Automatic jacking platform for large building aerial building machine and construction method of automatic jacking platform

By adding an automatic lifting platform in the middle of the aerial building machine in large buildings, the problems of insufficient coverage capacity and low construction safety of the tower crane are solved, and wider material transfer and higher construction safety are achieved.

CN119616223AActive Publication Date: 2025-03-14CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510041490.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-10
Publication Date
2025-03-14
Estimated Expiration
2045-01-10

AI Technical Summary

Technical Problem

The existing aerial building machine has limited coverage capacity in the middle of large buildings, and the increase in the length of the boom of the tower crane will increase the risk of overturning and affect construction safety.

Method used

An automatic lifting platform for aerial building construction machine in large buildings is designed. By adding an amplification platform in the middle of the building construction machine, the coverage of the tower crane is expanded, and the lifting and shrinking of the platform is achieved through the hydraulic cylinder lifting mechanism to adapt to different weather conditions.

Benefits of technology

The transfer range of materials in the middle of large buildings has been improved, the length of the crane's boom is shortened, the construction safety is enhanced, and the stability of the platform in bad weather is improved by adjusting the center of gravity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119616223A_ABST
    Figure CN119616223A_ABST
Patent Text Reader

Abstract

The invention relates to an automatic jacking platform for an overhead building machine of a large building and a construction method of the automatic jacking platform, aiming at the jacking platform, the automatic jacking platform comprises a base, a platform, a push plate, an inclined strut, an amplification platform, a first positioning seat, a lead screw and a second positioning seat, the lead screw rotatably penetrates through the automatic jacking platform, and the automatic jacking platform is arranged above the first positioning seat and the push plate at an interval; the motors are fixed to the two sides of the base, and output shafts of the motors are fixedly connected with the lead screws. The positioning rod penetrates through the push plate in a sliding manner, and the upper and lower ends of the positioning rod are fixed on two sides of the base; and the jacking mechanism is mounted at the bottom of the base. The construction method comprises the steps that S1, a plurality of pre-embedded assemblies which are spaced up and down and spaced left and right are arranged on the shear wall; s2, brackets are mounted on the embedded assemblies; s3, a fixed clamping seat and a movable clamping seat are arranged; s4, jacking by a jacking mechanism; and S5, cyclic jacking operation is completed. The jacking platform can be additionally arranged in the middle of the large building, so that the jacking platform can easily enter the coverage range of the tower crane at the side position of the building machine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to an automatic jacking platform for a large-scale aerial building construction machine.

[0002] The invention also relates to a construction method based on the automatic jacking platform. Background Art

[0003] The aerial building machine and its construction technology use mechanical operation and intelligent control to realize the industrialized intelligent construction of cast-in-place reinforced concrete for high-rise residential buildings. One of its obvious features is that the entire process is completed in the air layer by layer. Therefore, it is also called the "aerial building machine". The equipment platform simulates a mobile building factory, moves the factory to the construction site, and uses mechanical operation, intelligent control and other means to cooperate with the existing commercial concrete supply chain and concrete high-altitude pumping technology to carry out cast-in-place construction technology for the synchronous construction of the main structure and the integrated insulation facing panels above the ground layer by layer, using machines instead of manual labor to realize the overall cast-in-place construction of high-rise and super-high-rise reinforced concrete.

[0004] However, existing building construction machines have a small tower crane coverage range and a narrow operating space. In addition, the tower crane on the building construction machine platform is generally located relatively close to the side, and has limited coverage capacity for the middle part of a large building. If the boom is lengthened, the risk of overturning increases, which is not conducive to construction safety. Summary of the invention

[0005] The purpose of the present invention is to provide an automatic jacking platform for a large-scale aerial building construction machine, which is conducive to adding a jacking platform in the middle of the large building, making it easy to enter the coverage range of the tower crane at the side of the building construction machine, which is conducive to improving the transportation range of materials in the middle of the large building, facilitating shortening the boom length of the tower crane at the side of the building construction machine, and ensuring construction safety.

[0006] Another object of the present invention is to provide a construction method based on the automatic jacking platform for the above-mentioned large-scale aerial building construction machine, which is conducive to the construction and implementation of cyclic jacking operations.

