflatable bag 1125 is connected to the cleaning nozzle 1123 through an air pipeline.
[0032] It should be understood that when used for a long time, the charging interface 11210 is exposed to the external environment for a long time, and dust and debris will inevitably adhere to it. These accumulations will have a series of negative effects on the charging process of the energy storage battery 111. First, dust may cause poor electrical contact, affect charging efficiency, and even cause the charging process to be interrupted. At the same time, corrosive substances in the dust may damage the electronic components of the charging interface 11210 and shorten its service life. In addition, the accumulation of dust may also affect the heat dissipation performance of the battery, causing the battery to overheat, and further affecting the performance and safety of the battery. More importantly, dust may also increase the internal resistance of the battery, affecting the battery's storage capacity and self-consumption capacity, which may cause the performance of the energy storage battery 111 to decline and the service life to be shortened in the long run. Therefore, regular cleaning of the charging interface 11210 is crucial to maintaining the performance of the energy storage battery 111, extending the life of the energy storage battery 111, and ensuring charging safety. In view of this, the present invention realizes comprehensive protection and automatic cleaning functions for the charging connector through the above-mentioned structural design, thereby improving the safety and efficiency of the charging process. That is, through the design of the charging terminal housing 1120 and the protection component, it effectively prevents external factors from damaging the charging connector, thereby improving the safety of the charging process. The charging terminal housing 1120 is located on the side wall of the charging slot, and can resist external impact and damage, thereby protecting the charging connector. The charging connector is protected from physical damage, and the plug ring 1122 is sleeved on the outside of the docking rod 1121, which further enhances the wear resistance and impact resistance of the docking rod 1121, effectively preventing the docking rod 1121 from being damaged in daily use, and extending the service life of the charging module 112. At the same time, in the annular gap formed between the plug ring 1122 and the docking rod 1121, a plurality of cleaning nozzles 1123 distributed in an annular array are provided at the position corresponding to the charging interface 11210, so as to blow away the dust and impurities at the charging interface 11210 and keep the charging contact surface clean; In addition, a sealing gasket 1124 is provided on the inner ring surface of the plug-in ring 1122 near its end position, and an air bag 1125 is provided inside the sealing gasket 1124. The design of the air bag 1125 not only provides an additional sealing effect to prevent dust and moisture from invading the charging interface 11210, but also provides a stable support and buffer for the charging rod 1126 through the elastic effect of the air bag 1125, thereby ensuring a close fit between the charging rod 1126 and the charging interface 11210 and enhancing the stability and reliability of the charging connection.
[0033] In this embodiment, as a preference, a charging rod 1126 is provided on the side wall of the energy storage battery 111 corresponding to the charging module 112, and a charging plug that is plugged into and matched with the charging interface 11210 is provided at the front end of the charging rod 1126, and a protruding extrusion portion 11260 is provided on the outside of the charging rod 1126. When the charging plug is inserted into the charging interface 11210 for plugging and matching, the extrusion portion 11260 is interference-fitted with the sealing gasket 1124. Figure 3 Also shown in .
[0034] In the above embodiment, when the energy storage battery 111 is being charged or replaced, when the charging plug 1126 is inserted into the charging interface 11210, the extrusion portion 11260 at its front end can be interference fit with the sealing gasket 1124 to squeeze the air bag 1125 in the sealing gasket 1124, so that the gas inside the air bag 1125 enters the cleaning nozzle 1123 through the gas pipeline and is ejected from the nozzle to purge the charging interface 11210, thereby achieving automatic cleaning of the charging interface 11210 when the energy storage battery 111 is being charged or replaced, ensuring that dust and impurities at the charging interface 11210 can be removed in time, improving the cleanliness of the charging interface 11210, and thus enhancing the reliability and safety of the charging connection.
[0035] As a further preferred implementation, a mounting member for supporting the energy storage battery 111 is further provided at the lower part of the charging slot. For details, please refer to Figure 2 , Figure 4 and Figure 5 The mounting member includes support plates 113 symmetrically arranged on both sides of the bottom of the charging slot, and guide grooves 1130 arranged along the length direction of the support plates 113 are opened on the upper parts of the two support plates 113, and one end of the guide groove 1130 in the length direction is connected to the outside, and a blocking baffle 114 is arranged at one end of the guide groove 1130, and the other end is open, and a plurality of guide rollers 1131 are arranged in an array in the two guide grooves 1130 along the length direction thereof; A clamping block 115 matched with the guide groove 1130 is further provided at the bottom of the energy storage battery 111 at a position corresponding to the guide groove 1130 on the two support plates 113 .