[0007] Regarding the technical subject of an automatic jacking platform for a large-scale aerial building construction machine, it includes Base; A platform mounted on the side of the base; Push plates, which are slidably mounted on both sides of the base; A diagonal brace, the lower end of which is hinged to the upper side of the push plate; an amplification platform, which is slidably connected to both sides of the platform and extends out of the platform, and the bottom portion of which is located outside the platform is hinged to the upper end of the diagonal support; A first positioning seat, which is fixed on both sides of the base and located below the push plate; A lead screw, the lower end of which is rotatably mounted on the first positioning seat and passes through the push plate in a threaded connection; A second positioning seat is fixed on both sides of the base and rotatably passed through by the lead screw, and is spaced above the first positioning seat and the push plate; The motor is fixed on both sides of the base, and its output shaft is fixedly connected to the lead screw; A positioning rod, which slides through the push plate and has upper and lower ends fixed on both sides of the base; The jacking mechanism is installed at the bottom of the base.

[0008] With such a structure, the augmented platform can be opened and retracted to increase the platform's coverage. When the augmented platform is opened, it is easy to enter the coverage of the building crane and facilitate the transportation of construction materials. When the augmented platform is retracted, the center of gravity can be adjusted to enhance the platform's ability to withstand adverse weather.

[0009] As a further improvement of the automatic lifting platform, a slide rail groove is arranged on the platform, and the slide rail groove is slidably adapted to be equipped with a moving block; the moving block is fixed at the bottom of the mounting seat; a tower crane is installed on the top of the mounting seat; one end of a push rod is hinged on both sides of the mounting seat, and the other end of the push rod is hinged with a fixed block, and the fixed block is fixed on the side of the amplification platform; the fixed block is slidably connected to the sliding rod, and the sliding rod is fixed on the side wall of the platform, the sliding rod is parallel to the side of the amplification platform, and the amplification platform is slidably plugged into the side wall of the platform; the side wall of the amplification platform is vertically plugged into the side wall of the platform.

[0010] With such a structure, a small tower crane can be installed on the augmented platform to form cross-coverage with the large tower crane of the building construction machine. When the augmented platform is opened, the tower crane can be extended to expand the coverage of the tower crane. When the augmented platform is retracted, the tower crane retracts to help protect against adverse weather. The platform allows the tower crane to be installed at a low position. After the platform realizes the jacking function, the height of the tower crane can be increased without the need to install extra standard sections. The added small tower crane makes the material transportation in the middle of a large building more flexible.

[0011] As a further improvement of the automatic lifting platform, the base has a cavity, the cavity is connected to the bottom surface, the bottom surface of the base has a circle of flanges, and the lifting mechanism includes: The fixed guide rail is installed on the bottom surface of the base and is arranged around a circle at intervals, and is in the form of a frame; a hydraulic cylinder mounted on the flange, with its piston sliding through the flange and extending into the fixed rail; A fixed card seat is fixedly mounted on the upper end of the fixed guide rail and is slid through by the piston of the hydraulic cylinder, with one end thereof extending horizontally out of the base; The movable clamping seat is slidably installed in the fixed guide rail and fixedly connected with the piston of the hydraulic cylinder.

[0012] With such a structure, the movable clamping seat is lifted by the hydraulic cylinder, and the movable clamping seat provides a reaction force, so that the base and the platform can be lifted.

[0013] As a further improvement of the automatic lifting platform, a space is reserved between the mounting seat and the platform, a universal ball is installed at the space, and the shell of the universal ball is embedded in the bottom of the mounting seat.

[0014] With this structure, the universal ball reduces friction and facilitates the movement of small tower cranes.

[0015] As a further improvement of the automatic jacking platform, a load-bearing mechanism is installed on the bottom surface of the platform, and the load-bearing mechanism includes a load-bearing column, a lower row of load-bearing rods and an upper row of load-bearing rods. The load-bearing column is fixedly installed on the bottom surface of the platform; one end of the lower row of load-bearing rods and the upper row of load-bearing rods are connected to the load-bearing column, and the other end is connected to the inner wall of the cavity of the base, and a belly rod is arranged between the lower row of load-bearing rods and the upper row of load-bearing rods.