[0036] Based on the technical solution disclosed in this embodiment, a special mounting piece is provided at the lower part of the charging slot to achieve stable support and precise positioning of the energy storage battery 111. Since the mounting piece is composed of support plates 113 symmetrically arranged on both sides of the bottom of the charging slot, and a guide groove 1130 arranged along the length direction of the support plate 113 is opened on the upper part of the support plate 113, and one end of the guide groove 1130 is connected to the outside, and the other end is open, and a plurality of guide rollers 1131 are provided in the internal array to ensure that the energy storage battery 111 can move smoothly along the guide groove 1130 to the specified position of the charging slot. At the same time, a clamping block 115 adapted to the guide groove 1130 is provided at the position of the guide groove 1130 on the two support plates 113 at the bottom of the energy storage battery 111, which enables the battery to be accurately docked with the charging slot, thereby improving the accuracy and efficiency of installation.
[0037] It should also be noted that in Figure 4 and Figure 5 As shown in the figure, a fastener for fastening the clamping block 115 at the bottom of the energy storage battery 111 is also provided inside the guide groove 1130, and the fastener includes a plug-in component and a clamping component; The plug-in assembly includes a plug-in slot 1160 arranged on a side plate surface of the blocking baffle 114 corresponding to the clamping block 115, and a magnetic attraction piece 11600 is arranged at the middle position of the slot bottom of the plug-in slot 1160, and a plug-in connector 1150 matching the plug-in slot 1160 is arranged at one end of the clamping block 115 corresponding to the plug-in slot 1160, and wedge-shaped inclined surfaces are arranged on both sides of the plug-in connector 1150, and a connecting piece that magnetically matches the magnetic attraction piece 11600 is connected to the contact between the plug-in connector 1150 and the plug-in slot 1160; The clamping assembly includes limit blocks 1161 movably arranged at both sides of the opening end of the guide groove 1130, and both sides of the end of the clamping block 115 away from the plug connector 1150 are provided with limit grooves adapted to the limit blocks 1161; A cavity 117 is provided inside the two support plates 113 and on both sides of the guide groove 1130, and a flip plate 118 is hinged in the cavity 117. One end of the flip plate 118 in the length direction extends along the direction of the plug-in groove 1160, and one side of the end thereof abuts against a top block 1180 extending into the plug-in groove 1160, and the top block 1180 cooperates with the wedge-shaped inclined surfaces on both sides of the plug connector 1150, and the side surface of the other end of the flip plate 118 in the length direction is hinged to the limit block 1161, and a torsion spring is provided at the hinge of the flip plate 118. Initially, the top block 1180 is located in the plug-in groove 1160.
[0038] Through the coordinated cooperation of the plug-in assembly and the clamping assembly of the above-mentioned embodiment, the energy storage battery 111 is installed and fixed in the charging slot quickly, stably and firmly. Specifically, the plug-in assembly is composed of a plug-in slot 1160 arranged on the plate surface of one side of the blocking baffle 114 corresponding to the clamping block 115, and a magnetic suction piece 11600 is arranged at the middle position of the bottom of the slot, and a plug connector 1150 matching the plug-in slot 1160 is arranged at one end of the clamping block 115 corresponding to the plug-in slot 1160. The wedge-shaped inclined surfaces on both sides of the plug connector 1150 and the connecting piece jointly realize the magnetic suction cooperation with the magnetic suction piece 1160, thereby ensuring the stable positioning of the clamping block 115, and the clamping assembly is composed of limit clamping blocks 1161 movably arranged at the positions on both sides of the opening end of the guide slot 1130, and limit grooves matching the limit clamping blocks 1161 are opened on both sides of the end of the clamping block 115 away from the plug connector 1150, thereby realizing the limit fixation of the clamping block 115; The following is combined with Figure 5 Figures (a) and (b) in the figure illustrate the specific implementation process. In the specific implementation, after the energy storage battery 111 is installed in place, the plug connector 1150 at one end of the clamping block 115 is inserted into the plug slot 1160, and the magnetic connection is achieved through the connecting piece and the magnetic attraction piece 11600 at the middle position of the slot bottom, providing a stable magnetic attraction force for it. At the same time, the wedge-shaped inclined surfaces on both sides of the plug connector 1150 correspond to the top block 1180 in the cavity 117 for guiding and matching. That is, during the gradual insertion of the plug connector 1150, the plug connector 1150 can be inserted through The wedge-shaped inclined surfaces on both sides thereof lift up the top block 1180, thereby prompting the top block 1180 to move under the guidance of the plug connector 1150, so as to push the flip plate 118 in the cavity 117 to flip, and then the flipping action of the flip plate 118 drives the limiting card block 1161 to be inserted into the limiting groove at the other end of the clamping block 115, so as to complete the limiting fixation of the clamping block 115, thereby promoting the stable installation of the energy storage battery 111, so as to ensure that the energy storage battery 111 is installed and fixed, and avoid its displacement, which in turn affects the normal charging and replacement of the energy storage battery 111. Compared with the prior art, the magnetically coupled plug connector 1150 and the connecting plate provide a fast and stable connection method, reducing the time and labor intensity required for traditional mechanical fastening. Secondly, the design of the wedge-shaped slope makes the plug connector 1150 and the plug slot 1160 fit more closely, enhancing the firmness of the connection. The linkage mechanism of the flip plate 118 and the limit block 1161 realizes an automated fastening process, improving the assembly efficiency and accuracy of the energy storage battery 111. The torsion spring design enables the flip plate 118 to automatically reset, providing convenience for its continuous operation, while also reducing installation errors of the energy storage battery 111 caused by improper operation.