[0016] By adopting such a structure and adding multiple load-bearing mechanisms, the interior of the base and the bottom surface of the platform are fully supported, which increases the overall rigidity. In addition, the rod structure support system avoids the problem of heavy deadweight of the solid structure, which helps to reduce the deadweight and facilitate jacking.

[0017] Regarding the technical topic of construction method, the specific steps are as follows: S1: When pouring the longitudinal and transverse shear walls of the elevator room on the first floor and the longitudinal and transverse shear walls of the staircase, set multiple embedded components at upper and lower intervals and left and right intervals on the shear walls; S2: After removing the formwork of the longitudinal and transverse shear walls of the elevator room on the first floor and the longitudinal and transverse shear walls of the stairwell, install the corbels on the embedded components; S3: A fixed card seat and a movable card seat are respectively placed on the upper and lower spaced corbels, and then the fixed card seat and the movable card seat are used to position the fixed guide rail 10 for assembly; the base is hoisted on the fixed guide rail, and then various components on the base are successively installed; S4: The lifting mechanism lifts up. When the bracket on the bottom of the movable card seat touches the lower end of the fixed guide rail, the base stops rising, reserving the construction space for the longitudinal and transverse shear walls of the second-floor elevator room and the longitudinal and transverse shear walls of the staircase, and the fixed card seat locates the embedded position of the second-floor embedded components; S5: After the construction of the longitudinal and transverse shear walls of the second-floor elevator room and the longitudinal and transverse shear walls of the stairwell is completed, a corbel is installed on the bottom of the fixed base to complete the force point conversion, and then the corbel on the bottom of the fixed base in the original position is removed, the limit of the movable base is released, and then the movable base is retracted, and then the corbel is installed on the bottom of the movable base to complete the force point conversion for the next round of jacking, and the corbel on the bottom of the movable base in the original position is removed, and the limit of the fixed guide rail is released, thereby completing a cycle of jacking operation, so that the tower crane on the platform gradually rises as the construction progresses.

[0018] As a further improvement of the construction method, the embedded components include embedded steel plates, embedded bolts and embedded nuts, the embedded nuts are welded to the back of the embedded steel plates; holes corresponding to the positions of the embedded nuts are drilled on the embedded steel plates; the embedded bolts pass through the embedded steel plates via the embedded nuts.

[0019] With such a structure, the embedded components can provide multiple installation points, and the threaded connection method is easy to disassemble.

[0020] As a further improvement of the construction method, the corbel includes a first angle steel and an I-beam; a hole is punched on the first angle steel, and the hole is connected to the part of the embedded bolt passing through the embedded steel plate and tightened with a first nut; the first angle steel is fixed in two rows at intervals, and the inner end of the I-beam is clamped between the two angle steels; the upper and lower flanges of the I-beam are fixed to the first angle steel by a first bolt and nut assembly, and a second angle steel is arranged between the web of the I-beam and the embedded steel plate, and the second angle steel is connected to the part of the embedded bolt passing through the embedded steel plate and tightened with a first nut, and the second angle steel and the I-beam are tightened by a second bolt and nut assembly; a sleeve is also threadedly connected to the embedded bolt passing through the second angle steel, and the sleeve is threadedly connected to the anchor rod to extend the length, an anchor plate is arranged at the outer end of the I-beam for compression, the anchor plate is passed through the anchor rod and tightened with a second nut.

[0021] Such a structure allows the I-beam to be installed stably, the anchor plate is convenient for applying prestress, and an inclined support leg can be added to the bottom of the I-beam to lean against the shear wall; the corbel is connected as a whole by threaded connection for easy disassembly.

[0022] As a further improvement of the construction method, lifting ears are provided at both ends of the anchor plate, and the lifting ears are fixedly connected with steel strands, and the upper ends of the steel strands are fixed to the embedded bolts with anchors.

[0023] With such a structure, the steel strands are convenient for hanging the ends of the I-beams, so that the I-beams as a whole are more stable.

[0024] As a further improvement to the construction method, the I-beams are arranged at intervals and can be penetrated by the piston of the hydraulic cylinder.

[0025] With such a structure, the bracket does not affect the use of the piston of the hydraulic cylinder.

[0026] The present invention is conducive to adding a jacking platform in the middle of a large building, making it easy for the platform to enter the coverage range of a tower crane at the side of a building construction machine, which is conducive to improving the transfer range of materials in the middle of the large building, facilitating shortening the boom length of the tower crane at the side of the building construction machine, and ensuring construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a structural schematic diagram of an embodiment.

[0028] Figure 2 It is a schematic structural diagram of another angle of the embodiment.

[0029] Figure 3 Schematic diagram of the assembly structure of the platform board and the amplification board.

[0030] Figure 4 A schematic diagram of the structure of the base.

[0031] Figure 5 This is a structural diagram of the platform plate.

[0032] Figure 6 It is a structural diagram of the load-bearing mechanism.

[0033] Figure 7 This is a schematic diagram of the structure of a tower crane.

[0034] Figure 8 This is a schematic diagram of the installation structure of the universal ball.

[0035] Fig. 9 This is a schematic diagram of the corbel installation structure.

[0036] Fig.10 This is a schematic diagram of the enlarged structure of the corbel.

[0037] Fig.11 It is a structural schematic diagram of the embedded components.

[0038] Fig.12 This is a structural diagram of the embedded component from another angle.

[0039] Figure numerals: 1, base; 101, cavity; 102, flange; 2, platform; 3, tower crane; 4, expansion platform; 5, support mechanism; 51, push plate; 52, diagonal support; 53, first positioning seat; 54, lead screw; 55, motor; 56, positioning rod; 57, second positioning seat; 6, retraction mechanism; 61, fixed block; 62, slide rod; 63, push rod; 64, mounting seat; 65, slide rail groove; 66, moving block; 7, load-bearing mechanism; 71, load-bearing column; 72, lower row load-bearing rod; 73, upper row load-bearing rod; 74, belly rod; 8, universal ball; 801, outer Shell; 9, guardrail; 10, fixed guide rail; 11, fixed holder; 12 movable holder; 13, hydraulic cylinder; 14, corbel; 141, first angle steel; 142, I-beam; 143, first nut; 144, first bolt and nut assembly; 145, second angle steel; 146, second bolt and nut assembly; 147, sleeve; 148, anchor rod; 149, second nut; 1410, lifting ear; 1411, steel strand; 1412, anchor; 1413, anchor plate; 15, embedded assembly; 151, embedded steel plate; 152, embedded bolt; 153, embedded nut. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] Example 1 like Figure 1-Figure 12 As shown, an automatic jacking platform for a large-scale aerial building construction machine includes Base 1; A platform 2, which is mounted on the upper side of the base 1; Push plates 51 are slidably mounted on both sides of the base 1; A diagonal brace 52, the lower end of which is hinged to the upper side of the push plate 51; The amplification platform 4 is slidably connected to both sides of the platform 2 and extends out of the platform 2, and the bottom surface of the part outside the platform 2 is hinged to the upper end of the diagonal support 52; A first positioning seat 53, which is fixed on both sides of the base 1 and is located below the push plate 51; A lead screw 54, the lower end of which is rotatably mounted on the first positioning seat 53, and passes through the push plate 51 in a threaded connection; The second positioning seat 57 is fixed on both sides of the base 1 and rotatably passed through by the lead screw 54, and is spaced above the first positioning seat 53 and the push plate 51; The motor 55 is fixed on both sides of the base 1, and its output shaft is fixed to the lead screw 54; A positioning rod 56, which slides through the push plate 51, and whose upper and lower ends are fixed on both sides of the base 1; The jacking mechanism is installed at the bottom of the base 1.

[0043] With such a structure, the augmented platform 4 can be opened and retracted to increase the coverage of the platform 2. When the augmented platform 4 is opened, it is convenient for entering the coverage of the tower crane of the building construction machine, which is conducive to the transportation of construction materials; when the augmented platform 4 is retracted, the center of gravity can be adjusted to enhance the platform's ability to withstand adverse weather.

[0044] In this embodiment, a slide rail groove 65 is provided on the platform 2, and the slide rail groove 65 is slidably adapted with a moving block 66; the moving block 66 is fixed at the bottom of the mounting seat 64; the tower crane 3 is installed on the top of the mounting seat 64; one end of a push rod 63 is hinged on both sides of the mounting seat 64, and the other end of the push rod 63 is hinged with a fixed block 61, and the fixed block 61 is fixed on the side of the amplification platform 4; the fixed block 61 is slidably connected to the slide bar 62, and the slide bar 62 is fixed on the side wall of the platform 2, and the slide bar 62 is parallel to the side of the amplification platform 4, and the amplification platform 4 is slidably plugged into the side wall of the platform 2; the side wall of the amplification platform 4 is vertically plugged into the side wall of the platform 2.