[0039] Based on the above embodiments, it is necessary to further explain that, please refer to Figure 2 and Figure 6 The battery exchange mechanism 100 includes a grabbing component 101 and a moving component. The grabbing component 101 moves downward in the battery exchange area 10 through the moving component to grab and replace the corresponding energy storage battery 111. The grabbing component 101 includes a supporting frame 1010. A grabbing plate 1012 is connected to the inside of the supporting frame 1010 through a pneumatic push rod 1011. A plurality of negative pressure suction cups 1013 are provided on the upper part of the grabbing plate 1012. The bottoms of the plurality of negative pressure suction cups 1013 are connected to the grabbing plate 1012 through a lifting push rod, and a vacuum pump 1014 for evacuating the negative pressure suction cups 1013 is installed at the bottom of the grabbing plate 1012.
[0040] It should be noted that the battery replacement mechanism 100 disclosed in this embodiment realizes the automatic grasping and replacement of the energy storage battery 111 through the integrated grasping component 101 and the moving component, wherein the grasping component 101 is composed of a supporting bracket 1010 and a pneumatic push rod 1011, the pneumatic push rod 1011 is connected to the grasping plate 1012, and the upper part of the grasping plate 1012 is equipped with a plurality of negative pressure suction cups 1013, which are connected to the grasping plate 1012 through a lifting push rod and are used to adsorb and release the energy storage battery 111, and the vacuum pump 1014 at the bottom of the negative pressure suction cup 1013 is responsible for vacuuming to ensure that the suction cup can firmly adsorb the energy storage battery 111 and realize stable grasping. Specifically, during the battery replacement process, the moving component moves the grasping component 101 to one side of the energy storage battery 111 to be replaced, so that the supporting bracket 1010 is relatively The replaced energy storage battery 111 is aligned below, and at the same time, the pneumatic push rod 1011 drives the grabbing plate 1012 in the supporting bracket 1010 to move to the area between the clamping blocks 115 on both sides directly below the energy storage battery 111, and the lifting push rod will push the negative pressure suction cup 1013 to rise at this time to contact and adsorb the bottom of the energy storage battery 111. At the same time, the vacuum pump 1014 starts to work and generates a vacuum negative pressure on the negative pressure suction cup 1013, so that the negative pressure suction cup 1013 can firmly adsorb the energy storage battery 111. After it is firmly adsorbed, the pneumatic push rod 1011 drives the grabbing plate 1012 to retreat into the supporting bracket 1010, and moves it to the power replacement door 12 through the moving parts, so as to realize the replacement and charging of the energy storage battery 111, and then complete the rapid replacement of the battery through the above-mentioned repeated process.
[0041] It should be added that, in the present embodiment, the moving component is a mechanism for driving the grasping component 101 to move, which is itself a prior art. Therefore, it is not specifically limited in the present solution. Only a preferred example is given here. It is preferably a multi-joint robotic arm 102, and is installed in the battery exchange area 10, and its action execution end (free end) is connected to the supporting frame 1010 of the grasping component 101 through a movable joint connection. In this way, the multi-joint robotic arm 102 can independently operate along the X, Y, and Z axes inside the packaging shell 1, thereby realizing precise position and posture control, thereby facilitating it to drive the grasping component 101 to grasp and replace the energy storage battery 111.
[0042] It should be noted that in order to make the technical solution of the present application clearer, the professional terms involved in the present application are explained here; In this application, the term "temperature sensor" refers to a detection device used to measure the temperature change of the energy storage battery 111 during the charging and replacement process, and convert this temperature change into an electrical signal output. This electrical signal can reflect the actual temperature state of the battery. In this application, it is used to monitor the temperature of the battery in real time to ensure the safety of the charging process and the stability of the battery performance; In this application, the term "current sensor" refers to a detection device used to measure the current change flowing through the energy storage battery 111 and convert the current change into an electrical signal output. This electrical signal can reflect the current state of the battery during the charging and discharging process. In this application, it is used to monitor the current of the battery in real time, so as to dynamically adjust the charging parameters, optimize the charging efficiency and protect the battery; In this application, the term "voltage sensor" refers to a detection device used to measure the voltage change across the energy storage battery 111 and convert the voltage change into an electrical signal output. This electrical signal can reflect the voltage state of the battery. In this application, it is used to monitor the voltage of the battery in real time to evaluate the charging state and health of the battery and ensure the safety and effectiveness of the charging process. In this application, the term "adjustment module" refers to an intelligent control unit integrated in the charging system, whose core function is to dynamically adjust the charging parameters according to the battery status and charging requirements to optimize the charging process and protect the battery. It includes interconnected voltage stabilizers, transformers and related control circuits. It maintains a stable output voltage through the voltage stabilizer to ensure the consistency and safety of the voltage during the battery charging process, while the transformer is responsible for converting the input AC power into DC power, or converting between different voltage levels to adapt to the charging requirements of the battery. At the same time, the control circuit, as the core of the adjustment module, includes a microcontroller (MCU) for receiving signals such as charging requirement parameters output by the data processor 23 and identifying and processing them. At the same time, the control circuit adjusts the working state of power devices such as the voltage stabilizer, transformer and related power MOSFET according to the preset adjustment logic feedback to adjust the charging current and voltage, and realize automatic switching of different stages such as constant current charging, constant voltage charging and floating charging. It should be noted that the components referred to by the above-mentioned professional terms are all existing mature technologies, and their technical principles will not be repeated here.
[0043] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A source-grid-storage-charging-swap device based on local green electricity, comprising a power supply side, a grid side, an energy storage side and a user load side, wherein the power supply side generates electricity based on a wind and solar power generation unit to generate green electricity, and outputs it to the grid side; the grid side transmits green electricity to the user load side and the energy storage side based on a transmission network, and the user load side is a power consumption terminal; the energy storage side is used to store the surplus electricity transmitted by the grid side and consumed by the user load side, and dynamically supplement the power supply to the user load side based on the power consumption demand of the user load side, characterized in that: The energy storage side also includes: The packaging shell (1) is fixedly arranged and has a cavity (117) inside, wherein two sides inside the cavity (117) are divided into a charging area (11) and a battery replacement area (10); A storage and charging unit, comprising a plurality of energy storage batteries (111) located in a charging area (11) and mounted on a charging rack (110) in the charging area (11), the charging rack (110) being provided with a plurality of charging slots corresponding to the energy storage batteries (111) from top to bottom, the plurality of energy storage batteries (111) being correspondingly inserted into the charging slots and connected to charging modules (112) in the charging slots, the charging modules (112) being connected to a power grid side via a line; A battery replacement mechanism (100) is arranged in a battery replacement area (10) and completes the battery replacement work by grabbing and replacing the energy storage battery (111) on the charging rack (110); a battery replacement door (12) is provided on one side of the battery replacement area (10) and is used to take out the grabbed and replaced energy storage battery (111) through the battery replacement door (12); A dynamic adjustment unit is arranged in the charging area (11), comprising a monitoring module and an adjustment module, wherein the monitoring module is used to collect state change data of the energy storage battery (111) during charging and replacement, and transmit the data to a data processor (23) located at the upper part of the charging area (11) for processing, so as to output the charging demand parameters of the energy storage battery (111) after the current replacement, and after receiving the charging demand parameters of the current energy storage battery (111) output by the data processor (23), the adjustment module performs feedback adjustment on the charging parameters of the charging module (112) corresponding to the energy storage battery (111) in real time.