[0045] With such a structure, a small tower crane 3 can be installed on the augmented platform 4 to form a cross-range coverage with the large tower crane of the building construction machine. When the augmented platform 4 is opened, the tower crane 3 can be extended to expand the coverage of the tower crane 3. When the augmented platform 4 is retracted, the tower crane 3 is retracted, which is helpful for resisting bad weather. The platform 2 allows the tower crane 3 to be installed at a low position. After the platform 2 realizes the jacking function, the height of the tower crane 3 can be increased without the need to install extra standard sections. The added small tower crane makes the material transportation in the middle of a large building more flexible.

[0046] In this embodiment, the base 1 has a cavity 101, the cavity 101 is connected to the bottom surface, the bottom surface of the base 1 has a circle of flanges 102, and the lifting mechanism includes: The fixed guide rail 10 is installed on the bottom surface of the base 1 and is arranged around a circle at intervals, and is in the form of a frame; A hydraulic cylinder 13, which is mounted on the flange 102, and whose piston slides through the flange 102 and extends into the fixed guide rail 10; A fixed card seat 11 is fixedly mounted on the upper end of the fixed guide rail 10 and is slidably passed through by the piston of the hydraulic cylinder 13, and one end of the fixed card seat 11 extends horizontally out of the base 1; The movable clamping seat 12 is slidably mounted in the fixed guide rail 10 and fixedly connected to the piston of the hydraulic cylinder 13 .

[0047] With such a structure, the movable clamping seat 12 is lifted by the hydraulic cylinder 13, and the movable clamping seat 12 provides a reaction force, so that the base 1 and the platform 2 can be lifted.

[0048] In this embodiment, a gap is reserved between the mounting seat 64 and the platform 2 , and a universal ball 8 is installed at the gap. The housing 801 of the universal ball 8 is embedded in the bottom of the mounting seat 64 .

[0049] With such a structure, the universal ball 8 reduces friction, making it easier to move the small tower crane 3 .

[0050] In this embodiment, a load-bearing mechanism 7 is installed on the bottom surface of the platform 2, and the load-bearing mechanism 7 includes a load-bearing column 71, a lower row of load-bearing rods 72 and an upper row of load-bearing rods 73. The load-bearing column 71 is fixedly installed on the bottom surface of the platform 2; one end of the lower row of load-bearing rods 72 and the upper row of load-bearing rods 73 are connected to the load-bearing column 71, and the other end is connected to the inner wall of the cavity of the base 1, and a belly rod 74 is arranged between the lower row of load-bearing rods 72 and the upper row of load-bearing rods 73.

[0051] By adopting such a structure and adding a plurality of load-bearing mechanisms 7, the interior of the base 1 and the bottom surface of the platform 2 are fully supported, thereby increasing the overall rigidity. In addition, the rod structure support system avoids the problem of heavy deadweight of the solid structure, which is conducive to reducing deadweight and facilitating jacking.

[0052] Example 2 Based on the construction method of an automatic jacking platform for a large-scale aerial building construction machine described in Example 1, the specific steps are as follows: S1: When pouring the longitudinal and transverse shear walls of the elevator room on the first floor and the longitudinal and transverse shear walls of the staircase, multiple embedded components 15 are arranged on the shear walls at upper and lower intervals and left and right intervals; S2: After the formwork of the longitudinal and transverse shear walls of the elevator room on the first floor and the longitudinal and transverse shear walls of the staircase are removed, the corbels 14 are installed on the embedded components 15; S3: The fixed clamping seat 11 and the movable clamping seat 12 are respectively placed on the upper and lower spaced corbels 14, and then the fixed clamping seat 11 and the movable clamping seat 12 are used to position the fixed guide rail 10 for assembly; the base 1 is hoisted on the fixed guide rail 10, and then the various components on the base 1 are successively installed; S4: The lifting mechanism is lifted. When the bracket 14 on the bottom of the movable card seat 12 touches the lower end of the fixed guide rail 10, the base 1 stops rising, and the construction space of the longitudinal and transverse shear walls of the second-floor elevator room and the longitudinal and transverse shear walls of the staircase is reserved, and the embedded position of the second-floor embedded component 15 is located by the fixed card seat 11; S5: After the construction of the longitudinal and transverse shear walls of the second-floor elevator room and the longitudinal and transverse shear walls of the stairwell is completed, the corbel 14 is installed on the bottom of the fixed base 11 to complete the force point conversion, and then the corbel 14 on the bottom of the fixed base 11 at the original position is removed, the limit of the movable base 12 is released, and the movable base 12 is retracted, and then the corbel 14 is installed on the bottom of the movable base 12 to complete the force point conversion of the next round of jacking, and the corbel 14 on the bottom of the movable base 12 at the original position is removed, and the limit of the fixed guide rail 10 is released, thereby completing a cycle of jacking operation, so that the tower crane on the platform 2 gradually rises as the construction progresses.