2. According to claim 1, a source-grid-storage-charging-swap integrated device based on local green electricity, characterized in that: The monitoring modules are correspondingly arranged in a plurality of charging slots, and collect state change data of the energy storage battery (111) in the charging slots when charging or replacing power. The monitoring modules include a temperature sensor (20), a current sensor (21), and a voltage sensor (22). The temperature sensor (20) is installed on a side wall of the charging slot, and a temperature measuring portion at one end of the temperature sensor (20) is close to the energy storage battery (111), and is used to collect temperature change data of the energy storage battery (111) when charging or replacing power. The current sensor (21) and the voltage sensor (22) are integrated on the charging module (112) in the charging slot, and are used to collect current change data and voltage change data of the charging module (112) when the energy storage battery (111) is charged or replaced.
3. According to claim 2, a source-grid-storage-charging-swap integrated device based on local green electricity is characterized by: The data processor (23) is respectively connected to the temperature sensor (20), the current sensor (21) and the voltage sensor (22) by signals, and performs calculation processing on the temperature change data, the current change data and the voltage change data collected by the temperature sensor (20), the current sensor (21) and the voltage sensor (22) after receiving the temperature change data, the current change data and the voltage change data. The calculation processing process of the data processor (23) includes: Step 1: synchronize the timestamps of the received temperature change data, current change data, and voltage change data, and process them for consistency by cleaning, deduplication, and format conversion; Step 2, sampling and aligning the temperature change data, current change data and voltage change data after consistency processing in step 1; Step 3, using a weighted average algorithm to perform feature data fusion processing on the temperature change data, current change data, and voltage change data after sampling alignment, and output a unified feature data collection; Step 4, calculating and processing the characteristic data set through the energy storage battery (111) charging evaluation model, and evaluating the status parameters of the energy storage battery (111) currently in the charging and swapping state, and then calculating and outputting the charging demand parameters of the current energy storage battery (111) based on the status parameters of the energy storage battery (111) currently in the charging and swapping state.
4. According to claim 3, a source-grid-storage-charging-swap integrated device based on local green electricity is characterized in that: In step 3, the feature data fusion process satisfies the following calculation process: ;in, Indicates at a point in time Temperature change data, Indicates at a point in time Current change data, Indicates at a point in time Voltage change data, , , Respectively represent the weights of temperature change data, current change data and voltage change data, represents the total number of time points, Represents the output feature data collection.
5. According to claim 3, a source-grid-storage-charging-swap integrated device based on local green electricity is characterized in that: In step 4, the energy storage battery (111) charging assessment model is constructed based on a Gaussian process regression model, wherein the Gaussian process regression model comprises a feature input layer, a kernel function calculation layer and a result output layer; The feature input layer is used to extract dynamically changing data source points in the feature data collection as model input to the kernel function calculation layer; The kernel function calculation layer defines a similarity measure of the dynamically changing data source points based on the dynamically changing data source points as the model input, and calculates and infers the dependency relationship between the dynamically changing data feature points by constructing a covariance matrix to output, and then iteratively calculates the posterior probability distribution of the status parameters of the energy storage battery (111) currently in the charging and swapping state based on the dependency relationship between the dynamically changing data feature points calculated and output by the covariance matrix, and performs matching and comparison based on the calculated posterior probability distribution of the status parameters and the expected threshold value, so as to evaluate and obtain the status parameters of the energy storage battery (111) currently in the charging and swapping state and output them; After the result output layer receives the status parameters of the energy storage battery (111) currently in the charging and swapping state output by the kernel function calculation layer, it comprehensively calculates the charging demand parameters of the energy storage battery (111) currently in the charging and swapping state based on the status parameters of the energy storage battery (111) and the charging rate requirement and outputs them.
6. According to claim 1, a source-grid-storage-charging-swap integrated device based on local green electricity, characterized in that: The charging module (112) comprises a charging terminal housing (1120) and a charging connector. The charging terminal housing (1120) is located on the side wall of the charging slot and has circuit components arranged therein. The charging connector is mounted on a side of the charging terminal housing (1120) corresponding to the energy storage battery (111). The charging connector comprises a protruding docking rod (1121) and a charging interface (11210) provided at one end of the docking rod (1121). A protective component is also provided around the docking rod (1121) near the charging interface (11210). The protective component comprises a plug ring ( 1122), and one end of the plug-in ring (1122) is closer to the energy storage battery (111) than the end of the docking rod (1121), and an annular gap is formed between the inside of the plug-in ring (1122) and the docking rod (1121), and a plurality of cleaning nozzles (1123) distributed in an annular array are provided at a position corresponding to the charging interface (11210) in the gap, and a sealing gasket (1124) is also provided on the inner ring surface of the plug-in ring (1122) near its end position, and an inflatable bag (1125) is provided inside the sealing gasket (1124), and the inflatable bag (1125) and the cleaning nozzle (1123) are connected via an air pipeline.
7. According to claim 6, a source-grid-storage-charging-swap integrated device based on local green electricity, characterized in that: A charging plug rod (1126) is provided on the side wall of the energy storage battery (111) corresponding to the charging module (112); a charging plug that is plugged into and matched with the charging interface (11210) is provided at the front end of the charging plug rod (1126); and a protruding pressing portion (11260) is provided on the outside of the charging plug rod (1126); when the charging plug is inserted into the charging interface (11210) for plugging and matching, the pressing portion (11260) is interference-fitted with the sealing gasket (1124).
8. According to claim 1, a source-grid-storage-charging-swap integrated device based on local green electricity, characterized in that: A mounting member for supporting the energy storage battery (111) is also provided at the lower part of the charging slot, the mounting member comprising support plates (113) symmetrically arranged at both sides of the bottom of the charging slot, guide grooves (1130) arranged along the length direction of the support plates (113) are provided on the upper parts of the two support plates (113), one end of the guide groove (1130) in the length direction is connected to the outside, and a blocking baffle (114) is provided at one end of the guide groove (1130), while the other end is open, and a plurality of guide rollers (1131) are also arranged in an array in the two guide grooves (1130) along the length direction thereof; A clamping block (115) adapted to the guide groove (1130) is also provided at the bottom of the energy storage battery (111) at positions corresponding to the guide grooves (1130) on the two support plates (113).
9. According to claim 8, a source-grid-storage-charging-swap integrated device based on local green electricity, characterized in that: A fastener for fastening the clamping block (115) at the bottom of the energy storage battery (111) is also provided inside the guide groove (1130), and the fastener comprises a plug-in assembly and a clamping assembly; The plug-in assembly comprises a plug-in slot (1160) arranged on a side plate surface of a blocking baffle (114) corresponding to a clamping block (115), and a magnetic attraction piece (11600) is provided at a middle position of the slot bottom of the plug-in slot (1160), a plug connector (1150) matching the plug-in slot (1160) is provided at one end of the clamping block (115) corresponding to the plug-in slot (1160), wedge-shaped inclined surfaces are provided on both sides of the plug connector (1150), and a connecting piece that magnetically matches the magnetic attraction piece (11600) is connected to the contact point between the plug connector (1150) and the plug-in slot (1160); The clamping assembly comprises limit clamping blocks (1161) movably arranged at positions on both sides of the opening end of the guide groove (1130), and limit grooves adapted to the limit clamping blocks (1161) are provided on both sides of an end of the clamping block (115) away from the plug connector (1150); A cavity (117) is provided inside the two support plates (113) and at positions on both sides of the guide groove (1130). A flip plate (118) is hinged in the cavity (117). One end of the flip plate (118) in the length direction extends in the direction of the plug groove (1160), and one side of the end portion thereof abuts against a top block (1180) extending into the plug groove (1160). The top block (1180) cooperates with the wedge-shaped inclined surfaces on both sides of the plug connector (1150). The side surface of the other end of the flip plate (118) in the length direction is hinged to the limit block (1161). A torsion spring is provided at the hinge of the flip plate (118). Initially, the top block (1180) is located in the plug groove (1160).
10. The local green electricity-based integrated power source, grid, storage, charging and replacement device according to claim 1, characterized in that: The battery replacement mechanism (100) comprises a gripping component (101) and a moving component, wherein the gripping component (101) moves downward in the battery replacement area (10) via the moving component to grip and replace the corresponding energy storage battery (111), wherein the gripping component (101) comprises a support frame (1010), wherein a gripping plate (1012) is connected to the support frame (1010) via a pneumatic push rod (1011), wherein a plurality of negative pressure suction cups (1013) are provided on the upper part of the gripping plate (1012), wherein the bottoms of the plurality of negative pressure suction cups (1013) are connected to the gripping plate (1012) via a lifting push rod, and a vacuum pump (1014) for evacuating the negative pressure suction cups (1013) is installed at the bottom of the gripping plate (1012).
Citation Information
Patent Citations
Charging device and vehicle provided with charging device
CN106218438A
Charging pile system with distributed photovoltaic trade
CN108879877A
Charging socket for new energy electric vehicle
CN112490745A
Charging method and device for rechargeable battery, and electronic equipment
CN116505617A
Solid-state battery SOC estimation method based on model fusion
CN117007974A