[0053] In this embodiment, the embedded component 15 includes an embedded steel plate 151, embedded bolts 152 and embedded nuts 153. The embedded nuts 153 are welded to the back of the embedded steel plate 151. Holes corresponding to the positions of the embedded nuts 153 are provided on the embedded steel plate 151. The embedded bolts 152 pass through the embedded steel plate 151 via the embedded nuts 153.

[0054] With such a structure, the embedded component 15 can provide multiple installation points, and the threaded connection method is easy to disassemble.

[0055] In this embodiment, the bracket 14 includes a first angle steel 141 and an I-beam 142; a hole is punched in the first angle steel 141, and the embedded bolt 152 is inserted into the part of the embedded steel plate 151, and is tightened with a first nut 143; the first angle steel 141 is fixed in two rows at intervals, and the inner end of the I-beam 142 is clamped between the two angle steels 141; the upper and lower flanges of the I-beam 142 are fixed to the first angle steel 141 by the first bolt and nut assembly 144, and a second angle steel is arranged between the web of the I-beam 142 and the embedded steel plate 151 145, the second angle steel 145 is connected to the part of the embedded bolt 152 passing through the embedded steel plate 151, and is tightened with the first nut 143, and the second angle steel 145 and the I-beam 142 are tightened by the second bolt and nut assembly 146; the embedded bolt 152 passing through the second angle steel 145 is also threadedly connected with a sleeve 147, and the sleeve 147 is threadedly connected with an anchor rod 148 to extend it, and an anchor plate 1413 is set at the outer end of the I-beam 142 for compression, and the anchor plate 1413 is passed through by the anchor rod 148 and is tightened with the second nut 149.

[0056] With such a structure, the I-beam 142 can be stably installed, the anchor plate 1413 can be used to apply prestress, and an inclined support leg can be added to the bottom surface of the I-beam 142 to lean against the shear wall; the entire corbel is threaded for easy disassembly.

[0057] In this embodiment, the lifting ears 1410 are provided at both ends of the anchor plate 1413 , and the lifting ears 1410 are fixedly connected with steel strands 1411 , and the upper ends of the steel strands 1411 are fixed to the embedded bolts 152 with anchors 1412 .

[0058] With such a structure, the steel strands 1411 are convenient for hanging the ends of the I-beams 142 , so that the I-beams 142 are more stable as a whole.

[0059] In this embodiment, the I-beams 142 are arranged at intervals and can be penetrated by the piston of the hydraulic cylinder 13 .

[0060] With such a structure, the bracket does not affect the use of the piston of the hydraulic cylinder 13.

[0061] The present invention is conducive to adding a jacking platform in the middle of a large building, making it easy for the platform to enter the coverage range of a tower crane at the side of a building construction machine, which is conducive to improving the transfer range of materials in the middle of the large building, facilitating shortening the boom length of the tower crane at the side of the building construction machine, and ensuring construction safety.

[0062] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For those skilled in the art of the present invention, several equivalent substitutions or obvious variations can be made without departing from the concept of the present invention, and the performance or use is the same, which should be regarded as belonging to the protection scope of the present invention.

Claims

1. An automatic lifting platform for a large-scale aerial building construction machine, characterized in that include: Base (1); A platform (2) mounted on the upper side of the base (1); Push plates (51) slidably mounted on both sides of the base (1); A diagonal brace (52), the lower end of which is hinged to the upper side of the push plate (51); An amplification platform (4) which is slidably connected to both sides of the platform (2) and extends out of the platform (2), wherein a portion of the bottom surface of the amplification platform (4) outside the platform (2) is hinged to the upper end of the diagonal support (52); A first positioning seat (53) fixed on both sides of the base (1) and located below the push plate (51); A lead screw (54), the lower end of which is rotatably mounted on the first positioning seat (53) and passes through the push plate (51) in a threaded connection; A second positioning seat (57) is fixed on both sides of the base (1) and is rotatably passed through by the lead screw (54), and is spaced above the first positioning seat (53) and the push plate (51); A motor (55) fixed on both sides of the base (1), whose output shaft is fixedly connected to the lead screw (54); A positioning rod (56) which slides through the push plate (51) and has upper and lower ends fixed on both sides of the base (1); A lifting mechanism is installed at the bottom of the base (1).

2. The automatic lifting platform for a large-scale aerial building construction machine according to claim 1 is characterized in that The platform (2) is provided with a slide rail groove (65), and the slide rail groove (65) is slidably adapted with a moving block (66); the moving block (66) is fixed at the bottom of the mounting seat (64); the tower crane (3) is installed on the top of the mounting seat (64); one end of a push rod (63) is hinged on both sides of the mounting seat (64), and the other end of the push rod (63) is hinged with a fixed block (61), and the fixed block (61) is fixed on the side of the amplification platform (4); the fixed block (61) is slidably connected to the slide rod (62), and the slide rod (62) is fixed on the side wall of the platform (2), the slide rod (62) is parallel to the side of the amplification platform (4), and the amplification platform (4) is slidably plugged into the side wall of the platform (2); the side wall of the amplification platform (4) and the side wall of the platform (2) are vertically plugged.

3. The automatic lifting platform for large-scale aerial building construction machine according to claim 2 is characterized in that The base (1) has a cavity (101), the cavity (101) is connected to the bottom surface, the bottom surface of the base (1) has a circle of flanges (102), and the lifting mechanism comprises: A fixed guide rail (10) is installed on the bottom surface of the base (1) and is arranged around a circle at intervals, and is in the form of a frame; A hydraulic cylinder (13) mounted on the flange (102), wherein the piston of the hydraulic cylinder (13) slides through the flange (102) and extends into the fixed guide rail (10); A fixed card seat (11) is fixedly mounted on the upper end of the fixed guide rail (10) and is slidably passed through the piston of the hydraulic cylinder (13), and one end of the fixed card seat extends laterally out of the base (1); The movable clamping seat (12) is slidably mounted in the fixed guide rail (10) and is fixedly connected to the piston of the hydraulic cylinder (13).

4. The automatic lifting platform for a large-scale aerial building construction machine according to claim 2 is characterized in that A gap is reserved between the mounting seat (64) and the platform (2), a universal ball (8) is installed at the gap, and the housing (801) of the universal ball (8) is embedded in the bottom of the mounting seat (64).

5. The automatic lifting platform for a large-scale aerial building construction machine according to claim 3 is characterized in that A load-bearing mechanism (7) is installed on the bottom surface of the platform (2), and the load-bearing mechanism (7) comprises a load-bearing column (71), a lower row of load-bearing rods (72) and an upper row of load-bearing rods (73); the load-bearing column (71) is fixedly installed on the bottom surface of the platform (2); one end of the lower row of load-bearing rods (72) and the upper row of load-bearing rods (73) are connected to the load-bearing column (71), and the other end is connected to the inner wall of the cavity of the base (1); a web bar (74) is arranged between the lower row of load-bearing rods (72) and the upper row of load-bearing rods (73).

6. A construction method based on the automatic jacking platform for a large-scale aerial building construction machine according to claim 3, characterized in that The specific steps are as follows: S1: When pouring the longitudinal and transverse shear walls of the elevator room on the first floor and the longitudinal and transverse shear walls of the staircase, multiple embedded components (15) are set on the shear walls at upper and lower intervals and left and right intervals; S2: After the formwork of the longitudinal and transverse shear walls of the elevator room on the first floor and the longitudinal and transverse shear walls of the staircase are removed, the brackets (14) are installed on the embedded components (15); S3: A fixed clamping seat (11) and a movable clamping seat (12) are respectively placed on the upper and lower spaced brackets (14), and then the fixed clamping seat (11) and the movable clamping seat (12) are used to position the fixed guide rail (10) for assembly; the base (1) is hoisted on the fixed guide rail (10), and then various components on the base (1) are successively installed; S4: The lifting mechanism is lifted, and when the bracket (14) on the bottom surface of the movable clamping seat (12) touches the lower end of the fixed guide rail (10), the base (1) stops rising, and the construction space of the longitudinal and transverse shear walls of the second-floor elevator room and the longitudinal and transverse shear walls of the staircase is reserved, and the embedded position of the second-floor embedded component (15) is located by the fixed clamping seat (11); S5: After the construction of the longitudinal and transverse shear walls of the elevator room on the second floor and the longitudinal and transverse shear walls of the staircase is completed, a bracket (14) is installed on the bottom surface of the fixed bracket (11) to complete the force point conversion, and then the bracket (14) on the bottom surface of the fixed bracket (11) at the original position is removed, the limit of the movable bracket (12) is released, and the movable bracket (12) is retracted, and then the bracket (14) is installed on the bottom surface of the movable bracket (12) to complete the force point conversion of the next round of jacking, and the bracket (14) on the bottom surface of the movable bracket (12) at the original position is removed, and the limit of the fixed guide rail (10) is released, thereby completing a cycle of jacking operation, so that the tower crane on the platform (2) gradually rises along with the construction progress.

7. The construction method of the automatic lifting platform for a large-scale aerial building construction machine according to claim 6 is characterized in that The embedded component (15) comprises an embedded steel plate (151), an embedded bolt (152) and an embedded nut (153); the embedded nut (153) is welded to the back of the embedded steel plate (151); holes corresponding to the positions of the embedded nuts (153) are provided on the embedded steel plate (151); and the embedded bolt (152) passes through the embedded steel plate (151) via the embedded nut (153).

8. The construction method of the automatic lifting platform for a large-scale aerial building construction machine according to claim 7 is characterized in that The bracket (14) comprises a first angle steel (141) and an I-beam (142); a hole is punched in the first angle steel (141), which is connected to the portion of the embedded bolt (152) that passes through the embedded steel plate (151), and is tightened with a first nut (143); the first angle steel (141) is fixed in two rows at intervals, and the inner end of the I-beam (142) is clamped between the two angle steels (141); the upper and lower flanges of the I-beam (142) are fixed to the first angle steel (141) by means of a first bolt and nut assembly (144); a second angle steel (145) is arranged between the web of the I-beam (142) and the embedded steel plate (151); The second angle steel (145) is connected to the portion of the embedded bolt (152) passing through the embedded steel plate (151) and is tightened with a first nut (143); the second angle steel (145) and the I-beam (142) are tightened via a second bolt and nut assembly (146); a sleeve (147) is threadedly connected to the embedded bolt (152) passing through the second angle steel (145); the sleeve (147) is threadedly connected to the anchor rod (148) to extend the length; an anchor plate (1413) is provided at the outer end of the I-beam (142) for compression; the anchor plate (1413) is passed through by the anchor rod (148) and is tightened with a second nut (149).

9. The construction method of the automatic lifting platform for a large-scale aerial building construction machine according to claim 8 is characterized in that Lifting ears (1410) are arranged at both ends of the anchor plate (1413), and the lifting ears (1410) are fixedly connected with steel strands (1411), and the upper ends of the steel strands (1411) are fixed to the embedded bolts (152) with anchors (1412).

10. The construction method of the automatic lifting platform for a large-scale aerial building construction machine according to claim 9 is characterized in that The I-beams (142) are arranged at intervals and can be penetrated by the piston of the hydraulic cylinder (13).

Citation Information

Patent Citations

  • Lifting platform for construction of elevator shaft of high-rise building

    CN110306776A

  • Intelligent integrated high-rise building machine

    CN110886488A

  • Multi-station, small-tonnage and short-stroke circulating jacking system for building machine

    CN116357067A

  • Hydraulic system for jacking work platform of super high-rise building

    CN202731271U

  • Construction building equipment and construction method thereof

    US20210198908A1